You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (9)
Developer's Application (183)
- All Documents
- Additional Information (Reg 6) (4)
- Application Form (5)
- Compulsory Acquisition Information (5)
- Draft Development Consent Orders (2)
- Environmental Statement (117)
- Other Documents (8)
- Plans (21)
- Reports (21)
Acceptance (10)
Pre Examination (18)
- All Documents
- Additional Submissions (11)
- Certificates (1)
- Other Documents (2)
- Procedural Decision (1)
- Procedural Decisions (2)
- Relevant Representation (1)
Examination (1029)
- All Documents
- Accompanied Site Inspection (1)
- Additional Submissions (6)
- Deadline 1 (251)
- Deadline 10 (72)
- Deadline 2 (29)
- Deadline 3 (112)
- Deadline 4 (156)
- Deadline 5 (29)
- Deadline 6 (83)
- Deadline 7 (121)
- Deadline 8 (22)
- Deadline 9 (89)
- Examination Library (1)
- Hearing Agenda (16)
- Hearing Notice (1)
- Issue Specific Hearing 3 (1)
- Preliminary Meeting Note (1)
- Procedural Decisions (20)
- Recording of hearing (15)
- Recording of Preliminary Meeting (1)
- Report on the Implications for European Sites (1)
- Unaccompanied Site Inspection (1)
Decision (152)
- All Documents
- Applicant’s letter to Secretary of State (1)
- Development Consent Order as made (1)
- Draft Development Consent Order (1)
- Habitats Regulation Assessment (2)
- Notice of the Decision by the SoS (1)
- Notification of Decision to Accept Application (1)
- Other Documents (6)
- Recommendation Report (1)
- Response to the Applicant’s letter (1)
- Response to the Secretary of State’s Minded to Approve Letter (17)
- Secretary of State Consultation (3)
- Secretary of State Consultation 2 (94)
- Secretary of State Consultation 3 (21)
- Secretary of State Decision letter and Statement of Reasons (approved) (1)
- Secretary of State Minded to Approve letter (1)
Decided (62)
- All Documents
- Correction Notice (1)
- Correction Order (1)
- Non-Material Change (18)
- Post Decision (21)
- + Secretary of State Consultation (21)
Transboundary Documents
- H3WF - Regulation 24 consultation response from France (Point-Focal Espoo)
- H3WF - Regulation 24 response from Sweden
- H3WF - Regulation 24 Transboundary Screening
- Reg 24 notification response France Point Focal Convention de Espoo
- Reg 24 notification response Belgium
- Reg 24 notification response Norway
- Reg 24 notification response Denmark
- Reg 24 notification response Netherlands
- Reg 24 notification response France Action de lEtat en Mer
- London Gazette Notice
Date
Source | Description |
---|---|
Other | |
Other |
Royal Society for Protection Birds (Document N/A)
Deadline 10 Submission - RSPB Deadline 10 Submissions - Please see REP10-056 a-h of Examination Library for individual documents
|
Other |
Royal Society for the Protection of Birds (Document N/A)
Deadline 10 Submission - Appendix C - Contracts for Difference Draft Budget Notice for the Third Allocation Round
|
Other |
The Wildlife Trusts (Document N/A)
Deadline 4 Submission - TWT response to Examiner's questions: supporting information 2
|
Other |
The Wildlife Trusts (Document N/A)
Deadline 4 Submission - TWT response to Examiner's questions: supporting information 1 - Cover Email
|
Other |
The Wildlife Trusts (Document N/A)
Deadline 4 Submission - Supporting evidence 2 - Please see REP4-121 a-c for individual documents
|
Other |
The Wildlife Trusts (Document N/A)
Deadline 4 Submission - Supporting evidence 1 - Please see REP4120 a-d of the Examining Library to see individual documents
|
Other |
Whale and Dolphin Conservation (Document N/A)
Deadline 4 Submission - Responses to further information requested by the Examining Authority - Please see REP4-118a-g of the Examination Library for individual documents
|
Other |
Royal Society for the Protection of Birds (PDF, 497 KB)
Deadline 10 Submission - Submission on alternative solutions, imperative reasons of overriding public interest and compensation
|
Other |
Royal Society for the Protection of Birds (PDF, 203 KB)
Deadline 10 - Further Submission
|
Other |
Royal Society for the Protection of Birds (PDF, 7 MB)
Deadline 10 Submission - Appendix D - Written Representation for the Royal Society for the Protection of Birds
|
Other |
Royal Society for the Protection of Birds (PDF, 2 MB)
Deadline 10 Submission - Appendix B - Managing Natura 2000 sites
|
Other |
Royal Society for the Protection of Birds (PDF, 10 MB)
Deadline 10 Submission - Appendix A- Offshore Energy Strategy Strategic Environmental Assessment - Consultation Feedback
|
Other |
Royal Society for the Protection of Birds (PDF, 537 KB)
Deadline 10 Submission - Appendix E - SMartWind - Appendix J - Response to the Royal Society for the Protection of Birds Written Representation
|
Other |
Royal Society for the Protection of Birds (PDF, 825 KB)
Deadline 10 Submission - Appendix F - Hornsea Two - Final submission on alternative solutions under the Habitats Regulations for the Royal Society for the Protection of Birds
|
Other |
The Wildlife Trusts (PDF, 7 MB)
Deadline 4 Submission - The identification of discrete and persistent areas of relatively high harbour porpoise density in the wider UK marine area
|
Other |
The Wildlife Trusts (PDF, 304 KB)
Deadline 4 Submission - Revised Approach to the Management of Commercial Fisheries in European Marine sites: Overarching Policy and Delivery Document
|
Other |
The Wildlife Trusts (PDF, 642 KB)
Deadline 4 Submission - Guiding Principles for assessing the impact of underwater noise
|
Other |
The Wildlife Trusts (PDF, 974 KB)
Deadline 4 Submission - Temporary shift in masked hearing thresholds in a harbour porpoise (Phocoena phocoena) after exposure to seismic airgun stimuli
|
Other |
The Wildlife Trusts (PDF, 6 MB)
Deadline 4 Submission - Technical Guidance for Assessing the Effects of Anthropogenic Sound on Marine Mammal Hearing (Version 2.0)
|
Other |
The Wildlife Trusts (PDF, 4 MB)
Deadline 4 Submission - Marine Mammal noise exposure Criteria Initial Scientific Recommendations
|
Other |
Whale and Dolphin Conservation (PDF, 511 KB)
Deadline 4 Submission - Impacts of offshore wind farm construction on harbour porpoises: acoustic monitoring of echo location activity using porpoise detectors (T-PODs)
|
Other |
Whale and Dolphin Conservation (PDF, 2 MB)
Deadline 4 Submission - Responses of harbour porpoises to pile driving at the Horns Rev 2 offshore wind farm in the Danish North Sea
|
Other |
Whale and Dolphin Conservation (PDF, 355 KB)
Deadline 4 Submission - Negative long term effects on harbour porpoises from a large scale offshore wind farm in the Baltic—evidence of slow recovery
|
Other |
Whale and Dolphin Conservation (PDF, 6 MB)
Deadline 4 Submission - Written Questions Response
|
Other |
Whale and Dolphin Conservation (PDF, 2 MB)
Deadline 4 Submission - High rates of vessel noise disrupt foraging in wild harbour porpoises (Phocoena phocoena)
|
Other |
Whale and Dolphin Conservation (PDF, 923 KB)
Deadline 4 Submission - Response to “Resilience of harbor porpoises to anthropogenic disturbance: Must they really feed continuously?”
