You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (26)
Developer's Application (636)
- All Documents
- Additional Information (Reg 6) (2)
- Application Form (7)
- Compulsory Acquisition Information (6)
- Draft Development Consent Order (3)
- Environmental Statement (424)
- Other Documents (52)
- Plans (51)
- Reports (91)
Acceptance (9)
Pre Examination (498)
- All Documents
- Additional Submissions (320)
- Appointment of Examining Authority (1)
- Certificates and Notices (5)
- Examination Library (1)
- Hearing Agenda (2)
- Procedural Deadline A (34)
- Procedural Deadline B (100)
- Procedural Decisions (8)
- + Recording of preliminary meeting (24)
- Relevant Representations Examination Library (1)
- Unaccompanied Site Inspection (2)
Examination (2996)
- All Documents
- Accompanied Site Inspection Itinerary (2)
- Additional Submissions (96)
- Certificates and Notices (1)
- Compulsory Acquisition Hearing 1 (CAH 1) Part 1 (8)
- Compulsory Acquisition Hearing 1 (CAH 1) Part 2 (6)
- + Deadline 1 (D1) (193)
- + Deadline 10 (D10) (632)
- + Deadline 2 (D2) (558)
- + Deadline 3 (D3) (154)
- + Deadline 4 (D4) (7)
- + Deadline 5 (D5) (313)
- + Deadline 6 (D6) (85)
- + Deadline 7 (D7) (294)
- + Deadline 8 (349)
- + Deadline 9 (D9) (49)
- Hearing Agenda (17)
- Hearing Notice (1)
- Issue Specific Hearing 1 (ISH1) (10)
- + Issue Specific Hearing 10 (ISH10) (15)
- Issue Specific Hearing 11 (ISH11) (9)
- Issue Specific Hearing 12 (ISH12) (8)
- Issue Specific Hearing 13 (ISH13) (7)
- Issue Specific Hearing 14 (ISH14) (9)
- Issue Specific Hearing 15 (ISH15) (10)
- Issue Specific Hearing 2 (ISH2) (8)
- Issue Specific Hearing 3 (ISH3) (8)
- Issue Specific Hearing 4 (ISH4) (8)
- Issue Specific Hearing 5 (ISH5) (10)
- Issue Specific Hearing 6 (ISH6) (9)
- Issue Specific Hearing 7 (ISH7) (14)
- Issue Specific Hearing 8 (ISH 8) (8)
- Issue Specific Hearing 9 (ISH9) (8)
- Open Floor Hearing 1 (OFH1) (4)
- Open Floor Hearing 10 (OFH 10) (1)
- Open Floor Hearing 10 (OFH10) (4)
- Open Floor Hearing 2 (OFH2) (4)
- Open Floor Hearing 3 (OFH 3) (4)
- Open Floor Hearing 4 (OFH 4) (4)
- Open Floor Hearing 5 (OFH 5) (4)
- Open Floor Hearing 6 (OFH 6) (4)
- Open Floor Hearing 7 (OFH 7) (4)
- Open Floor Hearing 8 (OFH 8) (4)
- Open Floor Hearing 9 (OFH 9) (4)
- Preliminary meeting note (1)
- Procedural Decisions (45)
- Report on the Implications for European Sites (RIES) (1)
- Unaccompanied Site Inspection (2)
Decision (210)
- All Documents
- Development Consent Order as Made by the Secretary of State (1)
- Habitats Regulations Assessment (1)
- Notification of Decision Letter (1)
- Other Documents (6)
- Post Examination Submissions (1)
- Post Recommendation Submissions (1)
- Recommendation Report (9)
- Regulation 31 Notice (1)
- + Secretary of State Consultation (188)
- Secretary of State Decision Letter (approved) (1)
Decided (1)
- EN010012 - Regulation 32 Transboundary Screening
- EN010012 Regulation 32 - Consultation response from Germany
- EN010012 Regulation 32 - Consultation response from Denmark
- EN010012 Regulation 32 - Consultation response from Norway
- EN010012 Regulation 32 - Consultation response from Poland
- EN010012 Regulation 32 - Consultation response from the Netherlands
- EN010012 Regulation 32 - Consultation response from Ireland
- EN010012 Regulation 32 - Consultation response from Austria
- EN010012 Regulation 32 - Consultation response from Estonia
- EN010012 Regulation 32 - Consultation response from Sweden
- EN010012 – Regulation 32 - Notification response from Russian Federation
- EN010012- Regulation 32 - Notification response from Czech Republic
- EN010012- Regulation 32 - Notification response from Austria
- EN010012- Regulation 32 - Notification response from Estonia
- EN010012- Regulation 32 - Notification response from Ireland
- EN010012- Regulation 32 - Notification response from Germany
- EN010012- Regulation 32 - Notification response from Canada
- EN010012- Regulation 32 - Notification response from Denmark
- EN010012- Regulation 32 - Notification response from Belgium
- EN010012- Regulation 32 - Notification response from Poland
- EN010012- Regulation 32 - Notification response from Iceland
- EN010012- Regulation 32 - Notification response from Norway
- EN010012- Regulation 32 - Notification response from Romania
- EN010012- Regulation 32 - Notification response from The Netherlands
- EN010012- Regulation 32 - Notification response from Italy
- EN010012- Regulation 32 - Notification response from Greece
- EN010012 The London Gazette Notice
Source | Description |
---|---|
Other |
NNB Generation Company (SZC) Limited (PDF, 32 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 1 of 6 - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 2 Submission - 2.5 Updated Main Development Site Rail Plans - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.6 Traffic Incident Management Plan - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 36 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 2 - Figures Part 1 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.11 Initial Statement of Common Ground - Royal Mail - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 42 MB)
Deadline 2 Submission - 2.4 Updated Access and Rights of Way Plans - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 6.3 Updated Volume 2 Main Development Site Chapter 11 Noise and Vibration Appendix 11H of the Environmental Statement: Noise Mitigation Scheme - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.30 Initial Statement of Common Ground - EDF Nuclear Generation Limited - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 2 Submission - 9.10.12 Initial Statement of Common Ground - East Suffolk Council and Suffolk County Council - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.3 Initial Statement of Common Ground - East Suffolk Internal Drainage Board - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 39 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Figures - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.18 Bat Roost Surveys in Trees - Associated Development Sites - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 43 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 6 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 9.10.18 Initial Statement of Common Ground - Marine Management Organisation - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.20 Draft Deed of Obligation (formally Section 106) Explanatory Memorandum - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.7 Construction Traffic Management Plan - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.28 Initial Statement of Common Ground - East Anglia One North and Two - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 21 MB)
