You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (4)
Developer's Application (58)
- All Documents
- Additional Information (Reg 6) (2)
- Application Form (4)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (2)
- Drawings (1)
- Environmental Statement (18)
- Other Documents (6)
- Plans (6)
- Reports (16)
Acceptance (11)
Pre Examination (14)
Examination (122)
- All Documents
- Accompanied Site Inspection (1)
- Additional Submissions (1)
- Deadline 1 (7)
- Deadline 2 (42)
- Deadline 3 (12)
- Deadline 4 (5)
- Deadline 5 (19)
- Deadline 6 (6)
- Deadline 7 (13)
- Issue Specific Hearing (1)
- Issue Specific Hearing on draft DCO (1)
- Preliminary Meeting Note (1)
- Procedural Decisions (7)
- Recording of hearing (5)
- Recording of Preliminary Meeting (1)
Decision (4)
Decided (41)
Source | Description |
---|---|
Other |
Department for Business, Energy and Industrial Strategy (PDF, 108 KB)
The Millbrook Gas Fired Generating Station (Amendment) Order 2020
|
Other |
Department for Business, Energy and Industrial Strategy (PDF, 158 KB)
Non Material Change Decision Letter
|
Other |
Millbrook Power Limited (PDF, 1,012 KB)
Millbrook Gas Fired Generating Station Order 2019 – NMC (Tracked) – submitted on 15 November 2019
|
Other |
Millbrook Power Limited (PDF, 255 KB)
Draft - Non-Material Amendment Order (SI version) – submitted on 15 November 2019
|
Other |
Millbrook Power Limited (PDF, 167 KB)
Cover email of 15 November 2019
|
Other |
Aylesbury Vale District Council (PDF, 97 KB)
Response to Non-Material Change Consultation
|
Other |
Central Bedfordshire Council (PDF, 234 KB)
Response to Non-Material Change Consultation
|
Other |
Energy Assets (PDF, 180 KB)
Response to Non-Material Change Consultation
|
Other |
ESP Utilities Group Limited (PDF, 194 KB)
Response to Non-Material Change Consultation
|
Other |
Harlaxton Energy Networks Ltd (PDF, 226 KB)
Response to Non-Material Change Consultation
|
Other |
Health and Safety Executive (PDF, 166 KB)
Response to Non-Material Change Consultation
|
Other |
National Grid Electricity Transmission Plc and National Grid Gas Plc (PDF, 113 KB)
Response to Non-Material Change Consultation
|
Other |
Natural England (PDF, 185 KB)
Response to Non-Material Change Consultation
|
Other |
Rookery South Limited (PDF, 185 KB)
Response to Non-Material Change Consultation
|
Other |
Southern Gas Networks plc (PDF, 659 KB)
Response to Non-Material Change Consultation
|
Other |
St Albans City and District Council (PDF, 11 KB)
Response to Non-Material Change Consultation
|
Other |
Telent / Teliasonera (PDF, 55 KB)
Response to Non-Material Change Consultation
|
Other |
The Chilterns Conservation Board (PDF, 191 KB)
Response to Non-Material Change Consultation
|
Other |
The Coal Authority (PDF, 177 KB)
Response to Non-Material Change Consultation
|
Other |
Wellingborough Borough Council (PDF, 104 KB)
Response to Non-Material Change Consultation
|
Other |
Millbrook Power Limited (PDF, 164 KB)
Elevations of GIS substation
|
Other |
Millbrook Power Limited (PDF, 5 MB)
2.4 Site layout plan and elevations of as permitted AIS substation and as permitted SEC
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Environmental Report (Version 2)
|
Other |
Millbrook Power Limited (PDF, 17 MB)
Environmental Report
|
Other |
Millbrook Power Limited (PDF, 4 MB)
2.7 Rights of Way, Streets and Access Plan (Revision 1)
|
Other |
Millbrook Power Limited (PDF, 4 MB)
