Documents Published By Stage

Pre Application (26)

Developer's Application (636)

Acceptance (9)

Pre Examination (498)

Examination (2996)

Decision (210)

Decided (1)

Transboundary Documents
Date

SourceDescription
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 4.1C Statement of Reasons Appendix C - Status of Negotiations with Statutory Undertakers - Revision 8.0
Other
NNB Generation Company (SZC) Limited (PDF, 28 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Clean Version - Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.3/10.8 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22N of the Environmental Statement: Marine Mammal Mitigation Protocol - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 5.14 Equality Statement Update
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 8.3/10.1 Associated Development Design Principles - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - Final Development Consent Order Signposting Document - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.16 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.9.D: Fen Meadow Strategy - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
Deadline 10 Submission - 4.3 Book of Reference - Revision 8.0
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 4.6 Schedule of Changes to the Book of Reference - Revision 7.0
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 6.14/10.24 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.11.A: Overarching Written Scheme of Investigation - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Clean Version - Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 6.18 Fourth ES Addendum, Volume 3: Appendix 3A - Sizewell C Desalination Plant Construction Discharge H1 Type Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 10 Submission - 2.5 Main Development Site Permanent Development Site Proposed Landscape Masterplan - Plans Not For Approval
Other
NNB Generation Company (SZC) Limited (PDF, 31 MB)
Deadline 10 Submission - 2.4 Access and Rights of Way Plans - Revision 8.0
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 10.19 Main Development Site - Operational Siting and Height Parameters
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.20 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.14.A: Water Monitoring and Response Strategy - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.34 Statement of Common Ground - Suffolk Coastal Friends of the Earth
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 9.10.21 Statement of Common Ground - Pro Corda Trust / Leiston Abbey
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 8.3/10.1 Associated Development Design Principles - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.6 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.9.D: Fen Meadow Strategy - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 36 MB)
Deadline 10 Submission - 6.13 Additional Ecology Survey Reports (October 2021)
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.20 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.14.A: Water Monitoring and Response Strategy - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 4.1B Statement of Reasons Appendix B - Status of Negotiations with Owners of the Order Land
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 5..11 Schedule of Other Consents, Licences and Agreements
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.121 Written Summaries of Oral Submissions made at Issue Specific Hearing 15: Proposed Temporary Desalination Plant (5 October 2021)
Other
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 10 Submission - 8.11/10.2 Code of Construction Practice - Appendices - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.127 Sizewell C Project - Planning Act 2008, Section 135 Consent
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 6.3/10.25 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment Appendix 16G of the Environmental Statement: Peat Strategy – Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 10 Submission - 6.3/10.25 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment Appendix 16G of the Environmental Statement: Peat Strategy - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.26 Statement of Common Ground - National Farmers Union
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.32 Statement of Common Ground - B1122 Action Group
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.4/10.28 Terrestrial Ecology Monitoring and Mitigation Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.122 Written Submissions Responding to Actions Arising from Issue Specific Hearing 15: Proposed Temporary Desalination Plant (5 October 2021)
Other
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 10 Submission - 6.14/10.9 Environmental Statement Addendum, Volume 3, Chapter 9 Rail - Appendix 9.3E: Draft Rail Noise Mitigation Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.14 National Policy Statement Tracker - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 40 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Clean Version - Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.14 National Policy Statement Tracker - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.65/10.23 Outline Vessel Management Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.24 Environmental Statement Addendum,Volume 3, Chapter 2 Main Development Site - Appendix 2.11.A: Overarching Written Scheme of Investigation - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.40 Statement of Common Ground - Create Consulting on behalf of Mr and Mrs Dowley
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 8.11/10.2 Code of Construction Practice - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.16/10.21 On-site Marsh Harrier Compensatory Habitat Strategy - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
Deadline 10 Submission - 8.3/10.27: Sizewell Link Road Landscape and Ecology Management Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.64/10.6 Draft Fen Meadow Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - PDB-2 Environmental Statement Signposting Document
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
Deadline 10 Submission - 6.3/10.17 Volume 2 Main Development Site - Chapter 2 Description of the Permanent Development - Appendix 2B of the Environmental Statement: Lighting Management Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 10 Submission - 9.10.18 Statement of Common Ground - Marine Management Organisation
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.89/10.7 Draft Fish Impingement and Entrainment Monitoring Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.37 Statement of Common Ground -Create Consulting on behalf of Mr and Ms Grant
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 9.35/10.30 Westleton Marsh Harrier Compensatory Habitat - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 10 Submission - 9.108/10.13 Draft Wet Woodland Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 10 Submission - 8.3/10.29: Two Village Bypass Landscape and Ecology Management Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 64 MB)
