The Sizewell C Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (26)

Developer's Application (636)

Acceptance (9)

Pre Examination (498)

Examination (2996)

Decision (210)

Decided (1)

Transboundary Documents
Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 5 Transboundary Effects Figure 5.1
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.5 Volume 4 Southern Park and Ride Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statements
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
5.1 Consultation Report Appendix E.1 - Part 2 of 2 Part E: Stage Three Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 40 MB)
6.3 Volume 2 Main Development Site Chapter 13 Landscape and Visual Figures 13.10.56 - 13.10.107
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.2 Volume 1 Introduction to the Environmental Statement Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 1 Introduction Appendices 1A - 1B
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 2 Overview of the Sizewell C Project Figure 2.1
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 4 Description of Operation
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 5 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 4 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14D Off-site Developments Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative ReportPart 3 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
5.2 Main Development Site Flood Risk Assessment Figures 31- 40
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
1.1 Appendix 1.1C Newspaper Notices
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
1.2 Application Form
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
1.3 Navigation Document
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.6 Volume 5 Two Village Bypass Chapter 1 Introduction Figures 1.1 - 1.3
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
5.5 Two Village Bypass Flood Risk Assessment Appendix A Two Village Bypass Modelling Report
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
5.10 Shadow Habitats Regulations Assessment Volume 1: Screening and Appropriate Assessment Part 3 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 71 - 80
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19A Groundwater and Surface Water: Numerical Modelling Report Part 3 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 48 MB)
5.1 Consultation Report Appendices F.1 - F.2 Part F: Stage Four Pre-application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
1.1 Appendix 1.1B Section 55 Application Checklist
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Figures 19.1 - 19.3
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
6.3 Volume 2 Main Development Site Chapter 3 Description of Construction Figures 3.1 - 3.14
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.4 Volume 3 Northern Park and Ride Chapter 2 Description of the Northern Park and Ride Figures 2.1 - 2.6
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 9 Terrestrial Historic Environment Appendices 9A - 9D
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.1 Consultation Report Annex E Stage 3 Issues Tables
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.3 Volume 2 Main Development Site Chapter 8 Conventional Waste and Material Resources Appendix 8A Waste Management Strategy
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.3 Volume 2 Main Development Site Chapter 9 Socio-economics Figures 9.1 - 9.7
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.9 Volume 8 Freight Management Facility Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statements
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 7 Terrestrial Ecology and Ornithology
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 4 Description of Operation Appendices 4A - 4C
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 6 Alternatives and Design Evolution
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 9 Terrestrial Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 28 Health and Wellbeing Appendices 28A - 28C
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.4 Volume 3 Northern Park and Ride Chapter 1 Introduction Figures 1.1 - 1.2
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
6.3 Volume 2 Main Development Site Chapter 24 Marine Navigation Appendices 24A - 24B
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.3 Volume 2 Main Development Site Chapter 25 Radiological Considerations Appendices 25A - 25C
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.3 Volume 2 Main Development Site Chapter 2 Description of Permanent Development Figures 2.1 - 2.13
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 26 Climate Change Appendices 26A - 26B
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 27 Major Accidents and Disasters Appendix 27A Sizewell C Project Environmental Risk Record
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.10 Volume 9 Rail Chapter 2 Description of Rail Figures 2.1 - 2.11
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.10 Volume 9 Rail Chapter 3 Alternatives and Design Evolution
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.3 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A Outline Drainage Strategy
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22A - Sizewell Characterisation Report - Phytoplankton: Edition 2
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22E - Sizewell Marine Mammals Characterisation
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.3 Volume 2 Main Development Site Chapter 20 Coastal Geomorphology and Hydrodynamics Appendix 20A Coastal Geomorphology and Hydrodynamics: Synthesis for Environmental Impact Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 21 Marine Water Quality and Sediments Figures 21.1 - 21.8
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22K - Sizewell C: Site Characterisation for the Disposal of Material Associated with Drilling and Dredging
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.10 Volume 9 Rail Chapter 4 Noise and Vibration Appendices 4A - 4B
Other
NNB Generation Company (SZC) Limited (PDF, 28 MB)
6.10 Volume 9 Rail Chapter 6 Landscape and Visual Figures 6.12 - 6.17
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.10 Volume 9 Rail Chapter 6 Landscape and Visual Appendices 6A - 6B
Other
NNB Generation Company (SZC) Limited (PDF, 45 MB)
6.10 Volume 9 Rail Chapter 11 Geology and Land Quality Appendices 11A - 11C Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 2 Description of Rail
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22G - Predictions of Entrainment by Sizewell C in Relation to Adjacent Fish and Invertebrate Populations
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22I - Sizewell C Impingement Predictions Based Upon Specific Cooling Water System Design
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.10 Volume 9 Rail Chapter 5 Air Quality Figures 5.1 - 5.2
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 5 Air Quality Appendices 5A - 5B
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 5 Air Quality
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 7 Terrestrial Ecology and Ornithology
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.10 Volume 9 Rail Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statement Annex 7A:1 Figures 7.1 - 7.16
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
6.10 Volume 9 Rail Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statements
Other
NNB Generation Company (SZC) Limited (PDF, 31 MB)
6.10 Volume 9 Rail Chapter 6 Landscape and Visual Figures 6.1 - 6.11
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
6.10 Volume 9 Rail Chapter 9 Terrestrial Historic Environment Appendices 9A - 9D
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 20 Coastal Geomorphology and Hydrodynamics
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 27 Major Accidents and Disasters
Other
NNB Generation Company (SZC) Limited (PDF, 22 MB)
6.10 Volume 9 Rail Chapter 2 Description of Rail Appendix 2A Rail Proposed Development Drawings
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22O - Eels Regulations Compliance Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 20 Coastal Geomorphology and Hydrodynamics Figure 20.1
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 21 Marine Water Quality and Sediments
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 8 Amenity and Recreation
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 9 Terrestrial Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22F - Review of Commercial and Recreational Fisheries activity in the vicinity of Sizewell Power Station: Edition 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22H - Modelling the Effect of Sizewell C Entrainment on the Phytoplankton of Sizewell B
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 28 Health and Wellbeing
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.10 Volume 9 Rail Chapter 8 Amenity and Recreation Figures 8.1 - 8.2
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.10 Volume 9 Rail Chapter 9 Terrestrial Historic Environment Figures 9.1 - 9.4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22M - Sizewell C Marine Ecology and Fisheries Final Scoping Report. Edition 2