|
Other |
Whale and Dolphin Conservation (PDF, 1 MB)
Deadline 4 Submission - Renewable Energy - Ecological and economic cost benefit analysis of offshore wind energy
|
Other |
Eversheds Sutherland (International) LLP on behalf of Shell UK Limited (Document N/A)
Deadline 10 submission - Written Representation
|
Other |
Maritime and Coastguard Agency (Document N/A)
Deadline 10 Submission - Further Submission
|
Other | |
Other |
Spirit Energy (Document N/A)
Deadline 10 Submission - Supplementary Position Statement in Light of Simulator Trial Results – Accepted at the discretion of the Examining Authority
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (Document N/A)
Deadline 10 Submission -Appendix 7 to Deadline 10 submission - Fisheries Coexistence and Liaison Plan
|
Other |
Addleshaw Goddard LLP on behalf Network Rail (Document N/A)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Andrew Mildinhall (PDF, 19 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Cawston Parish Council (Document N/A)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Chris and Helen Monk (PDF, 111 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Cliver Searson and Nicola Tanner (PDF, 16 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Cllr Graham Everett (Document N/A)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Dota Williams (PDF, 58 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Graham and Emily Whiteley (PDF, 17 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Guy Pitcher (Document N/A)
Deadline 10 Submission - Post Hearing Submission
|
Other |
Judy Holland (PDF, 6 MB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Karen Hamilton at Brodies LLP on behalf of Spirit Energy (PDF, 1 MB)
Deadline 10 Submission - Protective Provisions and Area Plan
|
Other |
Maritime and Coastguard Agency (Document N/A)
Deadline 10 Submission - Response to Examining Authority's Written Questions
|
Other |
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc (PDF, 43 KB)
Deadline 10 Submission - Protective Provisions
|
Other |
Nicola Banham (PDF, 15 KB)
Deadline 10 Submission - Response to Deadline 10 - Accepted at the discretion of the Examining Authority
|
Other |
Nicola Banham (PDF, 19 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Norfolk County Council (Document N/A)
Deadline 10 Submission - Response to Examining Authority's Written Questions
|
Other |
Oulton Parish Council (Document N/A)
Deadline 10 Submission - Written submission of Oral Representation - Accepted at the discretion of the Examining Authority
|
Other |
Oulton Parish Council (Document N/A)
Deadline 10 Submission - Post Hearing Submission
|
Other |
Phil and Amelia Whiting (Document N/A)
Deadline 10 Submission - Post Hearing Submission
|
Other |
Polly Brockis (PDF, 231 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Polly Brockis (PDF, 15 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Ray & Diane Pearce (PDF, 3 MB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Ray Pearce and Diane Pearce (PDF, 4 MB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Steffan Aquarone (Document N/A)
Deadline 10 Submission - Additional Post Hearing Submission
|
Other |
Steffan Aquarone (Document N/A)
Deadline 10 Submission - Post Hearing Submission
|
Other |
Steve and Joanne Harding (PDF, 16 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
The Crown Estate Commissioners (Document N/A)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Tony Barnett (PDF, 484 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Trinity House (Document N/A)
Deadline 10 submission - Written Representation to Examining Authority
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Broadland District Council - Accepted at the discretion of the Examining Authority
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 10 Submission - Appendix 10 to Deadline 10 submission - Applicant's response to Natural England's Deadline 9 submission (Ornithology)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 465 KB)
Deadline 10 Submission - Applicant's Final Statement of Commonality of Statements of Common Ground (SoCG)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 390 KB)
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and NFFO and VisNed
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 302 KB)
Deadline 10 Submission - Letter of No Impediment - Great Crested Newt mitigation licence application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 208 KB)
Deadline 10 Submission - Written Summary of Applicant's oral case put at Issue Specific Hearing 10
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 602 KB)
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Maritime Coastguard Agency
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 10 Submission - Schedule of Changes DCO and DML (From DL9 to DL10)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 476 KB)
Deadline 10 Submission - Appendix 5 to Deadline 10 submission - Aviation Summary Statement
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 10 Submission - Final Draft Development Consent Order (Clean)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 775 KB)
Deadline 10 Submission - Applicant's Final Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 274 KB)
Deadline 10 Submission - Appendix 1 to Deadline 10 submissions - Summary Statement on MCA and the Array Development Principles
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 470 KB)
Deadline 10 Submission - Offshore Ecology Matters Closing Legal Submission on behalf of the Applicant
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 390 KB)
Deadline 10 Submission - Appendix 4 to Deadline 10 submission - Applicant's response to Spirit Energy Matters Not Agreed at deadline 9
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 214 KB)
Deadline 10 Submission - Written Summary of Applicant's Oral case put at Further Compulsory Acquisition Hearing
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 271 KB)
Deadline 10 Submission - Covering Letter to Deadline 10 submission
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 168 KB)
Deadline 10 Submission - Position statement for Network Rail
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 413 KB)
Deadline 10 Submission - Appendix 3 to Deadline 10 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 330 KB)
Deadline 10 Submission - Appendix 2 to Deadline 10 submission - Benthic Impacts Control Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 10 Submission - Development Consent Order Comparisons (Deadline 10 version against Deadline 9 version)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 503 KB)
Deadline 10 Submission - Joint Statement made by Applicant and Spirit Energy
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 10 Submission - Development Consent Order Comparisons (Deadline 10 version against Application version)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
D9_HOW03_Appendix 21_OCTMP_tracked description: Deadline 10 Submission – Updated version of Ørsted Hornsea Project Three (UK) Ltd’s Deadline 9 Submission Appendix 21 - Outline Construction Traffic Management Plan – Tracked Changes (REP9-049)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 266 KB)
Deadline 10 Submission - Appendix 8 to Deadline 10 submission - Final Agreed Layout Development Principles
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 10 Submission - Applicants Statement of Case
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 209 KB)
Deadline 10 Submission - Appendix 6 to Deadline 10 submission - Summary Statement on Shipping and Navigation
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 329 KB)
Deadline 10 Submission - Applicant's Commentary to Matters Raised at the Open Floor Hearing on 25 March 2019
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 10 Submission - Appendix 9 to Deadline 10 submission - Hornsea Project Two Kittiwake Collision Risk
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
D9_HOW03_Appendix 20_OCTMP_clean description: Deadline 10 Submission – Updated version of Ørsted Hornsea Project Three (UK) Ltd’s Deadline 9 Submission Appendix 20 - Outline Construction Traffic Management Plan – Clean (REP9-048)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 278 KB)
Deadline 10 Submission - Revised Hierarchy of Management Plans
|
Other | |
Other | |
Other | |
Other |
Recording of Open Floor Hearing 3 - 25 March 2019 (PDF, 31 KB)
|
Other |
Darren Hilldrup (PDF, 15 KB)
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
|
Other |
David Vince & Nicola Draycott (PDF, 14 KB)
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
|
Other |
Marine Management Organisation (PDF, 941 KB)
Deadline 9 Submission - Response to Deadline 9
|
Other |
Mark Daniels (PDF, 15 KB)
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
|
Other |
National Farmers Union and Land Interest Group (PDF, 308 KB)
Deadline 9 Submission - Response to Deadline 9
|
Other |
Natural England (PDF, 3 MB)
Deadline 9 Submission - Comments on the Examining Authority's Rule 17 letter to the Applicant dated 19th March 2019 (ExA Q F3.1)
|
Other |
Natural England (PDF, 4 MB)
Deadline 9 Submission - Natural England’s Response to Rule 17 Letter dated 19 March 2019 (ExA Qs F4.1, F4.2, F4.3)
|
Other |
Natural England (PDF, 4 MB)
Deadline 9 Submission - SNS SAC Draft Conservation Objectives and Advice on Activities
|
Other |
Natural England (PDF, 5 MB)
Deadline 9 Submission - Offshore Register Entry for the SNS SAC (Citation)
|
Other |
Natural England (PDF, 3 MB)
Deadline 9 Submission - Natural England’s Comments on the Applicants D7 submissions
|
Other |
Natural England (PDF, 3 MB)
Deadline 9 Submission - Natural England’s Response to Rule 17 Letter dated 21 March 2019 (ExA Q F6.1)
|
Other |
Natural England (PDF, 3 MB)
Deadline 9 Submission - Correction to REP7-078
|
Other |
Addleshaw Goddard LLP on behalf of Network Rail (PDF, 9 MB)
Deadline 9 Submission - Letter to the Examining Authority
|
Other |
Norfolk County Council (PDF, 114 KB)
Deadline 9 Submission - Response to further information requested by the Examining Authority
|
Other |
Oulton Parish Council (PDF, 157 KB)
Deadline 9 Submission - Response to Deadline 9
|
Other |
Recording of Open Floor Hearing 2 - 28 January 2019 (PDF, 31 KB)
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 11 MB)
Deadline 9 Submission - Appendix 5 - Markham Treaty (UK version) dated 26 May 1992
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 8 MB)
Deadline 9 Submission - Appendix 6 - Sworn Statutory Declaration
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 7 MB)
Deadline 9 Submission - Appendix 1 - Sworn Statement by Rune Boge
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 8 MB)
Deadline 9 Submission - Appendix 3 - Spirit Energy Note on Impact of Matters Not Agreed
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 2 MB)
Deadline 9 Submission - Appendix 2 - GCA Final Report 25 March 2019
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 7 MB)
Deadline 9 Submission - Response to Deadline 9
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 10 MB)
Deadline 9 Submission - Appendix 4 - Areas of Agreement on J6A Data Set Analysis
|
Other |
The Royal Society for the Protection of Birds (PDF, 363 KB)
Deadline 9 Submission - Response to Deadline 9
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 9 Submission - Appendix 21 - Outline Construction Traffic Management Plan – Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 9 Submission - Appendix 34 - Updated Offshore Outline Written Scheme of Investigation
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 9 Submission - Appendix 3 - Revised Location Plan Offshore and Onshore
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 14 - Revised Onshore Limits of Deviation Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 10 - Revised Public Rights of Way Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 23 MB)
Deadline 9 Submission - Land Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 368 KB)
Deadline 9 Submission - Appendix 23 - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Book of Reference - Schedule of Changes (between Deadline 4 and Deadline 9)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 312 KB)
Deadline 9 Submission - Appendix 1 - Applicant’s response to Spirit Energy’s submission at Deadline 7
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 12 - Revised Statutory and Non-Statutory Nature Conservation Sites plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Annex A - Schedule of Objection to Granting of Compulsory Acquisition Powers
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Appendix 27 - Revised Offshore Historic Environment Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 9 Submission - Appendix 11 - Revised Historic or Scheduled Monument Sites Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 22 MB)
Deadline 9 Submission - Appendix 13 - Revised Tree Preservation Order and Hedgerow Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 9 Submission - Appendix 25 - Final Statement on Areas of agreement on the J6A data set analysis
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 9 Submission - Appendix 26 - Safety Justification for Single Line of Orientation Layout
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 335 KB)
Deadline 9 Submission - Appendix 22 - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 9 Submission - Appendix 17 - Pearson et al., 1968
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Appendix 28 - Revised Offshore Indicative Extent Of Marine Licences
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 917 KB)
Deadline 9 Submission - Appendix 24 - Natural England Deadline 6 submission for Hornsea Project Two
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 227 KB)
Deadline 9 Submission - Appendix 2 - Final Agreed Layout Development Principles
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Appendix 15 - Wakefield et al., 2017
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 9 Submission - Appendix 20 - Outline Construction Traffic Management Plan - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 271 KB)
Deadline 9 Submission - Appendix 16 - Applicant's position in relation to displacement impacts
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 331 KB)
