You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (26)
Developer's Application (636)
- All Documents
- Additional Information (Reg 6) (2)
- Application Form (7)
- Compulsory Acquisition Information (6)
- Draft Development Consent Order (3)
- Environmental Statement (424)
- Other Documents (52)
- Plans (51)
- Reports (91)
Acceptance (9)
Pre Examination (498)
- All Documents
- Additional Submissions (320)
- Appointment of Examining Authority (1)
- Certificates and Notices (5)
- Examination Library (1)
- Hearing Agenda (2)
- Procedural Deadline A (34)
- Procedural Deadline B (100)
- Procedural Decisions (8)
- + Recording of preliminary meeting (24)
- Relevant Representations Examination Library (1)
- Unaccompanied Site Inspection (2)
Examination (2996)
- All Documents
- Accompanied Site Inspection Itinerary (2)
- Additional Submissions (96)
- Certificates and Notices (1)
- Compulsory Acquisition Hearing 1 (CAH 1) Part 1 (8)
- Compulsory Acquisition Hearing 1 (CAH 1) Part 2 (6)
- + Deadline 1 (D1) (193)
- + Deadline 10 (D10) (632)
- + Deadline 2 (D2) (558)
- + Deadline 3 (D3) (154)
- + Deadline 4 (D4) (7)
- + Deadline 5 (D5) (313)
- + Deadline 6 (D6) (85)
- + Deadline 7 (D7) (294)
- + Deadline 8 (349)
- + Deadline 9 (D9) (49)
- Hearing Agenda (17)
- Hearing Notice (1)
- Issue Specific Hearing 1 (ISH1) (10)
- + Issue Specific Hearing 10 (ISH10) (15)
- Issue Specific Hearing 11 (ISH11) (9)
- Issue Specific Hearing 12 (ISH12) (8)
- Issue Specific Hearing 13 (ISH13) (7)
- Issue Specific Hearing 14 (ISH14) (9)
- Issue Specific Hearing 15 (ISH15) (10)
- Issue Specific Hearing 2 (ISH2) (8)
- Issue Specific Hearing 3 (ISH3) (8)
- Issue Specific Hearing 4 (ISH4) (8)
- Issue Specific Hearing 5 (ISH5) (10)
- Issue Specific Hearing 6 (ISH6) (9)
- Issue Specific Hearing 7 (ISH7) (14)
- Issue Specific Hearing 8 (ISH 8) (8)
- Issue Specific Hearing 9 (ISH9) (8)
- Open Floor Hearing 1 (OFH1) (4)
- Open Floor Hearing 10 (OFH 10) (1)
- Open Floor Hearing 10 (OFH10) (4)
- Open Floor Hearing 2 (OFH2) (4)
- Open Floor Hearing 3 (OFH 3) (4)
- Open Floor Hearing 4 (OFH 4) (4)
- Open Floor Hearing 5 (OFH 5) (4)
- Open Floor Hearing 6 (OFH 6) (4)
- Open Floor Hearing 7 (OFH 7) (4)
- Open Floor Hearing 8 (OFH 8) (4)
- Open Floor Hearing 9 (OFH 9) (4)
- Preliminary meeting note (1)
- Procedural Decisions (45)
- Report on the Implications for European Sites (RIES) (1)
- Unaccompanied Site Inspection (2)
Decision (210)
- All Documents
- Development Consent Order as Made by the Secretary of State (1)
- Habitats Regulations Assessment (1)
- Notification of Decision Letter (1)
- Other Documents (6)
- Post Examination Submissions (1)
- Post Recommendation Submissions (1)
- Recommendation Report (9)
- Regulation 31 Notice (1)
- + Secretary of State Consultation (188)
- Secretary of State Decision Letter (approved) (1)
Decided (1)
- EN010012 - Regulation 32 Transboundary Screening
- EN010012 Regulation 32 - Consultation response from Germany
- EN010012 Regulation 32 - Consultation response from Denmark
- EN010012 Regulation 32 - Consultation response from Norway
- EN010012 Regulation 32 - Consultation response from Poland
- EN010012 Regulation 32 - Consultation response from the Netherlands
- EN010012 Regulation 32 - Consultation response from Ireland
- EN010012 Regulation 32 - Consultation response from Austria
- EN010012 Regulation 32 - Consultation response from Estonia
- EN010012 Regulation 32 - Consultation response from Sweden
- EN010012 – Regulation 32 - Notification response from Russian Federation
- EN010012- Regulation 32 - Notification response from Czech Republic
- EN010012- Regulation 32 - Notification response from Austria
- EN010012- Regulation 32 - Notification response from Estonia
- EN010012- Regulation 32 - Notification response from Ireland
- EN010012- Regulation 32 - Notification response from Germany
- EN010012- Regulation 32 - Notification response from Canada
- EN010012- Regulation 32 - Notification response from Denmark
- EN010012- Regulation 32 - Notification response from Belgium
- EN010012- Regulation 32 - Notification response from Poland
- EN010012- Regulation 32 - Notification response from Iceland
- EN010012- Regulation 32 - Notification response from Norway
- EN010012- Regulation 32 - Notification response from Romania
- EN010012- Regulation 32 - Notification response from The Netherlands
- EN010012- Regulation 32 - Notification response from Italy
- EN010012- Regulation 32 - Notification response from Greece
- EN010012 The London Gazette Notice
Source | Description |
---|---|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 8 Submission - 3.1 Ninth Draft DCO Addendum
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 8 Submission - 5.1 Consultation Report Fifth Addendum - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 8 Submission - 2.10(B) Sizewell Link Road Plans for Approval 1 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 40 MB)
