Hornsea Project Three Offshore Wind Farm

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (9)

Developer's Application (183)

Acceptance (10)

Pre Examination (18)

Examination (1029)

Decision (152)

Decided (62)

Date

SourceDescription
Other
Andy and Clare Parle (PDF, 82 KB)
Deadline 7 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Broadland District Council (PDF, 2 MB)
Deadline 7 Submission - Appendix A to Broadland District Council's Statement of Common Ground
Other
Broadland District Council (PDF, 3 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three UK) Ltd. and Broadland District Council
Other
Broadland District Council (PDF, 421 KB)
Deadline 7 Submission - Post Hearing Submission
Other
DLA Piper UK LLP on behalf of Cadent Gas Limited (PDF, 43 KB)
Deadline 7 Submission - Protective Provisions
Other
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Engagement with Ørsted on Traffic in Cawston - Agreement , Disagreement and Suggestions for Management and Mitigation
Other
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Chairman's Response to ISH9 Agenda Item 5G
Other
Cawston Parish Council (PDF, 7 MB)
Deadline 7 Submission - Cawston HGV Traffic Diversion Proposal
Other
Cawston Parish Council (PDF, 7 MB)
Deadline 7 Submission - Comments on Revised Draft Traffic Management Plan
Other
Cawston Parish Council (PDF, 8 MB)
Deadline 7 Submission - Evidence of No Passing Places for HGVs in Central Cawston
Other
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Response to ISH9 - Traffic Impacts Action Point 14
Other
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Post Hearing Submission and Written Submission of Oral Case - ISH 9
Other
Claire Gray (PDF, 15 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
CPRE Norfolk (PDF, 423 KB)
Deadline 7 Submission - Response to Deadline 7 - Including supportive material
Other
Eastern Power Networks plc (PDF, 46 KB)
Deadline 7 Submission - Protective Provisions
Other
Elliot and Amanda Marks (PDF, 117 KB)
Deadline 7 Submission - Response to Deadline 7 All Things Nice Cawston - Accepted at the Discretion of the Examining Authority
Other
Frances L. Rossington (PDF, 16 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Heidi Hobday (PDF, 14 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Helen & Chris Monk (PDF, 366 KB)
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
Other
John Bentley (PDF, 78 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Kate Wyatt (PDF, 18 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Marine Management Organisation (PDF, 1 MB)
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES) and comment on the Examining Authority’s Schedule of Changes to the draft Development Consent Order (DCO)
Other
Marine Management Organisation (PDF, 1 MB)
Deadline 7 Submission- Response to Deadline 7
Other
Maritime & Coastguard Agency (PDF, 546 KB)
Deadline 7 Submission - Responses to the Examining Authority’s request for further information
Other
Mike Linley (PDF, 15 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Mr Stephen & Mrs Clare Brown (PDF, 18 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Mulbarton Parish Council (PDF, 1,004 KB)
Deadline 7 Submission - Onshore Substation – Option E
Other
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc (PDF, 43 KB)
Deadline 7 Submission - Response to Deadline 7
Other
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc and National Grid Gas Plc (PDF, 17 KB)
Deadline 7 Submission - Protective Provisions
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex A - Further Advice on REP5 -010 Preliminary Trenching Assessment (PTA)
Other
Natural England (PDF, 294 KB)
Deadline 7 Submission - Annex B - Sabellaria Spinulosa Advice Note
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on Markham’s Triangle pMCZ
Other
Natural England (PDF, 15 MB)
Deadline 7 Submission - JNCC Report 598
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex C - Cable Protection Advice Note
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Natural England & JNCC joint Technical Guidance Note - Marine Buffers and Margins
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Response to Rule 17 Questions
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on Cromer Shoal Chalk Beds MCZ
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex E - Ornithology Response
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex D - Note on Small Scale Impact
Other
Natural England (PDF, 16 MB)
Deadline 7 Submission - Non-breeding season populations of seabirds in UK waters
Other
Natural England (PDF, 426 KB)
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES)
Other
Natural England (PDF, 13 MB)
Deadline 7 Submission - SNCB response to MSS Avoidance Rate Report
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on The Wash and North Norfolk Coast SAC
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on North Norfolk Sand Banks and Saturn Reef SAC
Other
Nicola Banham (PDF, 16 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Nicola Stokes (PDF, 47 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
North Norfolk District Council (PDF, 368 KB)
Deadline 7 Submission - Post Hearing Submission to ISH 9
Other
Oulton Parish Council (PDF, 4 MB)
Deadline 7 Submission - Post Hearing Submission
Other
Peter Crossley (PDF, 45 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Polly Brockis (PDF, 155 KB)
Deadline 7 Submission - Post hearing Submission - Accepted at the Discretion of the Examining Authority
Other
Brodies LLP on behalf of Spirit Energy (PDF, 4 MB)
Deadline 7 Submission - Appendix 4 - Aviation Slides
Other
Brodies LLP on behalf of Spirit Energy (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission to ISH 8
Other
Brodies LLP on behalf of Spirit Energy (PDF, 6 MB)
Deadline 7 Submission - Appendix 3 - DNV GL Technical Note
Other
The Royal Society for the Protection of Birds (PDF, 1 MB)
Deadline 7 Submission - Response to Deadline 7
Other
Trinity House (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission to ISH 9
Other
Trinity House (PDF, 208 KB)
Deadline 7 Submission - Post Hearing Submission to ISH 8
Other
V. I. Purdy (PDF, 552 KB)
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the Discretion of the Examining Authority
Other
V.I.Purdy (PDF, 778 KB)
Deadline 7 Submission - Further Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 259 KB)
Deadline 7 Submission - Appendix 11 - Furness et al., 2013
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,019 KB)