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.3 Volume 2 Main Development Site Chapter 21 Marine Water Quality and Sediments Appendices 21A - 21F
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 25 Radiological Considerations
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 26 Climate Change
Other
NNB Generation Company (SZC) Limited (PDF, 60 KB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Annex 14C.3B - Badger Draft Licence CONFIDENTIAL
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.10 Volume 9 Rail Chapter 12 Groundwater and Surface Water Figure 12.1
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22N - Sizewell C Draft Marine Mammal Mitigation Protocol (MMMP)
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 23 Marine Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.10 Volume 9 Rail Chapter 4 Noise and Vibration Figures 4.1 - 4.4
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Figures 22.1 - 22.16
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.3 Volume 2 Main Development Site Chapter 23 Marine Historic Environment Appendices 23A - 23C
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.3 Volume 2 Main Development Site Chapter 24 Marine Navigation Figures 24.1 - 24.4
Other
NNB Generation Company (SZC) Limited (PDF, 50 MB)
6.10 Volume 9 Rail Chapter 11 Geology and Land Quality Appendices 11A - 11C Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 12 Groundwater and Surface Water
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.3 Volume 2 Main Development Site Chapter 6 Alternatives and Design Evolution Appendix 6A Alternative Sizewell B Relocated Facilities Implementation Scenario
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 8 Conventional Waste and Material Resources
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.4 Volume 3 Northern Park and Ride Chapter 4 Noise and Vibration Figures 4.1 - 4.7
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 4 Noise and Vibration Appendix 4A Construction and Operational Noise Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 9 Socio-economics
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
6.3 Volume 2 Main Development Site Chapter 9 Socio-economics Appendices 9A - 9F
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.9 Volume 8 Freight Management Facility Chapter 5 Air Quality Figure 5.1
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.9 Volume 8 Freight Management Facility Chapter 6 Landscape and Visual Appendices 6A - 6B
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.9 Volume 8 Freight Management Facility Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statement Annex 7A.1: Figures 7.1 - 7.5
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.9 Volume 8 Freight Management Facility Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 6 Landscape and Visual Appendices 6A - 6B
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 5 Air Quality Figure 5.1
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
6.9 Volume 8 Freight Management Facility Chapter 6 Landscape and Visual Figures 6.1 - 6.10
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.9 Volume 8 Freight Management Facility Chapter 2 Description of the Freight Management Facility
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.9 Volume 8 Freight Management Facility Chapter 2 Description of the Freight Management Facility Appendix 2A Proposed Development Drawings
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 8 Amenity and Recreation
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 7 Spent Fuel and Radioactive Waste Management
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.5 Volume 4 Southern Park and Ride Chapter 12 Groundwater and Surface Water Figure 12.1
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.9 Volume 8 Freight Management Facility Chapter 5 Air Quality Appendix 5A Dust Risk Assessment for the Freight Management Facility
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 6 Landscape and Visual
Other
NNB Generation Company (SZC) Limited (PDF, 28 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 6 Landscape and Visual Figures 6.1 - 6.8
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 4 Noise and Vibration
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.9 Volume 8 Freight Management Facility Chapter 5 Air Quality
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.9 Volume 8 Freight Management Facility Chapter 8 Amenity and Recreation
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.9 Volume 8 Freight Management Facility Chapter 9 Terrestrial Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statement Annex 7A1: Figures 7.1 - 7.5
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 3 Description of Construction
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.3 Volume 2 Main Development Site Chapter 3 Description of Construction Appendices 3A - 3C
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 7 Terrestrial Ecology and Ornithology
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
6.5 Volume 4 Southern Park and Ride Chapter 6 Landscape and Visual Figures 6.13 - 6.16
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.4 Volume 3 Northern Park and Ride Chapter 2 Description of the Northern Park and Ride Appendix 2A Proposed Development Drawings
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 5 Description of Decommissioning
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 24 Marine Navigation
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 3 Alternatives and Design Evolution
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 4 Noise and Vibration
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.3 Volume 2 Main Development Site Chapter 23 Marine Historic Environment Figure 23.1 - 23.3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 2 Description of Permanent Development
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.3 Volume 2 Main Development Site C Chapter 22 Marine Ecology and Fisheries Appendix 22B - Sizewell Zooplankton Characterisation: 2008-2012
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22C - Sizewell Benthic Ecology Characterisation
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C5 Marsh Harrier Mitigation Area Feasibility Report
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.10 Shadow Habitats Regulations Assessment Volume 3: Stage 4 Imperative Reasons of Public Interest
Other
NNB Generation Company (SZC) Limited (PDF, 45 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 4 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 24 MB)
5.5 Two Village Bypass Flood Risk Assessment Appendix A Two Village Bypass Modelling Report - Appendix C Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.10 Shadow Habitats Regulations Assessment Volume 4: Compensatory Measures
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.11 Schedule of Other Consents, Licences, and Agreements Appendices A - C
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
5.5 Two Village Bypass Flood Risk Assessment Appendix A Two Village Bypass Modelling Report - Appendix A Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 26 MB)
5.5 Two Village Bypass Flood Risk Assessment Appendix A Two Village Bypass Modelling Report - Appendix A Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19A Groundwater and Surface Water: Numerical Modelling Report Part 1 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.1 Consultation Report Annex B Stage 1 Section 42 Consultee Response Summaries
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
5.1 Consultation Report Annex C Stage 2 Issues Table
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
6.3 Volume 2 Main Development Site Chapter 15 Amenity and Recreation Appendices 15A - 15J Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
6.3 Volume 2 Main Development Site Chapter 15 Amenity and Recreation Appendices 15A - 15J Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
5.1 Consultation Report Annex G Stage 4 Issues Tables
Other
NNB Generation Company (SZC) Limited (PDF, 37 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 2 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
5.1 Consultation Report Appendices B.1 - B.15 Part B: Stage 1 Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
5.1 Consultation Report Appendices D.1 - D.7 Part D: Stage Two Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
5.2 Main Development Site Flood Risk Assessment Figures 51- 60
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 81 - 88
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.1 Consultation Report Annex F Stage 3 Section 42 Consultee Response Summaries
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.1 Consultation Report Annex H Stage 4 Section 42 Consultee Response Summaries
Other
NNB Generation Company (SZC) Limited (PDF, 39 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 3 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
5.1 Consultation Report Annex A Stage 1 Issues Table
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
5.5 Two Village Bypass Flood Risk Assessment Appendix A Two Village Bypass Modelling Report - Appendix B Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 29 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C2A Reptile Mitigation Strategy Figures 14C2A.1 - 14C2A.18
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C6B Water Vole Draft Licence Figures 14C6B.1 - 14C6B.8
