Silvertown Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (108)

Acceptance (10)

Pre Examination (31)

Examination (673)

Decision (69)

Decided (0)

Date

SourceDescription
Other
Size: 5 MB
Recommendation Report
Final Recommendation Report and Errata
Other
Size: 2 MB
Development Consent Order as Made by the Secretary of State
Other
Size: 450 KB
Secretary of State Decision Letter
Other
Size: 12 MB
Post-examination Submissions
Other
Size: 74 KB
Notification of Decision Letter
Other
Size: 30 KB
Transport for London
Response to SoS Consultation of 28 March 2018
Other
Size: 96 KB
Department for Transport
Consultation letter to Transport for London
Other
Size: 18 KB
Westcombe Society
Late Response to SoS Consultation of 26 February 2018
Other
Size: 36 KB
No to Silvertown Tunnel
Late Response to SoS Consultation of 26 February 2018
Other
Size: 15 KB
Frevisse Dearsley-Hitchcock
Response to SoS Consultation of 26 February 2018
Other
Size: 155 KB
Living Streets
Response to SoS Consultation of 26 February 2018
Other
Size: 157 KB
Public Health England
Response to SoS Consultation of 26 February 2018
Other
Size: 15 KB
Paul Mitcheson
Response to SoS Consultation of 26 February 2018
Other
Size: 15 KB
Jonathan Hill
Response to SoS Consultation of 26 February 2018
Other
Size: 14 KB
Brooks Jackson
Response to SoS Consultation of 26 February 2018
Other
Size: 49 KB
Richard Gray
Response to SoS Consultation of 26 February 2018
Other
Size: 289 KB
Royal Borough of Greenwich
Response to SoS Consultation of 26 February 2018
Other
Size: 15 KB
Matthew Sparkes
Response to SoS Consultation of 26 February 2018
Other
Size: 106 KB
Friends of the Earth
Response to SoS Consultation of 26 February 2018
Other
Size: 33 KB
London Borough of Southwark
Response to SoS Consultation of 26 February 2018
Other
Size: 14 KB
Rosalind Readhead
Response to SoS Consultation of 26 February 2018
Other
Size: 105 KB
Richard Dinkeldein
Response to SoS Consultation of 26 February 2018
Other
Size: 94 KB
Motorcycle Action Group
Response to SoS Consultation of 26 February 2018
Other
Size: 101 KB
London Borough of Newham
Response to SoS Consultation of 26 February 2018
Other
Size: 38 KB
John Deakins
Response to SoS Consultation of 26 February 2018
Other
Size: 189 KB
Dominic Leggett
Response to SoS Consultation of 26 February 2018
Other
Size: 46 KB
Greenwich Green Party
Response to SoS Consultation of 26 February 2018
Other
Size: 14 KB
Leo Fletcher
Response to SoS Consultation of 26 February 2018
Other
Size: 39 KB
John Zhang
Response to SoS Consultation of 26 February 2018
Other
Size: 71 KB
Historic England
Response to SoS Consultation of 26 February 2018
Other
Size: 14 KB
Alexander Nikolov
Response to SoS Consultation of 26 February 2018
Other
Size: 20 KB
Andrea Carey Fuller
Response to SoS Consultation of 26 February 2018
Other
Size: 204 KB
Health and Safety Executive
Response to SoS Consultation of 12 February 2018
Other
Size: 176 KB
Transport for London
Response to SoS Consultation of 12 February 2018
Other
Size: 43 KB
Department for Transport
Consultation Letter to all Interested Parties
Other
Size: 16 MB
Transport for London
Drawings 1-8 accompanying Updated Air Quality Assessment
Other
Size: 1 MB
Transport for London
Updated Air Quality Assessment
Other
Size: 51 KB
Transport for London
Update Letter to DfT dated 31 January 2018
Other
Size: 82 KB
Department for Transport
Consultation Letter to Transport for London and Health and Safety Executive
Other
Size: 55 KB
Transport for London
TfLs response dated 17 November 2017 to the SoS consultation letter of 14 November 2017
Other
Size: 167 KB
Department for Transport
Letter of response to TfLs letter dated 17 November 2017
Other
Size: 38 KB
DfT Consultation Letter 14 November 2017
Other
Size: 111 KB
Department for Transport
Letter and Written Ministerial Statement on behalf of the SoS to extend the deadline for the decision to 10 May 2018 (an extension of 6 months)
Other
Size: 14 MB
Transport for London
Late Response to SoS Consultation. Accepted at the discretion of the SoS
Other
Size: 81 KB
Royal Borough of Greenwich
Late Response to SoS Consultation. Accepted at the discretion of the SoS
Other
Size: 139 KB
Department for Transport
Letter confirming extension of decision deadline to 10 November 2017
Other
Size: 489 KB
Transport for London
Further Late Response to SoS Consultation. Accepted at the discretion of the SoS
Other
Size: 1 MB
Transport for London
Late Response to SoS Consultation. Accepted at the discretion of the SoS
Other
Size: 77 KB
Friends of the Earth
Late Response to SoS Consultation of 1 September 2017. Accepted at the discretion of the SoS
Other
Size: 31 KB
Newham Friends of the Earth
Response to SoS Consultation of 1 September 2017
Other
Size: 34 KB
Public Health England
Response to SoS Consultation of 1 September 2017
Other
Size: 214 KB
Campaign for Better Transport
Response to SoS Consultation of 1 September 2017
Other
Size: 236 KB
John Zhang
Response to SoS Consultation of 1 September 2017
Other
Size: 24 KB
Sally Hughes
Response to SoS Consultation of 1 September 2017
Other
Size: 408 KB
London Borough of Newham
Response to SoS Consultation of 1 September 2017
Other
Size: 7 MB
Transport For London
Late Response to SoS Consultation of 31 July 2017
Other
Size: 267 KB
Transport for London
Further Response to SoS Consultation of 1 September 2017
Other
Size: 41 KB
Alan Bradley
Response to SoS Consultation of 1 September 2017
Other
Size: 181 KB
DfT Consultation Letter 1 September 2017
Other
Size: 310 KB
Transport for London
Response to SoS Consultation of 9 August 2017
Other
Size: 54 KB
Friends of the Earth
Response to SoS Consultation of 9 August 2017
Other
Size: 43 KB
London Borough of Southwark
Response to SoS Consultation of 9 August 2017
Other
Size: 361 KB
London Borough of Newham
Response to SoS Consultation of 31 July 2017
Other
Size: 2 MB
Transport for London
Response to SoS Consultation of 31 July 2017
Other
Size: 6 MB
Royal Borough of Greenwich
Response to SoS Consultation of 31 July and 9 August 2017
Other
Size: 59 KB
London Borough of Tower Hamlets
Response to SoS Consultation of 31 July 2017
Other
Size: 43 KB
Health and Safety Executive
Response to SoS Consultation of 31 July 2017
Other
Size: 228 KB
DfT Consultation Letter 9 August 2017
Other
Size: 637 KB
DfT Consultation Letter dated 31 July 2017
Other
Size: 98 KB
S.99 Notification of Completion of ExA Examination Silvertown Tunnel
Notification of Completion of Examination
Other
Size: 121 KB
ASD Limited
Late Submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 43 KB
Morden College
Late Submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 42 KB
London Borough of Tower Hamlets
Submission for Deadline 7
Other
Size: 421 KB
Transport for London
Bus Strategy Revision 2
Other
Size: 4 MB
Transport for London
4.3 Book of Reference Revision 3 Track Changed
Other
Size: 714 KB
Transport for London
8.125 ULEZ Consultation Webpage
Other
Size: 7 MB
Transport for London
8.127 ULEZ Integrated Impact Assessment
Other
Size: 1 MB
Transport for London
2.10 River Restrictions Plans Revision 1
Other
Size: 145 KB
Transport for London
8.130 Legal Agreement Position Statement - LB Newham
Other
Size: 424 KB
Transport for London
Bus Strategy Revision 2 Track Changed
Other
Size: 82 KB
Transport for London
8.120 Deadline 7 Cover Letter
Other
Size: 114 KB
No to Silvertown Tunnel
Submission for Deadline 7
Other
Size: 143 KB
Transport for London
8.124 Response to ExA's Notification of Request for Further Information (Rule 17)
Other
Size: 179 KB
Transport for London
Statement of Common Ground between Transport for London and Morden College
Other
Size: 14 MB
Transport for London
8.126 ULEZ Consultation and Information Document
Other
Size: 301 KB
London Borough of Newham
Deadline 7 Final Position Statement
Other
Size: 75 KB
Thames Water
Joint statement between the Applicant and Thames Water
Other
Size: 53 KB
HSE
Submission for Deadline 7
Other
Size: 440 KB
Transport for London
8.132 Compulsory Acquisition Update
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 6 Track Changed
Other
Size: 515 KB
London Borough of Newham
Draft s106 Agreement
Other
Size: 1 MB
Transport for London
8.84 Monitoring and Mitigation Strategy Revision 2
Other
Size: 650 KB
Transport for London
8.122 Closing Statement
Other
Size: 412 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 6 Track Changed
Other
Size: 327 KB
London Borough of Newham
Updated Legal Position Statement
Other
Size: 4 MB
Transport for London
4.3 Book of Reference Revision 3
Other
Size: 473 KB
Motorcycle Action Group
Submission for Deadline 7
Other
Size: 286 KB
Royal Borough of Greenwich
Submission for Deadline 7
Other
Size: 436 KB
Brenntag UK Limited
Submission for Deadline 7
Other
Size: 49 KB
London Borough of Newham
Covering Letter for Deadline 7
Other
Size: 283 KB
Transport for London
8.121 Document Explaining DCO Amendments
Other
Size: 126 KB
Transport for London
8.129 Legal Agreement Position Statement - LB Tower Hamlets
Other
Size: 2 MB
Transport for London
8.84 Monitoring and Mitigation Strategy Revision 2 Track Changed
Other
Size: 248 KB
Transport for London
8.67 Application and Examination Document Tracker Revision 2
Other
Size: 164 KB
Transport for London
8.131 Legal Agreement Position Statement - RB Greenwich
Other
Size: 111 KB
Silvertown Homes Limited
Submission for Deadline 7
Other
Size: 63 KB
London Borough of Lewisham
Submission for Deadline 7
Other
Size: 11 KB
Transport for London
8.134 PLA Position Statement
Other
Size: 782 KB
Transport for London
3.1 Draft DCO Revision 6
Other
Size: 13 KB
Transport for London
8.133 Keystone Silvertown Homes Limited Position Statement
Other
Size: 80 KB
Environment Agency
Submission for Deadline 7
Other
Size: 133 KB
Marine Management Organisation
Submission for Deadline 7
Other
Size: 262 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 6
Other
Size: 4 MB
Transport for London
8.128 ULEZ Variation Order
Other
Size: 5 MB
London Borough of Southwark
Submission for Deadline 7
Other
Size: 201 KB
London Borough of Newham
s106 Heads of Terms
Other
Size: 7 MB
Port of London Authority
Submission for Deadline 7
Other
Size: 468 KB
Transport for London
8.123 Comments on Deadline 6 Submissions
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 6 Track Changed from Original
Other
Size: 475 KB
Transport for London
