You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (7)
Developer's Application (55)
Acceptance (10)
Pre Examination (12)
Examination (178)
- All Documents
- + Deadline (78)
- Deadline 1 - 09-03-2016 (7)
- Deadline 2 - 23-03-2016 (13)
- Deadline 3 - 06-04-2016 (21)
- Deadline 4 - 27-04-2016 (4)
- Deadline 5 - 05/06/2016 (6)
- Deadline 6 - 19-06-2016 (15)
- Deadline 6 19-06-2016 (4)
- Examination Library.pdf (1)
- + Hearing (6)
- Hearing Notice (1)
- + Hearings (4)
- Notification regarding close of examination (1)
- Preliminary Meeting (3)
- Procedural Decisions (13)
- Site Visit (Accompanied) - 17-03-2016 - 1000 - Edmonton EcoPark (1)
Decision (14)
Decided (14)
Source | Description |
---|---|
Other |
Notification of Completion of ExA Examination (PDF, 98 KB)
|
Other |
Canal and River Trust (PDF, 117 KB)
Response to the Rule 17 Issued 29 July 2016
|
Other |
Lee Valley Regional Park Authority (PDF, 6 MB)
Comments for Deadline 8
|
Other |
National Grid (PDF, 267 KB)
Response to the Rule 17 Issued 29 July 2016
|
Other |
North London Waste Authority (PDF, 76 MB)
AD06.02 Environmental Statement Vol 3 Appendices (REV 01) - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 43 MB)
AD06.02 Environmental Statement Vol 1 Figures and Appendices- resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 160 KB)
AD07.37 NLHPP Roadmap of Plans
|
Other |
North London Waste Authority (PDF, 2 MB)
AD03 03 Development Consent Obligations (Rev 2 Clean)- Late submission
|
Other |
North London Waste Authority (PDF, 40 MB)
D06.02 Environmental Statement Vol 2 Appendices 7.1 to 7.3 - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 157 KB)
AD07.39 Note on Revisions to the Environmental Statement
|
Other |
North London Waste Authority (PDF, 9 MB)
AD06.02 Environmental Statement Vol 3 - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 375 KB)
AD05.12 Code of Construction Practice (Rev 2 Clean) - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 813 KB)
AD07.31 Statement of the Final Position Concerning Outstanding Objections to Compulsory Acquisition
|
Other |
North London Waste Authority (PDF, 208 KB)
AD07.32 Table of Revisions to the DCO Schedule 6-8 Explanatory Diagrams
|
Other |
North London Waste Authority (PDF, 248 KB)
AD07.32 Table of Revisions to the Book of Plans Since Application
|
Other |
North London Waste Authority (PDF, 349 KB)
AD07.35 Note of Clarification Following the Accompanied Site Inspection on 17 August 2016
|
Other |
North London Waste Authority (PDF, 811 KB)
AD03.01 Draft DCO (Rev 4 Clean)
|
Other |
North London Waste Authority (PDF, 48 MB)
AD06.02 Environmental Statement Vol 2 Appendices 2.1 to 5 - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 10 MB)
AD06.02 Environmental Statement Vol 2 Appendices 8.1 to 11.3 - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 407 KB)
AD03.01 Validation report of the Draft DCO (Rev 4).