Plan showing revised details of the LLRS (Appendix A to the Non-material change main document)
|
Other |
Millbrook Power Limited (PDF, 1,005 KB)
Revised draft Development Consent Order (track changes)
|
Other |
Millbrook Power Limited (PDF, 772 KB)
Application for Non-Material Change to the Millbrook Gas Fired Generating Station Order (2019) (Version 2)
|
Other |
Millbrook Power Limited (PDF, 3 MB)
Land Plans
|
Other |
Millbrook Power Limited (PDF, 4 MB)
2.5 Land Plans (Revision 1)
|
Other |
Millbrook Power Limited (PDF, 6 MB)
Application for a Non-Material Change to the Millbrook Gas Fired Generating Station Order (2019)
|
Other |
Millbrook Power Limited (PDF, 5 MB)
2.3 Indicative Layout Plans (Revision 1)
|
Other |
Millbrook Power Limited (PDF, 184 KB)
Revised draft Development Consent Order (clean)
|
Other |
Millbrook Power Limited (PDF, 6 MB)
2.6 Works Plans (Revision1)
|
Other |
Millbrook Power Limited (PDF, 5 MB)
Works Plans
|
Other |
Millbrook Power Limited (PDF, 2 MB)
Boundary Review
|
Other |
Millbrook Power Limited (PDF, 3 MB)
Rights of Way, Streets and Access Plans
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Advert Notice - Section 153 of the Planning Act 2008 and Regulation 6 of the Infrastructure Planning (Changes to, and revocation of, Development Consent Orders) Regulations 2011
|
Other |
Millbrook Power Limited (PDF, 455 KB)
Proposed Indicative Site Layout
|
Other |
Millbrook Power Limited (PDF, 234 KB)
Site layout plan of GIS substation
|
Other |
Millbrook Power Limited (PDF, 112 KB)
Cover Letter to BEIS
|
Other |
Development Consent Order as Made by the Secretary of State (PDF, 1,009 KB)
|
Other |
Recommendation Report (PDF, 2 MB)
|
Other | |
Other |
Secretary of State Decision Letter (PDF, 738 KB)
|
Other |
Examination Library (PDF, 462 KB)
|
Other |
Notification of Completion of ExA's Examination (PDF, 93 KB)
|
Other |
Millbrook Power Limited (PDF, 16 MB)
Certified Deed of Development Consent Obligations dated 12 September 2018
|
Other |
CLH Pipeline System (PDF, 177 KB)
Deadline 7 Submission - CHL Pipeline System Response
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Deadline 7 Submission - Explanatory Memorandum Rev 3 - Clean
|
Other |
Millbrook Power Limited (PDF, 8 MB)
Deadline 7 Submission - Rights of Way Streets and Access Plans Rev 2
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Deadline 7 Submission - Joint Statement with Network Rail
|
Other |
Millbrook Power Limited (PDF, 33 KB)
Deadline 7 Submission - Book of Reference Rev 7 - Clean
|
Other |
Millbrook Power Limited (PDF, 225 KB)
Deadline 7 Submission - Explanation of Amendments Rev 4
|
Other |
Millbrook Power Limited (PDF, 830 KB)
Deadline 7 Submission - Draft DCO Rev 4 - Tracked Changes
|
Other |
Millbrook Power Limited (PDF, 33 KB)
Deadline 7 Submission - Book of Reference Rev 3 - Tracked Changes
|
Other |
Millbrook Power Limited (PDF, 779 KB)
Deadline 7 Submission - Draft DCO Rev 4 vs Rev 3 - Tracked Changes
|
Other |
Millbrook Power Limited (PDF, 192 KB)
Deadline 7 Submission - Covering Letter
|
Other |
Millbrook Power Limited (PDF, 731 KB)
Deadline 7 Submission - Final Draft DCO Rev 4 - Clean
|
Other |
Millbrook Power Limited (PDF, 398 KB)
Deadline 7 Submission - Explanatory Memorandum Rev 3 - Tracked Changes
|
Other |
Network Rail (PDF, 19 KB)
Deadline 7 Submission - Network Rail Response
|
Other |
Rule 17 Letter (PDF, 66 KB)
The ExA’s Procedural Decision into the changes to the Application.