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A8 Bats Part 5 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 31 MB)
F6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C1A Bat Mitigation Strategy Figures 14C1A.1 - 14C1A.14
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water
Other
NNB Generation Company (SZC) Limited (PDF, 44 MB)
5.1 Consultation Report Appendix E.4 - Part 1 of 2 Part E: Stage Three Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
5.1 Consultation Report Appendices F.3 - F.11 Part F: Stage Four Pre-application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 46 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 6 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
5.3 Northern Park and Ride Flood Risk Assessment Figures 1- 4
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
5.4 Southern Park and Ride Flood Risk Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
5.8 Freight Management Facility Flood Risk Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 46 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 12 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 14 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
5.5 Two Village Bypass Flood Risk Assessment Appendix A Two Village Bypass Modelling Report - Appendix C Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
5.6 Sizewell Link Road Flood Risk Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
5.10 Shadow Habitats Regulations Assessment Volume 1: Screening and Appropriate Assessment Part 5 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19A Groundwater and Surface Water: Numerical Modelling Report Part 4 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
5.1 Consultation Report Appendices G.1 - G.8 Part G: Other Appendices
Other
NNB Generation Company (SZC) Limited (PDF, 43 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 5 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.3 Northern Park and Ride Flood Risk Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 25 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 10 - 20
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
5.8 Freight Management Facility Flood Risk Assessment Figures 1-4
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
5.13 Community Impact Report
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
5.13 Community Impact Report Figures 1 - 7
Other
NNB Generation Company (SZC) Limited (PDF, 37 MB)
6.3 Volume 2 Main Development Site Chapter 17 Soils and Agriculture Appendices 17A - 17C
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.9 Rail Flood Risk Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 24 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 31 - 40
Other
NNB Generation Company (SZC) Limited (PDF, 21 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 51 - 60
Other
NNB Generation Company (SZC) Limited (PDF, 48 MB)
5.9 Rail Flood Risk Assessment Figures 1 - 7
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
5.10 Shadow Habitats Regulations Assessment Volume 1: Screening and Appropriate Assessment Part 2 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 4 Noise and Vibration
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.3 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2B Lighting Management Plan
Other
NNB Generation Company (SZC) Limited (PDF, 45 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19B: Sizewell C Conceptual Site Model of the Hydrogeological Regime Part 4 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C7B Natterjack Toad Draft Licence Figures 14C7B.1 - 14C7B.5
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.1 Consultation Report Annex D Stage 2 Section 42 Consultee Response Summaries
Other
NNB Generation Company (SZC) Limited (PDF, 42 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 1 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
5.1 Consultation Report
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.5 Two Village Bypass Flood Risk Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 25 MB)
5.5 Two Village Bypass Flood Risk Assessment Appendix A Two Village Bypass Modelling Report - Appendix B Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 25 MB)
5.6 Sizewell Link Road Flood Risk Assessment Figures 1 - 4
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14B2 Ornithology Synthesis Report
Other
NNB Generation Company (SZC) Limited (PDF, 27 MB)
6.3 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment Appendices 16A - 16H - Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 29 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 11 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
5.1 Appendix E.2 Part E: Stage Three Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
5.1 Consultation Report Appendix E.3 Part E: Stage Three Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
5.10 Shadow Habitats Regulations Assessment Volume 1: Screening and Appropriate Assessment Part 4 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
5.10 Shadow Habitats Regulations Assessment Volume 2: Stage 3 Assessment of Alternative Solutions
Other
NNB Generation Company (SZC) Limited (PDF, 50 MB)
6.3 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment Appendices 16A - 16H - Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 45 MB)
5.1 Consultation Report Appendix E.1 - Part 1 of 2 Part E: Stage Three Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 25 MB)
5.2 Main Development Site Flood Risk Assessment Figures 61- 69
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 17 Soils and Agriculture
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
6.3 Volume 2 Main Development Site Chapter 17 Soils and Agriculture Figures 17.1 - 17.5
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
5.12 Statement of Statutory Nuisance
Other
NNB Generation Company (SZC) Limited (PDF, 26 MB)
5.7 Yoxford Roundabout and Other Highway Improvements Flood Risk Assessment Figures 1 - 4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.11 Schedule of Other Consents, Licences, and Agreements
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.7 Yoxford Roundabout and Other Highway Improvements Flood Risk Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 28 MB)
5.1 Consultation Report Appendices D.8 - D.14 Part D: Stage Two Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 23 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A8 Bats Part 1 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 25 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A7 Ornithology Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 22 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 6 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 10 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 12 Air Quality
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C8 Consultation Table
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
2.5 Highways Plans Plans not for Approval
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
2.5 Main Development Site Permanent Development Site Proposed Landscape Masterplan Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A6 - Reptiles Annex 14A6.1: Figures 14A6.1 - 14A6.6
Other
NNB Generation Company (SZC) Limited (PDF, 40 MB)
6.3 Volume 2 Main Development Site Chapter 10 Transport Figures 10.11 - 10.23
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.3 Volume 2 Main Development Site Chapter 10 Transport Appendices 10A - 10C
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
6.3 Volume 2 Main Development Site Chapter 13 Landscape and Visual Figures 13.10.01 - 13.10.55
Other
NNB Generation Company (SZC) Limited (PDF, 26 MB)
6.3 Volume 2 Main Development Site Chapter 13 Landscape and Visual Appendices 13A - 13I (excluding Appendix 13B)
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A6 Reptiles
Other
NNB Generation Company (SZC) Limited (PDF, 23 MB)
2.7 Southern Park and Ride Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 39 MB)
2.10 Sizewell Link Road - Part 2 of 2 Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Figures 11.1 - 11.8
Other
NNB Generation Company (SZC) Limited (PDF, 26 MB)
6.3 Volume 2 Main Development Site Chapter 13 Landscape and Visual Appendix 13B Night-time Appraisal Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
6.3 Volume 2 Main Development Site Chapter 12 Air Quality Figures 12.1 - 12.2
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
6.3 Volume 2 Main Development Site Chapter 12 Air Quality Appendices 12A - 12F Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 27 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A4 Invertebrates
Other
NNB Generation Company (SZC) Limited (PDF, 39 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A3 - Plants and Habitats
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
2.6 Northern Park and Ride Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
2.2 Crown Land Plans
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.3 Volume 2 Main Development Site Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A2 - Designated Sites Annex 14A2.1: Figures 14A2.1 - 14A2.3
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
2.8 Two Village Bypass Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
2.3 Works Plans - Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 46 MB)
