The Sizewell C Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (26)

Developer's Application (636)

Acceptance (9)

Pre Examination (498)

Examination (2996)

Decision (210)

Decided (1)

Transboundary Documents
Date

SourceDescription
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 1 of 6 - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 2 Submission - 2.5 Updated Main Development Site Rail Plans - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.6 Traffic Incident Management Plan - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 2 - Figures Part 1 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.11 Initial Statement of Common Ground - Royal Mail - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 42 MB)
Deadline 2 Submission - 2.4 Updated Access and Rights of Way Plans - Revision 4.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 6.3 Updated Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11H of the Environmental Statement: Noise Mitigation Scheme - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.30 Initial Statement of Common Ground - EDF Nuclear Generation Limited - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 2 Submission - 9.10.12 Initial Statement of Common Ground - East Suffolk Council and Suffolk County Council - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.3 Initial Statement of Common Ground - East Suffolk Internal Drainage Board - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 39 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Figures - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.18 Bat Roost Surveys in Trees - Associated Development Sites - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 43 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 6 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 9.10.18 Initial Statement of Common Ground - Marine Management Organisation - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.20 Draft Deed of Obligation (formally Section 106) Explanatory Memorandum - Tracked Changes Version - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.7 Construction Traffic Management Plan - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.28 Initial Statement of Common Ground - East Anglia One North and Two - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 21 MB)
Deadline 2 Submission - 9.18 Bat Roost Surveys in Trees - Associated Development Sites Appendices A-B - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.31 Initial Statement of Common Ground - English Heritage Trust - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 8.17 Draft Deed of Obligation (formally Section 106 Agreement) - Tracked Changes Version - Revision 4.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.1 Draft Development Consent Order (Draft DCO) Tracked Changes Version – Revision 4 against Revision 3 - Revision 4.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.3 Updated Associated Developments Design Principles - Clean - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Appendices - Part 1 of 4 - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 44 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 2 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.2 Explanatory Memorandum Revision 3 – Clean Version - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.34 Initial Statement of Common Ground - Suffolk Coastal Friends of the Earth - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.23 Bird Survey Report - Green Rail Route - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 3.1 Draft Development Consent Order (Draft DCO) Clean Version – Revision 4 - Revision 4.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.22 Initial Statement of Common Ground - Public Health England - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 5.10 Shadow Habitats Regulations Assessment Second Addendum - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 8.17 Draft Deed of Obligation (formally Section 106 Agreement) - Clean Version - Revision 4.0
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 2 Submission - 6.14 Environmental Statement Addendum Volume 7, Chapter 2 Figures: Updated Yoxford Roundabout Description of Development Figures - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.19 Bird Survey Report - Northern Park and Ride - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 2 Submission - 2.5 Proposed Site Plan Leiston Leisure Centre Phase - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 6.14 Environmental Statement Addendum Appendices 2.2.A-2.2.B Updated Descriptions of Development - Clean Version - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Appendices - Part 3 of 4 - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Appendices - Part 2 of 4 - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.29 Initial Statement of Common Ground - Stop Sizewell C - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 8.11 Updated Code of Construction Practice - Clean Version - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.5 Initial Statement of Common Ground - Highways England - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.9 Initial Statement of Common Ground - Cadent Gas Limited - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 7 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.26 Initial Statement of Common Ground - National Farmers Union
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.16 Initial Statement of Common Ground - East of England Ambulance Trust - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.8 Construction Worker Travel Plan - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 1 - SZC Co. Responses
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 9.14 National Policy Statement (NPS) Tracker - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.25 Initial Statement of Common Ground - National Trust - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 29 MB)
Deadline 2 Submission - Draft Deed of Obligation (formally Section 106 Agreement) - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 2 Submission - 8.12 Updated Mitigation Route Map - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.4 Draft Development Consent Order Signposting Document - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.25 Written Summaries of Oral Submissions made at Open Floor Hearings 18-21 May 2021
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.26 Written Submissions in Response to Oral Submissions made at Open Floor Hearings 18-21 May 2021 - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.13 Initial Statement of Common Ground - Suffolk Fire and Rescue - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