|
Other |
Central Bedfordshire Council (PDF, 205 KB)
Response to Rule 17 letter dated 16 July 2018
|
Other |
Covanta Rookery South Limited (PDF, 96 KB)
Response to Deadline 6
|
Other |
Historic England (PDF, 73 KB)
Response to Rule 17 Letter dated 16 July 2018
|
Other |
Millbrook Power Limited (PDF, 168 KB)
Deadline 6 Covering Letter
|
Other |
Natural England (PDF, 68 KB)
Response to Rule 17 Letter dated 16 July 2018
|
Other |
Network Rail Infrastructure Limited (PDF, 396 KB)
Response to Deadline 6
|
Other |
Millbrook Power Limited (PDF, 6 MB)
2.6 Works Plans Rev 1 FINAL
|
Other |
Millbrook Power Limited (PDF, 4 MB)
2.5 Land Plans Rev 1 FINAL
|
Other |
Millbrook Power Limited (PDF, 4 MB)
2.7 Access Plans Rev 1 FINAL
|
Other |
Millbrook Power Limited (PDF, 5 MB)
2.3 Indicative Layout Plans Rev 1 FINAL
|
Other |
Millbrook Power Limited (PDF, 10 MB)
2.1 Site Location Plan Low RES FINAL
|
Other |
Millbrook Power Limited (PDF, 1 MB)
2.2 Existing Site Layout Plan Rev D FINAL
|
Other |
Millbrook Power Limited (PDF, 1 MB)
3.1 DCO Rev 3 Clean FINAL
|
Other |
Millbrook Power Limited (PDF, 413 KB)
3.2 DCO Explanatory Memorandum Tracked Rev 2 FINAL
|
Other |
Millbrook Power Limited (PDF, 2 MB)
3.2 DCO Explanatory Memorandum Clean Rev 2 FINAL
|
Other |
Millbrook Power Limited (PDF, 1 MB)
3.1 DCO Rev 3 Tracked FINAL
|
Other |
Millbrook Power Limited (PDF, 561 KB)
4.1 Statement of Reasons Clean Rev 1 FINAL
|
Other |
Millbrook Power Limited (PDF, 33 KB)
4.3 Book of Reference Rev 2 TRACKED FINAL
|
Other |
Millbrook Power Limited (PDF, 33 KB)
4.3 Book of Reference Rev 2 CLEAN FINAL
|
Other |
Millbrook Power Limited (PDF, 617 KB)
4.1 Statement of Reasons Tracked Rev 1 FINAL
|
Other |
Millbrook Power Limited (PDF, 202 KB)
Schedule of Amendments at Deadline 5
|
Other |
Millbrook Power Limited (PDF, 335 KB)
Draft S106 Agreement (Deadline 5 Submission Version) FINAL
|
Other |
Millbrook Power Limited (PDF, 163 KB)
Millbrook Power Limited Deadline 5 Covering Letter
|
Other |
Millbrook Power Limited (PDF, 896 KB)
MPL Outline CEMP Revision 2 for Deadline 5 FINAL
|
Other |
Network Rail (PDF, 83 KB)
Network Rail's response to deadline 5
|
Other |
Rule 17 Letter (PDF, 70 KB)
|
Other |
Covanta Rookery South Limited (PDF, 123 KB)
Covanta's response to deadline 4
|
Other |
Millbrook Power Limited (PDF, 485 KB)
Applicant's response to ExA's SWQ's
|
Other |
Millbrook Power Limited (PDF, 271 KB)
Cover Letter / Guide to the Applicants DCO
|
Other |
Millbrook Power Limited (PDF, 285 KB)
Statement of Common Ground produced jointly by Millbrook Power and Environment Agency
|
Other |
Network Rail Infrastructure Limited (PDF, 33 KB)
Network Rail's response to deadline 4
|
Other |
Further Written Questions (PDF, 32 KB)
Second Written Questions
|
Other |
National Grid (PDF, 109 KB)
Deadline 2 Submission - Confirmation of the withdrawal of Relevant Representation
|
Other |
Millbrook Power Limited (PDF, 301 KB)
Written Summary of the Applicants Oral Case - Compulsory Acquisition
|
Other |
Millbrook Power Limited (PDF, 196 KB)
Explanations of Amendments to Draft DCO
|
Other |
Millbrook Power Limited (PDF, 359 KB)
Applicant comments on Central Bedford Council's Local Impact Report
|
Other |