Deadline 9 Submission - Appendix 19 - Response to Examining Authority's FQ3.1 Rule 17 Collision Risk Modelling
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 9 Submission - Appendix 18 - Langston et al., 2013
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 9 Submission - Appendix 35 - Outline Code of Construction Practice (tracked changes)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 38 - Outline Ecological Management Plan - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 9 Submission - Appendix 30 - Revised Offshore Order Limits and Grid Coordinates Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 9 Submission - Appendix 36 - Outline Code of Construction Practice - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 9 Submission - Appendix 5 -Revised Order Limits and Grid Coordinates Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 9 Submission - Appendix 32 - Outline Landscape Plan (tracked change)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 37 - Outline Ecological Management Plan -Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 9 Submission - Appendix 29 -Revised Offshore Works Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 9 Submission - Appendix 8 - Revised Access to Works Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 396 KB)
Deadline 9 Submission - Appendix 39 - In-Principle Monitoring Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 6 Submission - Appendix 6 - Revised Works Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 9 Submission - Appendix 4 - Revised Location Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 9 Submission - Appendix 33 - Outline Landscape Plan - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Applicant's Compulsory Acquisition (CA) Schedule
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 371 KB)
Deadline 9 Submission - Draft Statement of Common Ground between Hornsea Project Three and the Royal Society for the Protection of Birds
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 509 KB)
Deadline 9 Submission - Position Statements for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 458 KB)
Deadline 9 Submission - Explanatory Memorandum to Development Consent Order
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Book of Reference - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 9 Submission - Applicant Responses to the Examining Authority's Further Information - Rule 17
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Book of Reference (Tracked changes)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 22 MB)
Deadline 9 Submission - Appendix 9 - Revised Streets Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 9 Submission - Cover Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 369 KB)
Deadline 9 Submission - Applicant’s Final Statement of Commonality of Statements of Common Ground (SoCG)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Revised Draft Development Consent Order – Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 9 Submission - Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd and Norfolk Vanguard Ltd and Norfolk Boreas Ltd
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 524 KB)
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Norfolk County Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 431 KB)
Deadline 9 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and Historic England
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 9 Submission - Revised Special Category Land Plan (Onshore and Offshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 376 KB)
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three and Trinity House
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Revised Draft Development Consent Order – Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 9 Submission - Schedule of Changes Development Consent Order and Deemed Marine Licences
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 489 KB)
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three UK) Ltd.,The Wildlife Trusts and Norfolk Wildlife Trust
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 638 KB)
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and the Marine Management Organisation
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 9 Submission - Revised Crown Land Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 268 KB)
Deadline 9 Submission - Updated Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd. and Natural England
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 869 KB)
Deadline 9 Submission - Statement of Reasons - Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 838 KB)
Deadline 9 Submission - Statement of Reasons - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 702 KB)
Deadline 9 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
|
Other |
Natural England (PDF, 6 MB)
Deadline 8 Submission - Annex 2.2A - Accepted at the discretion of the Examining Authority
|
Other |
Alison and Michael Barrett (PDF, 41 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
|
Other |
David Vince & Nicola Draycott (PDF, 139 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
|
Other |
Elliot & Amanda Marks (PDF, 16 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
|
Other |
Graham Whiteley (PDF, 16 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
|
Other |
Helen & Chris Monk (PDF, 18 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
|
Other |
Mulbarton Parish Council (PDF, 54 KB)
Deadline 8 Submission - Written Representation
|
Other |
Richard Buxton Solicitors on behalf of Mulbarton Parish Council (PDF, 2 MB)
Deadline 8 Submission - Written Representation
|
Other |
Oulton Parish Council (PDF, 200 KB)
Deadline 8 Submission - Comments to Deadline 7 Submissions
|
Other |
Phil Daniels (PDF, 116 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
|
Other |
Public Health England (PDF, 163 KB)
Deadline 8 Submission - Response to Consultation
|
Other |
Revd Helen Rengert (PDF, 168 KB)
Deadline 8 Submission - Written Submission - Accepted at the discretion of the Examining Authority
|
Other |
Trinity House (PDF, 126 KB)
Deadline 8 Submission - Written Representation
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 341 KB)
Deadline 8 Submission - Appendix 1 to Deadline 8 submission - Applicant’s Comments on Natural England’s response to the Rule 17 (REP7-064)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 8 Submission - Cover Email
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 8 Submission - Appendix 2 to Deadline 8 submission – MMO’s Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 223 KB)
Deadline 8 Submission - Cover Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 387 KB)
Deadline 8 Submission - Applicant’s Statement of Commonality of Statements of Common Ground (SoCG)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 410 KB)
Deadline 8 Submission - Forestry Commission Letter – Consent pursuant to Section 135 of the Planning Act 2008
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 678 KB)
Deadline 8 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 257 KB)
Deadline 8 Submission - Statement of Common Ground between Hornsea Project Three and Natural England for Offshore Ornithology
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 868 KB)
Deadline 8 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
|
Other |
Request for Further Information - Rule 17 (PDF, 109 KB)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 592 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other | |
Other | |
Other | |
Other |
Agenda for Further Compulsory Acquisition Hearing (PDF, 16 KB)
|
Other |
Agenda for Further Issue Specific Hearing (PDF, 15 KB)
|
Other |
Agenda for Open Floor Hearing 3 (PDF, 15 KB)
|
Other |
Andy and Clare Parle (PDF, 82 KB)
Deadline 7 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Broadland District Council (PDF, 2 MB)
Deadline 7 Submission - Appendix A to Broadland District Council's Statement of Common Ground
|
Other |
Broadland District Council (PDF, 3 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three UK) Ltd. and Broadland District Council
|
Other |
Broadland District Council (PDF, 421 KB)
Deadline 7 Submission - Post Hearing Submission
|
Other |
DLA Piper UK LLP on behalf of Cadent Gas Limited (PDF, 43 KB)
Deadline 7 Submission - Protective Provisions
|
Other |
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Engagement with Ørsted on Traffic in Cawston - Agreement , Disagreement and Suggestions for Management and Mitigation
|
Other |
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Chairman's Response to ISH9 Agenda Item 5G
|
Other |
Cawston Parish Council (PDF, 7 MB)
Deadline 7 Submission - Cawston HGV Traffic Diversion Proposal
|
Other |
Cawston Parish Council (PDF, 7 MB)
Deadline 7 Submission - Comments on Revised Draft Traffic Management Plan
|
Other |
Cawston Parish Council (PDF, 8 MB)
Deadline 7 Submission - Evidence of No Passing Places for HGVs in Central Cawston
|
Other |
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Response to ISH9 - Traffic Impacts Action Point 14
|
Other |
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Post Hearing Submission and Written Submission of Oral Case - ISH 9
|
Other |
Claire Gray (PDF, 15 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
CPRE Norfolk (PDF, 423 KB)
Deadline 7 Submission - Response to Deadline 7 - Including supportive material
|
Other |
Eastern Power Networks plc (PDF, 46 KB)
Deadline 7 Submission - Protective Provisions
|
Other |
Elliot and Amanda Marks (PDF, 117 KB)
Deadline 7 Submission - Response to Deadline 7 All Things Nice Cawston - Accepted at the Discretion of the Examining Authority
|
Other |
Frances L. Rossington (PDF, 16 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Heidi Hobday (PDF, 14 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
|
Other |
Helen & Chris Monk (PDF, 366 KB)
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
|
Other |
John Bentley (PDF, 78 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Kate Wyatt (PDF, 18 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Marine Management Organisation (PDF, 1 MB)
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES) and comment on the Examining Authority’s Schedule of Changes to the draft Development Consent Order (DCO)
|
Other |
Marine Management Organisation (PDF, 1 MB)
Deadline 7 Submission- Response to Deadline 7
|
Other |
Maritime & Coastguard Agency (PDF, 546 KB)
Deadline 7 Submission - Responses to the Examining Authority’s request for further information
|
Other |
Mike Linley (PDF, 15 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Mr Stephen & Mrs Clare Brown (PDF, 18 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
|
Other |
Mulbarton Parish Council (PDF, 1,004 KB)
Deadline 7 Submission - Onshore Substation – Option E
|
Other |
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc (PDF, 43 KB)
Deadline 7 Submission - Response to Deadline 7
|
Other |
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc and National Grid Gas Plc (PDF, 17 KB)
Deadline 7 Submission - Protective Provisions
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex A - Further Advice on REP5 -010 Preliminary Trenching Assessment (PTA)
|
Other |
Natural England (PDF, 294 KB)
Deadline 7 Submission - Annex B - Sabellaria Spinulosa Advice Note
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on Markham’s Triangle pMCZ
|
Other |
Natural England (PDF, 15 MB)
Deadline 7 Submission - JNCC Report 598
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex C - Cable Protection Advice Note
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Natural England & JNCC joint Technical Guidance Note - Marine Buffers and Margins
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Response to Rule 17 Questions
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on Cromer Shoal Chalk Beds MCZ
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex E - Ornithology Response
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex D - Note on Small Scale Impact
|
Other |
Natural England (PDF, 16 MB)
Deadline 7 Submission - Non-breeding season populations of seabirds in UK waters
|
Other |
Natural England (PDF, 426 KB)
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES)
|
Other |
Natural England (PDF, 13 MB)
Deadline 7 Submission - SNCB response to MSS Avoidance Rate Report
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on The Wash and North Norfolk Coast SAC
|
Other |
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on North Norfolk Sand Banks and Saturn Reef SAC
|
Other |
Nicola Banham (PDF, 16 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
|
Other |
Nicola Stokes (PDF, 47 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
North Norfolk District Council (PDF, 368 KB)
Deadline 7 Submission - Post Hearing Submission to ISH 9
|
Other |
Oulton Parish Council (PDF, 4 MB)
Deadline 7 Submission - Post Hearing Submission
|
Other |
Peter Crossley (PDF, 45 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
|
Other |
Polly Brockis (PDF, 155 KB)
Deadline 7 Submission - Post hearing Submission - Accepted at the Discretion of the Examining Authority
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 4 MB)
Deadline 7 Submission - Appendix 4 - Aviation Slides
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission to ISH 8
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 6 MB)
Deadline 7 Submission - Appendix 3 - DNV GL Technical Note
|
Other |
The Royal Society for the Protection of Birds (PDF, 1 MB)
Deadline 7 Submission - Response to Deadline 7
|
Other |
Trinity House (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission to ISH 9
|
Other |
Trinity House (PDF, 208 KB)
Deadline 7 Submission - Post Hearing Submission to ISH 8
|
Other |
V. I. Purdy (PDF, 552 KB)
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the Discretion of the Examining Authority
|
Other |
V.I.Purdy (PDF, 778 KB)
Deadline 7 Submission - Further Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 259 KB)
Deadline 7 Submission - Appendix 11 - Furness et al., 2013
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,019 KB)
Deadline 7 Submission - Appendix 21 - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 173 KB)
Deadline 7 Submission - Appendix 10 - Chamberlain et al. 2006