Deadline 2 Submission - 2.3 Works Plan - Part 1 of 3 - Revision 4.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.2 Initial Statement of Common Ground - Essex and Suffolk Water - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.4 Initial Statement of Common Ground - Environment Agency - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.35 Initial Statement of Common Ground - Department of Transport - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 4 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 2 - Figures Part 3 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 2 Submission - 9.12 One dimensional modelling of Soft Coastal Defence Feature (SCDF) - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.20 Initial Statement of Common Ground - Suffolk Coast and Heaths AONB Partnership - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 1.3 Updated Navigation Document - Revision 10.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 9.13 Sizewell C Coastal Defences Design Report - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.10 Initial Statement of Common Ground - Network Rail - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 2 Submission - 2.9 Updated Yoxford Roundabout Plans for Approval - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 2 Submission - 2.3 Works Plans - Part 2 of 3 - Revision 4.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.23 Initial Statement of Common Ground - Together Against Sizewell C - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.14 Initial Statement of Common Ground - Office for Nuclear Regulation - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.27 Initial Statement of Common Ground - Minsmere Levels Stakeholder Group - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.20 Bird Survey Report - Southern Park and Ride - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.21 Initial Statement of Common Ground - Pro Corda Trust / Leiston Abbey - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 4.1C Updated Statement of Reasons Appendix C - Status of Negotiations with Statutory Undertakers’ - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 2 Submission - 4.6 Updated Book of Reference and Schedule of Changes to the Book of Reference (BoR) - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 2 - Figures Part 4 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) Volume 2 - Figures Part 7 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Figures - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Appendices - Part 4 of 4 - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 6.14 Environmental Statement Addendum Appendices 2.2.A-2.2.B Updated Descriptions of Development - Tracked Changes Version - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.4 Updated Draft Development Consent Order Signposting Document - Tracked Changes Version - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10 Statement of Commonality of Statement of Common Ground (SoCG) - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.21 Bird Survey Report - Two Village Bypass - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 8.11 Updated Code of Construction Practice - Tracked Changes Version - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 33 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 3 of 6 - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 2 Submission - 2.5 Main Development Site Construction Parameter Plans - Plans For Approval - Revision 5.0
Other
NNB Generation Company (SZC) Limited (PDF, 44 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 4 of 6 - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 18 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 5 of 6 - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.1 Initial Statement of Common Ground - Anglian Water Services Limited - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 15 MB)
Deadline 2 Submission - 4.3 Book of Reference - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.19 Initial Statement of Common Ground - Magnox Limited and Nuclear Decommissioning Authority - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 2 Submission - 6.3 Updated Volume 2 Chapter 2 Appendix 2A of the Environmental Statement - Outline Drainage Strategy - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 2 MB)
Deadline 2 Submission - Deadline 2 Cover letter
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.24 Bird Survey Report - Freight Management Facility - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 1 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.8 Initial Statement of Common Ground - National Grid Transmissions Plc - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 4.1B Updated Statement of Reasons (SoR) Appendix B ‘Status of Negotiations with Owners of the Order Land’ - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 5 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 42 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) Volume 2 - Figures Part 5 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 2 Submission - 6.14 Updated Volume 2 Main Development Site Environmental Statement and Environmental Statement Addendum Figures - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 21 MB)
Deadline 2 Submission - 9.10.7 Initial Statement of Common Ground - Natural England - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.6 Initial Statement of Common Ground - Historic England - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 2 of 6 - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 2 Submission - 9.16 Marsh Harrier Habitat Report - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - PDB-2 Updated Environmental Statement Signposting Document - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) Volume 2 - Figures Part 6 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.20 Draft Deed of Obligation (formally Section 106) Explanatory Memorandum - Clean Version - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.2 Explanatory Memorandum Revision 3 – Tracked Changes Version - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 2 - Figures Part 2 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 6.3 Volume 2 Chapter 15 Appendix 15I of the Environmental Statement - Updated Rights of Way and Access Strategy - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 13 MB)
Deadline 2 Submission - 2.5 Main Development Site Operational Parameter Plans - Plans For Approval - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.22 Bird Survey Report - Sizewell Link Road - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.17 Initial Statement of Common Ground - Suffolk Constabulary - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 41 MB)
Deadline 2 Submission - 8.1 Main Development Site Design and Access Statement Second Addendum - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 2 Submission - 9.27 Second Notification of Proposed Project Changes - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
Deadline 2 Submission - 9.15 Minsmere Monitoring and Mitigation Plan - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.32 Initial Statement of Common Ground - B1122 Action Group - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 8.3 Updated Associated Developments Design Principles - Tracked Changes - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 4.1A Updated Statement of Reasons Appendix A - Statement of Reasons Justification Tables - Revision 2.0
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 3 of 7
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.4 Planning Statement Update - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 2 Submission - 3.1 Fourth Draft Development Consent Order Addendum - Proposed Changes to the Draft Development Consent Order (DCO) - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.15 Initial Statement of Common Ground - Ipswich and East Suffolk Clinical Commissioning Group - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.17 Bat Roost Surveys in Trees - Main Development Site - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 22 MB)
Deadline 2 Submission - 2.3 Works Plan - Part 3 of 3 - Revision 4.0
Other
NNB Generation Company (SZC) Limited (PDF, 45 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 6 of 6 - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.33 Initial Statement of Common Ground - Suffolk Coast Destination Management Organisation - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 2 Submission - 2.2 Updated Crown Land Plans - Revision 3.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.24 Initial Statement of Common Ground - Royal Society for the Protection of Birds and Suffolk Wildlife Trust - Revision 1.0
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.4 Implementation Plan Update - Revision 2.0