6.3 Volume 2 Main Development Site Chapter 13 Landscape and Visual Appendix 13B Night-time Appraisal Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A2 - Designated Sites
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
2.5 Main Development Site Conventional Island (Unit 1) Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
2.5 Main Development Site Cooling Water Pumphouse & Associated Buildings (Unit 1) Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 1 MB)
6.3 Volume 2 Main DevelopmentSite Chapter 10 Transport
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 5 Transboundary Effects Appendix 5A: Long Form Transboundary Screening Matrix
Other
NNB Generation Company (SZC) Limited (PDF, 33 MB)
6.3 Volume 2 Main Development Site Chapter 10 Transport Figures 10.1 - 10.10
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 4 Assessment of Cumulative Effects with Other Plans, Projects and Programmes
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 5 Transboundary Effects
Other
NNB Generation Company (SZC) Limited (PDF, 48 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11B Construction Noise Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11D Sound Level Assessment of the Creation of Fen Meadow Compensation Areas
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
2.5 Main Development Site Nuclear Island (Unit 1) Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
2.5 Rail Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
2.5 Main Development Site Fence Details Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
2.5 Main Development Site Construction Parameter Plans Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
2.5 Main Development Site Conventional Island (Unit 2) Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
2.5 Main Development Site Cooling Water Pumphouse & Associated Buildings (Unit 2) Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 46 MB)
2.5 Main Development Site Landscape Plans Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
2.9 Yoxford Roundabout and Other Highway Improvement Plans - Yoxford Roundabout Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
2.9 Yoxford Roundabout and Other Highway Improvements Plans - A12/A144 Junction South of Bramfield Plan For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
2.12 Rail - Saxmunham to Leiston Branch Line Upgrades Proposed Plans Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11F Road Traffic Flow Data
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11H Noise Mitigation Scheme
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
2.5 Main Development Site Operational Parameter Plans Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
2.5 Main Development Site Pylons Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A3 - Plants and Habitats Annex 14A3.1: Figures 14A3.1 - 14A3.2
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A5 - Amphibians Annex 14A5.1: Figure 14A5.1
Other
NNB Generation Company (SZC) Limited (PDF, 44 MB)
2.4 Access and Rights of Way Plans
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
2.5 Main Development Site Sizewell B Relocated Facilities Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
2.12 Rail - Saxmunham to Leiston Branch Line Upgrades Existing Plans Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 22 MB)
2.8 Two Village Bypass Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
2.9 Yoxford Roundabout and Other Highway Improvement Plans - Yoxford Roundabout Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
2.10 Sizewell Link Road - Part 1 of 2 Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
2.11 Freight Management Facility Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
2.5 Main Development Site Nuclear Island (Unit 2) Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
2.5 Main Development Site Operational Service Centre Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
2.9 Yoxford Roundabout and Other Highway Improvement Plans - A12/B1119 Junction at Saxmundham Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
2.9 Yoxford Roundabout and Other Highway Improvement Plans - A1094/B1069 Junction South of Knodishal Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 31 MB)
2.1 Land Plans
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
2.5 Main Development Site Highway Plans Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
2.10 Sizewell Link Road Plans - Part 1 of 3 Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 22 MB)
2.10 Sizewell Link Road Plans - Part 3 of 3 Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
2.5 Main Development Site Sizewell B Relocated Facilities Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
2.5 Main Development Site Site Sections Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
2.9 Yoxford Roundabout and Other Highway Improvements Plans - A12/A144 Junction South of Bramfield Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
2.9 Yoxford Roundabout and Other Highway Improvement Plans - A12/B1119 Junction at Saxmundham Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
2.12 Rail - Green Rail Route Plans (Outside Of The Main Development Site Boundary) Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
2.12 Rail - Green Rail Route Plans (Outside Of The Main Development Site Boundary) Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 42 MB)
2.3 Works Plans - Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
2.3 Works Plans - Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
2.6 Northern Park and Ride Plans Not for Approval
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
2.7 Southern Park and Ride Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
2.9 Yoxford Roundabout and Other Highway Improvements Plans - A1094/B1069 Junction South of Knodishall Plan Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 43 MB)
2.10 Sizewell Link Road Plans - Part 2 of 3 Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 21 MB)
6.3 Volume 2 Main Development Site Chapter 1 Introduction Figures 1.1 - 1.12
Other
NNB Generation Company (SZC) Limited (PDF, 44 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 11 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 13 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A9 Terrestrial Mammals Annex 14A9.1: Figures 14A9.1 - 14A9.6
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C Protected Species
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
5.4 Southern Park and Ride Flood Risk Assessment Figures 1 - 4
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
5.6 Sizewell Link Road Flood Risk Assessment Appendix A Sizewell Link Road Modelling Report
Other
NNB Generation Company (SZC) Limited (PDF, 28 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C1B Bat Method Statement Figures 14C1B.1 - 14C1B.12
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C6A Water Vole Mitigation Strategy Figures 14C6A.1 - 14C6A.8
Other
NNB Generation Company (SZC) Limited (PDF, 37 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 7 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 9 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A7 Ornithology Annex 14A7.1: Figures 14A7.26 - 14A7.31
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14E Biodiversity Net Gain Report
Other
NNB Generation Company (SZC) Limited (PDF, 37 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A9 Terrestrial Mammals
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A8 Bats Part 4 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 1 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19A Groundwater and Surface Water: Numerical Modelling Report Part 2 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14B1 Plants and Habitats Synthesis Report
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19A Groundwater and Surface Water: Numerical Modelling Report Part 5 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 42 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19B: Sizewell C Conceptual Site Model of the Hydrogeological Regime Part 1 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19B: Sizewell C Conceptual Site Model of the Hydrogeological Regime Part 5 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 40 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19B: Sizewell C Conceptual Site Model of the Hydrogeological Regime Part 2 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
6.3 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment Appendices 16A - 16H - Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 48 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 2 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 15 Amenity and Recreation
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C7A Natterjack Toad Mitigation Strategy Figures 14C7A.1 - 14C7A.5
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14C4 Fen Meadow Compensation Study
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
6.3 Volume 2 Main Development Site Chapter 15 Amenity and Recreation Figures 15.1 - 15.13
Other
NNB Generation Company (SZC) Limited (PDF, 43 MB)
6.3 Volume 2 Main Development Site Chapter 15 Amenity and Recreation Appendices 15A - 15J Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 24 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendices 19C - 19F