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 337 KB)
Deadline 7 Submission - Appendix 16 - Newell et al., 2004
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 13 - Collision Risk Estimates for Mitigation Scenarios
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 7 Submission - Appendix 1 - Outline Landscape Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 192 KB)
Deadline 7 Submission - Appendix 12 - Position Statement on Ornithology Mitigation Options
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 15 - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 192 KB)
Deadline 7 Submission - Appendix 18 - Desprez 2000
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 443 KB)
Deadline 7 Submission - Appendix 28 - Cumulative Link Impact Assessment relating to Traffic- Oulton and Cawston
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,020 KB)
Deadline 7 Submission - Appendix 29 - Aviation Meeting Minutes – CHC Helicopter Operator
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 155 KB)
Deadline 7 Submission - Appendix 19 - Foden et al 2009
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 21 - Appendix B
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 175 KB)
Deadline 7 Submission - Appendix 22 - Position Statement on Turbulence
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 471 KB)
Deadline 7 Submission - Appendix 24 - Construction Traffic Noise Assessment Clarification Note
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 7 Submission - Appendix 25 - Outline Construction Traffic Management Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 7 Submission - Appendix 2- Outline Ecological Management Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 26 - Construction Traffic Noise and Vibration Assessment for Cawston Village
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 400 KB)
Deadline 7 Submission - Appendix 3 - In-Principle Monitoring Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 255 KB)
Deadline 7 Submission - Appendix 23 - Updated Layout Development Principles
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 33 - Le et al., 2014
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 38 - Neart na Gaoithe HRA
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 180 KB)
Deadline 7 Submission - Appendix 31 - Applicant’s response to Examining Authority's Rule 17 to Maritime & Coastguard Agency
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 37 - East Anglia Three HRA
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 36 - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 7 Submission - Appendix 41 - Outline Code of Construction Practice
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 34 - Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 30 - Aviation Workshop Draft Minutes – Helicopter Operators
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 284 KB)
Deadline 7 Submission - Appendix 40 - Ornithology roadmap with Natural England for the examination phase (ver.D)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 32 - Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 35 - Spirit Energy Protective Provisions
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 713 KB)
Deadline 7 Submission - Appendix 4 - Outline Cable Specification and Installation Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 522 KB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Broadland District Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Schedule of Changes Development Consent Order and Deemed Marine Licences
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 7 - Cook et al., 2012
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 6 - Jenkins et al., 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Cover Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 662 KB)
Deadline 7 Submission - Applicants Comments on the Report on the Implications for European Sites (RIES)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 304 KB)
Deadline 7 Submission - Appendix 42 - Position statement in relation to the Radar Early Warning System at J6A platform
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 322 KB)
Deadline 7 Submission - Applicant’s Statement of Commonality of Statements of Common Ground (SoCG)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 512 KB)
Deadline 7 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Revised Draft Development Consent Order – Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 7 Submission - Appendix 9 - Norfolk Vanguard Ornithology Technical Appendix
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 737 KB)
Deadline 7 Submission - Appendix 5 - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 161 KB)
Deadline 6 Submission - Applicant’s Response to IPs DL6 DCO Comments
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Revised Draft Development Consent Order - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 8 - East Anglia Three Evidence Plan (Meeting 6)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 7 Submission - Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 191 KB)
Deadline 7 Submission - Appendix 20 - Protocol S1 - Alerstam et al., 2007
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Highways England
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 271 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 9
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 674 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 7
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 226 KB)
Deadline 7 Submission - Appendix 43 - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and South Norfolk Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 574 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 8
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 700 KB)
Deadline 7 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 27 - Development of the Cawston Traffic Intervention Scheme
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 17 - Newell et al., 1998
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd. and Eastern Inshore Fisheries and Conservation Authority
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (ZIP, 4 MB)
Deadline 7 Submission - Appendix 15 Annex A Data - Raw Data
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (ZIP, 127 KB)
Deadline 7 Submission - Appendix 15 Annex A Data - Population Estimates and Densities
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 206 KB)
Deadline 7 Submission - Appendix 44 - Areas of agreement on the J6A data analysis
|
Other | |
Other | |
Other | |
Other | |
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 6 Submission - Post hearing submission
|
Other | |
Other | |
Other | |
Other | |
Other |
Notification of Procedural Decision (PDF, 100 KB)
The Examining Authority's schedule of changes to the draft Development Consent Order
|
Other |
Notification of Procedural Decision (PDF, 86 KB)
Rule 17 - 26 February 2019
Request for further information from the Maritime and Coastguard Agency
|
Other |
Report on the Implications of European Sites (RIES) (PDF, 927 KB)
Issued by the Examining Authority - 21 February 2019
|
Other |
Accompanied Site Inspection Itinerary - 5 March 2019 (PDF, 52 KB)
|
Other |
Helen & Chris Monk (PDF, 15 KB)
Deadline 6 Submission - Suggested Location for Accompanied Site Inspection - Accepted at the discretion of the Examining Authority
|
Other |
South Norfolk Council, North Norfolk District Council and Broadland District Council (PDF, 208 KB)
Deadline 6 Submission - Revised version of the applicant’s Outline Landscape Plan requested by the Examining Authority
|
Other |
DLA Piper UK LLP on behalf of Cadent Gas Limited (PDF, 44 KB)
Deadline 6 Submission - Response to Deadline 6
|
Other |
Historic England (PDF, 303 KB)
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
|
Other |
Marine Management Organisation (PDF, 2 MB)
Deadline 6 Submission - Written Representation
|
Other |
Marine Management Organisation (PDF, 2 MB)
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
|
Other |
Maritime & Coastguard Agency (PDF, 951 KB)
Deadline 6 Submission - Responses to the applicants comments on representations made by Maritime & Coastguard Agency at deadline 4.
|
Other |
Maritime & Coastguard Agency (PDF, 803 KB)
Deadline 6 Submission - Report following aviation trials and exercises in relation to offshore wind farms
|
Other |
Bidwells LLP on behalf of Mr Kemp (PDF, 1,008 KB)
Deadline 6 Submission - Post hearing submission
|
Other |
Mulbarton Parish Council (PDF, 5 MB)
Deadline 6 Submission - Response to Deadline 6
|
Other |
N2RS (PDF, 135 KB)
Deadline 6 Submission - Local cumulative environmental impact assessments of the cable route on landscape, tourism, traffic and recreation
|
Other |
N2RS (PDF, 64 KB)
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
|
Other |
N2RS (PDF, 145 KB)
Deadline 6 Submission - Concerns about Public Engagement and Observations on the Current Project Design
|
Other |
National Farmers Union And The Land Interest Group (PDF, 975 KB)
Deadline 6 Submission - Written submission - Issue Specific Hearing - Compulsory Acquisition - Thursday 31st January 2019
|
Other |
National Farmers Union And The Land Interest Group (PDF, 887 KB)
Deadline 6 Submission - Written submission - Issue Specific Hearing – Draft Development Consent Order - Wednesday 30th January 2019
|
Other |
DLA Piper UK LLP on behalf of National Grid (PDF, 41 KB)
Deadline 6 Submission - Response to Deadline 6
|
Other |
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH 5 Annex H - Natural England’s Response to REP5-014
|
Other |
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH5 Annex G- Natural England’s Comments on the Applicant’s response to ExA Q2.2.38
|
Other |
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH5 Annex A - Natural England’s Comments on REP 4-097 Biotope Clarification paper as requested at ISH 5
|
Other |
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH 5 Annex B - Natural England’s comments on REP5 – 010 Preliminary Trenching Assessment (PTA)
|
Other |
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH 5 Annex E- Natural England’s comments on REP3 – 024 Appendix 15 The Wash and North Norfolk Coast (W&NNC) SAC In-combination Assessment
|
Other |
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH5 Annex F - Natural England’s Response to the Applicant’s response to ExA Q2.2.25
|
Other |
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH 5 Appendix C- Natural England Comments on REP5 – 011- Appendix 3 Cable Specification Installation Plan (CSIP)
|
Other |
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH6 Annex A -Natural England’s Comments on the Applicant’s Proposed DML appeal conditions
|
Other |
Natural England (PDF, 3 MB)
Deadline 6 Submission - Written Submission of Representations at Issue Specific Hearing 5 - Offshore Ecology
|
Other |
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH 5 Annex D- Natural England Comments on REP4-012 pg 43 onwards Applicants response to ExA Q2.2.46 in relation to MEEB.
|
Other |
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH6 Annex B- Natural England’s Comments on REP4-023 Code of Construction Practice Rev.2
|
Other |
Natural England (PDF, 3 MB)
Deadline 6 Submission - Written summary of Representations made at ISH6 DCO Hearing
|
Other |
Addleshaw Goddard LLP on behalf of Network Rail (PDF, 39 KB)
Deadline 6 Submission - Response to Item 11(c) of the Agenda
|
Other |
North Norfolk District Council (PDF, 3 MB)
Deadline 6 Submission - Post hearing submission - Issue Specific Hearing on 30 January 2019
|
Other |
Oulton Parish Council (PDF, 48 KB)
Deadline 6 Submission - Response to Deadline 6
|
Other |
The Royal Society for the Protection of Birds (PDF, 3 MB)
Deadline 6 Submission - Written Submission
|
Other |
The Royal Society for the Protection of Birds (PDF, 6 MB)
Deadline 6 Submission - Appendix 3.2 - Collision Risk Modelling: update and clarification
|
Other |
The Wildlife Trusts (PDF, 283 KB)
Deadline 6 Submission - Post-hearing submission and further comments
|
Other |
Trinity House (PDF, 447 KB)
Deadline 6 Submission - Written Representation for Issue Specific Hearing 6 - Draft Development Consent Order
|
Other |
Weybourne Parish Council (PDF, 58 KB)
Deadline 6 Submission - Response to Deadline 6
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 6 Submission - Appendix 10 -Horsewill and Robinson 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 6 Submission - Appendix 14 - Warwick-Evans et al., 2018
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 6 Submission - Appendix 12 - Preliminary Trenching Assessment
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Appendix 16 - Johnston et al., 2014 with Corrigendum
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 6 Submission - Appendix 15 - Pennycuick 1997
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 6 Submission - Appendix 11 - Aitken et al., 2014
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Appendix 1 -Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 167 KB)
Deadline 6 Submission - Appendix 18 - Duant et al 2002
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 6 Submission - Appendix 13 - Ornithology roadmap with Natural England for the examination phase (ver.C)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 622 KB)
Deadline 6 Submission - Appendix 17 - Garthe et al., 1999
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Appendix 23 - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 6 Submission - Appendix 19 - Alerstam et al., 2007
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Appendix 2 - Outline Code of Construction Practice
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 6 Submission - Appendix 20 - Graham et al., 2018
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Appendix 3 - Outline Construction Traffic Management Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 6 Submission - Appendix 27 - Forsythe et al., 1995
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Appendix 22 - Marine Mammal Hearing Clarifications
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 6 Submission - Appendix 24 - Proposed Use of Temporary Working Areas for Micrositing - Implications for Environmental Statement