Millbrook Power Limited (PDF, 235 KB)
SoCG for Applicant and Historic England
|
Other |
Millbrook Power Limited (PDF, 113 KB)
Cover Letter / Guide to the Applicants DCO
|
Other |
Millbrook Power Limited (PDF, 359 KB)
Deadline 3 Submission - Applicants comments of Bedford Borough Council's Local Impact Report
|
Other |
Millbrook Power Limited (PDF, 738 KB)
Draft Development Consent Order - clean
|
Other |
Millbrook Power Limited (PDF, 12 MB)
Written Summary of the Applicants Oral Case - DCO
|
Other |
Millbrook Power Limited (PDF, 304 KB)
Written Summary of the Applicants Oral Case - Environmental
|
Other |
Millbrook Power Limited (PDF, 761 KB)
Draft Development Consent Order - Tracked
|
Other |
Millbrook Power Limited (PDF, 354 KB)
Applicants Comments on Responses to Examining Authority FWQ
|
Other |
Millbrook Power Limited (PDF, 438 KB)
Applicants response to Written Representations
|
Other |
Recording of Compulsory Acquisition Hearing (PDF, 33 KB)
|
Other | |
Other | |
Other | |
Other | |
Other |
Millbrook Power Limited (PDF, 286 KB)
Late Deadline 2 Submission accepted at the discretion of the Examining Authority - Statement of Common Ground between Millbrook Power Limited and Environment Agency
|
Other |
Millbrook Power Limited (PDF, 181 KB)
Late Deadline 2 Submission accepted at the discretion of the Examining Authority - Statement of Common Ground between Millbrook Power Limited and Natural England
|
Other |
Accompanied Site Inspection Itinerary (PDF, 5 MB)
|
Other |
Agendas for Hearings in May 2018 (PDF, 61 KB)
|
Other |
Millbrook Power Limited (PDF, 2 MB)
Late Deadline 2 Submission accepted at the discretion of the Examining Authority - Statement of Common Ground between Millbrook Power Limited and Central Bedfordshire Council
|
Other |
Anglian Water (PDF, 85 KB)
Deadline 2 Submission - Written Representations
|
Other |
Anglian Water (PDF, 808 KB)
Deadline 2 Submission - Water Asset Plan
|
Other |
Bedford Borough Council (PDF, 3 MB)
Deadline 2 Submission - Local Impact Report and Plans
|
Other |
Central Bedfordshire Council (PDF, 932 KB)
Deadline 2 Submission - Plan 3 The Forest of Marston Vale
|
Other |
Central Bedfordshire Council (PDF, 460 KB)
Deadline 2 - Summary of Written Representations
|
Other |
Central Bedfordshire Council (PDF, 2 MB)
Deadline 2 Submission - Plan 1 Rookery Pit and Surrounding Area
|
Other |
Central Bedfordshire Council (PDF, 550 KB)
Deadline 2 Submission - Written Representations
|
Other |
Central Bedfordshire Council (PDF, 475 KB)
Deadline 2 Submission - Local Impact Report
|
Other |
Central Bedfordshire Council (PDF, 597 KB)
Deadline 2 Submission - Proposed Written Response to Examinating Authority’s Written Questions
|
Other |
Central Bedfordshire Council (PDF, 1 MB)
Deadline 2 Submission - Plan 2 Sites that fell under the 1980-81 clay permissions
|
Other |
Covanta Rookery South Limited (PDF, 2 MB)
Deadline 2 Submission - Covering Email
|
Other |
Covanta Rookery South Limited (PDF, 1 MB)
Deadline 2 Submission - Work Plans
|
Other |
Environment Agency (PDF, 69 KB)
Deadline 2 Submission - Response to ExA's Written Questions
|
Other |
Forest of Marston Vale (PDF, 21 KB)
Deadline 2 Submission - Woodland Model Figures
|
Other |