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
6.3 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment Figures 16.1 - 16.6
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 9 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendices 18B - 18E
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
5.1 Consultation Report Appendices A.1 - A.16 Part A: Informal Consultation (Pre-Stage 1)
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
5.1 Consultation Report Appendices C.1 - C.9 Part C: Informal Consultation (Development Sites)
Other
NNB Generation Company (SZC) Limited (PDF, 39 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 8 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 28 MB)
5.2 Main Development Site Flood Risk Assessment Appendices 1-7 Part 10 of 14
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A5 Amphibians
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.3 Volume 2 Main Development Site Chapter 13 Landscape and Visual Figures 13.1 - 13.8
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.3 Volume 2 Main Development Site Chapter 13 Landscape and Visual Figures 13.9.01 - 13.9.32
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4E Two Village Bypass Planning Statement
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
7.1 Grid Connection Statement
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4D Freight Management Facility Planning Statement
Other
NNB Generation Company (SZC) Limited (PDF, 59 KB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A Confidential Ecology Appendix CONFIDENTIAL
Other
NNB Generation Company (SZC) Limited (PDF, 63 KB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix F of Appendix 18A - Ground Investigation on Sizewell C Construction Site Area and Associated Development Part 2 of 2 Confidential Document submitted by the Applicant – please refer to the Applicant’s letters dated 16 November 2020 [AS-006] and 8 January 2021 [AS-049] and the ExA’s Procedural Decision dated 22 January 2021 [PD-010]
Other
NNB Generation Company (SZC) Limited (PDF, 62 KB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix L of Appendix 18A - Pre-existing Geotechnical Data Synthesis and Interpretative Report - Confidential Document submitted by the Applicant – please refer to the Applicant’s letters dated 16 November 2020 [AS-006] and 8 January 2021 [AS-049] and the ExA’s Procedural Decision dated 22 January 2021 [PD-010]
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 1 Introduction and Methodology Figures 1.1 - 1.2
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
8.1 Main Development Site Design and Access Statement Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
3.3 Draft Development Consent Order Validation Report
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
1.1 Appendix 1.1A List of Application Documents
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 2 Overview of the Sizewell C Project Appendix 2A - Sizewell B Relocated Facilities Environmental Statement Part 4 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.2 Volume 1 Introduction to the Environmental Statement Chapter 4 Project Evolution and Alternatives
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
8.5 Transport Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 29 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 2 Overview of the Sizewell C Project Appendix 2A - Sizewell B Relocated Facilities Environmental Statement Part 2 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 33 MB)
8.5 Transport Assessment Appendices 2A - 7B
Other
NNB Generation Company (SZC) Limited (PDF, 44 MB)
8.5 Transport Assessment Appendices 9B - 10A
Other
NNB Generation Company (SZC) Limited (PDF, 932 KB)
8.8 Construction Worker Travel Plan (CWTP)
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
3.1 Draft Development Consent Order (Draft DCO)
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
3.2 Explanatory Memorandum
Other
NNB Generation Company (SZC) Limited (PDF, 23 MB)
8.2 Outline Landscape and Ecological Management Plan (oLEMP)
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.2 Volume 1 Introduction to the Environmental Statement Chapter 6 EIA Methodology
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.1 Environmental Statement - Non-Technical Summary
Other
NNB Generation Company (SZC) Limited (PDF, 29 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 6 EIA Methodology Appendix 6B - EIA Scoping Opinion
Other
NNB Generation Company (SZC) Limited (PDF, 63 KB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix F of Appendix 18A - Summary of Terrestrial Surface Water Quality Monitoring - Confidential Document submitted by the Applicant – please refer to the Applicant’s letters dated 16 November 2020 [AS-006] and 8 January 2021 [AS-049] and the ExA’s Procedural Decision dated 22 January 2021 [PD-010]
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
5.14 Equality Statement
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
4.1 Statement of Reasons Figure 1.1 Site Context Plan
Other
NNB Generation Company (SZC) Limited (PDF, 51 KB)
4.1 Statement of Reasons Appendix B Status of Negotiations with Owners of the Order Land CONFIDENTIAL
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 2 Overview of the Sizewell C Project Appendix 2A - Sizewell B Relocated Facilities Environmental Statement Part 1 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 6 EIA Methodology Appendices 6D - 6Y
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.2 Volume 1 Introduction to the Environmental Statement Chapter 5 Other Permits, Licences and Consents
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.2 Volume 1 Introduction to the Environmental Statement Chapter 2 Overview of the Sizewell C Project
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 1 Introduction Figure 1.1
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
1.1 Cover letter
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
4.1 Statement of Reasons
Other
NNB Generation Company (SZC) Limited (PDF, 729 KB)
4.1 Statement of Reasons Appendices A - B
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.2 Volume 1 Introduction to the Environmental Statement Chapter 3 Legislation and Policy Context
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 11 Geology and Land Quality
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 6 Landscape and Visual
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22D - Sizewell Characterisation Report - Fish
Other
NNB Generation Company (SZC) Limited (PDF, 21 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 61 - 70
Other
NNB Generation Company (SZC) Limited (PDF, 22 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 41 - 50
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
5.2 Main Development Site Flood Risk Assessment Figures 11- 20
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A8 Bats Annex 14A8.1: Figures 14A8.1 - 14A8.20
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
5.1 Consultation Report Appendix E.4 Part 2 of 2 Part E: Stage Three Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
5.2 Main Development Site Flood Risk Assessment Figures 01- 10
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
5.2 Main Development Site Flood Risk Assessment Figures 21- 30
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A7 Ornithology Annex 14A7.1: Figures 14A7.1 - 14A7.13
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 7 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 43 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix 18A Phase 2 Geo-environmental Interpretative Report Part 8 of 11
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
5.1 Consultation Report Appendices E.5 - E.7 Part E: Stage Three Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
5.1 Consultation Report Appendices E.8 - E.10 Part E: Stage Three Pre-Application Consultation
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
5.2 Main Development Site Flood Risk Assessment Figures 41- 50
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
5.10 Shadow Habitats Regulations Assessment Volume 1: Screening and Appropriate Assessment Part 1 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 23 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19A Groundwater and Surface Water: Numerical Modelling Report Part 6 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11G Predicted Road Traffic Noise on Existing Roads
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4B Northern Park and Ride Planning Statement
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4C Southern Park and Ride Planning Statement
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
8.4 Planning Statement Appendix 8.4J Section 106 Heads of Terms
Other
NNB Generation Company (SZC) Limited (PDF, 37 MB)
8.1 Main Development Site Design and Access Statement Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4F Sizewell Link Road Planning Statement
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4G Yoxford Roundabout and Other Highway Improvements Planning Statement
Other
NNB Generation Company (SZC) Limited (PDF, 1 MB)
8.7 Construction Traffic Management Plan (CTMP)
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
8.10 Accommodation Strategy Figures 2.1 - 5.1
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.11 Code of Construction Practice (CoCP)