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 6 Submission - Appendix 29 - Applicants interpretation of Natural England’s position in relation to collision risk modelling
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 6 Submission - Appendix 26 - Outline Ecological Management Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 6 Submission - Appendix 28 - Position of the Applicant in relation to collision risk modelling
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 21 - Brassuer et al., 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 4 - Rock Protection Decommissioning Methods
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Commentary on progress made with Spirit Energy at Deadline 6
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 9 - Trinder M., 2017
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 6 Submission - Appendix 3b - Annex A - Hornsea Three Highway Intervention Schemes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 6 Submission - Appendix 30 - Outline Onshore Written Scheme of Investigation
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Cover Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 27 MB)
Deadline 6 Submission - Appendix 3a - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 6 Submission - Application for Non-material amendments including Additional Land
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 6 Submission - Appendix 8 -Smart Wind and Forewind 2014 Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 31 - CIGRE Report 2009 - Service Experience of HV Underground and Submarine Cable Systems
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 6 Submission - Appendix 6 - Offshore ornithology Hearing Clarifications-cumulative and in combination assessment methods and age class data
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 7 - Johnson and Cook 2016
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 6 Submission - Appendix 5 - Comments on Condition Assessment for The Wash and North
Norfolk Coast SAC
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Revised Draft Development Consent Order – Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Written summary of Applicant’s oral case put at Compulsory Acquisition Hearing (31st Jan 2019)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Schedule of Changes - Development Consent Order and Deemed Marine Licences
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
Deadline 6 Submission - Appendix 25 - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Written summary of Applicant’s oral case put at Issue Specific Hearing 5 (29th Jan 2019)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Written summary of Applicant’s oral case put at Issue Specific Hearing 6 (30th Jan 2019)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Statement of Commonality of Statements of Common Ground (SoCG)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 6 Submission -Revised Draft Development Consent Order - Clean
|
Other | |
Other | |
Other | |
Other | |
Other |
Marine Management Organisation (PDF, 1 MB)
Deadline 5 Submission - Late Submission
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 107 KB)
Deadline 5 Submission - Appendix 10 - Habitats and Wild Birds Directives: guidance on the application of article
|
Other |
Mulbarton Parish Council (PDF, 3 MB)
Deadline 5 Submission - Map of the Norwich Southern Bypass Protection Zone (NSBPZ)
|
Other |
Natural England (PDF, 1 MB)
Deadline 5 Submission - Updated Appendix 3 to Natural England's written summary on ISH 2 Ornithology
|
Other | |
Other |
Notification of Procedural Decision - Rule 9 (PDF, 84 KB)
|
Other |
Oulton Parish Council (PDF, 16 KB)
Deadline 5 Submission
|
Other |
Proposed provisions checklist (PDF, 42 KB)
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 1 MB)
Deadline 5 Submission - Comments on the Applicant’s responses to the Examining Authority’s Written Questions and Appendices
|
Other |
The Royal Society for the Protection of Birds (PDF, 20 MB)
Deadline 5 Submission and Appendices
|
Other |
Trinity House (PDF, 259 KB)
Deadline 5 Submission - Response to Examining Authority’s Further Written Questions
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 5 Submission - Appendix 1 - Appendix G to the Transport Assessment
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Appendix 3 - Outline Cable Specification and Installation Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 5 Submission - Appendix 2 - Preliminary Trenching Assessment
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Appendix 4 - Second Issue Specific Hearing clarifications in relation to offshore ornithology
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 5 Submission - Appendix 11 - MarESA Summaries EpusOborApri and PoVen biotopes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Appendix 5 - Confirmation of migratory seabirds considered in migratory collision risk modelling
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 14 - Beatrice A Platform Helideck Information Plate
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 13 - Statement of Experience - Anatec Ali MacDonald, John Beattie, and Samantha Westwood
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 4 Submission - Comments on Interested Parties’ Responses to the Examining Authority's Second Written Questions submitted at Deadline 4
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Statement of Common Ground between Hornsea Project Three and Maritime and Coastguard Agency
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 6 - Apportioning Immature Auks to Colonies
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Statement of Commonality of Statements of Common Ground
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 27 MB)
Deadline 5 Submission - Appendix 8 - Main Construction Compound Access Strategy VISSIM Modelling Update
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 9 - Summary of Array Layout Position and Applicants response to Interested Parties answers to Examining Authority's Q2.5.1, Q2.5.6 and Q2.5.7
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 5 Submission - Appendix 7 - Aircraft Management Guidelines
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 5 Submission - Position Statement between: Hornsea Project Three (UK) Ltd. and Shell UK Ltd
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 5 Submission - Cover Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 12 - Ornithology roadmap with Natural England for the examination phase (ver.B)
|
Other |
Hearing Agenda for Compulsory Acquisition Hearing (PDF, 65 KB)
Compulsory Acquisition Hearing - Thursday 31 January 2019
|
Other |
Hearing Agenda for Issue Specific Hearing 5 (PDF, 90 KB)
Issue Specific Hearing 5: Offshore ecology - Tuesday 29 January 2019
|
Other |
Hearing Agenda for Issue Specific Hearing 6 (PDF, 65 KB)
Issue Specific Hearing 6: The draft Development Consent Order - Wednesday 30 January
|
Other |
Hearing Agenda for Open Floor Hearing (PDF, 47 KB)
Open Floor Hearing - Monday 28 January 2019
|
Other |
Itinerary for Accompanied Site Inspection (ASI) (PDF, 51 KB)
Accompanied Site Inspection (ASI) - Monday 28 January 2019
|
Other |
Natural England (PDF, 6 MB)
Deadline 4 Submission - Late Submission - Cruise report for the surveys undertaken
|
Other |
Ray Pearce (PDF, 3 MB)
Deadline 4 Submission - Late Submission accepted at the discretion of the Examining Authority's discretion
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 4 Submission - Appendix 1 Outline Ecological Management Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 563 KB)
Deadline 4 Submission - Appendix 5 Design Objectives and Principles for the HVDC Converter/HVAC Substation and HVAC Booster Station Buildings
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 713 KB)
Deadline 4 Submission - Appendix 6 Moray West OWF Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 4 Submission - Appendix 2 Outline Code of Construction Practice
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 659 KB)
Deadline 4 Submission - Appendix 3 Outline Construction Traffic Management Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 4 Outline Landscape Management Plan
|
Other |
DLA Piper UK LLP on behalf of Cadent Gas Limited (PDF, 8 MB)
Deadline 4 Submission - Written Submission and appendices
|
Other |
Highways England (PDF, 584 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
|
Other |
Historic England (PDF, 467 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
|
Other |
Marine Management Organisation (PDF, 6 MB)
Deadline 4 Submission - A synthesis of current knowledge on the genesis of the Great Yarmouth and Norfolk Bank Systems - Cooper 2008
|
Other |
Marine Management Organisation (PDF, 3 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
|
Other |
Maritime & Coastguard Agency (PDF, 408 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
|
Other |
National Federation of Fishermen's Organisations (PDF, 1 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
|
Other |
DLA Piper UK LLP on behalf of National Grid (PDF, 87 KB)
Deadline 4 Submission - Written Submission
|
Other |
Natural England (ZIP, 7 MB)
Deadline 4 Submission - Raw GIS data delivered from the CEND 22/13 survey
|
Other |
Natural England (Document 249 KB)
Deadline 4 Submission - Reef polygon and point layers
|
Other |
Natural England (PDF, 5 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions, Further information requested by the Examining Authority and Appendix
|
Other |
Norfolk County Council (PDF, 270 KB)
Deadline 4 Submission - Response Examining Authority's Written Question 2.1.11
|
Other |
Norfolk County Council (PDF, 320 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
|
Other |
Norfolk County Council (PDF, 265 KB)
Deadline 4 Submission - Response Examining Authority's Written Question 2.9.3
|
Other |
Norfolk County Council (PDF, 271 KB)
Deadline 3 Submission - Response Examining Authority's Written Question 2.13.10
|
Other |
North Norfolk District Council (PDF, 411 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
|
Other |
Oulton Parish Council (PDF, 27 KB)
Deadline 4 Submission
|
Other |
Royal Society for the Protection of Birds (PDF, 30 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and appendices
|
Other |
South Norfolk Council (PDF, 121 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
|
Other |
Brodies LLP on behalf of Spirit Energy (PDF, 4 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and Appendix
|
Other |
The Crown Estate (PDF, 106 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
|
Other |
The Wildlife Trusts (PDF, 710 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
|
Other |
Whale and Dolphin Conservation (PDF, 6 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 3 Submission - Appendix 77 - Detailed response to the Examining Authority's Q2.2.3
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 11 - Nabe-Nielsen et al., 2018
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 56 - Manwell et al., 2009
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 54 - List of Aviation Assumptions Used in Assessments
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 23 MB)
Deadline 4 Submission - Appendix 52 - Nuon/Vattenfall Report 2017
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 73 - Detailed response to the Examining Authority's Q2.2.30 and Q2.2.39
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Highways England
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 46 - In-Principle Southern North Sea SCI Site Integrity Plan: V2.0
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 25 MB)
Deadline 4 Submission - Appendix 86 - Works Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
Deadline 4 Submission - Appendix 91 - Statutory and Non-Statutory Nature Conservation Sites (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 3 Submission - Late Submission - Book of Reference - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 4 Submission - Appendix 93 - Onshore Limits of Deviation Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 16 - Cook et al., 2014
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 4 Submission - Appendix 92 - Tree Preservation Order and Hedgerow Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Norfolk County Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 29 - Supplementary advice on Conservation Objectives for NNSSR SAC, JNCC 2017
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Reasons - Clean
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Revised Draft Development Consent Order – Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Commonality of Statements of Common Ground
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and the Marine Management Organisation
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 23 - Welcker et al., 2017
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Hearing Speaker Biographies and Statement of Experience
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 17 MB)
Deadline 4 Submission - Appendix 85A - Land Plan - Onshore
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 4 Submission - Book of Reference (Tracked changes)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 3 Submission - Appendix 89 - Public Rights of Way Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 8 - Natural England Letter of No Impediment (Badger Licence)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
Deadline 4 Submission - Appendix 87 - Access to Works Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Comments on Written Representations and Responses submitted by Interested Parties at Deadline 3
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 9 - Booth et al., 2017
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 78 - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 4 Submission - Appendix 84 - Onshore Order Limits
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Application for non-material amendments including Additional Land
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 4 Submission - Book of Reference - Schedule of Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 25 MB)
Deadline 4 Submission - Appendix 85C - Land Plan - Onshore
