You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (26)
Developer's Application (636)
- All Documents
- Additional Information (Reg 6) (2)
- Application Form (7)
- Compulsory Acquisition Information (6)
- Draft Development Consent Order (3)
- Environmental Statement (424)
- Other Documents (52)
- Plans (51)
- Reports (91)
Acceptance (9)
Pre Examination (498)
- All Documents
- Additional Submissions (320)
- Appointment of Examining Authority (1)
- Certificates and Notices (5)
- Examination Library (1)
- Hearing Agenda (2)
- Procedural Deadline A (34)
- Procedural Deadline B (100)
- Procedural Decisions (8)
- + Recording of preliminary meeting (24)
- Relevant Representations Examination Library (1)
- Unaccompanied Site Inspection (2)
Examination (2996)
- All Documents
- Accompanied Site Inspection Itinerary (2)
- Additional Submissions (96)
- Certificates and Notices (1)
- Compulsory Acquisition Hearing 1 (CAH 1) Part 1 (8)
- Compulsory Acquisition Hearing 1 (CAH 1) Part 2 (6)
- + Deadline 1 (D1) (193)
- + Deadline 10 (D10) (632)
- + Deadline 2 (D2) (558)
- + Deadline 3 (D3) (154)
- + Deadline 4 (D4) (7)
- + Deadline 5 (D5) (313)
- + Deadline 6 (D6) (85)
- + Deadline 7 (D7) (294)
- + Deadline 8 (349)
- + Deadline 9 (D9) (49)
- Hearing Agenda (17)
- Hearing Notice (1)
- Issue Specific Hearing 1 (ISH1) (10)
- + Issue Specific Hearing 10 (ISH10) (15)
- Issue Specific Hearing 11 (ISH11) (9)
- Issue Specific Hearing 12 (ISH12) (8)
- Issue Specific Hearing 13 (ISH13) (7)
- Issue Specific Hearing 14 (ISH14) (9)
- Issue Specific Hearing 15 (ISH15) (10)
- Issue Specific Hearing 2 (ISH2) (8)
- Issue Specific Hearing 3 (ISH3) (8)
- Issue Specific Hearing 4 (ISH4) (8)
- Issue Specific Hearing 5 (ISH5) (10)
- Issue Specific Hearing 6 (ISH6) (9)
- Issue Specific Hearing 7 (ISH7) (14)
- Issue Specific Hearing 8 (ISH 8) (8)
- Issue Specific Hearing 9 (ISH9) (8)
- Open Floor Hearing 1 (OFH1) (4)
- Open Floor Hearing 10 (OFH 10) (1)
- Open Floor Hearing 10 (OFH10) (4)
- Open Floor Hearing 2 (OFH2) (4)
- Open Floor Hearing 3 (OFH 3) (4)
- Open Floor Hearing 4 (OFH 4) (4)
- Open Floor Hearing 5 (OFH 5) (4)
- Open Floor Hearing 6 (OFH 6) (4)
- Open Floor Hearing 7 (OFH 7) (4)
- Open Floor Hearing 8 (OFH 8) (4)
- Open Floor Hearing 9 (OFH 9) (4)
- Preliminary meeting note (1)
- Procedural Decisions (45)
- Report on the Implications for European Sites (RIES) (1)
- Unaccompanied Site Inspection (2)
Decision (210)
- All Documents
- Development Consent Order as Made by the Secretary of State (1)
- Habitats Regulations Assessment (1)
- Notification of Decision Letter (1)
- Other Documents (6)
- Post Examination Submissions (1)
- Post Recommendation Submissions (1)
- Recommendation Report (9)
- Regulation 31 Notice (1)
- + Secretary of State Consultation (188)
- Secretary of State Decision Letter (approved) (1)
Decided (1)
- EN010012 - Regulation 32 Transboundary Screening
- EN010012 Regulation 32 - Consultation response from Germany
- EN010012 Regulation 32 - Consultation response from Denmark
- EN010012 Regulation 32 - Consultation response from Norway
- EN010012 Regulation 32 - Consultation response from Poland
- EN010012 Regulation 32 - Consultation response from the Netherlands
- EN010012 Regulation 32 - Consultation response from Ireland
- EN010012 Regulation 32 - Consultation response from Austria
- EN010012 Regulation 32 - Consultation response from Estonia
- EN010012 Regulation 32 - Consultation response from Sweden
- EN010012 – Regulation 32 - Notification response from Russian Federation
- EN010012- Regulation 32 - Notification response from Czech Republic
- EN010012- Regulation 32 - Notification response from Austria
- EN010012- Regulation 32 - Notification response from Estonia
- EN010012- Regulation 32 - Notification response from Ireland
- EN010012- Regulation 32 - Notification response from Germany
- EN010012- Regulation 32 - Notification response from Canada
- EN010012- Regulation 32 - Notification response from Denmark
- EN010012- Regulation 32 - Notification response from Belgium
- EN010012- Regulation 32 - Notification response from Poland
- EN010012- Regulation 32 - Notification response from Iceland
- EN010012- Regulation 32 - Notification response from Norway
- EN010012- Regulation 32 - Notification response from Romania
- EN010012- Regulation 32 - Notification response from The Netherlands
- EN010012- Regulation 32 - Notification response from Italy
- EN010012- Regulation 32 - Notification response from Greece
- EN010012 The London Gazette Notice
Source | Description |
---|---|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 4.1C Statement of Reasons Appendix C - Status of Negotiations with Statutory Undertakers - Revision 8.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 28 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Clean Version - Part 1 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.3/10.8 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22N of the Environmental Statement: Marine Mammal Mitigation Protocol - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 5.14 Equality Statement Update
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 8.3/10.1 Associated Development Design Principles - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - Final Development Consent Order Signposting Document - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.16 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.9.D: Fen Meadow Strategy - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 36 MB)