Statement of Common Ground between Transport for London and Lidoka submitted at D7 (Revision 1)
Other
Size: 145 KB
Friends of the Earth
Submission for Deadline 7
Other
Size: 24 KB
The East Greenwich Residents Association
Response on Monitoring and Mitigation Strategy
Other
Size: 139 KB
Dominic Leggett
Late Submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 7 MB
Transport for London
Post Hearing submission Document (Compulsory Acquisition). Plan showing land ownerships at Thames Wharf and at the Carlsberg Tetley site, with safeguarded wharf boundary overlaid (see page 14 of Doc Ref REP6-074)
Other
Size: 394 KB
Transport for London
Post Hearing submission Document (Compulsory Acquisition). Copies of letters of withdrawal (see page 6 of Doc Ref REP6-074)
Other
Size: 272 KB
Transport for London
Post Hearing submission Document (Compulsory Acquisition). Mayor’s response to RBGs consultation on Studio 338 planning application (see page 10 of Doc Ref REP6-074)
Other
Size: 2 MB
The Waterfront Limited Partnership
Late Submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 112 KB
Rule 17 Letter
Notification of Request for Further Information (the Applicant)
Other
Size: 2 MB
Ansco Arena
Late Submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 50 MB
Transport for London
6.2 ES Figures - Drawings 7.1-11.2 Revision 1
Other
Size: 13 MB
Transport for London
6.2 ES Figures - Drawings 4.1 - 6.1-6.2 Revision 1
Other
Size: 10 MB
Transport for London
6.2 ES Figures - Drawings 6.7-6.8 Revision 1
Other
Size: 12 MB
Transport for London
6.2 ES Figures - Drawings 6.9-6.10 Revision 1
Other
Size: 4 MB
Transport for London
6.2 ES Figures - Drawings 6.3-6.4 Revision 1
Other
Size: 4 MB
Transport for London
6.2 ES Figures - Drawings 6.5-6.6 Revision 1
Other
Size: 18 MB
Transport for London
6.2 ES Figures - Drawings 15.1-15.2 Revision 1
Other
Size: 4 MB
Transport for London
6.2 ES Figures - Drawings 16.6-16.10 Revision 1
Other
Size: 17 MB
Transport for London
6.2 ES Figures - Drawings 14.6-14.8 Revision 1
Other
Size: 22 MB
Transport for London
6.2 ES Figures - Drawings 17.1-17.2 Revision 1
Other
Size: 11 MB
Transport for London
6.2 ES Figures - Drawings 16.1-16.5 Revision 1
Other
Size: 46 MB
Transport for London
6.10 Code of Construction Practice Revision 4
Other
Size: 39 MB
Transport for London
6.2 ES Figures - Drawings 14.1-14.5 Revision 1
Other
Size: 46 MB
Transport for London
6.10 Code of Construction Practice Revision 4 (Tracked changes)
Other
Size: 17 MB
Transport for London
2.1 Tunnels Location and Operational Boundaries Plans Revision 1
Other
Size: 196 KB
Motorcycle Action Group
Post Hearing Submission
Other
Size: 41 KB
Brenntag UK Limited
Post Hearing Submission
Other
Size: 9 MB
Transport for London
2.9 Traffic Regulation Measures Plans Revision 1
Other
Size: 601 KB
Westcombe Society
Post Hearing Submission
Other
Size: 823 KB
Transport for London
8.117 Sketch Plan Appraising Feasibility of Bus Stop
Other
Size: 2 MB
Transport for London
8.84 Monitoring and Mitigation Strategy Revision 1- (Tracked changes)
Other
Size: 77 KB
Friends of the Earth
Post Hearing Submission
Other
Size: 517 KB
Transport for London
7.12 Mitigation Route Map Revision 3 (Tracked changes)
Other
Size: 94 KB
No to Silvertown Tunnel
Further Post Hearing Submission
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 5 (Tracked changes)
Other
Size: 720 KB
Transport for London
7.11 Charging Policies and Procedures Revision 3 (Tracked changes)
Other
Size: 181 KB
Transport for London
8.114 Marine Policy Compliance Statement
Other
Size: 645 KB
Darryl Chamberlain
Submission for Deadline 6
Other
Size: 166 KB
Royal Borough of Greenwich
Submission for Deadline 6
Other
Size: 169 KB
Transport for London
8.107 Document Explaining DCO Amendments
Other
Size: 252 KB
Transport for London
SoCG001 - Statement of Common Ground with Natural England at Deadline 6
Other
Size: 7 MB
Transport for London
2.2 General Arrangement Plans Revision 1. Late Submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 635 KB
Transport for London
8.116 Schedule of Compliance with the National Policy Statement
Other
Size: 205 KB
Southern Gas Networks plc
Withdrawal of Representations
Other
Size: 47 KB
Grant Shepherd
Post Hearing Submission
Other
Size: 1 MB
Transport for London
2.10 River Restrictions Plans
Other
Size: 1 MB
Transport for London
8.84 Monitoring and Mitigation Strategy Revision 1
Other
Size: 410 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 5 (Tracked changes)
Other
Size: 774 KB
Transport for London
3.1 Draft DCO Revision 5
Other
Size: 257 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 5
Other
Size: 960 KB
Health and Safety Executive
Post Hearing Submission (including correction email)
Other
Size: 197 KB
Birch Sites Limited
Withdrawal of Representations
Other
Size: 43 KB
Greater London Motorcycle Action Group
Post Hearing Submission
Other
Size: 1,001 KB
Rebecca Moore
Post Hearing Submission
Other
Size: 163 KB
Transport for London
8.110 Post-hearing Submission Document (Compulsory Acquisition)
Other
Size: 3 MB
Transport for London
7.4 Design Principles Revision 3 (Tracked changes)
Other
Size: 431 KB
Transport for London
8.112 Response to Action Point 1 from the OFH on 28 March 2017
Other
Size: 13 MB
Transport for London
8.109 Post-hearing Submission Document (Outstanding Issues)
Other
Size: 20 MB
Transport for London
8.113 Response to Silvertown Homes Ltd Deadline 5 Representation
Other
Size: 18 KB
Thames Water
Post Hearing Submission
Other
Size: 672 KB
Environment Agency
Post Hearing Submission
Other
Size: 121 KB
No to Silvertown Tunnel
Post Hearing Submission
Other
Size: 419 KB
Transport for London
8.82 Bus Strategy Revision 1
Other
Size: 14 MB
Transport for London
6.3.4.1 ES Appendix 4A Construction Method Statement
Other
Size: 14 MB
Transport for London
6.3.4.1 ES Appendix 4A Construction Method Statement (Tracked changes)
Other
Size: 34 KB
London Borough of Tower Hamlets
Submission for Deadline 6
Other
Size: 264 KB
Transport for London
8.108 Explanatory Note on Updated Certified Documents
Other
Size: 3 MB
Transport for London
7.4 Design Principles Revision 3
Other
Size: 16 KB
East Greenwich Residents Association (EGRA)
Post Hearing Submission
Other
Size: 57 KB
Lichfields on behalf of U and I Group Plc
Post Hearing Submission
Other
Size: 522 KB
Transport for London
8.111 Post-hearing Submission Document (DCO)
Other
Size: 1 MB
Transport for London
8.115 Assessment of Risk and Changes to Exposure Levels
Other
Size: 466 KB
Transport for London
7.12 Mitigation Route Map Revision 3
Other
Size: 83 KB
Transport for London
8.106 Deadline 6 Cover Letter
Other
Size: 613 KB
Transport for London
7.11 Charging Policies and Procedures Revision 3
Other
Size: 243 KB
Transport for London
8.119 Response on Option Appraisal (Five Case) from ISH 28 March 2017
Other
Size: 1,014 KB
Transport for London
8.118 Response to Bus Issues Raised at dDCO ISH 29 March 2017
Other
Size: 22 KB
Darcy de Sade
Post Hearing Submission
Other
Size: 782 KB
London Borough of Southwark
Post Hearing Submission
Other
Size: 241 KB
Transport for London
8.67 Application and Examination Document Tracker Revision 1
Other
Size: 13 MB
Transport for London
2.8 Engineering Section Drawings and Plans Revision 1. Late Submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 5 MB
Transport for London
2.6 Rights of Way and Access Plans Revision 1
Other
Size: 4 MB
Transport for London
2.5 Works Plans Revision 1
Other
Size: 197 KB
Transport for London
8.68 Environmental Documents Structure Diagram Revision 1
Other
Size: 3 MB
Transport for London
2.7 Classification of Roads Plan Revision 1
Other
Size: 1 MB
Transport for London
8.88 Landscaping Plan Revision 1
Other
Size: 25 MB
Port of London Authority
Submission for Deadline 6
Other
Size: 296 KB
London Borough of Newham
Post Hearing Submission
Other
Size: 199 KB
Environment Agency
Preferred Protective Provisions (Clean and Tracked change versions)
Other
Size: 16 KB
Helen Hutchinson
Post Hearing Submission
Other
Size: 137 KB
London Borough of Hackney
Post Hearing Submission
Other
Size: 549 KB
London Borough of Lewisham
Post Hearing Submission
Other
Size: 455 KB
Campaign for Better Transport
Post Hearing Submission
Other
Size: 537 KB
Transport for London
8.82 Bus Strategy Revision 1 (Tracked changes)
Other
Size: 208 KB
Marine Management Organisation
Post Hearing Submission
Other
Size: 122 KB
Silvertown Homes Limited
Post Hearing Submission
Other
Size: 98 KB
ExA Decision on the acceptance of the 5 proposed NMCs
Panels Procedural Decision to Accept the Applicants Non-Material Changes dated 12 January and 3 February 2017
Other
Size: 38 KB
Note of Unaccompanied Site Inspection on 27 March 2017
Other
audio recording
Size: 46 MB
Audio Recording of the Issue Specific Hearing on 29 March 2017
Issue Specific Hearing on the draft Development Consent Order, and Other Matters of Legal Drafting
Other
audio recording
Size: 33 MB
Audio Recording of the Compulsory Acquisition Hearing on 29 March 2017
Other
audio recording
Size: 36 MB
Audio Recording of the Issue Specific Hearing on 28 March 2017 - Part 1
Issue Specific Hearing on any other outstanding issues including Environmental Matters
Other
audio recording
Size: 45 MB
Audio Recording of the Issue Specific Hearing on 28 March 2017 - Part 2
Issue Specific Hearing on any other outstanding issues including Environmental Matters
Other
audio recording
Size: 19 MB
Audio Recording of the Open Floor Hearing on 28 March 2017
Other
Size: 21 KB
Open Floor Hearing Action Points
Action Points arising from the Open Floor Hearing held on 28 March 2017
Other
Size: 33 KB
Issue Specific Hearing Action Points
Action Points arising from the Issue Specific Hearing (ISH) on any other outstanding issues including Environmental Matters held on 28 March 2017
Other
Size: 81 KB
Southern Gas Networks plc and Birch Sites Limited
Additional Submission accepted at the discretion of the Examining Authority in advance of the CAH scheduled for 29 March 2017
Other
Size: 42 KB
IOD Skip Hire Ltd
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 16 KB
Natural England
Additional Submission accepted at the discretion of the Examining Authority in advance of the ISH scheduled for 28 March 2017
Other
Size: 596 KB
Transport for London
Revised draft DCO (Clean) - Accepted at the discretion of the Examining Authority on 24.03.2017 in advance of the DCO ISH scheduled for 29 March 2017.