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
8.3 Associated Development Design Principles
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
8.4 Planning Statement Appendix 8.4A Site Selection Report
Other
NNB Generation Company (SZC) Limited (PDF, 39 MB)
8.5 Transport Assessment Figures 1.1-12.1
Other
NNB Generation Company (SZC) Limited (PDF, 49 MB)
8.5 Transport Assessment Appendices 8A - 9A
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 3 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 44 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 2 Figures 2.1 to 2.32 - Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4H Rail Planning Statement
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4I Implementation Plan
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.10 Accommodation Strategy
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
8.12 Mitigation Route Map
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.4 Planning Statement Appendix 8.4K Site Water Supply Strategy
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.13 Sustainability Statement Appendix A Sustainability Performance of Associated Development
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 1 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 59 KB)
6.6 Volume 5 Two Village Bypass Chapter 7 Terrestrial Ecology and Ornithology Annex 7A.5A Draft Badger LicenceMethod Statement CONFIDENTIAL
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.9 Economic Statement
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.9 Economic Statement Appendices A-B
Other
NNB Generation Company (SZC) Limited (PDF, 39 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 2 Figures 2.1 to 2.32 - Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 60 KB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Annex 14C.3A - Badger Mitigation Strategy CONFIDENTIAL
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.14 Water Framework Directive Compliance Assessment Report Appendices 3B-3H
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.15 Combined Heat and Power Feasibility Study
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 1 Appendix 1A
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
8.16 Community Safety Management Plan (CSMP) Appendix 1.A.1 HPC Worker Code of Conduct
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22J - Modelling of Sediment Dispersion of Dredge Material for SZC Construction and Operation
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
6.3 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22L - Underwater Noise Effects Assessment for Sizewell C: Edition 2
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 1 Introduction and Methodology Appendices 1A - 1B
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.11 Volume 10 Project-Wide, Cumulative and Transboundary Effects Chapter 2 Inter-relationship Effects Appendix 2A Interrelationship effects on human and other receptors
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
8.4 Planning Statement
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
8.9 Economic Statement Figures 5.1 - 5.4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.16 Community Safety Management Plan (CSMP)
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 3 Figures 3.1 to 3.22 - Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 48 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 3 Figures 3.1 to 3.22 - Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 1 Introduction and Methodology
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
8.14 Water Framework Directive Compliance Assessment Report Appendices 2A-2C
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
8.14 Water Framework Directive Compliance Assessment Report Appendix 3A Extended Water Body Summary Reports
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.13 Sustainability Statement
Other
NNB Generation Company (SZC) Limited (PDF, 219 KB)
8.14 Water Framework Directive Executive Summary
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 3 Assessment of Project-wide Effects
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 1 Appendix 1B
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 2 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 4 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 45 MB)
8.14 Water Framework Directive Compliance Assessment Report Part 2 Figures 2.1 to 2.32 - Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
6.3 Volume 2 Main Development Site Chapter 12 Air Quality Appendices 12A - 12F Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 13 Landscape and Visual
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A1 - General Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
2.5 Main Development Site Main Platform Proposed General Arrangement (Operational) Plans For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
2.11 Freight Management Facility Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11A Noise and Vibration Baseline Report
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11C Operational Phase: Sound Level Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.3 Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11E Sound Level Assessment of the Proposed Sports Facilities
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 2 Inter-relationship effects
Other
NNB Generation Company (SZC) Limited (PDF, 32 KB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 1 Introduction Appendix 1B Statement of Competence - CONFIDENTIAL
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
8.6 Traffic Incident Management Plan (TIMP)
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 6 EIA Methodology Appendix 6C - Responses to EIA Scoping Opinion Comments
Other
NNB Generation Company (SZC) Limited (PDF, 29 MB)
8.1 Main Development Site Design and Access Statement Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 63 KB)
6.3 Volume 2 Main Development Site Chapter 18 Geology and Land Quality Appendix F of Appendix 18A - Ground Investigation on Sizewell C Construction Site Area and Associated Development Part 1 of 2 - Confidential Document submitted by the Applicant – please refer to the Applicant’s letters dated 16 November 2020 [AS-006] and 8 January 2021 [AS-049] and the ExA’s Procedural Decision dated 22 January 2021 [PD-010]
Other
NNB Generation Company (SZC) Limited (PDF, 49 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 6 EIA Methodology Appendix 6A - EIA Scoping Report
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
7.2 Regulation 6 Additional Information
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
1.1 Appendix 1.1D Glossary
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A4 - Invertebrates Annex 14A4.1: Figures 14A4.1 - 14A4.3
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
4.2 Funding Statement
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
6.1 Volume 1 Introduction to the Environmental Statement Chapter 2 Overview of the Sizewell C Project Appendix 2A - Sizewell B Relocated Facilities Environmental Statement Part 3 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 7 Terrestrial Ecology and Ornithology
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 8 Amenity and Recreation
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
6.7 Volume 6 Sizewell Link Road Chapter 8 Amenity and Recreation Figures 8.1 - 8.2
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
6.7 Volume 6 Sizewell Link Road Chapter 6 Landscape and Visual Appendices 6A - 6B
Other
NNB Generation Company (SZC) Limited (PDF, 45 MB)
6.3 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19B: Sizewell C Conceptual Site Model of the Hydrogeological Regime Part 3 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A7 Ornithology Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
5.2 Main Development Site Flood Risk Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 24 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 1 - 9
Other
NNB Generation Company (SZC) Limited (PDF, 21 MB)
5.5 Two Village Bypass Flood Risk Assessment Figures 21 - 30
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A7 Ornithology Annex 14A7.1: Figures 14A7.14 - 14A7.25
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A8 Bats Part 3 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
6.3 Volume 2 Main Development Site Chapter 14 Terrestrial Ecology and Ornithology Appendix 14A8 Bats Part 2 of 5
Other
NNB Generation Company (SZC) Limited (PDF, 49 MB)
6.7 Volume 6 Sizewell Link Road Chapter 9 Terrestrial Historic Environment Appendices 9A-9D
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.7 Volume 6 Sizewell Link Road Chapter 10 Soils and Agriculture Figures 10.1 - 10.5
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 5 Air Quality
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.6 Volume 5 Two Village Bypass Chapter 10 Soils and Agriculture Figures 10.1 - 10.5
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 11 Geology and Land Quality
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.6 Volume 5 Two Village Bypass Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statements
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highways Improvements Chapter 10 Soils and Agriculture