Deadline 10 Submission - 4.3 Book of Reference - Revision 8.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 4.6 Schedule of Changes to the Book of Reference - Revision 7.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 6.14/10.24 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.11.A: Overarching Written Scheme of Investigation - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Clean Version - Part 2 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 6.18 Fourth ES Addendum, Volume 3: Appendix 3A - Sizewell C Desalination Plant Construction Discharge H1 Type Assessment
|
Other |
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 10 Submission - 2.5 Main Development Site Permanent Development Site Proposed Landscape Masterplan - Plans Not For Approval
|
Other |
NNB Generation Company (SZC) Limited (PDF, 31 MB)
Deadline 10 Submission - 2.4 Access and Rights of Way Plans - Revision 8.0
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 10.19 Main Development Site - Operational Siting and Height Parameters
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.20 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.14.A: Water Monitoring and Response Strategy - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.34 Statement of Common Ground - Suffolk Coastal Friends of the Earth
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 9.10.21 Statement of Common Ground - Pro Corda Trust / Leiston Abbey
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 8.3/10.1 Associated Development Design Principles - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.6 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.9.D: Fen Meadow Strategy - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 36 MB)
Deadline 10 Submission - 6.13 Additional Ecology Survey Reports (October 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.20 Environmental Statement Addendum, Volume 3, Chapter 2 Main Development Site - Appendix 2.14.A: Water Monitoring and Response Strategy - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 4.1B Statement of Reasons Appendix B - Status of Negotiations with Owners of the Order Land
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 5..11 Schedule of Other Consents, Licences and Agreements
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.121 Written Summaries of Oral Submissions made at Issue Specific Hearing 15: Proposed Temporary Desalination Plant (5 October 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 10 Submission - 8.11/10.2 Code of Construction Practice - Appendices - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.127 Sizewell C Project - Planning Act 2008, Section 135 Consent
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 6.3/10.25 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment Appendix 16G of the Environmental Statement: Peat Strategy – Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 10 Submission - 6.3/10.25 Volume 2 Main Development Site Chapter 16 Terrestrial Historic Environment Appendix 16G of the Environmental Statement: Peat Strategy - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.26 Statement of Common Ground - National Farmers Union
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.32 Statement of Common Ground - B1122 Action Group
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.4/10.28 Terrestrial Ecology Monitoring and Mitigation Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.122 Written Submissions Responding to Actions Arising from Issue Specific Hearing 15: Proposed Temporary Desalination Plant (5 October 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 11 MB)
Deadline 10 Submission - 6.14/10.9 Environmental Statement Addendum, Volume 3, Chapter 9 Rail - Appendix 9.3E: Draft Rail Noise Mitigation Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.14 National Policy Statement Tracker - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 40 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Clean Version - Part 3 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.14 National Policy Statement Tracker - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.65/10.23 Outline Vessel Management Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.24 Environmental Statement Addendum,Volume 3, Chapter 2 Main Development Site - Appendix 2.11.A: Overarching Written Scheme of Investigation - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.40 Statement of Common Ground - Create Consulting on behalf of Mr and Mrs Dowley
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 8.11/10.2 Code of Construction Practice - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.16/10.21 On-site Marsh Harrier Compensatory Habitat Strategy - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 30 MB)
Deadline 10 Submission - 8.3/10.27: Sizewell Link Road Landscape and Ecology Management Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.64/10.6 Draft Fen Meadow Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - PDB-2 Environmental Statement Signposting Document
|
Other |
NNB Generation Company (SZC) Limited (PDF, 32 MB)
Deadline 10 Submission - 6.3/10.17 Volume 2 Main Development Site - Chapter 2 Description of the Permanent Development - Appendix 2B of the Environmental Statement: Lighting Management Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 47 MB)