Forest of Marston Vale (PDF, 214 KB)
Deadline 2 Submission
|
Other |
Jeremy Ramsden (PDF, 67 KB)
Deadline 2 Submission - Written Representation
|
Other |
John Moran (PDF, 37 KB)
Deadline 2 Submission
|
Other |
Millbrook Power Limited (PDF, 373 KB)
Deadline 2 Submission - Written Summary of the Issue Specific Hearing on DCO
|
Other |
Millbrook Power Limited (PDF, 10 MB)
Deadline 2 Submission - Outline Landscape and Ecology Mitigation and Management Strategy (Revision 1)
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Deadline 2 Submission - Outline Construction Environmental Management Plan (Revision 1)
|
Other |
Millbrook Power Limited (PDF, 307 KB)
Deadline 2 Submission - Statement of Common Ground between Millbrook Power Limited and National Grid Electricity Transmission plc
|
Other |
Millbrook Power Limited (PDF, 646 KB)
Deadline 2 Submission - Figure 11.1 ZTV Percentage Heights (Revision 1)
|
Other |
Millbrook Power Limited (PDF, 4 MB)
Deadline 2 Submission - Baseline Noise Survey Report and Operational Plan Noise Impact Assessment Report (Revision 1)
|
Other |
Millbrook Power Limited (PDF, 304 KB)
Deadline 2 Submission - Statement of Common Ground between Millbrook Power Limited and National Grid Gas plc
|
Other |
Millbrook Power Limited (PDF, 113 KB)
Deadline 2 Submission - Covering Letter
|
Other |
Millbrook Power Limited (PDF, 5 MB)
Deadline 2 Submission - Statement of Common Ground between Millbrook Power Limited and Bedford Borough Council
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Deadline 2 Submission - Draft Development Consent Order (Revision 1) (Tracked Changes)
|
Other |
Millbrook Power Limited (PDF, 4 MB)
Deadline 2 Submission - Additional Submission on The Current Status of Low Level Restoration Scheme Baseline Works for Millbrook Power
|
Other |
Millbrook Power Limited (PDF, 542 KB)
Deadline 2 Submission - Plan 31116/2001/008 – Revision B
|
Other |
Millbrook Power Limited (PDF, 315 KB)
Deadline 2 Submission - Explanation of Amendments made to the Draft Development Consent Order and other Application Documents
|
Other |
Millbrook Power Limited (PDF, 4 MB)
Deadline 2 Submission - Comments on Relevant Representations
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Deadline 2 Submission - Draft Development Consent Order Clean Version
|
Other |
Millbrook Power Limited (PDF, 9 MB)
Deadline 2 Submission - Responses to the Examining Authority’s First Round of Written Questions with relevant supporting evidence and other documentation appended
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Deadline 2 Submission - Explanatory Memorandum (Revision 1)
|
Other |
Ministry of Defence (PDF, 81 KB)
Deadline 2 Submission - MOD Safeguarding Letter
|
Other |
National Grid (PDF, 12 KB)
Deadline 2 Submission - Written Representation
|
Other |
National Grid (PDF, 10 KB)
Deadline 2 Submission - Response to ExA's Written Questions
|
Other |
Network Rail (PDF, 2 MB)
Deadline 2 Submission - Written Representation
|
Other | |
Other |
Forest of Marston Vale (PDF, 257 KB)
Deadline 1 Submission - Request for the Forest of Marston Vale Trust to be registered
as a formal stakeholder for the Millbrook Power application and the attached letter of 14 November 2014.