Deadline 8 Submission - 2.10(B) Sizewell Link Road Plans Not for Approval 1 of 2
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.10(E) Statement of Commonality of Statements of Common Ground
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site Chapter 3 Description of Construction Appendix 3D of the Environmental Statement: Construction Method Statement - Clean Version - Revision 5.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 6.14 Environmental Statement Addendum, Volume 3 Environmental Statement Addendum Appendices, Chapter 2 Main Development Site, Appendix 2.14.A: Water Monitoring and Response Strategy - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2B of the Environmental Statement: Lighting Management Plan - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.90 Draft Sabellaria Reef Management and Monitoring Plan - Tracked Changes Version - Version 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 8 Submission - 9.98 Response to the ExA's Second Commentary on the draft DCO - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 8 Submission - 2.10(B) Sizewell Link Road Plans for Approval 3 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Tracked Changes Version - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site, Chapter 16 Terrestrial Historic Environment Appendix 16G of the Environment Statement: Peat Strategy - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 8.3(C) Associated Development Design Principles - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 8 Submission - 2.3(E) Work Plans Part 1 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.109 SZC Co. Response to Request for Further Information at Deadline 8 - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 13 MB)
Deadline 8 Submission - 8.3 A(B) Two Village Bypass Landscape and Ecology Management Plan Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 13 MB)
Deadline 8 Submission - 2.5(A) Main Development Site Cooling Water Pumphouse and Associated Buildings Unit 2 Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 16 MB)
Deadline 8 Submission - 2.5(A) Main Development Site Conventional Island (Unit 1) Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 8 Submission - 9.35(A) Westleton Marsh Harrier Compensatory Habitat Strategy Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 4.1A(B) Statement of Reasons Appendix A Justification Tables
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.99 Comments on Earlier Deadlines and Subsequent Written Submissions to CAH1 and ISH8-ISH10
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.64 Draft Fen Meadow Plan - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 15 MB)
Deadline 8 Submission - 2.12(B) Green Rail Route Plans Not for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 8 Submission - Environmental Statement Addendum Volume 3 Environmental Statement Addendum Appendices Chapter 2 Main Development Site Appendix 2.15.A: Coastal Processes Monitoring and Mitigation Plan - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 13 MB)
Deadline 8 Submission - 2.12(B) Green Rail Route Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 8 Submission - 2.13 NDA Magnox Protective Provisions Access Road Plan
|
Other |
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 8 Submission - 2.3(F) Work Plans Part 2 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 8 Submission - 2.5 Main Development Site Main Platform Proposed General Arrangement Plans (Operational) Plans Not for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 8 Submission - 3.1(I) Draft DCO Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 8 Submission - 6.19 Fifth Environmental Statement Addendum - Volume 2: Figures - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.105 Written Submissions responding to actions arising from Issue Specific Hearing 12: Community (15 September 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 8 Submission - 2.5(D) Main Development Site Highway Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 8 Submission - 2.5(D) MDS Permanent Development Site Proposed Landscape Masterplan - Plans Not for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 8 Submission - 9.88 Estate Wide Management Plan for the EDF Energy Estate - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 22 MB)
Deadline 8 Submission - 2.3(E) Work Plans Part 3 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 8 Submission - 2.5 Main Development Site Highways Plans Not for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 19 MB)
