You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (9)
Developer's Application (183)
- All Documents
- Additional Information (Reg 6) (4)
- Application Form (5)
- Compulsory Acquisition Information (5)
- Draft Development Consent Orders (2)
- Environmental Statement (117)
- Other Documents (8)
- Plans (21)
- Reports (21)
Acceptance (10)
Pre Examination (18)
- All Documents
- Additional Submissions (11)
- Certificates (1)
- Other Documents (2)
- Procedural Decision (1)
- Procedural Decisions (2)
- Relevant Representation (1)
Examination (1029)
- All Documents
- Accompanied Site Inspection (1)
- Additional Submissions (6)
- Deadline 1 (251)
- Deadline 10 (72)
- Deadline 2 (29)
- Deadline 3 (112)
- Deadline 4 (156)
- Deadline 5 (29)
- Deadline 6 (83)
- Deadline 7 (121)
- Deadline 8 (22)
- Deadline 9 (89)
- Examination Library (1)
- Hearing Agenda (16)
- Hearing Notice (1)
- Issue Specific Hearing 3 (1)
- Preliminary Meeting Note (1)
- Procedural Decisions (20)
- Recording of hearing (15)
- Recording of Preliminary Meeting (1)
- Report on the Implications for European Sites (1)
- Unaccompanied Site Inspection (1)
Decision (152)
- All Documents
- Applicant’s letter to Secretary of State (1)
- Development Consent Order as made (1)
- Draft Development Consent Order (1)
- Habitats Regulation Assessment (2)
- Notice of the Decision by the SoS (1)
- Notification of Decision to Accept Application (1)
- Other Documents (6)
- Recommendation Report (1)
- Response to the Applicant’s letter (1)
- Response to the Secretary of State’s Minded to Approve Letter (17)
- Secretary of State Consultation (3)
- Secretary of State Consultation 2 (94)
- Secretary of State Consultation 3 (21)
- Secretary of State Decision letter and Statement of Reasons (approved) (1)
- Secretary of State Minded to Approve letter (1)
Decided (62)
- All Documents
- Correction Notice (1)
- Correction Order (1)
- Non-Material Change (18)
- Post Decision (21)
- + Secretary of State Consultation (21)
- H3WF - Regulation 24 consultation response from France (Point-Focal Espoo)
- H3WF - Regulation 24 response from Sweden
- H3WF - Regulation 24 Transboundary Screening
- Reg 24 notification response France Point Focal Convention de Espoo
- Reg 24 notification response Belgium
- Reg 24 notification response Norway
- Reg 24 notification response Denmark
- Reg 24 notification response Netherlands
- Reg 24 notification response France Action de lEtat en Mer
- London Gazette Notice
Source | Description |
---|---|
Other |
Andy and Clare Parle (PDF, 82 KB)
Deadline 7 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Broadland District Council (PDF, 2 MB)
Deadline 7 Submission - Appendix A to Broadland District Council's Statement of Common Ground
|
Other |
Broadland District Council (PDF, 3 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three UK) Ltd. and Broadland District Council
|
Other |
Broadland District Council (PDF, 421 KB)
Deadline 7 Submission - Post Hearing Submission
|
Other |
DLA Piper UK LLP on behalf of Cadent Gas Limited (PDF, 43 KB)
Deadline 7 Submission - Protective Provisions
|
Other |
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Engagement with Ørsted on Traffic in Cawston - Agreement , Disagreement and Suggestions for Management and Mitigation
|
Other |
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Chairman's Response to ISH9 Agenda Item 5G
|
Other |
Cawston Parish Council (PDF, 7 MB)
Deadline 7 Submission - Cawston HGV Traffic Diversion Proposal
|
Other |
Cawston Parish Council (PDF, 7 MB)
Deadline 7 Submission - Comments on Revised Draft Traffic Management Plan
|
Other |
Cawston Parish Council (PDF, 8 MB)
Deadline 7 Submission - Evidence of No Passing Places for HGVs in Central Cawston
|
Other |
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Response to ISH9 - Traffic Impacts Action Point 14
|
Other |
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Post Hearing Submission and Written Submission of Oral Case - ISH 9
|
Other |
Claire Gray (PDF, 15 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
CPRE Norfolk (PDF, 423 KB)
Deadline 7 Submission - Response to Deadline 7 - Including supportive material
|
Other |
Eastern Power Networks plc (PDF, 46 KB)
Deadline 7 Submission - Protective Provisions
|
Other |
Elliot and Amanda Marks (PDF, 117 KB)
Deadline 7 Submission - Response to Deadline 7 All Things Nice Cawston - Accepted at the Discretion of the Examining Authority
|
Other |
Frances L. Rossington (PDF, 16 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Heidi Hobday (PDF, 14 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
|
Other |
Helen & Chris Monk (PDF, 366 KB)
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
|
Other |
John Bentley (PDF, 78 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Kate Wyatt (PDF, 18 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Marine Management Organisation (PDF, 1 MB)
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES) and comment on the Examining Authority’s Schedule of Changes to the draft Development Consent Order (DCO)
|
Other |
Marine Management Organisation (PDF, 1 MB)
Deadline 7 Submission- Response to Deadline 7
|
Other |
Maritime & Coastguard Agency (PDF, 546 KB)