|
Other |
North London Waste Authority (PDF, 324 KB)
AD07.38 Joint Statements with Lee Valley Regional Park Authority ,National Grid Electricity Transmission PLC and Zayo UK Ltd
|
Other |
North London Waste Authority (PDF, 228 KB)
AD07.36 Applicant’s Response to the Rule 17 Letter Dated 1 August 2016 Relating to Appeals
|
Other |
North London Waste Authority (PDF, 33 KB)
AD04.03 Book of Reference (Rev 2) - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 1 MB)
AD03.01 Draft DCO (Rev 4 - Comparison Deadline 8 Version Against Deadline 7 Version)
|
Other |
North London Waste Authority (PDF, 1 MB)
AD03.01 Draft DCO (Rev 4 - Comparison Deadline 8 Version Against Application Version)
|
Other |
North London Waste Authority (PDF, 90 KB)
Joint Statement with Lee Valley Regional Park Authority on negotiations for private agreement
|
Other |
North London Waste Authority (PDF, 388 KB)
AD07.33 Table of Revisions to the Draft DCO
|
Other |
North London Waste Authority (PDF, 50 MB)
AD02.01 Book of Plans (REV 02)Issue- resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 1 MB)
AD06.02 Environmental Statement Vol 1 - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 20 MB)
AD02.02 Design Code Principles (Rev 01) Issue - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 70 MB)
AD06.02 Environmental Statement Vol 2 Figures 2.1 to 11.2 - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 18 KB)
AD03.01 Validation certificate of the Draft DCO (Rev 4)
|
Other |
North London Waste Authority (PDF, 3 MB)
AD06.02 Environmental Statement Vol 2 - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 350 KB)
AD03.02 Explanatory Memorandum (Rev 1)
|
Other |
North London Waste Authority (PDF, 7 MB)
AD03.05 DCO Schedules 6-8 Explanatory Diagrams (REV 01) -resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 264 KB)
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 2 Clean) - Issue - resubmitted as the final version of the document
|
Other |
North London Waste Authority (PDF, 368 KB)
AD03.03 Development Consent Obligations (Rev 2 Tracked)- Late submission
|
Other |
Royal Mail Group (PDF, 63 KB)
Written Representation- Late submission
|
Other |
Transport for London (PDF, 99 KB)
Response to the Rule 17 Issued 29 July 2016
|
Other |
Rule 17 Letter sent to North London Waste Authority (PDF, 1,020 KB)
Request for Further Information
|
Other |
Rule 17 Letter sent to Canal and River Trust (PDF, 79 KB)
Request for Further Information
|
Other |
Rule 17 Letter sent to Kennet Properties Limited (PDF, 78 KB)
Request for Further Information
|
Other |
Rule 17 Letter sent to Lee Valley Regional Park Authority (PDF, 79 KB)
Request for Further Information
|
Other |
Rule 17 Letter sent to National Grid (PDF, 79 KB)
Request for Further Information
|
Other |
Rule 17 Letter sent to Thames Water Utilities Limited (PDF, 78 KB)
Request for Further Information
|
Other |
Rule 17 Letter sent to Transport for London (PDF, 80 KB)
Request for Further Information
|
Other |
Rule 17 Letter sent to Zayo Group Limited (PDF, 77 KB)
Request for Further Information
|
Other | |
Other |
Biffa Waste Services Ltd (PDF, 361 KB)
Late submission for Deadline 7 accepted at the discretion of the Examining Authority
|
Other |
David Arweny (PDF, 30 KB)
Submission for Deadline 7
|
Other |
KTI Energy Limited (PDF, 21 KB)
Post Hearing Submission
|
Other |
KTI Energy Limited (PDF, 18 KB)
Submission for Deadline 7
|
Other |
National Grid (PDF, 190 KB)
Post Hearing Submission
|
Other |
North London Waste Authority (PDF, 264 KB)
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 2 Clean)
|
Other |
North London Waste Authority (PDF, 687 KB)
AD03.01 Draft DCO (Rev 3 Clean)
|
Other |
North London Waste Authority (PDF, 18 MB)
AD02.02 Design Code Principles Rev 1
|
Other |
North London Waste Authority (PDF, 650 KB)
AD07.24 Indicative Crane Oversailing Radius
|