Other
Size: 27 KB
Transport for London
Interim dDCO Explanatory Document - Accepted at the discretion of the Examining Authority on 24.03.2017 in advance of the DCO ISH scheduled for 29 March 2017.
Other
Size: 1 MB
Transport for London
Revised draft DCO (Track Change) - Accepted at the discretion of the Examining Authority on 24.03.2017 in advance of the DCO ISH scheduled for 29 March 2017.
Other
Size: 11 MB
Silvertown Homes Limited (formerly known as Quintain Limited)
Late Submission for Deadline 5 accepted at the discretion of the Examining Authority
Other
Size: 9 KB
Helen Hutchinson and Duncan Marley
Late Submission for Deadline 5 accepted at the discretion of the Examining Authority
Other
Size: 17 KB
Ralph Hardwick
Late Submission for Deadline 5 accepted at the discretion of the Examining Authority
Other
Size: 112 KB
ExCeL London Ltd
Statement of Common Ground with Transport for London. Late submission for Deadline 5 accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Greater London Authority
Late Submission for Deadline 5 accepted at the discretion of the Examining Authority
Other
Size: 341 KB
London City Airport
Submission for Deadline 5
Other
Size: 200 KB
Health and Safety Executive
Comments on Responses to ExA's Second Written Questions
Other
Size: 500 KB
Environment Agency
Submission for Deadline 5
Other
Size: 861 KB
Transport for London
8.103 Buses Minimum Opening Year Scenario Analysis
Other
Size: 80 KB
Brenntag UK Limited
Submission for Deadline 5
Other
Size: 198 KB
Waterfront Limited Partnership
Submission for Deadline 5
Other
Size: 5 MB
Tarmac Trading Limited
Comments on Responses to ExA's Second Written Questions and other comments
Other
Size: 159 KB
London Borough of Hackney
Comments on Responses to ExA's Second Written Questions and other comments
Other
Size: 4 MB
Port of London Authority
Comments on Responses to ExA's Second Written Questions and other comments
Other
Size: 92 KB
London Borough of Tower Hamlets
Late Submission for Deadline 5. This document has replaced a previous version which was submitted in error
Other
Size: 60 KB
No to Silvertown Tunnel
Submission for Deadline 5
Other
Size: 244 KB
Transport for London
SoCG001 - Statement of Common Ground with Natural England - Deadline 5 update
Other
Size: 264 KB
London Borough of Newham
Submission for Deadline 5
Other
Size: 157 KB
London Borough of Lewisham
Comments on Responses to ExA's Second Written Questions and other comments
Other
Size: 141 KB
London Borough of Southwark
Comments on Responses to ExA's Second Written Questions and other comments
Other
Size: 15 MB
Transport for London
8.104 Summary of Responses to Consultation on Proposed Non-Material Changes to Scheme
Other
Size: 128 KB
Trinity (D) Limited
Submission for Deadline 5
Other
Size: 443 KB
Transport for London
8.105 Applicant's Update Note
Other
Size: 263 KB
Transport for London
SoCG004 - Statement of Common Ground with Marine Management Organisation - Deadline 5 update
Other
Size: 446 KB
Royal Borough of Greenwich
Submission for Deadline 5
Other
Size: 104 KB
Southern Gas Networks and Birch Sites Limited
Submission for Deadline 5
Other
Size: 88 KB
Knight Dragon Developments Limited
Submission for Deadline 5
Other
Size: 69 KB
Transport for London
8.102 Deadline 5 Cover Letter
Other
Size: 673 KB
Lichfields on behalf of U and I Group Plc
Submission for Deadline 5
Other
Size: 46 KB
A Arthur
Submission for Deadline 5
Other
Size: 53 KB
Rebecca Moore
Submission for Deadline 5
Other
Size: 569 KB
Ansco Arena Limited
Submission for Deadline 5
Other
Size: 264 KB
Report on the Implications for European Sites (RIES)
Issued by the Panel on 20 March 2017
Other
Size: 2 MB
Silvertown Tunnel ExA's preferred DCO
Panel's revised draft Development Consent Order issued on 20 March 2017
Other
Size: 63 KB
Agenda for Open Floor Hearing
Agenda for Open Floor Hearing on 28 March 2017
Other
Size: 65 KB
Draft Development Consent Order Hearing Agenda
Agenda for the Issue Specific Hearing on 29 March 2017
Other
Size: 83 KB
Compulsory Acquisition Hearing Agenda
Agenda for the Compulsory Acquisition Hearing on 29 March 2017
Other
Size: 115 KB
Outstanding Issues including Environmental Matters Hearing Agenda
Agenda for Issue Specific Hearing on 28 March 2017
Other
Size: 49 KB
Note of Unaccompanied Site Inspection on 16 January 2017
Other
Size: 24 KB
Friends of the Earth
Submission for Deadline 4
Other
Size: 127 KB
Directions to Intercontinental London
Venue for the Hearings in March 2017
Other
Size: 46 MB
Transport for London
6.10 Code of Construction Practice Revision 3
Other
Size: 25 MB
Transport for London
2.3 Land Plans Revision 1
Other
Size: 46 MB
Transport for London
6.10 Code of Construction Practice Revision 3 (Tracked changes)
Other
Size: 146 KB
Lidoka Estates Ltd
Submission for Deadline 4
Other
Size: 136 KB
Transport for London
8.96 SWQ Geology, Soils and Contaminated Land GS Report
Other
Size: 80 KB
Natural England
Response to ExA’s Second Written Questions
Other
Size: 669 KB
Transport for London
7.11 Charging Policies and Procedures Revision 2
Other
Size: 255 KB
London Borough of Southwark
Update and comments on the updated draft Development Consent Order
Other
Size: 4 MB
Transport for London
2.4 Special Category Land Plan(s) Revision 2
Other
Size: 389 KB
Historic England
Response to ExA’s Second Written Questions
Other
Size: 133 KB
Transport for London
8.99 SWQ Heritage HT Report
Other
Size: 241 KB
Dominic Leggett
Submission for Deadline 4
Other
Size: 538 KB
Transport for London
8.91 SWQ DCO Wording DC Report
Other
Size: 204 KB
London Borough of Hackney
Response to ExA’s Second Written Questions
Other
Size: 5 MB
Transport for London
8.86 Wharves Access Impact Technical Note
Other
Size: 16 KB
Thames Water
Response to ExA’s Second Written Questions
Other
Size: 2 MB
Transport for London
4.1 Statement of Reasons Revision 2 (Tracked changes)
Other
Size: 1 MB
Transport for London
8.84 Monitoring and Mitigation Strategy
Other
Size: 718 KB
Transport for London
3.1 Draft DCO Revision 4
Other
Size: 634 KB
Environment Agency
Response to ExA’s Second Written Questions and other comments
Other
Size: 164 KB
Royal Mail Group Limited
Email confirming withdrawal of objection
Other
Size: 429 KB
Transport for London
7.12 Mitigation Route Map Revision 2
Other
Size: 12 MB
Transport for London
8.94 SWQ Traffic and Transportation TT Report
Other
Size: 2 MB
Transport for London
6.3.9.8 ES Appendix 9H Revision 1 (Tracked changes)
Other
Size: 580 KB
London Borough of Newham
Response to ExA’s Second Written Questions and other comments
Other
Size: 4 MB
Port of London Authority
Further submission for Deadline 4
Other
Size: 27 MB
Transport for London
8.83 Design and Access Statement Addendum
Other
Size: 153 KB
Transport for London
8.92 SWQ Terrestrial Ecology TE Report
Other
Size: 2 MB
Transport for London
7.4 Design Principles Revision 2
Other
Size: 370 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 4 (Tracked changes)
Other
Size: 39 KB
London Borough of Bexley
Response to ExA’s Second Written Questions and other comments
Other
Size: 2 MB
Transport for London
8.101 SWQ Surface Water, Flood Risk Assessment SW Report
Other
Size: 334 KB
Transport for London
8.90 SWQ General GA Report
Other
Size: 17 KB
ASD Limited (Kloeckner Metals UK)
Submission for Deadline 4
Other
Size: 531 KB
Health and Safety Executive
Response to ExA’s Second Written Questions and other comments
Other
Size: 527 KB
Transport for London
7.12 Mitigation Route Map Revision 2 (Tracked changes)
Other
Size: 164 KB
Transport for London
8.85 520 Over-Height Vehicles (OHV) Scenario Noise Impacts
Other
Size: 2 MB
Transport for London
6.3.9.8 ES Appendix 9H Revision 1
Other
Size: 2 MB
Transport for London
7.4 Design Principles Revision 2 (tracked changes)
Other
Size: 283 KB
Southern Gas Networks and Birch Sites Limited
Response to ExA’s Second Written Questions
Other
Size: 2 MB
Transport for London
8.89 SWQ Compulsory Acquisition CA Report
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 4 (Tracked changes)
Other
Size: 39 KB
ExCeL London
Submission for Deadline 4
Other
Size: 1 MB
Transport for London
8.93 SWQ Construction on Land CL Report
Other
Size: 121 KB
Silvertown Homes Limited (formerly known as Quintain Limited)
Submission for Deadline 4
Other
Size: 303 KB
Marine Management Organisation
Response to ExA’s Second Written Questions
Other
Size: 1 MB
Transport for London
8.88 Landscaping Plan
Other
Size: 4 MB
Transport for London
4.3 Book of Reference Revision 2
Other
Size: 4 MB
Transport for London
4.3 Book of Reference Revision 2 (Tracked changes)
Other
Size: 660 KB
Transport for London
8.100 SWQ Marine Ecology ME Report
Other
Size: 2 MB
Transport for London
4.1 Statement of Reasons Revision 2
Other
Size: 521 KB
Royal Borough of Greenwich
Response to ExA’s Second Written Questions and other comments
Other
Size: 831 KB
Transport for London
7.11 Charging Policies and Procedures Revision 2 (Tracked changes)
Other
Size: 179 KB
London Borough of Tower Hamlets
Further submission for Deadline 4
Other
Size: 454 KB
Nathaniel Lichfield and Partners on behalf of U and I Group Plc
Submission for Deadline 4
Other
Size: 22 MB
Transport for London
8.98 SWQ Health, Safety and Security HSS Report
Other
Size: 1,022 KB
Port of London Authority
Response to ExA’s Second Written Questions
Other
Size: 83 KB
Health and Safety Executive
Submission for Deadline 4
Other
Size: 93 KB
Transport for London
8.80 Deadline 4 Cover Letter
Other
Size: 349 KB
London Borough of Southwark
Response to ExA’s Second Written Questions
Other
Size: 173 KB
Transport for London
8.95 SWQ Air Quality AQ Report
Other
Size: 308 KB
London Borough of Hackney
Update and comments on the updated draft Development Consent Order
Other
Size: 359 KB
London Borough of Lewisham
Response to ExA’s Second Written Questions
Other
Size: 224 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 4
Other
Size: 153 KB