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.6 Volume 5 Two Village Bypass Chapter 8 Amenity and Recreation
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.6 Volume 5 Two Village Bypass Chapter 8 Amenity and Recreation Figures 8.1 - 8.2
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.7 Volume 6 Sizewell Link Road Chapter 9 Terrestrial Historic Environment Figures 9.1A - 9.4B
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highways Improvements Chapter 10 Soils and Agriculture Appendix 10A Agricultural Land Classification Report
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
6.7 Volume 6 Sizewell Link Road Chapter 6 Landscape and Visual Figures 6.14 - 6.19
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.7 Volume 6 Sizewell Link Road Chapter 8 Amenity and Recreation Appendix 8A Tranquillity Assessment using the Natural Tranquillity Method
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 5 Air Quality
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.6 Volume 5 Two Village Bypass Chapter 5 Air Quality Appendix 5A Dust Risk Assessment for Two Village Bypass
Other
NNB Generation Company (SZC) Limited (PDF, 26 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 11 Geology and Land Quality Appendices 11A - 11C
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
6.6 Volume 5 Two Village Bypass Chapter 9 Terrestrial Historic Environment Appendices 9A - 9D
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.6 Volume 5 Two Village Bypass Chapter 8 Amenity and Recreation Appendix 8A Tranquillity Assessment using the Natural Tranquillity Method
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 9 Terrestrial Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.6 Volume 5 Two Village Bypass Chapter 9 Terrestrial Historic Environment Figures 9.1 - 9.4
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 12 Groundwater and Surface Water Figure 12.1
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
4.3 Book of Reference
Other
NNB Generation Company (SZC) Limited (PDF, 26 MB)
6.7 Volume 6 Sizewell Link Road Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statements
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 2 Description of Yoxford Roundabout and Other Highway Improvements Appendices 2A - 2B
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 4 Noise and Vibration
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 4 Noise and Vibration Appendices 4A - 4B
Other
NNB Generation Company (SZC) Limited (PDF, 43 MB)
6.7 Volume 6 Sizewell Link Road Chapter 6 Landscape and Visual Figures 6.1 - 6.13
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.6 Volume 5 Two Village Bypass Chapter 2 Description of Two Village Bypass
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
6.6 Volume 5 Two Village Bypass Chapter 2 Description of Two Village Bypass Appendix 2A Proposed Development Drawings
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 12 Groundwater and Surface Water
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.9 Volume 8 Freight Management Facility Chapter 8 Amenity and Recreation Figure 8.1
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.9 Volume 8 Freight Management Facility Chapter 9 Terrestrial Historic Environment Figures 9.1 - 9.3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 11 Geology and Land Quality
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.4 Volume 3 Northern Park and Ride Chapter 5 Air Quality
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.4 Volume 3 Northern Park and Ride Chapter 10 Soils and Agriculture
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.4 Volume 3 Northern Park and Ride Chapter 10 Soils and Agriculture Appendix 10A Agricultural Land Classification
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 6 Landscape and Visual
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.4 Volume 3 Northern Park and Ride Chapter 6 Landscape and Visual Appendices 6A - 6B
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.5 Volume 4 Southern Park and Ride Chapter 10 Soils and Agriculture
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 10 Soils and Agriculture Appendix 10A Agricultural Land Classification
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 10 Soils and Agriculture Appendix 10A Agricultural Land Classification
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
6.9 Volume 8 Freight Management Facility Chapter 11 Geology and Land Quality Appendices 11A - 11C
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.10 Volume 9 Rail Chapter 10 Soils and Agriculture
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.10 Volume 9 Rail Chapter 10 Soils and Agriculture Appendix 10A Green Rail Route: Agricultural Land Classification
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.4 Volume 3 Northern Park and Ride Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.4 Volume 3 Northern Park and Ride Chapter 2 Description of the Northern Park and Ride
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.4 Volume 3 Northern Park and Ride Chapter 12 Groundwater and Surface Water Figure 12.1
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.5 Volume 4 Southern Park and Ride Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
6.10 Volume 9 Rail Chapter 10 Soils and Agriculture Figures 10.1 - 10.5
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.9 Volume 8 Freight Management Facility Chapter 12 Groundwater and Surface Water Figure 12.1
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.10 Volume 9 Rail Chapter 1 Introduction Figures 1.1 - 1.3
Other
NNB Generation Company (SZC) Limited (PDF, 33 MB)
6.10 Volume 9 Rail Chapter 11 Geology and Land Quality Appendices 11A - 11C Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 7 Terrestrial Ecology and Ornithology
Other
NNB Generation Company (SZC) Limited (PDF, 26 MB)
6.4 Volume 3 Northern Park and Ride Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statements
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.5 Volume 4 Southern Park and Ride Chapter 6 Landscape and Visual Appendices 6A - 6B
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
6.5 Volume 4 Southern Park and Ride Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statement Annex 7A.1: Figures 7.1 - 7.13
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.9 Volume 8 Freight Management Facility Chapter 10 Soils and Agriculture
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.4 Volume 3 Northern Park and Ride Chapter 8 Amenity and Recreation Figure 8.1
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.4 Volume 3 Northern Park and Ride Chapter 9 Terrestrial Historic Environment Figures 9.1 - 9.3
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.4 Volume 3 Northern Park and Ride Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statement Annex 7A.1: Figures 7.1 - 7.9
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 5 Air Quality
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.5 Volume 4 Southern Park and Ride Chapter 5 Air Quality Appendix 5A Dust Risk Assessment for Southern Park and Ride
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 9 Terrestrial Historic Environment Figures 9.1 - 9.4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 4 Noise and Vibration Figure 4.1
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.4 Volume 3 Northern Park and Ride Chapter 5 Air Quality Appendix 5A Dust Risk Assessment for Northern Park and Ride
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
6.4 Volume 3 Northern Park and Ride Chapter 6 Landscape and Visual Figures 6.1 - 6.14
Other
NNB Generation Company (SZC) Limited (PDF, 22 MB)
6.4 Volume 3 Northern Park and Ride Chapter 11 Geology and Land Quality Appendices 11A - 11C
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
6.5 Volume 4 Southern Park and Ride Chapter 6 Landscape and Visual Figures 6.1 - 6.12
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 10 Soils and Agriculture
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 10 Soils and Agriculture Appendix 10A Agricultural Land Classification Report
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 9 Terrestrial Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
6.4 Volume 3 Northern Park and Ride Chapter 9 Terrestrial Historic Environment Appendices 9A - 9D
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 8 Amenity and Recreation
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.5 Volume 4 Southern Park and Ride Chapter 1 Introduction Figures 1.1 - 1.2
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 2 Description of the Southern Park and Ride
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.5 Volume 4 Southern Park and Ride Chapter 8 Amenity and Recreation
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 11 Geology and Land Quality
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 12 Groundwater and Surface Water
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 3 Alternatives and Design Evolution
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.5 Volume 4 Southern Park and Ride Chapter 4 Noise and Vibration Figures 4.1 - 4.7
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
6.4 Volume 3 Northern Park and Ride Chapter 10 Soils and Agriculture Figures 10.1 - 10.5
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.5 Volume 4 Southern Park and Ride Chapter 2 Description of the Southern Park and Ride Figures 2.1 - 2.6