Deadline 10 Submission - 9.10.18 Statement of Common Ground - Marine Management Organisation
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.89/10.7 Draft Fish Impingement and Entrainment Monitoring Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.37 Statement of Common Ground -Create Consulting on behalf of Mr and Ms Grant
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 9.35/10.30 Westleton Marsh Harrier Compensatory Habitat - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 10 Submission - 9.108/10.13 Draft Wet Woodland Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 10 Submission - 8.3/10.29: Two Village Bypass Landscape and Ecology Management Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 64 MB)
Deadline 10 Submission - 9.10.24 Statement of Common Ground - Royal Society for the Protection of Birds and Suffolk Wildlife Trust
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.90/10.10 Draft Sabellaria Reef Management and Monitoring Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 10 Submission -8.3/10.29: Two Village Bypass Landscape and Ecology Management Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.16/10.21 On-site Marsh Harrier Compensatory Habitat Strategy - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.10.3 Statement of Common Ground - East Suffolk Internal Drainage Board
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 9.10.28 Statement of Common Ground - East Anglia One North and Two
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 6.3/10.8 Volume 2 Main Development Site Chapter 22 Marine Ecology and Fisheries Appendix 22N of the Environmental Statement: Marine Mammal Mitigation Protocol - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 10 Submission - 9.88/10.15 Estate Wide Management Plan for the EDF Energy Estate - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.116 Sizewell C Desalination Plant Greenhouse Gas Emissions Assessment
|
Other |
NNB Generation Company (SZC) Limited (PDF, 28 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Tracked Changes Version - Part 1 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.89/10.7 Draft Fish Impingement and Entrainment Monitoring Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 6.3/10.26 Volume 2 Main Development Site - Chapter 15 Amenity and Recreation - Appendix 15l of the Environmental Statement: Rights of Way and Access Strategy - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.15 Statement of Common Ground - Ipswich and East Suffolk Clinical Commissioning Group
|
Other |
NNB Generation Company (SZC) Limited (PDF, 31 MB)
Deadline 10 Submission - 9.92 Draft Bat Method Statement Part 6 of 6
|
Other |
NNB Generation Company (SZC) Limited (PDF, 39 MB)
Deadline 10 Submission - 8.17/10.4 Completed Deed of Obligation - Scanned Copy - Part 2 of 6
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 5.10/10.11 Shadow Habitats Regulations Assessment Addendum Appendix 9A: Southern North Sea Site Integrity Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.4/10.28 Terrestrial Ecology Monitoring and Mitigation Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.2 Statement of Common Ground - Northumbrian Water Limited (Essex and Suffolk Water)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.67 Quantifying Uncertainty in Entrapment Predictions for Sizewell C
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.65/10.23 Outline Vessel Management Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 10 Submission - 9.10.5 Statement of Common Ground - National Highways
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 9.10.12 Statement of Common Ground - East Suffolk Council and Suffolk County Council
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 9.12 Preliminary Design and Maintenance Requirements for the Sizewell C Coastal Defence Feature
|
Other |
NNB Generation Company (SZC) Limited (PDF, 16 MB)
Deadline 10 Submission - 9.10.4 Statement of Common Ground - Environment Agency
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.124 Comments on Responses to SZC Co's Responses to the Examining Authority's Second Written Questions (ExQ2)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 48 MB)
Deadline 10 Submission - 6.3/10.3 Volume 2 Main Development Site Chapter 3 Description of Construction Appendix 3D of the Environment Statement: Construction Method Statement - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 2.14 East Anglia ONE North Order Limits Interaction - Offshore Plan
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 9.35/10.30 Westleton Marsh Harrier Compensatory Habitat - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.29 Statement of Common Ground - Stop Sizewell C
|
Other |
NNB Generation Company (SZC) Limited (PDF, 30 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Annexures - Part 1 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.9 Statement of Common Ground - Cadent Gas Limited
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 10 Submission - 9.108/10.13 Draft Wet Woodland Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 2.15 East Anglia ONE Sizewell Gap Transport Interaction Plan
|
Other |
NNB Generation Company (SZC) Limited (PDF, 38 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Tracked Changes Version - Part 2 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 111 MB)