Motorcycle Action Group
Submission for Deadline 4
Other
Size: 240 KB
Brenntag UK Limited
Response to ExA’s Second Written Questions and other comments
Other
Size: 2 MB
Transport for London
8.81 Document Explaining DCO Amendments
Other
Size: 134 KB
Transport for London
8.97 SWQ Noise and Vibration NV Report
Other
Size: 361 KB
Transport for London
8.82 Bus Strategy
Other
Size: 114 KB
London Borough of Tower Hamlets
Response to ExA’s Second Written Questions
Other
Size: 138 KB
Transport for London
SoCG001 - Statement of Common Ground with Natural England (Revision 2)
Other
Size: 133 KB
Procedural Decision Letter
Notification of procedural decisions regarding the applicant’s proposed changes to the application, publication of second written questions, notification of hearings and amendments to the timetable for the Examination
Other
Size: 187 KB
Examining Authority Second Written Questions
Other
Size: 67 KB
Transport for London
8.79 Cover Letter for Addendum to proposed change request
Other
Size: 5 MB
Transport for London
8.78 Addendum to proposed change request
Other
Size: 74 KB
ExA notification to the Applicant regarding the proposed changes to the application
Letter dated 1 February 2017
Other
Size: 967 KB
Transport for London
Further email regarding non material change consultation publicity. Late submission for Deadline 3 accepted at the discretion of the Examining Authority
Other
Size: 40 KB
Transport for London
Email regarding non material change consultation publicity
Other
Size: 276 KB
Transport for London
8.60 Written Summary for Traffic and Transport Modelling ISH on 17 January 2017
Other
Size: 5 MB
Transport for London
8.71 Response to Action Point 3 from the ISH on 17 January 2017
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 3 (Tracked changes)
Other
Size: 8 MB
Transport for London
8.63 Written Summary for CAH on 20 January 2017
Other
Size: 354 KB
Transport for London
8.73 Response to Action Point 8.2 from the ISH on 17 January 2017
Other
Size: 2 MB
Transport for London
8.70 Response to Action Points 1 and 2 from the ISH on 17 January 2017
Other
Size: 118 KB
Transport for London
SoCG019 Statement of Common Ground with Historic England
Other
Size: 33 KB
London Borough of Tower Hamlets
Post Hearing Submission
Other
Size: 80 KB
Dominic Leggett
Post Hearing Submission
Other
Size: 97 KB
Transport for London
SoCG023 Statement of Common Ground with Health and Safety Executive
Other
Size: 2 MB
Transport for London
8.66 Slurry Tunnel Boring Machine (TBM) and Treatment Plant Environmental Appraisal
Other
Size: 216 KB
Brenntag UK Limited
Post Hearing Submission
Other
Size: 6 MB
Transport for London
8.76 Appendices 1-6 to Written Summary for Environmental ISH of 18 January 2017
Other
Size: 129 KB
Transport for London
8.59 Applicant's Update Note
Other
Size: 65 KB
Thames Water
Post Hearing Submission
Other
Size: 629 KB
Transport for London
8.72 Response to Action Point 6, 7 and 8.1 from the ISH on 17 January 2017
Other
Size: 221 KB
Transport for London
8.74 Response to Action Points 12 and 13 from the ISH on 17 January 2017
Other
Size: 23 MB
Darryl Chamberlain
Submission for Deadline 3
Other
Size: 918 KB
Health and Safety Executive
Post Hearing Submission
Other
Size: 123 KB
Transport for London
8.67 Application and Examination Document Tracker
Other
Size: 143 KB
Transport for London
SoCG001 Statement of Common Ground with Natural England
Other
Size: 694 KB
Transport for London
3.1 Draft DCO Revision 3
Other
Size: 1 MB
London Borough of Newham
Post Hearing Submission
Other
Size: 696 KB
Transport for London
8.62 Written Summary for dDCO ISH on 19 January 2017
Other
Size: 88 KB
Transport for London
SoCG002 Statement of Common Ground with Highways England
Other
Size: 3 MB
London Borough of Southwark
Post Hearing Submission
Other
Size: 793 KB
Westcombe Society
Post Hearing Submission
Other
Size: 76 KB
Transport for London
8.58 Deadline 3 Cover Letter
Other
Size: 197 KB
Transport for London
8.68 Environmental Documents Structure Diagram
Other
Size: 62 KB
Rebecca Moore
Post Hearing Submission
Other
Size: 2 MB
Transport for London
8.69 Impact of the Scheme on Low Income Residents
Other
Size: 230 KB
Environment Agency
Post Hearing Submission
Other
Size: 2 MB
Royal Borough of Greenwich
Post Hearing Submission
Other
Size: 54 KB
No to Silvertown Tunnel
Post Hearing Submission
Other
Size: 166 KB
Royal Mail Group Limited
Correspondence with Applicant
Other
Size: 187 KB
Transport for London
8.75 Response to Action Point 14 from the ISH on 17 January 2017
Other
Size: 9 MB
Port of London Authority
Post Hearing Submission
Other
Size: 413 KB
Emily and Mike Norton
Post Hearing Submission
Other
Size: 63 KB
Public Health England
Post Hearing Submission
Other
Size: 2 MB
London City Airport
Further Post Hearing Submission
Other
Size: 6 MB
Transport for London
8.77 Appendices 7-13 to Written Summary for Environmental ISH 18 January 2017
Other
Size: 363 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 3 (Tracked changes)
Other
Size: 1 MB
Transport for London
8.65 Environmental Appraisal of Precast Concrete (PCC) Segment Manufacturing Plant
Other
Size: 174 KB
Transport for London
7.10 Consent and Agreements Position Statement Revision 1
Other
Size: 133 KB
Transport for London
SoCG005 Statement of Common Ground with Environment Agency
Other
Size: 220 KB
Marine Management Organisation
Post Hearing Submission
Other
Size: 1 MB
London Borough of Lewisham
Post Hearing Submission
Other
Size: 248 KB
London Borough of Hackney
Post Hearing Submission
Other
Size: 221 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 3
Other
Size: 4 MB
Transport for London
2.5 Work Plans Revision 1
Other
Size: 727 KB
Lidoka Estates Ltd
Post Hearing Submission
Other
Size: 541 KB
Transport for London
8.61 Written Summary for Air Quality, Noise and other Environmental Issues ISH on 18 January 2017
Other
Size: 771 KB
Mark Barnes
Post Hearing Submission
Other
Size: 494 KB
Southern Gas Networks and Birch Sites Limited
Submission for Deadline 3
Other
Size: 126 KB
Transport for London
8.64 Document Explaining DCO Amendments
Other
Size: 338 KB
London City Airport
Post Hearing Submission
Other
Size: 261 KB
Tarmac Trading Limited
Post Hearing Submission
Other
Size: 189 KB
Friends of the Earth
Post Hearing Submission
Other
Size: 169 KB
Transport for London
7.10 Consent and Agreements Position Statement Revision 1 (Tracked changes)
Other
audio recording
Size: 31 MB
Audio Recording of the Issue Specific Hearing on 19 January 2017 - Part 3
Issue Specific Hearing on Development Consent Order
Other
audio recording
Size: 25 MB
Audio Recording of the Issue Specific Hearing on 19 January 2017 - Part 4
Issue Specific Hearing on Development Consent Order
Other
audio recording
Size: 27 MB
Audio Recording of the Issue Specific Hearing on 19 January 2017 - Part 1
Issue Specific Hearing on Development Consent Order
Other
audio recording
Size: 12 MB
Audio Recording of the Issue Specific Hearing on 19 January 2017 - Part 2
Issue Specific Hearing on Development Consent Order
Other
audio recording
Size: 110 MB
Audio Recording of the Compulsory Acquisition Hearing on 20 January 2017
Audio Recording of the Compulsory Acquisition Hearing
Other
audio recording
Size: 30 MB
Audio Recording of the Issue Specific Hearing on 18 January 2017 - Part 2
Issue Specific Hearing on Air Quality, Noise and Other Environmental Issues
Other
audio recording
Size: 16 MB
Audio Recording of the Issue Specific Hearing on 18 January 2017 - Part 4
Issue Specific Hearing on Air Quality, Noise and Other Environmental Issues
Other
audio recording
Size: 19 MB
Audio Recording of the Issue Specific Hearing on 18 January 2017 - Part 1
Issue Specific Hearing on Air Quality, Noise and Other Environmental Issues
Other
audio recording
Size: 35 MB
Audio Recording of the Issue Specific Hearing on 18 January 2017 - Part 3
Issue Specific Hearing on Air Quality, Noise and Other Environmental Issues
Other
audio recording
Size: 199 MB
Audio Recording of the Issue Specific Hearing on 17 January 2017 - Part 2
Issue Specific Hearing on Traffic/Transport Modelling, Forecasting and User Charging and Economic Issues
Other
audio recording
Size: 139 MB
Audio Recording of the Issue Specific Hearing on 17 January 2017 - Part 1
Issue Specific Hearing on Traffic/Transport Modelling, Forecasting and User Charging and Economic Issues
Other
Size: 61 KB
Issue Specific Hearing Action Points
Action Points arising from the Issue Specific Hearing (ISH) on Traffic Transport Modelling, Forecasting and User Charging & Economic Issues held on 17 January 2017
Other
Size: 30 KB
Issue Specific Hearing Action Points
Action Points arising from the Issue Specific Hearing (ISH) on Development Consent Order held on 19 January 2017
Other
Size: 29 KB
Issue Specific Hearing Action Points
Action Points arising from the Issue Specific Hearing (ISH) on Noise, Air Quality and other Environmental Issues held on 18 January 2017
Other
Size: 42 KB
Compulsory Acquisition Hearing Action Points
Action Points arising from the Compulsory Acquisition Hearing held on 20 January 2017
Other
Size: 677 KB
Southern Gas Networks & Birch Sites Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 324 KB
Trinity (D) Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 697 KB
Knight Dragon Developments Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 153 KB
Freysporne Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 6 MB
Nathaniel Lichfield and Partners on behalf of U and I Group Plc
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 1 MB
Ansco Arena Limited and The Waterfront Limited Partnership
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 400 KB
BL CW Holdings Ltd
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 12 MB
Transport for London
Proposed change request not as yet accepted by the ExA
Other
Size: 76 KB
Transport for London
Cover letter for Proposed change request not as yet accepted by the ExA