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 4 Submission - Appendix 88 - Streets Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 3 Submission - Appendix 83 - Location Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 90 - Historic and Scheduled Monument Sites Plan (Onshore)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Cover Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 4 Submission - Appendix 85B - Land Plan - Onshore
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three(UK) Ltd. and South Norfolk Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Schedule of Changes - Development Consent Order and Deemed Marine Licences
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Reasons - Tracked Changes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 66 - Hornsea Project Two Examining Authority's Recommendation Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 17 MB)
Deadline 4 Submission - Appendix 7- HGV Haul Road Reduction Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 57 - Helideck Certificates for Chiswick and Grove Platforms
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 4 Submission - Appendix 72 - Hornsea Project Three Aviation Team
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 64 - Dogger Bank Creyke Beck Examining Authority's Recommendation Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 59 - Fisheries Coexistence and Liaison Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 4 Submission - Appendix 75 - Energy Voice, 2018
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 60 - Draft CfD Budget Notice
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 4 Submission - Appendix 71 - Natural England Response to Hornsea Two Deadline 5
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 69 - Norfolk Vanguard Offshore Ornithology Chapter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 68 - East Anglia Three HRA Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 82 - Location Plan Offshore and Onshore
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 76 - HeliOffshore 2017
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 4 Submission - Appendix 81 - Proposed Minor Amendments Comparison Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 63 - Detailed response to the Examining Authority's Q2.2.7 and Q2.2.44
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 53 - Illustrative cable trench cross sections for ducted installation In response to Examining Authority's Q2.1.3
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Revised Draft Development Consent Order
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 18 - Garthe and Huppop 2004
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 36 - Aitchinson 2012
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 45 - Detailed response to the Examining Authority's Q2.2.65
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 4 Submission - Appendix 67 - Hornsea Project Two HRA Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 65 - Dogger Bank Creyke HRA Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 157 KB)
Deadline 4 Submission - Appendix 51 - Defra MCZ Guidance 2010
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 74 - Anatec Report (2016)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 58 - Indicative Array Layout Based on +-150m Development Lanes
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 62 - Detailed response to the Examining Authority's Q2.2.34
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 43 - Outline Skills and Employment Plan Attachment to the Q2.10.1
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 17 MB)
Deadline 4 Submission - Appendix 38 - Regeneris Consulting and The Tourism Company Report, 2014
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 41 - Regeneris Consulting Report, 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 34 - Noise Clarifications
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 44 - Detailed response to the Examining Authority's Q2.2.68
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 22 - Desholm 2005
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 27 - Pennycuick et al., 1987
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 10 - Brandt et al., 2018
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 25 - Parry 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 33 KB)
Deadline 4 Submission - Annex A – Schedule of Objection to Granting of Compulsory Acquisition Powers
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 4 Submission - Appendix 15 - Furness 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 20 - Masden 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 32 - Further Design Development of Option 1:Passing Places at the Main Construction Compound
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 3 Submission - Appendix 39 - Environmental Resources Management Report, 2014
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 47 - In-Principle Monitoring Plan V3.0
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 50 - Roulund et al., 2019b
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 49 - Roulund et al., 2019a
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 4 Submission - Appendix 33 - Main Construction Compound Access Strategy VISSIM Modelling
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 24 - Cook et al., 2018
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 31 - List of Aviation Assumptions
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 30 - Detailed response to the Examining Authority's Q2.2.20
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 14 - Bowgen and Cook, 2018
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 19 - Lawson et al., 2016
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 submission - Appendix 17 - Dierschke and Garthe 2006
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 26 - Sotheran et al., 2017
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 13 - Wisniewska et al., 2016
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 28 - Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 21 - Wade et al., 2016
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 4 Submission - Appendix 70 - Inch Cape Scoping Opinion (Ornithology)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 55 - Updated Layout Development Principles
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 12 - Scheidat et al., 2011
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd and Norfolk Vanguard Ltd and Norfolk Boreas Ltd
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 37 - Riddington et al., 2008
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 40 - Chris McDermott, IEMA Quality Mark Article
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 42 - Regeneris Consulting Report, 2016
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 48 - Detailed response to the Examining Authority's Q2.9.3
|
Other |
Natural England (PDF, 236 KB)
Deadline 3 Submission - Late submission
|
Other |
Further Written Questions (PDF, 553 KB)
|
Other | |
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 3 Submission - Appendix 7 - S. Gubbay JNCC 2007
|
Other |
Cadent Gas Limited (PDF, 32 KB)
Deadline 3 Submission - Comments on revised draft DCO
|
Other |
Cawston Parish Council (PDF, 115 KB)
Deadline 3 Submission - Post hearing submission
|
Other |
Corpusty & Saxthorpe Parish Council (PDF, 38 KB)
Deadline 3 Submission - Post hearing submission - Late Submission
|
Other |
CPRE Norfolk (PDF, 266 KB)
Deadline 3 Submission - Post Hearing Submission
|
Other |
Edgefield Parish Council (PDF, 38 KB)
Deadline 3 Submission - Post hearing submission - Late Submission
|
Other |
Historic England (PDF, 552 KB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases
|
Other |
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Post hearing submission including written submission of oral cases and comments on the revised draft DCO
|
Other |
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Annex C - Comments on Herring Noise Contours
|
Other |
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Example MCZ screening document
|
Other |
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Annex A -Guidance on MCZ assessments
|
Other |
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Example MCZ Stage 1 assessment
|
Other |
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Annex B - Comments on In Principle Monitoring Plan
|
Other |
Maritime & Coastguard Agency (PDF, 511 KB)
Deadline 3 Submission - Responses to further information requested by the ExA
|
Other |
Mulbarton Parish Council (PDF, 172 KB)
Deadline 3 Submission - Submissions of oral cases
|
Other |
National Farmers Union and Land Interest Group (PDF, 1 MB)
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 4 December 2018
|
Other |
National Farmers Union and Land Interest Group (PDF, 2 MB)
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 6 December 2018
|
Other |
National Farmers Union and Land Interest Group (PDF, 1 MB)
Deadline 3 Submission - Outline Soil Management Plan - Supporting Material of Written Submission to Issue Specific Hearing - 6 December 2018
|
Other |
National Farmers Union and Land Interest Group (PDF, 1 MB)
Deadline 3 Submission - Written Submission - Open Floor Hearing 3 December 2018
|
Other |
National Farmers Union and Land Interest Group (PDF, 2 MB)
Deadline 3 Submission - Construction Environmental Management Plan - Supporting Material of Written Submission to Issue Specific Hearing - 6 December 2018
|
Other |
National Farmers Union and Land Interest Group (PDF, 1 MB)
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 7 December 2018
|
Other |
National Federation of Fisherman's Organisation (PDF, 1 MB)
Deadline 3 Submission - Post Hearing Submission
|
Other |
DLA Piper UK LLP on behalf of National Grid (PDF, 34 KB)
Deadline 3 Submission - Comments on revised draft DCO
|
Other |
Natural England (PDF, 339 KB)
Deadline 3 Submission - Overarching concerns with project timetables
|
Other |
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 1 - Ornithology
|
Other |
Natural England (PDF, 7 MB)
Deadline 3 Submission - Method statement for ornithological, marine mammal and marine mega fauna survey
|
Other |
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 4
|
Other |
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 2 - Benthic Annex 2 2B Response on REP2-004
|
Other |
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 2 - Benthic
|
Other |
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 1
|
Other |
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 3
|
Other |
Norfolk County Council (PDF, 830 KB)
Deadline 3 Submission - Local Impact Report Amendments
|
Other |
Norfolk County Council (PDF, 320 KB)
Deadline 3 Submission - Comments on revised draft DCO
|
Other |
North Norfolk District Council (PDF, 3 MB)
Deadline 3 Submission - Representations following Issue Specific Hearings
|
Other |
Oulton Parish Council (PDF, 341 KB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases
|
Other |
Oulton Parish Council (PDF, 29 KB)
Deadline 3 Submission - Post Hearing Submission
|
Other |
Joanna Church on behalf of Richard Bacon MP (PDF, 60 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Royal Society for the Protection of Birds (PDF, 674 KB)
Deadline 3 Submission - Guillemot Razorbill and Kittiwake Phenology 2016-17
|
Other |
Royal Society for the Protection of Birds (PDF, 1,023 KB)
Deadline 3 Submission - Responses to further information requested by the ExA
|
Other |
Scottish Natural Heritage (PDF, 58 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Bidwells on behalf of Sir Edward Evans-Lombe (PDF, 1 MB)
Deadline 3 Submission - Response to Examining Authority's Written Question 1.1.12
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix G - Map of the UK exclusive economic zone
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZM - Expert Assessment of flying conditions for Ara - Sample of weather forecasts at block J-West (1 October 2017 –29 September 2018)
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZO - Issue Specific Hearing 1 Summary of oral evidence
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Post Issue Specific Hearing 1 Submissions - List of Appendices
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZL- Map showing Spirit Energy's Proposed protective provisions -Composite of Spirit Energy and Ørsted maps
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZN - Comprehensive Analysis of Flying Conditions (Percentage Frequency Outcome) Based on 3-hourly Weather date for J6A (1 October 2017 – 29 September 2018)
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZJ - Map showing Spirit Energy's proposed protective provisions - Hornsea and 5NM radius
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZG - Technical Note
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 7 MB)
Deadline 3 Submission - Appendix ZH - Map showing Spirit Energy's proposed protective provisions - Hornsea and all radii
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZI - Map showing Spirit Energy's proposed protective provisions -Hornsea and 2NM radius
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZK - Map showing Spirit Energy's proposed protective provisions - Hornsea and 7.5NM radius
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 7 MB)
Deadline 3 Submission - Appendix ZD - Addendum to Noble Denton Marine Services Report to Spirit Energy report review of marine hazards
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZF - Legislative Framework Summary
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 7 MB)
Deadline 3 Submission - Appendix ZE - Addendum to AviateQ International Limited Report
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix ZB - Spirit Energy Proposed protective provisions
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 11 MB)
Deadline 3 Submission - Appendix Z - CAA Operational manual extracts - Appendix 1 to the AviateQ International Limited Report
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix T - Markham St - 1 Decommissioning programme
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix Q - Hornsea two offshore wind farm order 2016 No. 0000 Article 6 (1) Schedule 12 parts 8 , 9 and 10
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix X - Letter from OGUK Oil and Gas Regulator