Deadline 7 Submission - Responses to the Examining Authority’s request for further information
|
Other |
Mike Linley (PDF, 15 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Mr Stephen & Mrs Clare Brown (PDF, 18 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
|
Other |
Mulbarton Parish Council (PDF, 1,004 KB)
Deadline 7 Submission - Onshore Substation – Option E
|
Other |
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc (PDF, 43 KB)
Deadline 7 Submission - Response to Deadline 7
|
Other |
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc and National Grid Gas Plc (PDF, 17 KB)
Deadline 7 Submission - Protective Provisions
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex A - Further Advice on REP5 -010 Preliminary Trenching Assessment (PTA)
|
Other |
Natural England (PDF, 294 KB)
Deadline 7 Submission - Annex B - Sabellaria Spinulosa Advice Note
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on Markham’s Triangle pMCZ
|
Other |
Natural England (PDF, 15 MB)
Deadline 7 Submission - JNCC Report 598
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex C - Cable Protection Advice Note
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Natural England & JNCC joint Technical Guidance Note - Marine Buffers and Margins
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Response to Rule 17 Questions
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on Cromer Shoal Chalk Beds MCZ
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex E - Ornithology Response
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex D - Note on Small Scale Impact
|
Other |
Natural England (PDF, 16 MB)
Deadline 7 Submission - Non-breeding season populations of seabirds in UK waters
|
Other |
Natural England (PDF, 426 KB)
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES)
|
Other |
Natural England (PDF, 13 MB)
Deadline 7 Submission - SNCB response to MSS Avoidance Rate Report
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on The Wash and North Norfolk Coast SAC
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on North Norfolk Sand Banks and Saturn Reef SAC
|
Other |
Nicola Banham (PDF, 16 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
|
Other |
Nicola Stokes (PDF, 47 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
North Norfolk District Council (PDF, 368 KB)
Deadline 7 Submission - Post Hearing Submission to ISH 9
|
Other |
Oulton Parish Council (PDF, 4 MB)
Deadline 7 Submission - Post Hearing Submission
|
Other |
Peter Crossley (PDF, 45 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Polly Brockis (PDF, 155 KB)
Deadline 7 Submission - Post hearing Submission - Accepted at the Discretion of the Examining Authority
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 4 MB)
Deadline 7 Submission - Appendix 4 - Aviation Slides
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission to ISH 8
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 6 MB)
Deadline 7 Submission - Appendix 3 - DNV GL Technical Note
|
Other |
The Royal Society for the Protection of Birds (PDF, 1 MB)
Deadline 7 Submission - Response to Deadline 7
|
Other |
Trinity House (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission to ISH 9
|
Other |
Trinity House (PDF, 208 KB)
Deadline 7 Submission - Post Hearing Submission to ISH 8
|
Other |
V. I. Purdy (PDF, 552 KB)
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the Discretion of the Examining Authority
|
Other |
V.I.Purdy (PDF, 778 KB)
Deadline 7 Submission - Further Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 259 KB)
Deadline 7 Submission - Appendix 11 - Furness et al., 2013
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,019 KB)
Deadline 7 Submission - Appendix 21 - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 173 KB)
Deadline 7 Submission - Appendix 10 - Chamberlain et al. 2006
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 337 KB)
Deadline 7 Submission - Appendix 16 - Newell et al., 2004
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 13 - Collision Risk Estimates for Mitigation Scenarios
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 7 Submission - Appendix 1 - Outline Landscape Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 192 KB)
Deadline 7 Submission - Appendix 12 - Position Statement on Ornithology Mitigation Options
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 15 - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 192 KB)
Deadline 7 Submission - Appendix 18 - Desprez 2000
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 443 KB)
Deadline 7 Submission - Appendix 28 - Cumulative Link Impact Assessment relating to Traffic- Oulton and Cawston
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,020 KB)
Deadline 7 Submission - Appendix 29 - Aviation Meeting Minutes – CHC Helicopter Operator
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 155 KB)
Deadline 7 Submission - Appendix 19 - Foden et al 2009
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 21 - Appendix B
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 175 KB)
Deadline 7 Submission - Appendix 22 - Position Statement on Turbulence
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 471 KB)