Other
Size: 114 KB
Pins Response to applicant's letter of 21 December 2016
Response to applicant's letter of 21 December 2016
Other
Size: 40 KB
Transport for London
Letter sent to ExA on 21 December 2016 relating to issue specific hearing on traffic modelling
Other
Size: 42 KB
Compulsory Acquisition Accompanied Site Inspection Itinerary
Itinerary outlining the accompanied site inspection with the Panel scheduled for 20 January 2017
Other
Size: 424 KB
Traffic and Transport Modelling Hearing Agenda
Agenda for the Issue Specific Hearing scheduled for 17 January 2017
Other
Size: 107 KB
Draft Development Consent Order Hearing Agenda
Agenda for Issue Specific Hearing on 19 January 2017
Other
Size: 87 KB
Compulsory Acquisition Hearing Agenda
Agenda for the Compulsory Acquisition Hearing scheduled for 20 January 2017
Other
Size: 525 KB
Air Quality, Noise and Other Environmental Issues Hearing Agenda
Agenda for Issue Specific Hearing on 18 January 2017
Other
Size: 27 KB
Rik Andrew
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 317 KB
Port of London Authority
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 170 KB
Brenntag UK Limited
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 101 KB
Health and Safety Executive
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 2 MB
Southern Gas Networks and Birch Sites Limited
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 141 KB
Glenny LLP on behalf of Newable Property Developments
Comments accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for January 2017
Other
Size: 2 MB
Health and Safety Executive
Late Submission for Deadline 2 accepted at the discretion of the Examining Authority
Other
Size: 21 KB
Transport for London
Applicant notice of hearings in January 2017
Other
Size: 87 KB
Other
Size: 92 MB
Transport for London
8.33 Updated Air Quality and Health Assessment
Other
Size: 593 KB
Transport for London
8.41 Adjacent River Crossings
Other
Size: 184 KB
Transport for London
8.55 Response to Action Points 8 and 9 from TT ISH
Other
Size: 14 KB
Transport for London
8.35 Outline Business Case Correction
Other
Size: 74 KB
Transport for London
CAH Appendix 1 - tracked change mark up of Table 1
Other
Size: 9 KB
Transport for London
8.54 Corrected Answer to TT6
Other
Size: 572 KB
Transport for London
8.31 Update on discussions with Public Health England
Other
Size: 748 KB
Transport for London
8.45 Thames Gateway Bridge VoT Study - Modelling Report
Other
Size: 280 KB
Transport for London
8.38 Comments on Written Representations - Land Interests Part 2
Other
Size: 190 KB
Transport for London
SoCG004 Statement of Common Ground with Marine Management Organisation
Other
Size: 74 KB
Transport for London
8.50 Steer Davies Gleave Memo
Other
Size: 13 MB
Transport for London
8.28 Appendices to Comments on Borough LIRs and WRs
Other
Size: 302 KB
Transport for London
8.44 Silvertown Modelling - Value of Time Discussion Note
Other
Size: 65 KB
Transport for London
CAH Appendix 2 - clean version of Table 1
Other
Size: 496 KB
Transport for London
CAH Appendix 3
Other
Size: 636 KB
Transport for London
8.32 Details of Proposed Noise Barriers at Siebert Road
Other
Size: 1 MB
Transport for London
8.26 Comments on Responses to ExA's First Written Questions
Other
Size: 1 MB
Transport for London
8.29 Written Summary for Traffic and Transport Modelling ISH on 7 December 2016
Other
Size: 8 MB
Transport for London
ES Drawing 17.2 Revision 1
Other
Size: 189 KB
Transport for London
8.52 Silvertown Modelling - Changes in Cross-River PT Travel
Other
Size: 1,018 KB
Transport for London
8.49 RSI Data and Matrix Development
Other
Size: 674 KB
Transport for London
8.37 Comments on Written Representations - Land Interests Part 1
Other
Size: 4 MB
Transport for London
8.42 Commentary on Interface between Strategic and Local Modelling
Other
Size: 516 KB
Transport for London
8.34 Distribution of User Benefits
Other
Size: 1,010 KB
Transport for London
8.43 Silvertown Modelling - Model Responsiveness
Other
Size: 2 MB
Transport for London
SoCG008 Statement of Common Ground with Essex County Council
Other
Size: 673 KB
Transport for London
8.48 Growth Assumptions
Other
Size: 88 KB
Transport for London
8.53 TfL Engagement with LB Southwark
Other
Size: 753 KB
Transport for London
8.39 Comments on Written Representations - Community
Other
Size: 854 KB
Transport for London
8.30 Written Summary for CAH on 8 December 2016
Other
Size: 2 MB
Transport for London
ES Drawing 10.3 Revision 1
Other
Size: 353 KB
Transport for London
8.40 Comments on Written Representations - Other
Other
Size: 2 MB
Transport for London
8.27 Comments on Borough LIRs and WRs
Other
Size: 532 KB
Transport for London
8.36 Comments on Written Representations - Statutory Bodies
Other
Size: 14 MB
Transport for London
8.51 Woolwich Ferry Waiting Area Improvement Study
Other
Size: 6 MB
Transport for London
8.46 Silvertown Crossing - Summary of Data Collection
Other
Size: 6 MB
Transport for London
8.47 River Crossings - Behavioural Surveys Final Report
Other
Size: 3 MB
Transport for London
6.3.10.2 ES Appendix 10B Marine Ecology Survey Report Revision 1
Other
Size: 759 KB
Transport for London
6.10 Code of Construction Practice Revision 2 (Tracked changes)
Other
Size: 245 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 2
Other
Size: 535 KB
Transport for London
7.7 Traffic Impacts Mitigation Strategy Revision 1
Other
Size: 441 KB
Transport for London
7.4 Design Principles Revision 1 (Tracked changes)
Other
Size: 22 MB
Royal Borough of Greenwich
Response to Action Points Part 1
Other
Size: 654 KB
Transport for London
3.1 Draft DCO Revision 2
Other
Size: 363 KB
Transport for London
7.4 Design Principles Revision 1
Other
Size: 587 KB
Transport for London
7.7 Traffic Impacts Mitigation Strategy Revision 1 (Tracked changes)
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 2 (Tracked changes)
Other
Size: 359 KB
Transport for London
3.2 Explanatory Memorandum to DCO (Tracked changes)
Other
Size: 926 KB
Transport for London
6.10 Code of Construction Practice Revision 2
Other
Size: 2 MB
Transport for London
6.3.10.2 ES Appendix 10B Marine Ecology Survey Report Revision 1 (Tracked changes)
Other
Size: 116 KB
Transport for London
8.25 Document Explaining DCO Amendments
Other
Size: 401 KB
London Borough of Hackney
Comments on Responses to ExA's First Written Questions and wording of the DCO
Other
Size: 2 MB
London Borough of Southwark
Submission for Deadline 2
Other
Size: 2 MB
London Borough of Lewisham
Submission for Deadline 2
Other
Size: 433 KB
Health and Safety Executive
Submission for Deadline 2
Other
Size: 472 KB
Ansco Arena
Submission for Deadline 2
Other
Size: 14 KB
Dr Kat Warren
Submission for Deadline 2
Other
Size: 240 KB
Port of London Authority
Comments submitted prior to Deadline 2
Other
Size: 11 MB
Port of London Authority
Further Submission for Deadline 2
Other
Size: 14 KB
Greenwich Society
Submission for Deadline 2
Other
Size: 503 KB
London Borough of Newham
Submission for Deadline 2
Other
Size: 61 KB
London Borough of Tower Hamlets
Submission for Deadline 2
Other
Size: 19 KB
Thames Water Utilities Limited
Post Hearing Submission
Other
Size: 118 KB
Transport for London
8.24 Deadline 2 Cover Letter
Other
Size: 213 KB
Friends of the Earth
Submission for Deadline 2
Other
Size: 16 KB
W Humphrey and K Humphrey
Submission for Deadline 2
Other
Size: 879 KB
Valerie Viehoff
Submission for Deadline 2
Other
Size: 3 MB
Affordable Architects Limited
Post Hearing Submission
Other
Size: 2 MB
Royal Borough of Greenwich
Post Hearing Submission
Other
Size: 40 KB
Chris Bentley and Sharon Brokenshire
Submission for Deadline 2
Other
Size: 15 MB
Port of London Authority
Submission for Deadline 2
Other
Size: 19 MB
Royal Borough of Greenwich
Response to Action Points Part 4
Other
Size: 16 MB
Royal Borough of Greenwich
Response to Action Points Part 2
Other
Size: 39 KB
Rebecca Moore
Submission for Deadline 2
Other
Size: 26 KB
Brenntag UK Limited
Submission for Deadline 2
Other
Size: 2 MB
Nathaniel Lichfield and Partners on behalf of U and I Group Plc
Post Hearing Submission
Other
Size: 246 KB
Public Health England
Draft Statement of Common Ground
Other
Size: 386 KB
Trinity (D) Limited
Submission for Deadline 2
Other
Size: 55 KB
No to Silvertown Tunnel
Submission for Deadline 2
Other
Size: 27 MB
Royal Borough of Greenwich
Response to Action Points Part 3
Other
Size: 642 KB
Public Health England
Correspondence with Applicant
Other
Size: 51 KB
Note of Unaccompanied Site Inspection on 5 December 2016
Other
Size: 57 KB
Compulsory Acquisition Hearing Action Points
Action Points arising from the Compulsory Acquisition Hearing held on 08.12.2016
Other
audio recording
Size: 20 MB
Audio Recording - ISH - 7 December 2016
Issue Specific Hearing into Traffic and Transport Modelling - Part 1
Other
audio recording
Size: 14 MB
Audio Recording - ISH - 7 December 2016
Issue Specific Hearing into Traffic and Transport Modelling - Part 4
Other
audio recording
Size: 18 MB
Audio Recording - CAH - 8 December 2016
Compulsory Acquisition Hearing - Part 2
Other
audio recording
Size: 22 MB
Audio Recording - CAH - 8 December 2016
Compulsory Acquisition Hearing - Part 1
Other
audio recording
Size: 26 MB
Audio Recording - ISH - 7 December 2016
Issue Specific Hearing into Traffic and Transport Modelling - Part 3
Other
audio recording
Size: 18 MB
Audio Recording - ISH - 7 December 2016
Issue Specific Hearing into Traffic and Transport Modelling - Part 2
Other
Size: 56 KB
ISH Action Points - Traffic & Transport Modelling
Action Points arising from the Issue Specific Hearing (ISH) into Traffic & Transport Modelling held on 07.12.2016
Other
Size: 54 KB
Accompanied Site Inspection Action Points List
Action Points arising from the Accompanied Site Inspection (ASI) held on 06.12.2016
Other
Size: 2 MB
Transport for London
Applicants letter of response to Hearing agendas - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 19 KB