Deadline 8 Submission - 2.5(A) Main Development Site Nuclear Island Unit 2 Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.102 Written Summaries of Oral Submissions made at Issue Specific Hearing 13: Landscape, Visual Impact, Design and Terrestrial Heritage (16 September 2021) - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 8 Submission - 6.14 Environmental Statement Addendum, Volume 3 Environmental Statement Addendum Appendices Chapter 9 Rail Appendix 9.3.E: Draft Rail Noise Mitigation Plan - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 8 Submission - 8.2(B) Outline Landscape and Ecology Management Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.10.23 Statement of Common Ground - Together Against Sizewell C - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.89 Draft Fish Impingement and Entrainment Monitoring Plan - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 3.2(H) Draft DCO Explanatory Memorandum Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.14 Updated National Policy Statement Tracker - Tracked Changes Version - Revision 5.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.107 Written Submissions responding to actions arising from Issue Specific Hearing 14: DCO, DoO and allied documents (17 September 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 8 Submission - 2.5(A) Main Development Site Main Platform General Arrangement (Operational) Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 29 MB)
Deadline 8 Submission - 2.10(B) Sizewell Link Road Plans for Approval 2 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 8 Submission - 2.5(C) Main Development Site Beach Landing Facility and SSSI Crossing Plans Part 2 of 2
|
Other |
NNB Generation Company (SZC) Limited (PDF, 16 MB)
Deadline 8 Submission - 2.5(C) Main Development Site Operational Parameter Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 13 MB)
Deadline 8 Submission - 6.14 Environmental Statement Addendum, Volume 3 Environmental Statement Addendum Appendices Chapter 9 Rail Appendix 9.3.E: Draft Rail Noise Mitigation Plan - Clean Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 4.1 C Updated Statement of Reasons Appendix C - Status of Negotiations with Statutory Undertakers - Revision 7.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.106 Written Submissions responding to actions arising from Issue Specific Hearing 13: Landscape, Visual Impact, Design and Terrestrial Heritage (16 September 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 18 MB)
Deadline 8 Submission - 2.12(A) - Saxmundham to Leiston Branch Line Upgrades Existing Plans Not for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 8 Submission - 6.13 Additional Ecology Survey Report (September 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 6.14 Environmental Statement Addendum Volume 3 Environmental Statement Addendum Appendices Chapter 2 Main Development Site Appendix 2.11.A: Overarching Archaeological Written Scheme of Investigation - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 8 Submission - 2.1(C) Land Plans
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 3.2(H) Draft DCO Explanatory Memorandum Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site, Chapter 3 Description of Construction, Appendix 3D of the Environmental Statement: Construction Method Statement - Tracked Changes Version - Revision 5.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 8 Submission - 6.14 Environmental Statement Addendum Volume 3 Environmental Statement Addendum Appendices Chapter 2 Main Development Site Appendix 2.9.D: Fen Meadow Strategy - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 37 MB)
Deadline 8 Submission - 9.99 Comments on Earlier Deadlines and Subsequent Written Submissions to CAH1 and ISH8-ISH10 - Appendices Part 1 of 2 - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.110 Sizewell C European Sea Bass Stock Assessment - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.35(A) Westleton Marsh Harrier Compensatory Habitat Strategy Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 32 MB)
Deadline 8 Submission - 2.4(F) Rights of Way and Access Plans
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 8 Submission - 8.3 B(B) Sizewell Link Road Landscape and Ecology Management Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 4.1B Statement of Reasons Appendix B - Status of Negotiations with Owners of the Order Land - Revision 8.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.104 Written Submissions responding to actions arising from Issue Specific Hearing 11: Flooding, Water and Coastal Processes (14 September 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 8 Submission - 4.6 Updated Book of Reference and Schedule of Changes to the Book of Reference (BoR) - Revision 6.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.90 Draft Sabellaria Reef Management and Monitoring Plan - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 8 Submission - 8.11(E) Code of Construction Practice Appendices Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 21 MB)
Deadline 8 Submission - 2.5(A) Main Development Site Nuclear Island Unit 1 Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 25 MB)