Deadline 10 Submission - 8.1/10.18 Main Development Site Design and Access Statement - Tracked Changes Version - Part 3 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 8.2/10.22: Outline Landscape and Ecology Management Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 23 MB)
Deadline 10 Submission - 6.3/10.14 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Clean Version - Part 1 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.14/10.9 Environmental Statement Addendum, Volume 3, Chapter 9 Rail - Appendix 9.3E: Draft Rail Noise Mitigation Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.10.16 Statement of Common Ground - East of England Ambulance Service NHS Trust
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.17 Statement of Common Ground - Suffolk Constabulary
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.10 Statement of Common Ground - Network Rail
|
Other |
NNB Generation Company (SZC) Limited (PDF, 40 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Annexures - Part 3 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.6 Statement of Common Ground - Historic England
|
Other |
NNB Generation Company (SZC) Limited (PDF, 35 MB)
Deadline 10 Submission - 6.3/10.17 Volume 2 Main Development Site - Chapter 2 Description of the Permanent Development - Appendix 2B of the Environmental Statement: Lighting Management Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 3.4: Final Development Consent Order Signposting Document - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 2 MB)
Deadline 10 Submission - 9.10.11 Statement of Common Ground - Royal Mail
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.125 Comments on Responses to the Examining Authority's Third Written Questions (ExQ3)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.92 Draft Bat Method Statement Part 1 of 6
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 8.20 Final Deed of Obligation Explanatory Memorandum - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 6.3/10.26 Volume 2 Main Development Site - Chapter 15 Amenity and Recreation - Appendix 15l of the Environmental Statement: Rights of Way and Access Strategy - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19 - Appendices - Part 2 of 4
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.31 Statement of Common Ground - English Heritage Trust
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.124 Comments on Responses to SZC Co's Responses to the Examining Authority's Second Written Questions (ExQ2): Appendices
|
Other |
NNB Generation Company (SZC) Limited (PDF, 8 MB)
Deadline 10 Submission - 9.10 Statement of Commonality of Statements of Common Ground
|
Other |
NNB Generation Company (SZC) Limited (PDF, 19 MB)
Deadline 10 Submission - 8.11/10.2 Code of Construction Practice - Appendices - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 33 MB)
Deadline 10 Submission - 6.3/10.14 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Clean Version - Part 3 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 3.2: Final Development Consent Order Explanatory Memorandum - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 14 MB)
Deadline 10 Submission - 9.88/10.15 Estate Wide Management Plan for the EDF Energy Estate - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 25 MB)
Deadline 10 Submission - 9.64/10.6 Draft Fen Meadow Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 8.20 Final Deed of Obligation Explanatory Memorandum - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 28 MB)
Deadline 10 Submission - 8.17/10.4 Completed Deed of Obligation - Scanned Copy - Part 6 of 6
|
Other |
NNB Generation Company (SZC) Limited (PDF, 48 MB)
Deadline 10 Submission - 6.3/10.14 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Clean Version - Part 2 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.90/10.10 Draft Sabellaria Reef Management and Monitoring Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.119: SZC Co. Comments on the Report on the Implications for European Sites (RIES)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.125 Comments on Responses to the Examining Authority's Third Written Questions (ExQ3): Appendices
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 8.11/10.2 Code of Construction Practice - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 9.10.12 Statement of Common Ground - East Suffolk Council and Suffolk County Council Appendix 11C: Operational Noise Summary
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 3.2: Final Development Consent Order Explanatory Memorandum - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 6.3/10.14 Volume 2 Main Development Site Chapter 2 Description of the Permanent Development Appendix 2A of the Environmental Statement: Drainage Strategy - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.23 Statement of Common Ground - Together against Sizewell C
|
Other |
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 10 Submission - 8.17/10.4: Completed Deed of Obligation - Scanned Copy - Part 5 of 6
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.123 SZC Co. Response to Request for Further Information at Deadline 10 (1 October 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.33 Statement of Common Ground - Suffolk Coastal Destination Management Organisation