Transport for London
Response to First Written Question AQ22 - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 2 MB
Transport for London
4.1 Statement of Reasons Revision 1 (Tracked changes). This version supersedes the version submitted for Deadline 1 - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 16 KB
Transport for London
Revised version of Schedule 7 of the draft DCO - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 81 KB
Transport for London
Revised version of Schedule 7 of the draft DCO (Tracked changes) - accepted at the discretion of the Examining Authority in advance of the Hearings scheduled for December 2016
Other
Size: 92 KB
Port of London Authority
Further Late Submission for Deadline 1 accepted at the discretion of the Examining Authority
Other
Size: 310 KB
Compulsory Acquisition Hearing Agenda
Agenda for the Compulsory Acquisition Hearing scheduled for 8 December 2016
Other
Size: 232 KB
Traffic and Transport Modelling Agenda
Agenda for the Issue Specific Hearing on Traffic and Transport Modelling scheduled for 7 December 2016
Other
Size: 14 MB
Accompanied Site Inspection
Itinerary and Map outlining the accompanied site inspection with the Panel scheduled for 6 December 2016
Other
Size: 52 KB
Ralph Hardwick
Late Submission for Deadline 1 accepted at the discretion of the Examining Authority
Other
Size: 346 KB
Port of London Authority
Summary of Written Representation. Late Submission for Deadline 1 accepted at the discretion of the Examining Authority
Other
Size: 160 KB
Public Health England
Response to Rule 17. Late Submission for Deadline 1 accepted at the discretion of the Examining Authority
Other
Size: 29 MB
Transport for London
8.8.6 GS Appendix G
Other
Size: 38 MB
Transport for London
8.8.4 GS Appendix E
Other
Size: 137 MB
Transport for London
8.8.8 GS Appendix I
Other
Size: 61 MB
Transport for London
8.8.5 GS Appendix F
Other
Size: 55 MB
Transport for London
8.8.7 GS Appendix H
Other
Size: 913 KB
Transport for London
SoCG023 Statement of Common Ground with Health and Safety Executive
Other
Size: 3 MB
Transport for London
SoCG010 Statement of Common Ground with London Borough of Bexley
Other
Size: 3 MB
Transport for London
SoCG031 Statement of Common Ground with Knight Dragon
Other
Size: 3 MB
Transport for London
SoCG024 Statement of Common Ground with BL CW Holdings Limited
Other
Size: 93 KB
Transport for London
SoCG017 Statement of Common Ground with London Borough of Waltham Forest
Other
Size: 85 KB
Transport for London
SoCG008 Statement of Common Ground with Essex County Council
Other
Size: 2 MB
Transport for London
SoCG003 Statement of Common Ground with London Borough of Barking and Dagenham
Other
Size: 239 KB
Transport for London
SoCG040 Statement of Common Ground with Thames Water
Other
Size: 141 KB
Transport for London
SoCG007 Statement of Common Ground with City of London Corporation
Other
Size: 246 KB
Transport for London
SoCG032 Statement of Common Ground with Lidoka
Other
Size: 105 KB
Transport for London
SoCG005 Statement of Common Ground with Environment Agency
Other
Size: 173 KB
Transport for London
SoCG044 Statement of Common Ground with 'Host Boroughs' and Tower Hamlets
Other
Size: 175 KB
Transport for London
SoCG011 Statement of Common Ground with London Borough of Hackney
Other
Size: 101 KB
Transport for London
SoCG001 Statement of Common Ground with Natural England
Other
Size: 507 KB
Transport for London
SoCG034 Statement of Common Ground with National Grid
Other
Size: 319 KB
Transport for London
SoCG028 Statement of Common Ground with Brenntag
Other
Size: 90 KB
Transport for London
SoCG015 Statement of Common Ground with London Borough of Southwark
Other
Size: 119 KB
Transport for London
SoCG012 Statement of Common Ground with London Borough of Lewisham
Other
Size: 417 KB
Transport for London
SoCG021 Statement of Common Ground with Port of London Authority
Other
Size: 139 KB
Transport for London
SoCG019 Statement of Common Ground with Historic England
Other
Size: 86 KB
Transport for London
SoCG014 Statement of Common Ground with London Borough of Redbridge
Other
Size: 24 MB
Transport for London
SoCG030 Statement of Common Ground with Quintain
Other
Size: 7 MB
Transport for London
SoCG029 Statement of Common Ground with Greater London Authority (land)
Other
Size: 31 MB
Transport for London
8.8.9 GS Appendices J-AA
Other
Size: 29 MB
Transport for London
8.8.3 GS Appendix D
Other
Size: 54 MB
Transport for London
8.8.10 GS Appendices BB-EE
Other
Size: 33 MB
Transport for London
8.8.2 GS Appendix C
Other
Size: 69 MB
Transport for London
8.7 FWQ Surface Water SW Report
Other
Size: 4 MB
Transport for London
8.9 FWQ Noise NV Report
Other
Size: 36 MB
Transport for London
8.4 FWQ Air Quality AQ Report
Other
Size: 179 KB
Transport for London
8.6 FWQ Terrestrial Ecology TE Report
Other
Size: 520 KB
Transport for London
8.8 FWQ Geology GS Report
Other
Size: 161 KB
Transport for London
Rule 17 RFI Response
Other
Size: 670 KB
Transport for London
8.9.1 NV Appendix D
Other
Size: 8 MB
Transport for London
ES Drawing 10.1 Revision 1
Other
Size: 26 MB
Transport for London
8.8.1 GS Appendices A-B
Other
Size: 483 KB
Transport for London
8.5 FWQ Marine Ecology ME Report
Other
Size: 8 MB
Transport for London
ES Drawing 8.1 Revision 1
Other
Size: 31 MB
Transport for London
8.20 FWQ Principles PN Report
Other
Size: 111 KB
Transport for London
8.1 Deadline 1 Cover Letter
Other
Size: 1 MB
Transport for London
6.3.10.1 ES Appendix 10A WFD Revision 1
Other
Size: 1 MB
Transport for London
6.3.10.1 ES Appendix 10A WFD Revision 1 (Tracked changes)
Other
Size: 14 MB
Transport for London
8.19 FWQ DCO DC Report
Other
Size: 496 KB
Transport for London
7.11 Charging Policies and Procedures Revision 1 (Tracked changes)
Other
Size: 846 KB
Transport for London
6.3.9.7 ES Appendix 9G HRA Revision 1 (Tracked changes)
Other
Size: 155 KB
Transport for London
8.10 FWQ Habitats regulation HRA Report
Other
Size: 1 MB
Transport for London
7.6 Monitoring Strategy Revision 1
Other
Size: 579 KB
Transport for London
8.18 FWQ Socio-Economic SE Report
Other
Size: 3 MB
Transport for London
8.11 FWQ Dredging and Navigation DN Report
Other
Size: 616 KB
Transport for London
7.12 Mitigation Route Map Revision 1 (Tracked changes)
Other
Size: 138 KB
Transport for London
8.2 Document Explaining DCO Amendments
Other
Size: 232 KB
Transport for London
6.3.8.1 ES Appendix 8A Heritage Asset Gazetteer Revision 1
Other
Size: 949 KB
Transport for London
8.15 FWQ Material Resources MR Report
Other
Size: 1 MB
Transport for London
7.6 Monitoring Strategy Revision 1 (Tracked changes)
Other
Size: 431 KB
Transport for London
7.12 Mitigation Route Map Revision 1
Other
Size: 374 KB
Transport for London
7.11 Charging Policies and Procedures Revision 1
Other
Size: 208 KB
Transport for London
6.3.8.1 ES Appendix 8A Heritage Asset Gazetteer Revision 1 (Tracked changes)
Other
Size: 61 MB
Transport for London
8.16 FWQ Traffic and Transport TT Report
Other
Size: 164 KB
Transport for London
8.12 FWQ Construction CL Report
Other
Size: 541 KB
Transport for London
8.14 FWQ Lighting LI Report
Other
Size: 198 KB
Transport for London
8.17 FWQ Heritage HT Report
Other
Size: 762 KB
Transport for London
6.3.9.7 ES Appendix 9G HRA Revision 1
Other
Size: 205 KB
Transport for London
8.3 Statements of Common Ground Report
Other
Size: 712 KB
Transport for London
8.21 FWQ Compulsory Acquisition CA Report
Other
Size: 160 KB
Transport for London
8.22 FWQ General GA Report
Other
Size: 2 MB
Transport for London
8.13 FWQ Health HSS Report
Other
Size: 11 MB
Morden College
Written Representation
Other
Size: 1 MB
Nathaniel Lichfield and Partners on behalf of U and I Group Plc
Written Representation Attachment
Other
Size: 453 KB
Westcombe Society
Written Representation
Other
Size: 3 MB
Transport for London
4.1 Statement of Reasons Revision 1 (Tracked changes). (Superseded by version published on 5 December 2016)
Other
Size: 531 KB
Nick Raynsford
Written Representation
Other
Size: 4 MB
Port of London Authority
Written Representation
Other
Size: 89 KB
Natural England
Response to ExA's First Written Questions
Other
Size: 51 KB
Network Rail
Written Representation
Other
Size: 378 KB
Trinity (D) Limited
Written Representation
Other
Size: 295 KB
Transport for London
6.1.8 ES CH8 Cultural Heritage Revision 1 (Tracked changes)
Other
Size: 1 MB
Transport for London
6.1.12 ES CH12 Geology and Soils Revision 1
Other
Size: 132 KB
Royal Mail Group Limited
Written Representation
Other
Size: 93 KB
Public Health England
Statement of Common Ground
Other
Size: 145 KB
Motorcycle Action Group
Written Representation
Other
Size: 4 MB
Transport for London
2.4 Special Category Land Plan(s) R1
Other
Size: 537 KB
Westcombe Society
Further Written Representation
Other
Size: 884 KB
Transport for London
6.1.10 ES CH10 Marine Ecology Revision 1
Other
Size: 8 MB
Royal Borough of Greenwich
Local Impact Report
Other
Size: 46 MB
Transport for London
6.10 Code of Construction Practice Revision 1
Other
Size: 312 KB
No to Silvertown Tunnel
Written Representation and Response to Rule 17
Other
Size: 59 KB
Public Health England
Response to ExA's First Written Questions
Other
Size: 47 KB
Transport for London
Update Report - clarification letter
Other
Size: 581 KB
Transport for London
6.1.13 ES CH13 Materials and Waste Revision 1
Other
Size: 174 KB
Simon Robinson
Written Representation
Other
Size: 65 KB
Nathaniel Lichfield and Partners on behalf of U and I Group Plc
Written Representation
Other
Size: 90 KB
Quintain Limited
Written Representation
Other
Size: 2 MB
Transport for London
4.1 Statement of Reasons Revision 1
Other
Size: 4 MB
Port of London Authority
Response to ExA's First Written Questions. Republished with covering addendum on 1 December 2016
Other
Size: 594 KB
Transport for London
6.1.13 ES CH13 Materials and Waste Revision 1 (Tracked changes)
Other