Deadline 8 Submission - 8.3 B(B) Sizewell Link Road Landscape and Ecology Management Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 8 Submission - 2.5(D) Main Development Site Landscape Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.88 Estate Wide Management Plan for the EDF Energy Estate - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 8 Submission - 2.5(C) Main Development Site Beach Landing Facility and SSSI Crossing Plans Part 1 of 2
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 5.11(B) Schedule of Other Consents, Licences and Agreements Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 29 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2B of the Environmental Statement: Lighting Management Plan - Clean Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 8 Submission -6.14 Environmental Statement Addendum Volume 3 Environmental Statement Addendum Appendices Chapter 2 Main Development Site Appendix 2.11.A: Overarching Archaeological Written Scheme of Investigation - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 8 Submission - 8.2(B) Outline Landscape and Ecology Management Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.14 Updated National Policy Statement Tracker - Tracked Changes Version - Revision 5.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 3.1(I) Draft DCO Tracked Changes Version- Revision 10 against Revision 9
|
Other |
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site Chapter 15 Amenity and Recreation Appendix 15I of the Environmental Statement: Rights of Way and Access Strategy - Clean Version -Revision 5.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 6.19 Fifth Environmental Statement Addendum - Volume 1: Main Text - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.101 Written Summaries of Oral Submissions made at Issue Specific Hearing 12: Community (15 September 2021)- Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 39 MB)
Deadline 8 Submission - 4.7 Land Plans showing Proposed Changes
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 8 Submission - 9.13 Sizewell C Coastal Defences Design Report
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.8 Wet Woodland Strategy - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 8 Submission - 8.12 Updated Mitigation Route Map incorporating the amendments shown in the Mitigation Route Map Third Addendum Revision 1 - Revision 6.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 8 Submission - 9.4 Terrestrial Ecology Monitoring and Mitigation Plan - Clean Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 399 KB)
Deadline 8 Submission - Deadline 8 Cover Letter
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site Chapter 15 Amenity and Recreation Appendix 15I of the Environmental Statement: Rights of Way and Access Strategy - Tracked Changes Version - Revision 5.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 8 Submission - 2.5(C) Main Development Site Rail Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 8 Submission - 2.5(A) Main Development Site Cooling Water Pumphouse and Associated Buildings Unit 1 Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 1.3 Updated Navigation Document - Revision 16.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 8 Submission - 8.17 Draft Deed of Obligation - Clean Version Part 2 of 2
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 8 Submission - 9.87 Draft Water Monitoring and Water Management Plan - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 16 MB)
Deadline 8 Submission - 2.5(A) Main Development Site Conventional Island (Unit 2) Plans for Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 28 MB)
Deadline 8 Submission - 9.64 Draft Fen Meadow Plan - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 8 Submission - 9.108 Draft Wet Woodland Plan
|
Other |
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 8 Submission - 8.11(E) Code of Construction Practice Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.10.25 Statement of Common Ground - National Trust - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 8 Submission - 9.11 Informal Recreation and Green Space Proposals - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 6.14 Environmental Statement Addendum Volume 3 Environmental Statement Addendum Appendices Chapter 2 Main Development Site Appendix 2.15.A: Coastal Processes Monitoring and Mitigation Plan - Clean Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 22 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Clean Version - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site, Chapter 22 Marine Ecology and Fisheries Appendix 22N of the Environmental Statement: Marine Mammal Mitigation Protocol - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 41 MB)
Deadline 8 Submission - 4.3 Updated Book of Reference and Schedule of Changes to the Book of Reference (BoR) - Revision 7.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 16 MB)