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 18 MB)
Deadline 3 Submission - Appendix O - Oil and Gas authority the maximising economic recovery strategy for the UK
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix S - East Anglia Three offshore wind farm order 2017 No. 826 Article 3 (1) Schedule 8 Part 7
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix P - CAA CAP1386 Safety review of offshore public transport helicopter operations in support of the exploitation of oil and gas - Progress Report
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix V - Planning Inspectorate advice note 9 - Rochdale Envelope
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix U - Marine Accident Investigation branch , report on the investigation of the collision between Sage Sky and Stema Barge II
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix ZC - Declaration - Chiswick Grove and J6A Safety Cases
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix R - Helioffshore safety proposals for offshore safety enhancements
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix ZA - Written Representation
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 25 MB)
Deadline 3 Submission - Appendix E - UK Marine Policy Statement
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 20 MB)
Deadline 3 Submission - Appendix W - Noble detention Marine Services - Hornsea 3 wind farm review of Marine hazards
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix I - CAA CAP1145 Safety review of offshore public transport helicopter operations in support of oil and the exploitation of oil and gas
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 21 MB)
Deadline 3 Submission - Appendix J - East Inshore and East offshore Marine Plan
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 561 KB)
Deadline 3 Submission - Post Issue Specific Hearing 1 Submissions
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 9 MB)
Deadline 3 Submission - Appendix A - Licence P.468 Dated 15 August 1983
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 11 MB)
Deadline 3 Submission - Appendix K - Transport committee's second report on offshore helicopter safety
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix M - CAA CAP764 Policy and guidelines on wind turbines
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 23 MB)
Deadline 3 Submission - Appendix L - CAA CAP1234 Safety review of offshore public transport helicopter operations in support of the exploitation of oil and gas - Progress report
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 801 KB)
Deadline 3 Submission - Cover Letter
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 9 MB)
Deadline 3 Submission - Appendix D - Planning Commission advice note 9 - Rochdale Envelope
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 9 MB)
Deadline 3 Submission - Appendix C - Maritime and Coastguard Agency MGN 372
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix H - MCA - Methodology for assessing the marine navigational safety & emergency response risks of offshore renewable energy installations
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix Y - AviateQ International Limited report
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix F - The exclusive economic zone order 2013
|
Other |
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix N - Maritime and Coastguard Agency MGN 543
|
Other |
Swardeston Parish Council (PDF, 157 KB)
Deadline 3 Submission - Post hearing submissions
|
Other |
Trinity House (PDF, 310 KB)
Deadline 3 Submission - Comments on revised draft DCO
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 3 Submission - Appendix 2 - Indicative HVDC cable corridor cross section
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 1
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 2
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Statement of Commonality of Statements of Common Ground
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 22 MB)
Deadline 3 Submission - Appendix 3 - Onshore Crossing Schedule
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 3 Submission - Statement of Common Ground between Hornsea Project Three and the Royal Society for the Protection of Birds
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Cover Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 3
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 3 Submission - Responses to Additional Submissions by Interested Party at Deadline 1 and 2
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 28 MB)
Deadline 3 Submission - Appendix 1 - Main Construction Compound Briefing Note
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 4
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 3 Submission - Appendix 6 - Marine Monitoring Handbook
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 23 MB)
Deadline 3 Submission - Appendix 8 - Ware S.J. & Kenny A.J. 2011
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 3 Submission - Appendix 9 - McGregor et al 2018 Marine Scotland
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 3 Submission - Appendix 13 - Figures to the Applicant’s Response to Examining Authority's Question Q1.2.46 (REP1-122)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 3 Submission - Appendix 5 - Adrian Judd, Cefas 2011
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 3 Submission - Appendix 11 -JNCC Report no 500 - Wilson et al. 2014
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 3 Submission - Appendix 10 - JNCC Report no 548 - Parsons et al. 2015
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 3 Submission - Appendix 12 - Collision Risk Model Band 2012
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 3 Submission - Appendix 18 - Kuhn O et al - 2nd generation DC grid access for offshore wind farms-HVDC in an AC fashion (CIGRE 2016)
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 3 Submission - Appendix 17 - Age class data
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 3 Submission - Appendix 16 - Ornithology roadmap with Natural England for the examination phase
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 3 Submission - Appendix 15 - The Wash and North Norfolk Coast SAC In-combination Assessment
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 3 Submission - Appendix 4 - Equalities Impact Assessment
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 3 Submission - Appendix 19 Indicative Proposed Minor Amendments to Order Limits
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 3 Submission - Appendix 14 - Markham’s Triangle PMCZ Lifetime Effects Assessment
|
Other | |
Other | |
Other | |
Other | |
Other |
Recording of Open Floor Hearing - 03 December 2018 (PDF, 31 KB)
|
Other |
Joanna Church on behalf of Richard Bacon MP (PDF, 7 MB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Longmans Software (PDF, 2 MB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Norfolk County Council (PDF, 81 KB)
Proposed Amendment to Requirement 15 (Surface Drainage)
|
Other |
Honingham Thorpe Farm (PDF, 149 KB)
Deadline 1 Submission - Written Statement
|
Other |
Helen & Chris Monk (PDF, 20 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Agenda for Issue Specific Hearing 1 (PDF, 93 KB)
Agenda for Issue Specific Hearing 1: Alternatives/Design Flexibility; onshore ecology; navigation and other offshore operations
|
Other |
Agenda for Issue Specific Hearing 2 (PDF, 91 KB)
Agenda for Issue Specific Hearing 2: Offshore ecology
|
Other |
Agenda for Issue Specific Hearing 3 (PDF, 103 KB)
Agenda for Issue Specific Hearing 3: The draft Development Consent Order
|
Other |
Agenda for Issue Specific Hearing 4 (PDF, 106 KB)
Agenda for Issue Specific Hearing 4: Other onshore matters
|
Other |
Agenda for Open Floor Hearing 1 (PDF, 68 KB)
Agenda for Open Floor Hearing 1
|
Other |
Highways England (PDF, 535 KB)
Deadline 2 Submission - Comment On Written Statement
|
Other |
Natural England (PDF, 15 KB)
Deadline 2 Submission - Comments On Responses of a Written Representation
|
Other |
No to Relay Stations (PDF, 37 KB)
Deadline 1 Submission - Notification of wish to make oral representations at an Issue Specific Hearing
|
Other |
Oulton Parish Council (PDF, 23 KB)
Deadline 2 Submission - Comments on responses to the Examining Authority's Written Questions
|
Other |
RSPB (PDF, 1 MB)
Deadline 2 Submission - Comments on responses to the Examining Authority's Written Questions
|
Other |
RSPB (PDF, 2 MB)
Deadline 2 Submission - Report on Seabird Tracking Fieldwork
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 2 Submission - Appendix 8 Race Bank Sandwave Recovery Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 429 KB)
Deadline 2 Submission - Appendix 1 Outline Travel Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 224 KB)
Deadline 2 Submission - Comments to Broadland District Council Local Impact Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 266 KB)
Deadline 2 Submission - Comments to South Norfolk Council Local Impact Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 133 KB)
Deadline 2 Submission - Covering Letter
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 2 Submission - Comments on Written Representations and Responses
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 320 KB)
Deadline 2 Submission - Statement of Commonality of Statements of Common Ground
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 956 KB)
Deadline 2 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and North Norfolk District Council
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 384 KB)
Deadline 2 Submission -Draft Statement of Common Ground between Hornsea Project Three and the Royal Society for the Protection of Birds
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 337 KB)
Deadline 2 Submission - Guide to the Application
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 2 - Applicant’s Response to Highways England Briefing Note 01A
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 2 Submission - Appendix 12 Memorandum of Understanding between the Hornsea Project Two and Natural England
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 2 Submission - Comments on Responses to the Examining Authority's Written Questions
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 288 KB)
Deadline 2 Submission - Comments to Norfolk County Council Local Impact Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 2 Submission - Registered Interest Accompanied Site Inspection
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 2 Submission - Appendix 3 Addendum to Appendix 30 (REP1-156): Permanent Access Note for Onshore HVAC Booster Station
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 532 KB)
Deadline 2 Submission - Appendix 11 SAR Technical Note
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 406 KB)
Deadline 2 Submission - Appendix 9 Response to Cromer Shoal MCZ Conservation Objectives
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 324 KB)
Deadline 2 Submission - Comments to North Norfolk District Council Local Impact Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 2 Submission - Appendix 6 Estimating Seabird Flight Height Using LiDAR
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 2 Submission - Appendix 4 Tree Plan
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 892 KB)
Deadline 2 Submission - Appendix 5 Seabird Flight Height Trial Report
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 2 Submission - Appendix 7 RSPB Seabird Tracking Study at the Flamborough and Filey
Coast
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 779 KB)
Deadline 2 Submission - Appendix 2 Addendum to Appendix 29 (REP1-171): Permanent Access Note for HVDC converter/HVAC substation
|
Other |
Spirit Energy (PDF, 74 KB)
Deadline 1 Submission - Inventory of Supporting Documents For Written Representations
|
Other |
Procedural Decisions (PDF, 108 KB)
Letter to Scottish Natural Heritage inviting them to become an Other Person for the purpose of the examination.
|
Other |
Ørsted Hornsea Project Three (UK) Ltd (PDF, 118 KB)
Hearing Notice
|
Other |
Honingham Aktieselskab (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Whale and Dolphin Conservation (PDF, 784 KB)
Deadline 1 Submission - Written Representation
|
Other |
Anglian Water Services Ltd (PDF, 164 KB)
Deadline 1 Submission - Letter To The Planning Inspectorate
|
Other |
Anglian Water Services Ltd (PDF, 144 KB)
Deadline 1 Submission - Written Representation
|
Other |
Beckhithe Farms Limited (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Broadland District Council (PDF, 338 KB)
Deadline 1 Submission - Boundaries of the Blickling Conservation Area
|
Other |
Broadland District Council (PDF, 158 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
Broadland District Council (PDF, 78 KB)
Deadline 1 Submission - Local Impact Report
|
Other |
Brown & Co On Behalf Of Gurloque Estate (PDF, 82 KB)
Deadline 1 Submission - Written Representation
|
Other |
Brown & Co On Behalf Of Honingham Aktieselskab (PDF, 87 KB)
Deadline 1 Submission - Specific Statement
|
Other |
Brown & Co On Behalf Of Kelling Estate (PDF, 93 KB)
Deadline 1 Submission - Specific Statement
|
Other |
Brown & Co On Behalf Of R Buxton (PDF, 70 KB)
Deadline 1 Submission - Specific Statement
|
Other |
Brown & Co On Behalf Of Richard Gordon (PDF, 88 KB)
Deadline 1 Submission - Specific Statement
|
Other |
Brown & Co On Behalf Of S H Back (PDF, 3 MB)
Deadline 1 Submission - Supporting Plans Proposed Cable Route
|
Other |
Brown & Co On Behalf Of S H Back (PDF, 82 KB)
Deadline 1 Submission - Specific Statement
|
Other |
Brown & Co On Behalf Of S H Back (PDF, 3 MB)
Deadline 1 Submission - Proposed Cable Route Amendments
|
Other |
Cadent Gas (PDF, 35 KB)
Deadline 1 Submission - Written Representation
|
Other |
Carl Baker and David Baker (PDF, 18 KB)
Deadline 1 Submission - Notification of wish to speak at an Open Floor Hearing
|
Other |
Cawston Parish Council (PDF, 47 KB)
Deadline 1 Submission - Written Representation
|
Other |
Charles Watt (PDF, 214 KB)
Deadline 1 Submission - Written Representation
|
Other |
Cllr Graham Everett (PDF, 14 KB)
Deadline 1 Submission - Notification of wish to speak at an Open Floor Hearing and an Issue Specific Hearing.