Deadline 2 Submission - 9.18 Bat Roost Surveys in Trees - Associated Development Sites Appendices A-B - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.31 Initial Statement of Common Ground - English Heritage Trust - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 8.17 Draft Deed of Obligation (formally Section 106 Agreement) - Tracked Changes Version - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.1 Draft Development Consent Order (Draft DCO) Tracked Changes Version – Revision 4 against Revision 3 - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.3 Updated Associated Developments Design Principles - Clean - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Appendices - Part 1 of 4 - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 44 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 2 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.2 Explanatory Memorandum Revision 3 – Clean Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.34 Initial Statement of Common Ground - Suffolk Coastal Friends of the Earth - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.23 Bird Survey Report - Green Rail Route - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 3.1 Draft Development Consent Order (Draft DCO) Clean Version – Revision 4 - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.22 Initial Statement of Common Ground - Public Health England - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 5.10 Shadow Habitats Regulations Assessment Second Addendum - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 8.17 Draft Deed of Obligation (formally Section 106 Agreement) - Clean Version - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 2 Submission - 6.14 Environmental Statement Addendum Volume 7, Chapter 2 Figures: Updated Yoxford Roundabout Description of Development Figures - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.19 Bird Survey Report - Northern Park and Ride - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 2 Submission - 2.5 Proposed Site Plan Leiston Leisure Centre Phase - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 6.14 Environmental Statement Addendum Appendices 2.2.A-2.2.B Updated Descriptions of Development - Clean Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Appendices - Part 3 of 4 - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Appendices - Part 2 of 4 - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.29 Initial Statement of Common Ground - Stop Sizewell C - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 8.11 Updated Code of Construction Practice - Clean Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.5 Initial Statement of Common Ground - Highways England - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.9 Initial Statement of Common Ground - Cadent Gas Limited - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 7 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.26 Initial Statement of Common Ground - National Farmers Union
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.16 Initial Statement of Common Ground - East of England Ambulance Trust - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.8 Construction Worker Travel Plan - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 1 - SZC Co. Responses
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 9.14 National Policy Statement (NPS) Tracker - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.25 Initial Statement of Common Ground - National Trust - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 29 MB)
Deadline 2 Submission - Draft Deed of Obligation (formally Section 106 Agreement) - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 2 Submission - 8.12 Updated Mitigation Route Map - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.4 Draft Development Consent Order Signposting Document - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.25 Written Summaries of Oral Submissions made at Open Floor Hearings 18-21 May 2021
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.26 Written Submissions in Response to Oral Submissions made at Open Floor Hearings 18-21 May 2021 - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.13 Initial Statement of Common Ground - Suffolk Fire and Rescue - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 34 MB)
Deadline 2 Submission - 2.3 Works Plan - Part 1 of 3 - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.2 Initial Statement of Common Ground - Essex and Suffolk Water - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.4 Initial Statement of Common Ground - Environment Agency - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.35 Initial Statement of Common Ground - Department of Transport - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 4 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 2 - Figures Part 3 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 2 Submission - 9.12 One dimensional modelling of Soft Coastal Defence Feature (SCDF) - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.20 Initial Statement of Common Ground - Suffolk Coast and Heaths AONB Partnership - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 1.3 Updated Navigation Document - Revision 10.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 9.13 Sizewell C Coastal Defences Design Report - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.10 Initial Statement of Common Ground - Network Rail - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 2 Submission - 2.9 Updated Yoxford Roundabout Plans for Approval - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 2 Submission - 2.3 Works Plans - Part 2 of 3 - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.23 Initial Statement of Common Ground - Together Against Sizewell C - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.14 Initial Statement of Common Ground - Office for Nuclear Regulation - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.27 Initial Statement of Common Ground - Minsmere Levels Stakeholder Group - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.20 Bird Survey Report - Southern Park and Ride - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.21 Initial Statement of Common Ground - Pro Corda Trust / Leiston Abbey - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 4.1C Updated Statement of Reasons Appendix C - Status of Negotiations with Statutory Undertakers’ - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 2 Submission - 4.6 Updated Book of Reference and Schedule of Changes to the Book of Reference (BoR) - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 41 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 2 - Figures Part 4 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) Volume 2 - Figures Part 7 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 19 