Deadline 7 Submission - Appendix 24 - Construction Traffic Noise Assessment Clarification Note
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 7 Submission - Appendix 25 - Outline Construction Traffic Management Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 7 Submission - Appendix 2- Outline Ecological Management Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 26 - Construction Traffic Noise and Vibration Assessment for Cawston Village
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 400 KB)
Deadline 7 Submission - Appendix 3 - In-Principle Monitoring Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 255 KB)
Deadline 7 Submission - Appendix 23 - Updated Layout Development Principles
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 33 - Le et al., 2014
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 38 - Neart na Gaoithe HRA
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 180 KB)
Deadline 7 Submission - Appendix 31 - Applicant’s response to Examining Authority's Rule 17 to Maritime & Coastguard Agency
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 37 - East Anglia Three HRA
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 36 - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 7 Submission - Appendix 41 - Outline Code of Construction Practice
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 34 - Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 30 - Aviation Workshop Draft Minutes – Helicopter Operators
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 284 KB)
Deadline 7 Submission - Appendix 40 - Ornithology roadmap with Natural England for the examination phase (ver.D)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 32 - Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 35 - Spirit Energy Protective Provisions
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 713 KB)
Deadline 7 Submission - Appendix 4 - Outline Cable Specification and Installation Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 522 KB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Broadland District Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Schedule of Changes Development Consent Order and Deemed Marine Licences
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 7 - Cook et al., 2012
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 6 - Jenkins et al., 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Cover Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 662 KB)
Deadline 7 Submission - Applicants Comments on the Report on the Implications for European Sites (RIES)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 304 KB)
Deadline 7 Submission - Appendix 42 - Position statement in relation to the Radar Early Warning System at J6A platform
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 322 KB)
Deadline 7 Submission - Applicant’s Statement of Commonality of Statements of Common Ground (SoCG)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 512 KB)
Deadline 7 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Revised Draft Development Consent Order – Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 7 Submission - Appendix 9 - Norfolk Vanguard Ornithology Technical Appendix
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 737 KB)
Deadline 7 Submission - Appendix 5 - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 161 KB)
Deadline 6 Submission - Applicant’s Response to IPs DL6 DCO Comments
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Revised Draft Development Consent Order - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 8 - East Anglia Three Evidence Plan (Meeting 6)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 7 Submission - Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 191 KB)
Deadline 7 Submission - Appendix 20 - Protocol S1 - Alerstam et al., 2007
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Highways England
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 271 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 9
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 674 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 7
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 226 KB)
Deadline 7 Submission - Appendix 43 - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and South Norfolk Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 574 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 8
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 700 KB)
Deadline 7 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 27 - Development of the Cawston Traffic Intervention Scheme
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 17 - Newell et al., 1998
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd. and Eastern Inshore Fisheries and Conservation Authority
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (ZIP, 4 MB)
Deadline 7 Submission - Appendix 15 Annex A Data - Raw Data
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (ZIP, 127 KB)
Deadline 7 Submission - Appendix 15 Annex A Data - Population Estimates and Densities
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 206 KB)
Deadline 7 Submission - Appendix 44 - Areas of agreement on the J6A data analysis
|