Deadline 8 Submission - 8.11(E) Code of Construction Practice Appendices Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 30 MB)
Deadline 8 Submission - 8.17 Draft Deed of Obligation - Clean Version - Part 1 of 2
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 8 Submission - 9.10.11 Statement of Common Ground - Royal Mail - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 29 MB)
Deadline 8 Submission - 2.10(B) Sizewell Link Road Plans Not for Approval 2 of 2
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site, Chapter 22 Marine Ecology and Fisheries Appendix 22N of the Environmental Statement: Marine Mammal Mitigation Protocol - Clean Version - Version 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.100 Written Summaries of Oral Submissions made at Issue Specific Hearing 11: Flooding, Water and Coastal Processes (14 September 2021) - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 8 Submission - 9.65 Outline Vessel Management Plan - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.89 Draft Fish Impingement and Entrainment Monitoring Plan - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 5.10 Shadow Habitats Regulations Assessment Addendum - Appendix 9A(B) Southern North Sea Site Integrity Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 8 Submission - 2.2(C) Crown Land Plans
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.103 Written Summaries of Oral Submissions made at Issue Specific Hearing 14: DCO, DoO and allied documents (17 September 2021) - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 8 Submission - 9.87 Draft Water Monitoring and Management Plan - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.97 Responses to the ExA's Third Written Questions (ExQ3) Volume 1 - SZC Co. Responses - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 5.10 Shadow Habitats Regulations Assessment Addendum - Appendix 9A(B): Southern North Sea Site Integrity Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.10.7 Statement of Common Ground - Natural England
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.16 On-site Marsh Harrier Compensatory Habitat Strategy - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.97 Responses to the ExA's Third Written Questions (ExQ3) Volume 2 - Appendices - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission -9.96 Comments on Responses to the ExA's Second Written Questions (ExQ2) - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 8.11(E) Code of Construction Practice Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 8 Submission - 6.3 Volume 2 Main Development Site, Chapter 16 Terrestrial Historic Environment Appendix 16G of the Environment Statement: Peat Strategy - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - Environmental Statement Addendum, Volume 3 Environmental Statement Addendum Appendices, Chapter 2 Main Development Site, Appendix 2.14.A: Water Monitoring and Response Strategy - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 8.3(C) Associated Development Design Principles - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 6.14 Environmental Statement Addendum Volume 3 Environmental Statement Addendum Appendices Chapter 2 Main Development Site Appendix 2.9.D: Fen Meadow Strategy - Tracked Changes Version - Revision 2 .0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.10.12 Statement of Common Ground - East Suffolk Council and Suffolk County Council - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 9.65 Outline Vessel Management Plan - Clean Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 8 Submission - 9.16 On-site Marsh Harrier Compensatory Habitat Strategy - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 8 Submission - 9.8 Wet Woodland Strategy - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 8 Submission - 9.4 Terrestrial Ecology Monitoring and Mitigation Plan - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 36 MB)
Late Deadline 8 Submission (accepted at the discretion of the ExA) - 9.99 Comments on Earlier Deadlines and Subsequent Written Submissions to CAH1 and ISH8-ISH10 - Appendices Part 3 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 27 MB)
Late Deadline 8 Submission (accepted at the discretion of the ExA) - 9.99 Comments on Earlier Deadlines and Subsequent Written Submissions to CAH1 and ISH8-ISH10 - Appendices Part 2 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 36 MB)
Deadline 8 Submission - 8.17 Draft Deed of Obligation - Appendix A - Plans - Revision 7.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 8 Submission - 8.17 Draft Deed of Obligation - Tracked Changes Version - Revision 8.0
|
Other |
NNB Generation Company (SZC) Limited on behalf of Sizewell C Project (PDF, 4 MB)
Deadline 8 Submission - 8.3 A(B) Two Village Bypass Landscape and Ecology Management Plan Tracked Changes Version
|