Deadline 10 Submission - 9.10.24 Statement of Common Ground - Royal Society for the Protection of Birds and Suffolk Wildlife Trust
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.90/10.10 Draft Sabellaria Reef Management and Monitoring Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 10 Submission -8.3/10.29: Two Village Bypass Landscape and Ecology Management Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.16/10.21 On-site Marsh Harrier Compensatory Habitat Strategy - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.10.3 Statement of Common Ground - East Suffolk Internal Drainage Board
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 9.10.28 Statement of Common Ground - East Anglia One North and Two
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 6.3/10.8 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22N of the Environmental Statement: Marine Mammal Mitigation Protocol - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 10 Submission - 9.88/10.15 Estate Wide Management Plan for the EDF Energy Estate - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.116 Sizewell C Desalination Plant Greenhouse Gas Emissions Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 28 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Tracked Changes Version - Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.89/10.7 Draft Fish Impingement and Entrainment Monitoring Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 6.3/10.26 Volume 2 Main Development Site - Chapter 15 Amenity and Recreation - Appendix 15l of the Environmental Statement: Rights of Way and Access Strategy - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.15 Statement of Common Ground - Ipswich and East Suffolk Clinical Commissioning Group
Other
NNB Generation Company (SZC) Limited (PDF, 31 MB)
Deadline 10 Submission - 9.92 Draft Bat Method Statement Part 6 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 39 MB)
Deadline 10 Submission - 8.17/10.4 Completed Deed of Obligation - Scanned Copy - Part 2 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 5.10/10.11 Shadow Habitats Regulations Assessment Addendum Appendix 9A: Southern North Sea Site Integrity Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.4/10.28 Terrestrial Ecology Monitoring and Mitigation Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.2 Statement of Common Ground - Northumbrian Water Limited (Essex and Suffolk Water)
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.67 Quantifying Uncertainty in Entrapment Predictions for Sizewell C
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.65/10.23 Outline Vessel Management Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 10 Submission - 9.10.5 Statement of Common Ground - National Highways
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 9.10.12 Statement of Common Ground - East Suffolk Council and Suffolk County Council
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 9.12 Preliminary Design and Maintenance Requirements for the Sizewell C Coastal Defence Feature
Other
NNB Generation Company (SZC) Limited (PDF, 16 MB)
Deadline 10 Submission - 9.10.4 Statement of Common Ground - Environment Agency
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.124 Comments on Responses to SZC Co's Responses to the Examining Authority's Second Written Questions (ExQ2)
Other
NNB Generation Company (SZC) Limited (PDF, 48 MB)
Deadline 10 Submission - 6.3/10.3 Volume 2 Main Development Site Chapter 3 Description of Construction Appendix 3D of the Environment Statement: Construction Method Statement - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 2.14 East Anglia ONE North Order Limits Interaction - Offshore Plan
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 9.35/10.30 Westleton Marsh Harrier Compensatory Habitat - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.29 Statement of Common Ground - Stop Sizewell C
Other
NNB Generation Company (SZC) Limited (PDF, 30 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Annexures - Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.9 Statement of Common Ground - Cadent Gas Limited
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 10 Submission - 9.108/10.13 Draft Wet Woodland Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 2.15 East Anglia ONE Sizewell Gap Transport Interaction Plan
Other
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Tracked Changes Version - Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 111 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Tracked Changes Version - Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 8.2/10.22: Outline Landscape and Ecology Management Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 10 Submission - 6.3/10.14 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Clean Version - Part 1 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.9 Environmental Statement Addendum, Volume 3, Chapter 9 Rail - Appendix 9.3E: Draft Rail Noise Mitigation Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.10.16 Statement of Common Ground - East of England Ambulance Service NHS Trust
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.17 Statement of Common Ground - Suffolk Constabulary
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.10 Statement of Common Ground - Network Rail
Other
NNB Generation Company (SZC) Limited (PDF, 40 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Annexures - Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.6 Statement of Common Ground - Historic England
Other
NNB Generation Company (SZC) Limited (PDF, 35 MB)
Deadline 10 Submission - 6.3/10.17 Volume 2 Main Development Site - Chapter 2 Description of the Permanent Development - Appendix 2B of the Environmental Statement: Lighting Management Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 3.4: Final Development Consent Order Signposting Document - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 2 MB)
Deadline 10 Submission - 9.10.11 Statement of Common Ground - Royal Mail
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.125 Comments on Responses to the Examining Authority's Third Written Questions (ExQ3)
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.92 Draft Bat Method Statement Part 1 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 8.20 Final Deed of Obligation Explanatory Memorandum - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 6.3/10.26 Volume 2 Main Development Site - Chapter 15 Amenity and Recreation - Appendix 15l of the Environmental Statement: Rights of Way and Access Strategy - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19 - Appendices - Part 2 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.31 Statement of Common Ground - English Heritage Trust
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.124 Comments on Responses to SZC Co's Responses to the Examining Authority's Second Written Questions (ExQ2): Appendices
Other
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 10 Submission - 9.10 Statement of Commonality of Statements of Common Ground
Other
NNB Generation Company (SZC) Limited (PDF, 19 MB)
Deadline 10 Submission - 8.11/10.2 Code of Construction Practice - Appendices - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 33 MB)