|
Other |
NNB Generation Company (SZC) Limited (PDF, 29 MB)
Deadline 10 Submission - 8.3/10.27: Sizewell Link Road Landscape and Ecology Management Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 8.4 Planning Statement - Final Update and Signposting Document
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 3.1: Final Development Consent Order - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 37 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Front End of Plans
|
Other |
NNB Generation Company (SZC) Limited (PDF, 17 MB)
Deadline 10 Submission - 8.17/10.4: Completed Deed of Obligation - Scanned Copy - Part 4 of 6
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 3.1: Final Development Consent Order - Tracked Changes Version -Revision 11 against Revision 1
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 6.14/10.5: Environmental Statement Addendum, Volume 3, Chapter 2, Appendix 2.15.A: Coastal Processes Monitoring and Mitigation Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 8.22 Final Deed of Obligation - Confirmation and Compliance Document
|
Other |
NNB Generation Company (SZC) Limited (PDF, 34 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19 - Appendices - Part 4 of 4
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 3.1: Final Development Consent Order - Tracked Changes Version - Revision 11 against Revision 10
|
Other |
NNB Generation Company (SZC) Limited (PDF, 12 MB)
Deadline 10 Submission - 8.12 Mitigation Route Map
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.10.13 Statement of Common Ground - Suffolk Fire and Rescue
|
Other |
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 10 Submission - 8.17/10.4 Completed Deed of Obligation - Scanned Copy - Part 1 of 6
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 6.14/10.5: Environmental Statement Addendum, Volume 3, Chapter 2, Appendix 2.15.A: Coastal Processes Monitoring and Mitigation Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 9 MB)
Deadline 10 Submission - 3.1: Tenth Draft Development Consent Order Addendum - Proposed Changes to the Draft Development Consent Order
|
Other |
NNB Generation Company (SZC) Limited (PDF, 42 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19 - Appendices - Part 1 of 4
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission -9.118 SZC Co. Response to Request for Further Information at Deadline 10 (20 September 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 6.20 SZC Co. Technical Note on Transport Environmental Assessment
|
Other |
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 10 Submission - 8.2/10.22: Outline Landscape and Ecology Management Plan - Clean Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - Cover Letter
|
Other |
NNB Generation Company (SZC) Limited (PDF, 44 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19 - Appendices - Part 3 of 4
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.117 Sizewell C Desalination Plant Air Quality Impact Assessment
|
Other |
NNB Generation Company (SZC) Limited (PDF, 20 MB)
Deadline 10 Submission - 8.17/10.4 Completed Deed of Obligation - Scanned Copy - Part 3 of 6
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.38 Statement of Common Ground - Paul Collins
|
Other |
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 10 Submission - 8.17/10.4 Deed of Obligation Engrossment Version - Annexures - Part 2 of 3
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 1.3: Navigation Document
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 9.126 SZC Co. Response to Request for Further Information at Deadline 10 (6 October 2021)
|
Other |
NNB Generation Company (SZC) Limited (PDF, 7 MB)
Deadline 10 Submission - 9.10.27 Statement of Common Ground - Minsmere Levels Stakeholder Group
|
Other |
NNB Generation Company (SZC) Limited (PDF, 24 MB)
Deadline 10 Submission - 9.10.25 Statement of Common Ground - National Trust
|
Other |
NNB Generation Company (SZC) Limited (PDF, 4 MB)
Deadline 10 Submission - 9.10.20 Statement of Common Ground - Suffolk Coast and Heaths AONB Partnership
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 2.16 East Anglia TWO Order Limits Interaction - Offshore Plan
|
Other |
NNB Generation Company (SZC) Limited (PDF, 32 MB)
Deadline 10 Submission - 6.3/10.3 Volume 2 Main Development Site Chapter 3 Description of Construction, Appendix 3D of the Environment Statement: Construction Method Statement - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 10 MB)
Deadline 10 Submission - 2.17 East Anglia TWO Transport Interaction Plan
|
Other |
NNB Generation Company (SZC) Limited (PDF, 2 MB)
Deadline 10 Submission - 8.23 Environment Agency - Deed of Covenant
|
Other |
NNB Generation Company (SZC) Limited (PDF, 3 MB)
Deadline 10 Submission - 3.4: Final Development Consent Order Signposting Document - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.120 Comments on Earlier Deadlines, Subsequent Written Submissions to ISH11-14 and Comments on Responses to Change Request 19
|
Other |
NNB Generation Company (SZC) Limited (PDF, 5 MB)
Deadline 10 Submission - 5.10/10.11 Shadow Habitats Regulations Assessment Addendum Appendix 9A: Southern North Sea Site Integrity Plan - Tracked Changes Version
|
Other |
NNB Generation Company (SZC) Limited (PDF, 6 MB)
Deadline 10 Submission - 9.10.7 Statement of Common Ground - Natural England
|