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Figures - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum Appendices - Part 4 of 4 - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 6.14 Environmental Statement Addendum Appendices 2.2.A-2.2.B Updated Descriptions of Development - Tracked Changes Version - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.4 Updated Draft Development Consent Order Signposting Document - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10 Statement of Commonality of Statement of Common Ground (SoCG) - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.21 Bird Survey Report - Two Village Bypass - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 2 Submission - 8.11 Updated Code of Construction Practice - Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 33 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 3 of 6 - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 2 Submission - 2.5 Main Development Site Construction Parameter Plans - Plans For Approval - Revision 5.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 44 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 4 of 6 - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 18 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 5 of 6 - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.1 Initial Statement of Common Ground - Anglian Water Services Limited - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 15 MB)
Deadline 2 Submission - 4.3 Book of Reference - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.19 Initial Statement of Common Ground - Magnox Limited and Nuclear Decommissioning Authority - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 2 Submission - 6.3 Updated Volume 2 Chapter 2 Appendix 2A of the Environmental Statement - Outline Drainage Strategy - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 2 MB)
Deadline 2 Submission - Deadline 2 Cover letter
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.24 Bird Survey Report - Freight Management Facility - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 35 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 1 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.8 Initial Statement of Common Ground - National Grid Transmissions Plc - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 4.1B Updated Statement of Reasons (SoR) Appendix B ‘Status of Negotiations with Owners of the Order Land’ - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 5 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 42 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) Volume 2 - Figures Part 5 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 2 Submission - 6.14 Updated Volume 2 Main Development Site Environmental Statement and Environmental Statement Addendum Figures - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 21 MB)
Deadline 2 Submission - 9.10.7 Initial Statement of Common Ground - Natural England - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.6 Initial Statement of Common Ground - Historic England - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 2 of 6 - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 2 Submission - 9.16 Marsh Harrier Habitat Report - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - PDB-2 Updated Environmental Statement Signposting Document - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) Volume 2 - Figures Part 6 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.20 Draft Deed of Obligation (formally Section 106) Explanatory Memorandum - Clean Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 3.2 Explanatory Memorandum Revision 3 – Tracked Changes Version - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 2 - Figures Part 2 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 6.3 Volume 2 Chapter 15 Appendix 15I of the Environmental Statement - Updated Rights of Way and Access Strategy - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 13 MB)
Deadline 2 Submission - 2.5 Main Development Site Operational Parameter Plans - Plans For Approval - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.22 Bird Survey Report - Sizewell Link Road - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.17 Initial Statement of Common Ground - Suffolk Constabulary - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 41 MB)
Deadline 2 Submission - 8.1 Main Development Site Design and Access Statement Second Addendum - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 2 Submission - 9.27 Second Notification of Proposed Project Changes - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 16 MB)
Deadline 2 Submission - 9.15 Minsmere Monitoring and Mitigation Plan - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.32 Initial Statement of Common Ground - B1122 Action Group - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 8.3 Updated Associated Developments Design Principles - Tracked Changes - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 4.1A Updated Statement of Reasons Appendix A - Statement of Reasons Justification Tables - Revision 2.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 35 MB)
Deadline 2 Submission - 9.11 Responses to the Examining Authority’s First Written Questions (ExQ1) - Volume 3 - Appendices Part 3 of 7
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.4 Planning Statement Update - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 2 Submission - 3.1 Fourth Draft Development Consent Order Addendum - Proposed Changes to the Draft Development Consent Order (DCO) - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.15 Initial Statement of Common Ground - Ipswich and East Suffolk Clinical Commissioning Group - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.17 Bat Roost Surveys in Trees - Main Development Site - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 22 MB)
Deadline 2 Submission - 2.3 Works Plan - Part 3 of 3 - Revision 4.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 45 MB)
Deadline 2 Submission - 8.5 Consolidated Transport Assessment Appendices Part 6 of 6 - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 2 Submission - 5.6Ad Sizewell Link Road Flood Risk Assessment Addendum - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 2 Submission - 9.10.33 Initial Statement of Common Ground - Suffolk Coast Destination Management Organisation - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 2 Submission - 2.2 Updated Crown Land Plans - Revision 3.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 9.10.24 Initial Statement of Common Ground - Royal Society for the Protection of Birds and Suffolk Wildlife Trust - Revision 1.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 2 Submission - 8.4 Implementation Plan Update - Revision 2.0
|