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.5 Volume 4 Southern Park and Ride Chapter 2 Description of the Southern Park and Ride Appendix 2A Proposed Development Drawings
Other
NNB Generation Company (SZC) Limited (PDF, 29 MB)
6.5 Volume 4 Southern Park and Ride Chapter 9 Terrestrial Historic Environment Appendices 9A - 9D
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 9 Terrestrial Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 6 Landscape and Visual
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statement
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 8 Amenity and Recreation Figure 8.1
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.9 Volume 8 Freight Management Facility Chapter 2 Description of the Freight Management Facility Figures 2.1 - 2.6
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 3 Alternatives and Design Evolution
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
6.5 Volume 4 Southern Park and Ride Chapter 10 Soils and Agriculture Figures 10.1 - 10.4
Other
NNB Generation Company (SZC) Limited (PDF, 25 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 6 Landscape and Visual Figures 6.9 - 6.12
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 7 Terrestrial Ecology and Ornithology
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 1 Introduction Figures 1.1 - 1.2
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.6 Volume 5 Two Village Bypass Chapter 3 Alternatives and Design Evolution
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.6 Volume 5 Two Village Bypass Chapter 4 Noise and Vibration Figures 4.1 - 4.2
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.7 Volume 6 Sizewell Link Road Chapter 2 Description of Sizewell Link Road
Other
NNB Generation Company (SZC) Limited (PDF, 46 MB)
6.7 Volume 6 Sizewell Link Road Chapter 2 Description of the Sizewell Link Road Appendix 2A Proposed Development Drawings Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
6.6 Volume 5 Two Village Bypass Chapter 6 Landscape and Visual Figures 6.1 - 6.12
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.6 Volume 5 Two Village Bypass Chapter 6 Landscape and Visual Appendices 6A - 6B
Other
NNB Generation Company (SZC) Limited (PDF, 46 MB)
6.7 Volume 6 Sizewell Link Road Chapter 2 Description of the Sizewell Link Road Appendix 2A Proposed Development Drawings Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.7 Volume 6 Sizewell Link Road Chapter 3 Alternatives and Design Evolution
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
6.6 Volume 5 Two Village Bypass Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statement Annex 7A.1: Figures 7.1 - 7.15
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
6.6 Volume 5 Two Village Bypass Chapter 11 Geology and Land Quality Appendices 11A - 11C Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 4 Noise and Vibration
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.7 Volume 6 Sizewell Link Road Chapter 4 Noise and Vibration Figures 4.1 - 4.2
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
6.6 Volume 5 Two Village Bypass Chapter 2 Description of Two Village Bypass Figures 2.1 - 2.6
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.6 Volume 5 Two Village Bypass Chapter 12 Groundwater and Surface Water
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.6 Volume 5 Two Village Bypass Chapter 12 Groundwater and Surface Water Appendix 12A Two Village Bypass River Corridor Survey
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.7 Volume 6 Sizewell Link Road Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 6 Landscape and Visual
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 4 Noise and Vibration Appendices 4A - 4B
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
6.6 Volume 5 Two Village Bypass Chapter 5 Air Quality Figure 5.1
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.6 Volume 5 Two Village Bypass Chapter 12 Groundwater and Surface Water Figure 12.1
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.7 Volume 6 Sizewell Link Road Chapter 1 Introduction Figures 1.1 - 1.4
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
6.7 Volume 6 Sizewell Link Road Chapter 2 Description of the Sizewell link road Figures 2.1 - 2.11
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 10 Soils and Agriculture
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
6.7 Volume 6 Sizewell Link Road Chapter 11 Geology and Land Quality Appendices 11A - 11C Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 4 Noise and Vibration Appendices 4A - 4B
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 5 Air Quality
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 10 Soils and Agriculture Appendix 10A Sizewell link road Agricultural Land Classification Report
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 5 Air Quality Appendix 5A Dust Risk Assessment for Yoxford Roundabout
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 5 Air Quality Figure 5.1
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 5 Air Quality Appendix 5A Dust Risk Assessment for Sizewell Link Road
Other
NNB Generation Company (SZC) Limited (PDF, 27 MB)
6.6 Volume 5 Two Village Bypass Chapter 11 Geology and Land Quality Appendices 11A - 11C Part 2 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 4 Noise and Vibration Figures 4.1 - 4.2
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 1 Introduction Figures 1.1 - 1.13
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 2 Description of Yoxford Roundabout and Other Highway Improvements Figures 2.1 - 2.7
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 3 Alternatives and Design Evolution
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 2 Description of Yoxford Roundabout and Other Highway Improvements
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
6.7 Volume 6 Sizewell Link Road Chapter 12 Groundwater and Surface Water Figure 12.1
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 12 Groundwater and Surface Water
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 11 Geology and Land Quality
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 4 Noise and Vibration
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 10 Soils and Agriculture Figures 10.1 - 10.5
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 11 Geology and Land Quality
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.10 Volume 9 Rail Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.10 Volume 9 Rail Chapter 1 Introduction Appendix 1A Sizewell Branch Track Condition Report
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
6.9 Volume 8 Freight Management Facility Chapter 9 Terrestrial Historic Environment Appendices 9A - 9C
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
6.9 Volume 8 Freight Management Facility Chapter 10 Soils and Agriculture Figures 10.1 - 10.5
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 5 Air Quality Figure 5.1
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 6 Landscape and Visual
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 4 Noise and Vibration
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 4 Noise and Vibration Appendix 4A Construction and Operational Noise Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.5 Volume 4 Southern Park and Ride Chapter 11 Geology and Land Quality
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
6.5 Volume 4 Southern Park and Ride Chapter 11 Geology and Land Quality Appendices 11A - 11C
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.9 Volume 8 Freight Management Facility Chapter 12 Groundwater and Surface Water
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.4 Volume 3 Northern Park and Ride Chapter 5 Air Quality Figure 5.1
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
6.5 Volume 4 Southern Park and Ride Chapter 8 Amenity and Recreation Figure 8.1
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
6.5 Volume 4 Southern Park and Ride Chapter 9 Terrestrial Historic Environment Figures 9.1 - 9.3
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
6.11 Volume 10 Project-wide, Cumulative and Transboundary Effects Chapter 4 Assessment of Cumulative Effects with Other Plans, Projects and Programmes Appendices 4A - 4C
Other
NNB Generation Company (SZC) Limited (PDF, 45 MB)
6.7 Volume 6 Sizewell Link Road Chapter 7 Terrestrial Ecology and Ornithology Appendix 7A Ecological Baseline and Method Statements Annex 7A.1: Figures 7.1 - 7.18
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 12 Groundwater and Surface Water
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
6.8 Volume 7 Yoxford Roundabout and Other Highway Improvements Chapter 1 Introduction
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.7 Volume 6 Sizewell Link Road Chapter 9 Terrestrial Historic Environment
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 6 Landscape and Visual
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
6.6 Volume 5 Two Village Bypass Chapter 6 Landscape and Visual Figures 6.13 - 6.16
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
6.7 Volume 6 Sizewell Link Road Chapter 11 Geology and Land Quality Appendices 11A - 11C Part 1 of 2
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
6.6 Volume 5 Two Village Bypass Chapter 7 Terrestrial Ecology and Ornithology