Other |
North London Waste Authority (PDF, 804 KB)
AD04.01 CA Statement of Reasons (Rev 1 Clean)
|
Other |
North London Waste Authority (PDF, 155 KB)
AD04.04 CA Powers Roadmap (Rev 2 Clean)
|
Other |
North London Waste Authority (PDF, 185 KB)
AD07.28 Table of Revisions to the Compulsory Acquisition Roadmap
|
Other |
North London Waste Authority (PDF, 163 KB)
AD04.04 CA Powers Roadmap (Rev 2 Tracked)
|
Other |
North London Waste Authority (PDF, 356 KB)
Validation Report DCO
|
Other |
North London Waste Authority (PDF, 240 KB)
AD07.23 Summary of Oral Submissions made at Compulsory Acquisition Hearing on 6 July
|
Other |
North London Waste Authority (PDF, 9 MB)
AD07.26 Plans and Drawings Updated for Deadline 7
|
Other |
North London Waste Authority (PDF, 231 KB)
CVs of Euston Ling and Ben Stansfield
|
Other |
North London Waste Authority (PDF, 223 KB)
AD07.18 Note Regarding the Rights Held by National Grid
|
Other |
North London Waste Authority (PDF, 284 KB)
AD07.22 Summary of Oral Submissions made at Issue Specific Hearing on 5 July
|
Other |
North London Waste Authority (PDF, 164 KB)
AD07.17 Table of Revisions to the Environmental Commitments and Mitigation Schedule
|
Other |
North London Waste Authority (PDF, 274 KB)
AD07.21 Response to Written Representation from Biffa
|
Other |
North London Waste Authority (PDF, 230 KB)
AD07.27 Table of Revisions to Plans and Drawings for Deadline 7
|
Other |
North London Waste Authority (PDF, 171 KB)
AD07.28 Table of Revisions to the Design Code Principles
|
Other |
North London Waste Authority (PDF, 136 KB)
AD07.17 Table of Revisions to the Statement of Reasons
|
Other |
North London Waste Authority (PDF, 256 KB)
AD07.19 Practical Management of Interactions with the National Grid DCO
|
Other |
North London Waste Authority (PDF, 917 KB)
AD03.01 Draft DCO (Rev 3 Tracked)
|
Other |
North London Waste Authority (PDF, 17 KB)
Validation Certificate DCO
|
Other |
North London Waste Authority (PDF, 4 MB)
AD03.03 Development Consent Obligations (Rev 1 Tracked)
|
Other |
North London Waste Authority (PDF, 5 MB)
AD07.25 Table of Revisions and Manuscript Amendments to Drawings as given to ExA During Hearing 5 July 2016
|
Other |
North London Waste Authority (PDF, 3 MB)
AD03.03 Development Consent Obligations (Rev 1 Clean)
|
Other |
North London Waste Authority (PDF, 286 KB)
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 2 Tracked)
|
Other |
North London Waste Authority (PDF, 855 KB)
AD04.01 CA Statement of Reasons (Rev 1 Tracked)
|
Other |
North London Waste Authority (PDF, 260 KB)
AD07.20 Update on the Status of Private Agreement Negotiations
|
Other |
North London Waste Authority (PDF, 326 KB)
AD07.14 Table of Revisions to the Draft DCO
|
Other |
North London Waste Authority (PDF, 168 KB)
AD07.16 Table of Revisions to the Code of Construction Practice. Late submission for Deadline 7 accepted at the discretion of the Examining Authority
|
Other |
North London Waste Authority (PDF, 388 KB)
AD05.12 Code of Construction Practice (Rev 2 Tracked). Late submission for Deadline 7 accepted at the discretion of the Examining Authority
|
Other |
North London Waste Authority (PDF, 375 KB)
AD05.12 Code of Construction Practice (Rev 2 Clean). Late submission for Deadline 7 accepted at the discretion of the Examining Authority
|
Other |
Thames Water Utilities Limited and Kennet Properties Limited (PDF, 51 KB)
Comments submitted in advance of the 6 July hearing
|
Other |
Transport for London (PDF, 134 KB)
Post Hearing Submission
|
Other |
Zayo Group UK Limited (PDF, 28 KB)
Submission for Deadline 7
|
Other | |
Other | |
Other | |
Other | |
Other |
Biffa Waste Services Ltd (PDF, 159 KB)
Late submission for Deadline 6 accepted at the discretion of the Examining Authority
|
Other |
Greater London Authority (PDF, 208 KB)