Deadline 7 Submission - Appendix 21 - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 173 KB)
Deadline 7 Submission - Appendix 10 - Chamberlain et al. 2006
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 337 KB)
Deadline 7 Submission - Appendix 16 - Newell et al., 2004
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 13 - Collision Risk Estimates for Mitigation Scenarios
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 7 Submission - Appendix 1 - Outline Landscape Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 192 KB)
Deadline 7 Submission - Appendix 12 - Position Statement on Ornithology Mitigation Options
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 15 - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 192 KB)
Deadline 7 Submission - Appendix 18 - Desprez 2000
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 443 KB)
Deadline 7 Submission - Appendix 28 - Cumulative Link Impact Assessment relating to Traffic- Oulton and Cawston
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,020 KB)
Deadline 7 Submission - Appendix 29 - Aviation Meeting Minutes – CHC Helicopter Operator
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 155 KB)
Deadline 7 Submission - Appendix 19 - Foden et al 2009
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 21 - Appendix B
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 175 KB)
Deadline 7 Submission - Appendix 22 - Position Statement on Turbulence
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 471 KB)
Deadline 7 Submission - Appendix 24 - Construction Traffic Noise Assessment Clarification Note
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 7 Submission - Appendix 25 - Outline Construction Traffic Management Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 7 Submission - Appendix 2- Outline Ecological Management Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 26 - Construction Traffic Noise and Vibration Assessment for Cawston Village
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 400 KB)
Deadline 7 Submission - Appendix 3 - In-Principle Monitoring Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 255 KB)
Deadline 7 Submission - Appendix 23 - Updated Layout Development Principles
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 33 - Le et al., 2014
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 38 - Neart na Gaoithe HRA
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 180 KB)
Deadline 7 Submission - Appendix 31 - Applicant’s response to Examining Authority's Rule 17 to Maritime & Coastguard Agency
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 37 - East Anglia Three HRA
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 36 - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 7 Submission - Appendix 41 - Outline Code of Construction Practice
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 34 - Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 30 - Aviation Workshop Draft Minutes – Helicopter Operators
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 284 KB)
Deadline 7 Submission - Appendix 40 - Ornithology roadmap with Natural England for the examination phase (ver.D)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 32 - Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 35 - Spirit Energy Protective Provisions
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 713 KB)
Deadline 7 Submission - Appendix 4 - Outline Cable Specification and Installation Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 522 KB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Broadland District Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Schedule of Changes Development Consent Order and Deemed Marine Licences
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 7 - Cook et al., 2012
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 6 - Jenkins et al., 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 662 KB)
Deadline 7 Submission - Applicants Comments on the Report on the Implications for European Sites (RIES)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 304 KB)
Deadline 7 Submission - Appendix 42 - Position statement in relation to the Radar Early Warning System at J6A platform
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 322 KB)
Deadline 7 Submission - Applicant’s Statement of Commonality of Statements of Common Ground (SoCG)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 512 KB)
Deadline 7 Submission - Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 7 Submission - Appendix 9 - Norfolk Vanguard Ornithology Technical Appendix
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 737 KB)
Deadline 7 Submission - Appendix 5 - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 161 KB)
Deadline 6 Submission - Applicant’s Response to IPs DL6 DCO Comments
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Revised Draft Development Consent Order - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 8 - East Anglia Three Evidence Plan (Meeting 6)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 7 Submission - Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 191 KB)
Deadline 7 Submission - Appendix 20 - Protocol S1 - Alerstam et al., 2007
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Highways England
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 271 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 9
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 674 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 7
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 226 KB)
Deadline 7 Submission - Appendix 43 - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and South Norfolk Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 574 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 8
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 700 KB)
Deadline 7 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 27 - Development of the Cawston Traffic Intervention Scheme
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 17 - Newell et al., 1998
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd. and Eastern Inshore Fisheries and Conservation Authority
Other
Ørsted Hornsea Project Three (UK) Ltd (ZIP, 4 MB)
Deadline 7 Submission - Appendix 15 Annex A Data - Raw Data
Other
Ørsted Hornsea Project Three (UK) Ltd (ZIP, 127 KB)
Deadline 7 Submission - Appendix 15 Annex A Data - Population Estimates and Densities
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 206 KB)
Deadline 7 Submission - Appendix 44 - Areas of agreement on the J6A data analysis