|
Other |
Millbrook Power Limited (PDF, 1 MB)
Deadline 1 Submission - Proposed Accompanied Site Inspection Itinerary and Viewpoints
|
Other |
Millbrook Power Limited (PDF, 171 KB)
Deadline 1 Submission - Updated Guide to the DCO Application Documents
|
Other |
Millbrook Power Limited (PDF, 339 KB)
Deadline 1 Submission - Statement of Common Ground between Millbrook Power Limited and Highways England
|
Other |
Millbrook Power Limited (PDF, 141 KB)
Deadline 1 Submission - Covering Letter
|
Other |
Network Rail (PDF, 19 KB)
Deadline 1 Submission
|
Other |
Public Health England (PDF, 40 KB)
Deadline 1 Submission
|
Other |
Preliminary Meeting Note (PDF, 59 KB)
|
Other | |
Other |
Written Questions (PDF, 196 KB)
|
Other |
Covanta Rookery South Limited (PDF, 84 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Covanta Rookery South Limited (PDF, 57 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Recording of Issue Specific Hearing on draft DCO (PDF, 31 KB)
13 March 2018
|
Other |
Recording of Preliminary Meeting (PDF, 31 KB)
13 March 2018
|
Other |
Rule 6 - Notification of the preliminary meeting (PDF, 306 KB)
|
Other |
Section 56 Notification (PDF, 56 KB)
|
Other |
Millbrook Power Limited (PDF, 33 KB)
Additional Submission - Accepted at the discretion of the Examining Authority: 4.3 Book of Reference_track changes
|
Other |
Millbrook Power Limited (PDF, 33 KB)
Additional Submission - Accepted at the discretion of the Examining Authority: 4.3 Book of Reference Schedule of Changes
|
Other |
Millbrook Power Limited (PDF, 681 KB)
Additional Submission- Accepted at the discretion of the Examining Authority: 1.1 Introduction to the Applicant and Guide to the Application
|
Other |
Millbrook Power Limited (PDF, 33 KB)
Additional Submission - Accepted at the discretion of the Examining Authority: 4.3 Book of Reference_clean
|
Other |
Borough Council of Wellingborough (PDF, 60 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Health and Safety Executive (PDF, 62 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Millbrook Power Limited (PDF, 33 KB)
Certificates of compliance with s56 and s59 of the Planning Act 2008 and Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
|
Other |
Public Health England (PDF, 8 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Notice of the Appointment of the Examining Authority (PDF, 56 KB)
|
Other |
Aylesbury Vale District Council (PDF, 53 KB)
Adequacy of Consultation Representation
|
Other |
Bedford Borough Council (PDF, 117 KB)
Adequacy of Consultation Representation
|
Other |
Borough Council of Wellingborough (PDF, 33 KB)
Adequacy of Consultation Representation
|
Other |
Buckinghamshire County Council (PDF, 201 KB)
Adequacy of Consultation Representation
|
Other |
Central Bedfordshire Council (PDF, 281 KB)
Adequacy of Consultation Representation
|
Other |
Dacorum Borough Council (PDF, 492 KB)
Adequacy of Consultation Representation
|
Other |
Luton Borough Council (PDF, 172 KB)
Adequacy of Consultation Representation
|
Other |
Millbrook Power Limited (PDF, 554 KB)
6.2 Environmental Statement Appendices - Volume N Electric and Magnetic Fields Assessment Report