Comments on responses to the ExA’s second written questions. Late submission for Deadline 6 accepted at the discretion of the Examining Authority
|
Other |
Agenda for the Issue Specific Hearing on 5 July 2016 (PDF, 107 KB)
|
Other | |
Other |
North London Waste Authority (PDF, 976 KB)
AD03.04 Updated Statement of Common Ground - London Borough of Enfield (Rev 1). Late submission for Deadline 6 accepted at the discretion of the Examining Authority
|
Other |
North London Waste Authority (PDF, 727 KB)
AD03.04 Statement of Common Ground - Canal and River Trust. Late submission for Deadline 6. Accepted at the discretion of the Examining Authority
|
Other |
Biffa Waste Services Ltd (PDF, 145 KB)
Submission for Deadline 6
|
Other |
Canal and River Trust (PDF, 642 KB)
Submission for Deadline 6 regarding protective provisions
|
Other |
North London Waste Authority (PDF, 508 KB)
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 1 Tracked)
|
Other |
North London Waste Authority (PDF, 421 KB)
Draft DCO Submitted for Deadline 6 (comparison)
|
Other |
North London Waste Authority (PDF, 8 MB)
AD07.10 Plans and Drawings Updated for Deadline 6
|
Other |
North London Waste Authority (PDF, 139 KB)
Table of Revisions to the Environmental Commitments and Mitigation Schedule
|
Other |
North London Waste Authority (PDF, 349 KB)
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 1 Clean)
|
Other |
North London Waste Authority (PDF, 121 KB)
Table of Revisions to Code of Construction Practice
|
Other |
North London Waste Authority (PDF, 354 KB)
Validation Report
|
Other |
North London Waste Authority (PDF, 318 KB)
Draft DCO Submitted for Deadline 6 (clean)
|
Other |
North London Waste Authority (PDF, 682 KB)
AD05.12 Code of Construction Practice (Rev 1 Tracked)
|
Other |
North London Waste Authority (PDF, 44 KB)
Validation certificate
|
Other |
North London Waste Authority (PDF, 392 KB)
AD07.09 Comments on Deadline 5 Submissions
|
Other |
North London Waste Authority (PDF, 473 KB)
AD05.12 Code of Construction Practice (Rev 1 Clean)
|
Other |
North London Waste Authority (PDF, 460 KB)
Table of DCO Amendments submitted for Deadline 6
|
Other |
Biffa Waste Services Ltd (PDF, 149 KB)
Submission for Deadline 5
|
Other |
London Borough of Enfield (PDF, 81 KB)
Response to the ExA's Second Written Questions
|
Other |
North London Waste Authority (PDF, 11 MB)
AD07.08 Responses to the ExA's Second Written Questions
|
Other |
North London Waste Authority (PDF, 652 KB)
AD03.04 Statement of Common Ground - Environment Agency
|
Other |
Royal Mail (PDF, 55 KB)
Written Representation
|
Other |
Royal Mail Limited (PDF, 165 KB)
Late representation submitted on 26 May 2016. Accepted at the discretion of the Examining Authority
|
Other |
Thames Water Utilities Ltd (PDF, 238 KB)
Response to the ExA's Second Written Questions
|
Other |
Notification of July Hearings (PDF, 75 KB)
|
Other |
Examining Authority's Second Written Questions (PDF, 147 KB)
|
Other |
North London Waste Authority (PDF, 2 MB)
AD03.04 Statement of Common Ground ? London Borough of Enfield. Late submission for Deadline 3 accepted at the discretion of the Examining Authority
|
Other |
North London Waste Authority (PDF, 389 KB)
AD07.06 Comments on Local Impact Reports
|
Other |
North London Waste Authority (PDF, 766 KB)
AD07.05 Comments on Written Representations
|
Other |
North London Waste Authority (PDF, 292 KB)
AD07.07 Comments on Responses to the ExA's First Written Questions
|
Other |
Thames Water (PDF, 54 KB)
Comments on Written Representations, Local Impact Reports and responses to ExA?s first written questions
|
Other |
Examination Library (PDF, 197 KB)
Published Exam Library
|
Other |
Zayo Group UK Limited (PDF, 343 KB)
Late representation submitted on 6 April 2016. Accepted at the discretion of the Examining Authority
|
Other |
Lee Valley Regional Park Authority (PDF, 614 KB)
Response to the ExA?s first written questions
