Silvertown Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (108)

Acceptance (10)

Pre Examination (31)

Examination (673)

Decision (71)

Decided (0)

Date

The list below includes additional evidence or documents received at pre-examination.

SourceDescription
Other
Size: 26 MB
Transport for London
The London Plan
Other
Size: 25 MB
Transport for London
Mayor's Transport Strategy
Other
Size: 5 MB
Transport for London
Connecting the Capital - Our plan for new river crossings for London
Other
Size: 3 MB
Transport for London
Updated Waterbodies and Watercourses Thames River Basin District plan
Other
Size: 301 KB
Transport for London
A letter of response to the Section 51 advice issued by the Planning Inspectorate on 15 June 2016. This letter also includes information about a report containing updated information which the Applicant intends to submit before the preliminary meeting
Other
Size: 33 KB
Transport for London
Silvertown Tunnel s58, s59 and EIA Regulation 13 certificates
Other
Size: 33 KB
Transport for London
Tracked changes version of the updated book or reference, showing the changes made against the version submitted with the application (revision 0). This document was submitted with the s. 58, s. 59 and EIA Regulation 13 certificates.
Other
Size: 33 KB
Transport for London
Updated book of reference (document ref. 4.3, revision 1) referred to in paragraph (c) of the s. 59 notice. This document was submitted with the s. 58, s. 59 and EIA Regulation 13 certificates.
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.