|
Other |
Millbrook Power Limited (PDF, 2 MB)
2.2 Existing Site Layout Plans
|
Other |
Millbrook Power Limited (PDF, 6 MB)
6.1 Environmental Statement
|
Other |
Millbrook Power Limited (PDF, 593 KB)
6.2 Environmental Statement Appendices – Volume F CHP Statement
|
Other |
Millbrook Power Limited (PDF, 608 KB)
4.1 Statement of Reasons
|
Other |
Millbrook Power Limited (PDF, 33 KB)
4.3 Book of Reference
|
Other |
Millbrook Power Limited (PDF, 982 KB)
6.2 Environmental Statement Appendices - Volume H Noise
|
Other |
Millbrook Power Limited (PDF, 5 MB)
5.1 Consultation Report
|
Other |
Millbrook Power Limited (PDF, 319 KB)
7.3 Index of Photographs
|
Other |
Millbrook Power Limited (PDF, 14 MB)
10.1 Planning Statement
|
Other |
Millbrook Power Limited (PDF, 606 KB)
6.4 Environmental Statement Non-Technical Summary
|
Other |
Millbrook Power Limited (PDF, 5 MB)
2.7 Rights of Way Streets and Access Plans
|
Other |
Millbrook Power Limited (PDF, 5 MB)
2.4 Indicative Elevation Drawings
|
Other |
Millbrook Power Limited (PDF, 1 MB)
3.2 Explanatory Memorandum
|
Other |
Millbrook Power Limited (PDF, 6 MB)
4.2 Funding Statement
|
Other |
Millbrook Power Limited (PDF, 172 KB)
10.3 Statement of Proposed Heads of Terms for an Agreement Pursant to s106 of the TCPA 1990
|
Other |
Millbrook Power Limited (PDF, 9 MB)
6.2 Environmental Statement Appendices - Volume M Historic Environment
|
Other |
Millbrook Power Limited (PDF, 248 KB)
1.4 Project Glossary
|
Other |
Millbrook Power Limited (PDF, 6 MB)
2.6 Works Plans
|
Other |
Millbrook Power Limited (PDF, 384 KB)
9.1 Grid Connection Statement
|
Other |
Millbrook Power Limited (PDF, 20 MB)
6.2 Environmental Statement Appendices - Volume B Scoping Report and Scoping Opinion
|
Other |
Millbrook Power Limited (PDF, 17 MB)
1.3 Copies of Newspaper Notices
|
Other |
Millbrook Power Limited (PDF, 430 KB)
9.2 Gas Pipeline Statement
|
Other |
Millbrook Power Limited (PDF, 597 KB)
Environmental Statement Appendices - Volume C Legislation and Policy
|
Other |
Millbrook Power Limited (PDF, 989 KB)
3.1 Draft Development Consent Order
|
Other |
Millbrook Power Limited (PDF, 655 KB)
1.2 Application form
|
Other |
Millbrook Power Limited (PDF, 450 KB)
5.5 Statement of Engagement of Section 79(1) of the Environmental Protection Act 1990
|
Other |
Millbrook Power Limited (PDF, 938 KB)
6.2 Environmental Statement Appendices – Volume E Outline CEMP
|
Other |
Millbrook Power Limited (PDF, 5 MB)
2.3 Indicative Site Layout Plans
|
Other |
Millbrook Power Limited (PDF, 4 MB)
2.5 Land Plans
|
Other |
Millbrook Power Limited (PDF, 546 KB)
6.2 Environmental Statement Appendices - Volume G Air Quality
|
Other |
Millbrook Power Limited (PDF, 22 MB)
10.2 Design and Access Statement
|
Other |
Millbrook Power Limited (PDF, 433 KB)
1.1 Introduction to the Applicant and Guide to the Application
|
Other |
Millbrook Power Limited (PDF, 268 KB)
5.6 Details of other consents and licenses required
|
Other |
Millbrook Power Limited (PDF, 5 MB)
5.7 No Significant Effects Report
|
Other |
Millbrook Power Limited (PDF, 481 KB)