|
Other |
Canal and River Trust (PDF, 80 KB)
Response to the ExA?s first written questions
|
Other |
Environment Agency (PDF, 242 KB)
Response to the ExA?s first written questions
|
Other |
Haringey Council (PDF, 964 KB)
Local Impact Report
|
Other |
London Borough of Barnet (PDF, 145 KB)
Local Impact Report
|
Other |
London Borough of Enfield (PDF, 2 MB)
Local Impact Report
|
Other |
London Borough of Enfield (PDF, 128 KB)
Response to the ExA?s first written questions
|
Other |
National Grid (PDF, 308 KB)
Response to the ExA?s first written questions
|
Other |
North London Waste Authority (PDF, 410 KB)
AD07.03 Table of Revisions to the Draft DCO
|
Other |
North London Waste Authority (PDF, 541 KB)
AD03.04 Statement of Common Ground - Natural England
|
Other |
North London Waste Authority (PDF, 341 KB)
Updated Draft Development Consent Order - Submitted for Deadline 3 - Clean version
|
Other |
North London Waste Authority (PDF, 49 MB)
AD07.02 Responses to the Examining Authority's First Written Questions
|
Other |
North London Waste Authority (PDF, 551 KB)
AD03.04 Statement of Common Ground - Greater London Authority
|
Other |
North London Waste Authority (PDF, 209 KB)
AD07.04 Applicant's Oral Submissions at the DCO Hearing 18 March 2016
|
Other |
North London Waste Authority (PDF, 3 MB)
AD03.04 Statement of Common Ground - Lee Valley Regional Park Authority
|
Other |
North London Waste Authority (PDF, 16 MB)
AD03.04 Statement of Common Ground - Transport for London
|
Other |
North London Waste Authority (PDF, 455 KB)
Updated Draft Development Consent Order - Submitted for Deadline 3 - Comparison version against Draft submitted October 2015
|
Other |
North London Waste Plan (PDF, 226 KB)
Response to the ExA?s first written questions
|
Other |
Thames Water (PDF, 73 KB)
Response to the ExA?s first written questions
|
Other |
Transport for London (PDF, 254 KB)
Response to the ExA?s first written questions
|
Other | |
Other | |
Other | |
Other |
Bestway Holdings Ltd (PDF, 452 KB)
Written Representation
|
Other |
Biffa Waste Services Ltd (PDF, 688 KB)
Written Representation (Updated on 5 April 2016 to include previously missing text on page 5, paragraph II)
|
Other |
Canal and River Trust (PDF, 484 KB)
Written representation (updated on 14 April 2016 to include the missing appendix 1 ? The Knottingley Power Protective Provisions)
|
Other |
Canal and River Trust (PDF, 27 KB)
Summary of Written Representation
|
Other |
David Arweny (PDF, 23 KB)
Written Representation
|
Other |
Environment Agency (PDF, 332 KB)
Written Representation and Summary
|
Other |
Lee Valley Regional Park Authority (PDF, 1 MB)
Written Representation
|
Other |
London Borough of Enfield (PDF, 378 KB)
Written Representation
|
Other |
National Grid (PDF, 76 KB)
Written Representation
|
Other |
River Lea Anglers Club (PDF, 29 KB)
Written Representation
|
Other |
Thames Water Utilities Limited and Kennet Properties Limited (PDF, 42 KB)
Written Representation
|
Other |
Transport for London (PDF, 192 KB)
Written Representation
|
Other |
Greater London Authority (PDF, 5 MB)
Written Representation and Local Impact Report
|
Other | |
Other |
Site visit Agenda Letter (PDF, 2 MB)
|
Other |
Canal and River Trust (PDF, 1 MB)
Comments in advance of the March Hearing on the Draft DCO
|
Other |
National Grid (PDF, 38 KB)
Comments for Deadline 1
|
Other |
North London Waste Authority (PDF, 229 KB)
AD07.01 Comments on Relevant Representations
|
Other |
The Eley Estate Company (PDF, 139 KB)
Comments for Deadline 1
|
Other |
Transport for London (PDF, 41 KB)
Comments in advance of the March Hearing on the Draft DCO
|
Other |
Preliminary Meeting note (PDF, 60 KB)
Note of the Preliminary meeting held on 24 February 2016
|
Other |
Rule 8 Letter (PDF, 134 KB)
|
Other |
Examining Authority's First Written Questions (PDF, 132 KB)
|
Other | |
Other | |
Other |