Size: 219 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 1
Other
Size: 82 KB
Sally Hughes
Written Representation
Other
Size: 1 MB
Transport for London
6.1.16 ES CH16 Water Quality Revision 1 (Tracked changes)
Other
Size: 12 MB
Rebecca Moore
Written Representation
Other
Size: 7 MB
Nathaniel Lichfield & Partners on behalf of U and I Group PLC
Original objection to TfL
Other
Size: 799 KB
Transport for London
6.10 Code of Construction Practice Revision 1 (Tracked changes)
Other
Size: 1 MB
Transport for London
6.1.16 ES CH16 Water Quality Revision 1
Other
Size: 430 KB
Southern Gas Networks
Response to ExA's First Written Questions
Other
Size: 442 KB
National Grid Electricity Transmission plc and National Grid Gas plc
Written Representation and Response to ExA's First Written Questions
Other
Size: 428 KB
Natural England
Written Representation and Further Response to ExA's First Written Questions
Other
Size: 345 KB
Royal Borough of Greenwich
Written Representation
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 1 (Tracked changes)
Other
Size: 1 MB
Transport for London
6.1.12 ES CH12 Geology and Soils Revision 1 (Tracked changes)
Other
Size: 32 KB
N J Marks
Written Representation
Other
Size: 18 KB
Rik Andrew
Written Representation
Other
Size: 366 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 1 (Tracked changes)
Other
Size: 290 KB
Transport for London
6.1.8 ES CH8 Cultural Heritage Revision 1
Other
Size: 651 KB
Transport for London
3.1 Draft DCO Revision 1
Other
Size: 665 KB
Quintain Limited
Further Written Representation
Other
Size: 305 KB
Royal Borough of Greenwich
Response to ExA's First Written Questions
Other
Size: 270 KB
Thames Water Utilities Limited
Written Representation
Other
Size: 935 KB
Transport for London
6.1.10 ES CH10 Marine Ecology Revision 1 (Tracked changes)
Other
Size: 435 KB
Campaign for Better Transport
Written Representation, Response to ExA's First Written Questions and Response to Rule 17
Other
Size: 51 KB
City of London Corporation
Written Representation
Other
Size: 12 KB
London Borough of Tower Hamlets
Response to ExA's First Written Questions
Other
Size: 118 KB
Alliance of British Drivers
Written Representation
Other
Size: 212 KB
London Borough of Southwark
Written Representation
Other
Size: 4 MB
Health and Safety Executive
Appendix 4 to 7 of Written Representation
Other
Size: 2 MB
Colin Espiner
Written Representation
Other
Size: 15 KB
Darryl Chamberlain
Written Representation
Other
Size: 299 KB
Environment Agency
Written Representation
Other
Size: 6 MB
King and Wood Mallesons LLP on behalf of BL CW Holdings Limited
Written Representation
Other
Size: 42 KB
Lidoka Estates Ltd
Comments regarding accompanied site inspection
Other
Size: 8 MB
London Borough of Southwark
Covering Email
Other
Size: 262 KB
London Borough of Newham
Response to ExA's First Written Questions
Other
Size: 281 KB
Marine Management Organisation
Written Representation and Response to ExA's First Written Questions
Other
Size: 131 KB
London Borough of Bexley
Local Impact Report
Other
Size: 369 KB
Brenntag UK Limited
Written Representation
Other
Size: 8 MB
London Borough of Southwark
Local Impact Report
Other
Size: 787 KB
Health and Safety Executive
Appendix 3 of Written Representation
Other
Size: 48 KB
London Borough of Bexley
Written Representation and comments on revised Applicant documents
Other
Size: 231 KB
Birch Sites Limited
Response to ExA's First Written Questions
Other
Size: 6 MB
London Borough of Hackney
Covering Email and Response to Rule 17
Other
Size: 293 KB
Ansco Limited
Response to ExA's First Written Questions
Other
Size: 48 KB
London Borough of Lewisham
Response to ExA's First Written Questions
Other
Size: 3 MB
London Borough of Tower Hamlets
Local Impact Report
Other
Size: 315 KB
Glenny LLP on behalf of Newable Property Developments Limited and Waterfront Studios Limited
Written Representation
Other
Size: 54 KB
Bazalgette Tunnel Limited (BTL)
Written Representation
Other
Size: 5 MB
London Borough of Lewisham
Covering Email
Other
Size: 40 KB
London Borough of Lewisham
Comments on Relevant Representations
Other
Size: 217 KB
Friends of the Earth England Wales and Northern Ireland
Response to Rule 17
Other
Size: 51 KB
London Borough of Tower Hamlets
Written Representation
Other
Size: 498 KB
Health and Safety Executive
Appendix 8 of Written Representation
Other
Size: 234 KB
London Borough of Lewisham
Written Representation
Other
Size: 88 KB
Affordable Architects Limited on behalf of Tary Holdings
Written Representation
Other
Size: 56 KB
London Borough of Southwark
Response to Rule 17
Other
Size: 1 MB
Health and Safety Executive
Summary of Written Representation, Written Representation and Response to ExA's First Written Questions
Other
Size: 269 KB
Health and Safety Executive
Appendix 2 of Written Representation
Other
Size: 5 MB
London Borough of Lewisham
Local Impact Report
Other
Size: 152 KB
Environment Agency
Response to ExA's First Written Questions
Other
Size: 10 MB
Knight Dragon
Written Representation and Response to ExA's First Written Questions
Other
Size: 6 MB
London Borough of Hackney
Local Impact Report
Other
Size: 449 KB
ExCeL London Ltd
Written Representation
Other
Size: 971 KB
Greater London Authority
Local Impact Report and Response to ExA's First Written Questions
Other
Size: 530 KB
Matthews and Son LLP on behalf of Tarmac Limited
Comments regarding accompanied site inspection
Other
Size: 50 KB
London Borough of Lewisham
Response to Rule 17
Other
Size: 95 KB
London Borough of Redbridge
Local Impact Report
Other
Size: 168 KB
London Borough of Newham
Written Representation
Other
Size: 86 KB
Greenwich Society
Written Representation
Other
Size: 453 KB
Emily and Mike Norton
Written Representation
Other
Size: 10 KB
Helen Hutchinson and Duncan Marley
Written Representation
Other
Size: 1 MB
Matthews and Son LLP on behalf of Tarmac Limited
Written Representation
Other
Size: 312 KB
London Borough of Newham
Local Impact Report
Other
Size: 474 KB
Hackney and Tower Hamlets Friends of the Earth
Written Representation and Response to Rule 17
Other
Size: 49 KB
London Borough of Southwark
Response to ExA's First Written Questions
Other
Size: 2 MB
Health and Safety Executive
Appendix 9 to 12 of Written Representation
Other
Size: 546 KB
East Greenwich Residents Association (EGRA)
Written Representation
Other
Size: 51 KB
London Borough of Hackney
Response to ExA's First Written Questions
Other
Size: 1 MB
Health and Safety Executive
Appendix 1 of Written Representation
Other
Size: 996 KB
London Borough of Newham
Covering Email and Letter
Other
Size: 583 KB
ASD Limited (Kloeckner Metals UK)
Written Representation
Other
Size: 187 KB
London Borough of Hackney
Written Representation
Other
Size: 69 KB
Rule 17 Letter
Notification of request for further information
Other
Size: 53 KB
Note of Unaccompanied Site Inspection on 11 October 2016
Other
Size: 119 KB
Note of the Preliminary Meeting
Other
audio recording
Size: 55 MB
Audio Recording of the Issue Specific Hearing on the Draft DCO on 12 October 2016
Other
audio recording
Size: 42 MB
Audio Recording of the 7pm Open Floor Hearing on 13 October 2016
Other
audio recording
Size: 33 MB
Audio Recording of the Preliminary Meeting on 11 October 2016
Other
audio recording
Size: 86 MB
Audio Recording of the 10am Open Floor Hearing on 13 October 2016
Other
Size: 736 KB
Examining Authority First Written Questions
Other
Size: 149 KB
Rule 8 Letter
Other
Size: 61 MB
Transport for London
6.3 ES Appendix 16.A FRA
Other
Size: 15 MB
Transport for London
Drawing 6.10 Local NO2 Results
Other
Size: 3 MB
Transport for London
6.10 Code of Construction Practice
Other
Size: 2 MB
Transport for London
Update Report October 2016
Other
Size: 1 MB
Transport for London
Chapter 6 Air Quality
Other
Size: 1 MB
Transport for London
Updated ES Drawing 14.6
Other
Size: 574 KB
Transport for London
ES Appendix 6B Model Verification V2 -Tracked Change version
Other
Size: 1 MB
Transport for London
Chapter 6 Air Quality - Tracked change version
Other
Size: 380 KB
Transport for London
ES Appendix 6B Model Verification V2
Other
Size: 43 KB
Lidoka Estates
Response to Rule 6
Other
Size: 47 KB
London Borough of Newham
Response to Rule 6
Other
Size: 68 KB
Quintain Limited
Response to Rule 6
Other
Size: 80 KB
No to SilvertownTunnel
Response to Rule 6
Other
Size: 249 KB
Birch Sites Limited
Response to Rule 6
Other
Size: 363 KB
Southern Gas Networks
Response to Rule 6
Other
Size: 39 KB
Transport for London
Response to Rule 6
Other
Size: 58 KB
Health and Safety Executive
Response to Rule 6
Other
Size: 57 KB
Agenda for Open Floor Hearings
Other
Size: 65 KB
Agenda for Issue Specific Hearing on the Draft Development Consent Order
Other
Size: 391 KB
Direction to Preliminary Meeting
Directions to the CentrEd room at the ExCel
Other
Size: 619 KB
Examination Library
Other
Size: 26 MB
Transport for London
The London Plan
Other
Size: 25 MB
Transport for London
Mayor's Transport Strategy
Other
Size: 5 MB
Transport for London
Connecting the Capital - Our plan for new river crossings for London
Other
Size: 3 MB
Transport for London
Updated Waterbodies and Watercourses Thames River Basin District plan
Other
Size: 301 KB
Transport for London
A letter of response to the Section 51 advice issued by the Planning Inspectorate on 15 June 2016. This letter also includes information about a report containing updated information which the Applicant intends to submit before the preliminary meeting
Other
Size: 275 KB
Rule 6 Letter
Other
Size: 57 KB
Rule 4 Appointment of Panel
Other
Size: 2 MB
Transport for London
Silvertown Tunnel s58, s59 and EIA Regulation 13 certificates
Other
Size: 3 MB
Transport for London
Tracked changes version of the updated book or reference, showing the changes made against the version submitted with the application (revision 0). This document was submitted with the s. 58, s. 59 and EIA Regulation 13 certificates.