6.2 Environmental Statement Appendices - Volume A Glossary
|
Other |
Millbrook Power Limited (PDF, 5 MB)
7.2 Plan Identifying Photomontage Locations and Directions of Photographs
|
Other |
Millbrook Power Limited (PDF, 436 KB)
6.2 Environmental Statement Appendices - Volume D Mitigation Roadmap
|
Other |
Millbrook Power Limited (PDF, 7 MB)
6.2 Environmental Statement Appendices - Volume K LVIA
|
Other |
Millbrook Power Limited (PDF, 46 MB)
6.2 Environmental Statement Appendices - Volume J Ground Conditions
|
Other |
Millbrook Power Limited (PDF, 16 MB)
6.2 Environmental Statement Appendices - Volume I Ecology
|
Other |
Millbrook Power Limited (PDF, 41 MB)
6.2 Environmental Statement Appendices - Volume L TA
|
Other |
Millbrook Power Limited (PDF, 27 MB)
6.3 Environmental Statement Figures
|
Other |
Millbrook Power Limited (PDF, 45 MB)
5.2 Consultation Report Appendices - Volume 2 Appendix 3.Y Part 1 of 2
|
Other |
Millbrook Power Limited (PDF, 22 MB)
7.1 Photographs and Photomontages (low resolution)
|
Other |
Millbrook Power Limited (PDF, 20 MB)
2.1 Site Location Plans
|
Other |
Millbrook Power Limited (PDF, 43 MB)
5.2 Consultation Report Appendices - Volume 1 Appendix 2.A - 3.X
|
Other |
Millbrook Power Limited (PDF, 39 MB)
5.2 Consultation Report Appendices - Volume 2 Appendix 3.Y Part 2 of 2
|
Other |
Millbrook Power Limited (PDF, 10 MB)
5.2 Consultation Report Appendices - Volume 3 Appendix 3.Z Part 5 of 6
|
Other |
Millbrook Power Limited (PDF, 28 MB)
5.2 Consultation Report Appendices - Volume 3 Appendix 3.Z Part 2 of 6
|
Other |
Millbrook Power Limited (PDF, 42 MB)
5.2 Consultation Report Appendices - Volume 3 Appendix 3.Z Part 1 of 6
|
Other |
Millbrook Power Limited (PDF, 46 MB)
5.2 Consultation Report Appendices - Volume 3 Appendix 3.Z Part 6 of 6
|
Other |
Millbrook Power Limited (PDF, 8 MB)
5.2 Consultation Report Appendices - Volume 3 Appendix 3.Z Part 3 of 6
|
Other |
Millbrook Power Limited (PDF, 28 MB)
5.2 Consultation Report Appendices - Volume 3 Appendix 3.Z Part 4 of 6
|
Other |
Millbrook Power Limited (PDF, 34 MB)
5.2 Consultation Report Appendices - Volume 4 Appendix 4A- 4O
|
Other |
Millbrook Power Limited (PDF, 26 MB)
5.4 Flood Risk Assessment
|
Other |
Millbrook Power Limited (PDF, 21 MB)
5.2 Consultation Report Appendices - Volume 5 Appendix 5.A - 5.G
|
Other |
Millbrook Power Limited (PDF, 8 KB)
6.2 Environmental Statement Appendices_Volume I Ecology CONFIDENTIAL
|
Other |
Milton Keynes Council (PDF, 308 KB)
Adequacy of Consultation Representation
|
Other |
Notification of Decision to Accept Application (PDF, 114 KB)
|
Other |
Section 55 Checklist (PDF, 174 KB)
|
Other |
St Albans City & District Council (PDF, 170 KB)
Adequacy of Consultation Representation
|
Other |
Acknowledgement of S46 Notification (PDF, 119 KB)
|
Other |
Millbrook Power Limited (PDF, 386 KB)
S46 Notification
|
Other |
140728 EN010068 Scoping Opinion (PDF, 13 MB)
Millbrook Power Project - Secretary of State's EIA Scoping Opinion
|
Other |
140620 EN010068 Milbrook Power Project EIA Scoping Report (PDF, 7 MB)
Millbrook Power Project - EIA Scoping Report
|