Silvertown Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (108)

Acceptance (10)

Pre Examination (31)

Examination (673)

Decision (71)

Decided (0)

Date

The list below consists of additional evidence or documents received during the examination outside the deadlines set by the Examining Authority. However, the Examining Authority has exercised its discretion and accepted these into the examination as additional submissions.

SourceDescription
Other
Size: 7 MB
Transport for London
Post Hearing submission Document (Compulsory Acquisition). Plan showing land ownerships at Thames Wharf and at the Carlsberg Tetley site, with safeguarded wharf boundary overlaid (see page 14 of Doc Ref REP6-074)
Other
Size: 394 KB
Transport for London
Post Hearing submission Document (Compulsory Acquisition). Copies of letters of withdrawal (see page 6 of Doc Ref REP6-074)
Other
Size: 272 KB
Transport for London
Post Hearing submission Document (Compulsory Acquisition). Mayor’s response to RBGs consultation on Studio 338 planning application (see page 10 of Doc Ref REP6-074)
Other
Size: 81 KB
Southern Gas Networks plc and Birch Sites Limited
Additional Submission accepted at the discretion of the Examining Authority in advance of the CAH scheduled for 29 March 2017
Other
Size: 42 KB
IOD Skip Hire Ltd
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 16 KB
Natural England
Additional Submission accepted at the discretion of the Examining Authority in advance of the ISH scheduled for 28 March 2017
Other
Size: 596 KB
Transport for London
Revised draft DCO (Clean) - Accepted at the discretion of the Examining Authority on 24.03.2017 in advance of the DCO ISH scheduled for 29 March 2017.
Other
Size: 27 KB
Transport for London
Interim dDCO Explanatory Document - Accepted at the discretion of the Examining Authority on 24.03.2017 in advance of the DCO ISH scheduled for 29 March 2017.
Other
Size: 1 MB
Transport for London
Revised draft DCO (Track Change) - Accepted at the discretion of the Examining Authority on 24.03.2017 in advance of the DCO ISH scheduled for 29 March 2017.
Other
Size: 67 KB
Transport for London
8.79 Cover Letter for Addendum to proposed change request
Other
Size: 5 MB
Transport for London
8.78 Addendum to proposed change request
Other
Size: 677 KB
Southern Gas Networks & Birch Sites Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 324 KB
Trinity (D) Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 697 KB
Knight Dragon Developments Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 153 KB
Freysporne Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 6 MB
Nathaniel Lichfield and Partners on behalf of U and I Group Plc
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 1 MB
Ansco Arena Limited and The Waterfront Limited Partnership
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 400 KB
BL CW Holdings Ltd
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 12 MB
Transport for London
Proposed change request not as yet accepted by the ExA
Other
Size: 76 KB
Transport for London
Cover letter for Proposed change request not as yet accepted by the ExA
Other
Size: 40 KB
Transport for London
Letter sent to ExA on 21 December 2016 relating to issue specific hearing on traffic modelling
Other
Size: 27 KB
Rik Andrew
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 317 KB
Port of London Authority
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 170 KB
Brenntag UK Limited
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 101 KB
Health and Safety Executive
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 2 MB
Southern Gas Networks and Birch Sites Limited
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 141 KB
Glenny LLP on behalf of Newable Property Developments
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 2 MB
Transport for London
Applicants letter of response to Hearing agendas - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 19 KB
Transport for London
Response to First Written Question AQ22 - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 2 MB
Transport for London
4.1 Statement of Reasons Revision 1 (Tracked changes). This version supersedes the version submitted for Deadline 1 - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 16 KB
Transport for London
Revised version of Schedule 7 of the draft DCO - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 81 KB
Transport for London
Revised version of Schedule 7 of the draft DCO (Tracked changes) - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.