Deadline 10 Submission - 6.3/10.14 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Clean Version - Part 3 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 3.2: Final Development Consent Order Explanatory Memorandum - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 10 Submission - 9.88/10.15 Estate Wide Management Plan for the EDF Energy Estate - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 25 MB)
Deadline 10 Submission - 9.64/10.6 Draft Fen Meadow Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 8.20 Final Deed of Obligation Explanatory Memorandum - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 28 MB)
Deadline 10 Submission - 8.17/10.4 Completed Deed of Obligation - Scanned Copy - Part 6 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 48 MB)
Deadline 10 Submission - 6.3/10.14 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Clean Version - Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.90/10.10 Draft Sabellaria Reef Management and Monitoring Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.119: SZC Co. Comments on the Report on the Implications for European Sites (RIES)
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.125 Comments on Responses to the Examining Authority's Third Written Questions (ExQ3): Appendices
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 8.11/10.2 Code of Construction Practice - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.12 Statement of Common Ground - East Suffolk Council and Suffolk County Council Appendix 11C: Operational Noise Summary
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 3.2: Final Development Consent Order Explanatory Memorandum - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 6.3/10.14 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.23 Statement of Common Ground - Together against Sizewell C
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 10 Submission - 8.17/10.4: Completed Deed of Obligation - Scanned Copy - Part 5 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.123 SZC Co. Response to Request for Further Information at Deadline 10 (1 October 2021)
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.33 Statement of Common Ground - Suffolk Coastal Destination Management Organisation
Other
NNB Generation Company (SZC) Limited (PDF, 29 MB)
Deadline 10 Submission - 8.3/10.27: Sizewell Link Road Landscape and Ecology Management Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 8.4 Planning Statement - Final Update and Signposting Document
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 3.1: Final Development Consent Order - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 37 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Front End of Plans
Other
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 10 Submission - 8.17/10.4: Completed Deed of Obligation - Scanned Copy - Part 4 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 3.1: Final Development Consent Order - Tracked Changes Version -Revision 11 against Revision 1
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 6.14/10.5: Environmental Statement Addendum, Volume 3, Chapter 2, Appendix 2.15.A: Coastal Processes Monitoring and Mitigation Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 8.22 Final Deed of Obligation - Confirmation and Compliance Document
Other
NNB Generation Company (SZC) Limited (PDF, 34 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19 - Appendices - Part 4 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 3.1: Final Development Consent Order - Tracked Changes Version - Revision 11 against Revision 10
Other
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 10 Submission - 8.12 Mitigation Route Map
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.13 Statement of Common Ground - Suffolk Fire and Rescue
Other
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 10 Submission - 8.17/10.4 Completed Deed of Obligation - Scanned Copy - Part 1 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 6.14/10.5: Environmental Statement Addendum, Volume 3, Chapter 2, Appendix 2.15.A: Coastal Processes Monitoring and Mitigation Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 3.1: Tenth Draft Development Consent Order Addendum - Proposed Changes to the Draft Development Consent Order
Other
NNB Generation Company (SZC) Limited (PDF, 42 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19 - Appendices - Part 1 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission -9.118 SZC Co. Response to Request for Further Information at Deadline 10 (20 September 2021)
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.20 SZC Co. Technical Note on Transport Environmental Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 10 Submission - 8.2/10.22: Outline Landscape and Ecology Management Plan - Clean Version
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - Cover Letter
Other
NNB Generation Company (SZC) Limited (PDF, 44 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19 - Appendices - Part 3 of 4
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.117 Sizewell C Desalination Plant Air Quality Impact Assessment
Other
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 10 Submission - 8.17/10.4 Completed Deed of Obligation - Scanned Copy - Part 3 of 6
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.38 Statement of Common Ground - Paul Collins
Other
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Annexures - Part 2 of 3
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 1.3: Navigation Document
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.126 SZC Co. Response to Request for Further Information at Deadline 10 (6 October 2021)
Other
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 9.10.27 Statement of Common Ground - Minsmere Levels Stakeholder Group
Other
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 10 Submission - 9.10.25 Statement of Common Ground - National Trust
Other
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.20 Statement of Common Ground - Suffolk Coast and Heaths AONB Partnership
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 2.16 East Anglia TWO Order Limits Interaction - Offshore Plan
Other
NNB Generation Company (SZC) Limited (PDF, 32 MB)
Deadline 10 Submission - 6.3/10.3 Volume 2 Main Development Site Chapter 3 Description of Construction, Appendix 3D of the Environment Statement: Construction Method Statement - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 2.17 East Anglia TWO Transport Interaction Plan
Other
NNB Generation Company (SZC) Limited (PDF, 2 MB)
Deadline 10 Submission - 8.23 Environment Agency - Deed of Covenant
Other
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 3.4: Final Development Consent Order Signposting Document - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19
Other
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 5.10/10.11 Shadow Habitats Regulations Assessment Addendum Appendix 9A: Southern North Sea Site Integrity Plan - Tracked Changes Version
Other
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.10.7 Statement of Common Ground - Natural England