Other
Size: 5 MB
Transport for London
Updated book of reference (document ref. 4.3, revision 1) referred to in paragraph (c) of the s. 59 notice. This document was submitted with the s. 58, s. 59 and EIA Regulation 13 certificates.
Other
Size: 27 KB
Greater London Authority
Adequacy of Consultation Representation
Other
Size: 450 KB
London Borough Tower Hamlets
Adequacy of Consultation Representation
Other
Size: 1 MB
London Borough of Bexley
Adequacy of Consultation Representation
Other
Size: 117 KB
London Borough of Lewisham
Adequacy of Consultation Representation
Other
Size: 99 KB
London Borough of Newham
Adequacy of Consultation Representation
Other
Size: 123 KB
London Borough of Redbridge
Adequacy of Consultation Representation
Other
Size: 514 KB
Section 55 Checklist for Silvertown Tunnel
Other
Size: 220 KB
London Borough of Waltham Forest
Adequacy of Consultation Representation
Other
Size: 211 KB
Royal Borough of Greenwich
Adequacy of Consultation Representation
Other
Size: 114 KB
Silvertown Tunnel Notification of Decision to Accept Application
Other
Size: 14 MB
6.3 ES Appendix 4.A
Other
Size: 708 KB
7.5 Charging Statement
Other
Size: 26 MB
6.3 ES Appendix 16.A
Other
Size: 18 MB
6.3 ES Appendix 7.A
Other
Size: 2 MB
6.3 ES Appendix 9.H
Other
Size: 5 MB
7.1 Case for the Scheme
Other
Size: 143 MB
7.3 Design and Access Statement
Other
Size: 2 MB
7.8.3 Social Impacts Appraisal
Other
Size: 6 MB
7.8.4 Distributional Impacts Appraisal
Other
Size: 3 MB
6.9 Sustainability Statement
Other
Size: 4 MB
6.3 ES Appendix 4.B
Other
Size: 736 KB
3.1 Draft Development Consent Order
Other
Size: 918 KB
1.3 Guide to the Application
Other
Size: 84 MB
5.2 Consultation Report Appendix F
Other
Size: 3 MB
4.3 Book of Reference
Other
Size: 6 MB
6.2 ES Figures Drawings 17.1 - 17.2
Other
Size: 6 MB
6.3 ES Appendix 16.B
Other
Size: 2 MB
6.3 ES Appendix 14.B
Other
Size: 9 MB
6.3 ES Appendix 16.F
Other
Size: 7 MB
5.1 Consultation Report
Other
Size: 675 KB
6.3 ES Appendix 6.B
Other
Size: 7 MB
6.3 ES Appendix 16.D
Other
Size: 19 MB
5.2 Consultation Report Appendix B
Other
Size: 1 MB
6.3 ES Appendix 9.G
Other
Size: 14 MB
2.8 Engineering Section Drawings and Plan
Other
Size: 376 KB
7.12 Mitigation Route Map
Other
Size: 920 KB
6.3 ES Appendix 16.C
Other
Size: 17 MB
6.5 Transport Assessment
Other
Size: 733 KB
6.3 ES Appendix 17.A
Other
Size: 5 MB
6.3 ES Appendix 12.B
Other
Size: 1 MB
6.3 ES Appendix 14.E
Other
Size: 6 MB
6.3 ES Appendix 8.B
Other
Size: 47 MB
6.2 ES Figures Drawings 6.9 - 6.10
Other
Size: 16 MB
5.2 Consultation Report Appendix E
Other
Size: 2 MB
6.3 ES Appendix 9.F
Other
Size: 461 KB
6.6 Statement in Respect of Statutory Nuisance
Other
Size: 511 KB
6.3 ES Appendix 9.A
Other
Size: 3 MB
7.8 Outline Business Case
Other
Size: 3 MB
6.3 ES Appendix 8.C
Other
Size: 32 MB
6.2 ES Figures Drawings 6.5 - 6.6
Other
Size: 1 MB
6.3 ES Appendix 9.B
Other
Size: 32 MB
6.2 ES Figures Drawings 6.3 - 6.4
Other
Size: 4 MB
5.2 Consultation Report Appendix D
Other
Size: 10 MB
6.2 ES Figures Drawings 16.6 - 16.10
Other
Size: 9 MB
5.2 Consultation Report Appendix J to S
Other
Size: 2 MB
6.3 ES Appendix 6.D
Other
Size: 39 MB
6.2 ES Figures Drawings 6.7 - 6.8
Other
Size: 4 MB
2.5 Work Plans
Other
Size: 593 KB
6.7 Energy and Carbon Statement
Other
Size: 1 MB
6.3 ES Appendix 14.C
Other
Size: 1 MB
1.2 Application Form
Other
Size: 10 MB
7.2 Planning Policy Compliance Statement
Other
Size: 10 MB
6.2 ES Figures Drawings 16.1 - 16.5
Other
Size: 34 MB
6.5 Transport Assessment Appendices
Other
Size: 1 MB
1.1 Covering Letter
Other
Size: 5 MB
2.6 Rights of Way and Access Plans
Other
Size: 1 MB
6.3 ES Appendix 14.D
Other
Size: 323 KB
3.2 Explanatory Memorandum to Draft Development Consent Order
Other
Size: 1 MB
6.3 ES Appendix 5.A
Other
Size: 34 MB
6.2 ES Figures Drawings 7.1 - 11.2
Other
Size: 351 KB
6.3 ES Appendix 16.E
Other
Size: 4 MB
2.4 Special Category Land Plan(s)
Other
Size: 471 KB
6.3 ES Appendix 3.A
Other
Size: 3 MB
6.10 Code of Construction Practice
Other
Size: 511 KB
6.3 ES Appendix 6.C
Other
Size: 70 MB
5.2 Consultation Report Appendix T5-T9
Other
Size: 4 MB
5.2 Consultation Report Appendix C
Other
Size: 789 KB
6.3 ES Appendix 16.G
Other
Size: 3 MB
2.7 Classification of Roads Plan
Other
Size: 3 MB
6.3 ES Appendix 12.A
Other
Size: 172 KB
7.10 Consent and Agreements Position Statement
Other
Size: 381 KB
6.3 ES Appendix 8.A
Other
Size: 2 MB
6.3 ES Appendix 9.E
Other
Size: 1 MB
6.3 ES Appendix 10.C
Other
Size: 14 MB
6.1 Environmental Statement
Other
Size: 8 MB
7.8.2 Regeneration and Development Impact Assessment
Other
Size: 654 KB
4.2 Funding Statement
Other
Size: 1 MB
6.3 ES Appendix 9.C
Other
Size: 636 KB
6.3 ES Appendix 10.A
Other
Size: 9 MB
6.2 ES Figures Drawings 14.6 - 14.8
Other
Size: 3 MB
6.3 ES Appendix 10.B
Other
Size: 604 KB
6.3 ES Appendix 1.A
Other
Size: 149 KB
6.3 ES Appendix 6.E
Other
Size: 339 KB
5.2 Consultation Report Appendix I
Other
Size: 1 MB
6.3 ES Appendix 14.A
Other
Size: 44 MB
5.2 Consultation Report Appendix T1-T4
Other
Size: 1 MB
7.6 Monitoring Strategy
Other
Size: 17 MB
2.1 Tunnels Location and Operational Boundaries Plans
Other
Size: 977 KB
5.2 Consultation Report Appendix A
Other
Size: 37 MB
5.2 Consultation Report Appendix H
Other
Size: 545 KB
7.4 Design Principles
Other
Size: 34 MB
5.2 Consultation Report Appendix G
Other
Size: 5 MB
6.3 ES Appendix 15.A
Other
Size: 5 MB
6.4 Environmental Statement Non Technical Summary
Other
Size: 2 MB
6.3 ES Appendix 6.A
Other
Size: 38 MB
6.2 ES Figures Drawings 15.1 - 15.2
Other
Size: 25 MB
2.3 Land Plans
Other
Size: 1 MB
6.3 ES Appendix 9.D
Other
Size: 310 KB
7.11 Charging Policy
Other
Size: 6 MB
6.8 Health and Equalities Impact Assessment
Other
Size: 2 MB
4.1 Statement of Reasons
Other
Size: 16 MB
7.9 Traffic Forecasting Report
Other
Size: 9 MB
2.9 Traffic Regulation Measures Plans
Other
Size: 7 MB
2.2 General Arrangement Plans
Other
Size: 7 MB
7.8.1 Economic Assessment Report
Other
Size: 13 MB
6.2 ES Figures Drawings 14.1 - 14.5
Other
Size: 344 KB
7.7 Traffic Impacts Mitigation Strategy
Other
Size: 38 MB
6.2 ES Figures Drawings 4.1 6.1-6.2
Other
Size: 117 KB
151005 TR010021 Acknowledgement of Receipt of Information
Section 46 Notification - Acknowledgement of reciept of information letter concerning the Silvertown Tunnel proposal.
Other
Size: 427 KB
Department for Transport
Direction by the Secretary of State under Section 35
Other
Size: 7 MB
Silvertown Tunnel Scoping Opinion Report
Scoping Opinion for Silvertown Tunnel
Other
Size: 29 MB
Silvertown Tunnel Applicants Scoping Report
Applicants Scoping Report
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.