|
Other |
Cllr Greg Peck (PDF, 42 KB)
Deadline 1 Submission - Accompanied Site Inspection Request
|
Other |
ConocoPhillips (UK) Ltd (PDF, 1 MB)
Deadline 1 Submission - Response to the Examining Authority’s Written Questions
|
Other |
Corpusty & Saxthorpe Council and Edgefield Parish Council (PDF, 14 KB)
Deadline 1 Submission - Joint Written Representation
|
Other |
D N Gray & Co (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Diocese of Norwich (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
East Anglia Two Limited and East Anglia One North Limited (PDF, 223 KB)
Deadline 1 Submission - Written Representation
|
Other |
Eastern Inshore Fisheries Conservation Authority (PDF, 1 MB)
Deadline 1 Submission - Response to The Examining Authority's Written Question
|
Other |
Eastern Inshore Fisheries Conservation Authority (PDF, 221 KB)
Deadline 1 Submission - Summary Written Representation
|
Other |
Eastern Inshore Fisheries Conservation Authority (PDF, 1 MB)
Deadline 1 Submission - Written Representation
|
Other |
Easton and Otley College (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Easton Estate (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Ebony Holdings (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Enviroment Agency (PDF, 120 KB)
Deadline 1 Submission - Response to the Examining Authority’s Written Questions
|
Other |
G.W. Harrold & Partners (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Great Melton Farm Limited (PDF, 214 KB)
Deadline 1 Submission - Written Representation
|
Other |
Great Yarmouth Borough Council (PDF, 45 KB)
Deadline 1 Submission - Written Representation
|
Other |
Greater Norwich Development Partnership (PDF, 985 KB)
Deadline 1 Submission - Joint Core Strategy Policy for Broadland, Norwich and South Norfolk
|
Other |
Gurloque Estate (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
H Jones (Farms) Ltd (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
H T Darling (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Highways England (PDF, 528 KB)
Deadline 1 Submission - Response to the Examining Authority’s Written Questions
|
Other |
Historic England (PDF, 156 KB)
Deadline 1 Submission - Response to the Examining Authority’s Written Questions
|
Other |
Historic England (PDF, 312 KB)
Deadline Submission 1 - Written Representation
|
Other |
Kelling Estate (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Marine Management Organisation (PDF, 376 KB)
Deadline 1 Submission - Written Representation
|
Other |
Marine Management Organisation (PDF, 231 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
Marine Management Organisation (PDF, 67 KB)
Deadline 1 Submission - Summary Written Representation
|
Other |
Maritime & Coastguard Agency (PDF, 182 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
Martin Paul Kemp (PDF, 15 KB)
Deadline 1 Submission - Written Representation
|
Other |
Melton Harrold, Sharon Harrold and Penny Jane Oakes (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Michael Wright (PDF, 62 KB)
Deadline 1 Submission - Written Representation
|
Other |
Ministry of Defence (PDF, 518 KB)
Deadline 1 Submission - Response to The Examining Authority's Written Question
|
Other |
Mr and Mrs Darling (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Mr and Mrs Hall (PDF, 60 KB)
Deadline 1 Submission - Written Representation
|
Other |
Mr and Mrs Pearce (PDF, 250 KB)
Deadline 1 Submission - Written Representation
|
Other |
Mrs C Barratt (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Mrs Julie Dacre (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Mrs S Bulwer-Long (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
N2RS (PDF, 2 MB)
Deadline 1 Submission - Written Representation
|
Other |
National Farmers Union (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
National Federation of Fishermen's Organisations (PDF, 676 KB)
Deadline Submission 1 - Written Representation
|
Other |
National Grid (PDF, 35 KB)
Deadline 1 Submission - Written Representation
|
Other |
National Grid Electricity Transmission Plc (NGET) (PDF, 17 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
Natural England (PDF, 249 KB)
Deadline 1 Submission - Annex D6: NE and JNCC detailed comments on Vol. 5 Annex 2.3 - MCZ Assessment
|
Other |
Natural England (PDF, 545 KB)
Deadline 1 Submission - Annex D7: Natural England Detailed Comments On ES Benthic Characterisation Of The Nearshore Cable Corridor
|
Other |
Natural England (PDF, 144 KB)
Deadline 1 Submission - Annex E: Natural England’s Additional Detailed Comments On Marine Mammals
|
Other |
Natural England (PDF, 479 KB)
Deadline 1 Submission - Annex D4: JNCC and Natural England Advice on Offshore Benthic Ecology
|
Other |
Natural England (PDF, 213 KB)
Deadline 1 Submission - Annex D2: Natural England and the Joint Nature Conservation Committee (JNCC) Advice on the Cable Protection Clarification Note
|
Other |
Natural England (PDF, 188 KB)
Deadline 1 Submission - Annex D3: NE and JNCC Advice on Sandwave Clearance Clarification Note and Other Relevant Documentation on Sandwave Levelling
|
Other |
Natural England (PDF, 239 KB)
Deadline 1 Submission - Annex D5: NE and JNCC comments on the Benthic Sections of the HRA revised in light of further information
|
Other |
Natural England (PDF, 558 KB)
Deadline 1 Submission - Written Representation
|
Other |
Natural England (PDF, 405 KB)
Deadline 1 Submission - Annex A: Schedule of Natural England‘s Responses to Examining Authority‘s First Round of Written Questions
|
Other |
Natural England (PDF, 562 KB)
Deadline 1 Submission - Annex C: Natural England Detailed Advice on Ornithology
|
Other |
Natural England (PDF, 194 KB)
Deadline 1 Submission - Annex D1: Natural England Advice on The Wash and North Norfolk Coast SAC Clarification Note
|
Other |
Natural England (PDF, 292 KB)
Deadline 1 Submission - Annex B: Natural England’s Detailed Comments on the Development Consent Order and Deemed Marine Licenses
|
Other |
Natural England (PDF, 388 KB)
Deadline 1 Submission - Natural England Offshore Wind Cabling: Ten Years Experience and Recommendations
|
Other |
Natural England (PDF, 163 KB)
Deadline 1 Submission - Annex H: Summary of Written Representations
|
Other |
Natural England (PDF, 325 KB)
Deadline 1 Submission - Annex H: Response to Relevant Representations Submitted by Other Parties
|
Other |
Natural England (PDF, 166 KB)
Deadline 1 Submission - Annex G: Summary of Relevant Representations
|
Other |
Natural England (PDF, 89 KB)
Deadline 1 Submission - Annex F: Documentation Submitted by the Applicant to Natural England Post Submission of the Relevant Representation
|
Other |
Nethergate Farms Partnership (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Network Rail (PDF, 1,015 KB)
Deadline 1 Submission - Written Representation
|
Other |
Nicholas Evans-Lombe (PDF, 214 KB)
Deadline 1 Submission - Written Representation
|
Other |
Norfolk County Council (PDF, 20 KB)
Deadline 1 submission - Response To The Examining Authority's Written Questions (Onshore Archaeology)
|
Other |
Norfolk County Council (PDF, 461 KB)
Deadline 1 Submission - Map 2 Onshore Infrastructure and Cable Route
|
Other |
Norfolk County Council (PDF, 363 KB)
Deadline 1 Submission - Map 4 Substation
|
Other |
Norfolk County Council (PDF, 447 KB)
Deadline 1 Submission - Detailed Highway and Environment Comments
|
Other |
Norfolk County Council (PDF, 463 KB)
Deadline 1 Submission - Local Impact Report
|
Other |
Norfolk County Council (PDF, 107 KB)
Deadline 1 Submission - S42 Additional Comments
|
Other |
Norfolk County Council (PDF, 115 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
Norfolk County Council (PDF, 248 KB)
Deadline 1 Submission - Map 3 Onshore Booster Location
|
Other |
Norfolk County Council (PDF, 283 KB)
Deadline 1 Submission - Map 1 Offshore Location
|
Other |
Norfolk County Council (PDF, 335 KB)
Deadline 1 Submission - S42 Comments Cable Route
|
Other |
Norfolk County Council (PDF, 233 KB)
Deadline 1 Submission - S42 Comments
|
Other |
Norfolk County Council (PDF, 88 KB)
Deadline 1 Submissions - Response to the Examining Authority's Written Questions
|
Other |
Norfolk Vanguard and Norfolk Boreas (PDF, 713 KB)
Deadline 1 Submission - Notification of wish to attend an Accompanied Site Inspection (ASI)
|
Other |
North Norfolk District Council (PDF, 217 KB)
Deadline 1 Submission - Local Impact Reports
|
Other |
North Norfolk District Council (PDF, 98 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
Oulton Parish Council (PDF, 26 KB)
Deadline 1 Submission - Written Representation
|
Other |
R Buxton (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
R Watkinson (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
R Youngs (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Richard Gordon (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
RSPB (PDF, 309 KB)
Deadline 1 Submission - Responses to the Examining Authority Written Questions
|
Other |
S H Back (PDF, 260 KB)
Deadline 1 Submission- Written Representation
|
Other |
Sherrill Bullimore (PDF, 868 KB)
Deadline 1 Submission - Written Representation
|
Other |
Simon Moores (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
Sir Edward Evans-Lombe (PDF, 18 KB)
Deadline 1 Submission - Notification of Wish to Speak at an Open Floor Hearing
|
Other |
Sir Edward Evans-Lombe (PDF, 214 KB)
Deadline 1 Submission - Written Representation
|
Other |
Sir John White and Kyle White (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
South Norfolk Council (PDF, 47 KB)
Deadline 1 Submission - Local Impact Report
|
Other |
South Norfolk Council (PDF, 282 KB)
Deadline 1 Submission - Development Management Policies
|
Other |
South Norfolk Council (PDF, 47 KB)
Deadline 1 Submission - Response to Examining Authority's Questions
|
Other |
Spirit Energy (PDF, 1 MB)
Deadline 1 Submission - Aviation Report
|
Other |
Spirit Energy (PDF, 2 MB)
Deadline 1 Submission - Flight Evaluation Report
|
Other |
Spirit Energy (PDF, 199 KB)
Deadline 1 Submission - Corporate Major Accident Prevention Policies
|
Other |
Spirit Energy (PDF, 9 MB)
Deadline 1 Submission - Review of Marine Hazards
|
Other |
Spirit Energy (PDF, 2 MB)
Deadline 1 Submission - ship/Platform Collision Report
|
Other |
Spirit Energy (PDF, 3 MB)
Deadline 1 Submission - Markham ST-1 Decommissioning Programme
|
Other |
Spirit Energy (PDF, 246 KB)
Deadline 1 Submission - Report on the investigation of collision between the offshore supply vessel Highland Pioneer and the DA jack-up rig of the Douglas Offshore installation in Liverpool Bay on 27 January 2000
|
Other |
Spirit Energy (PDF, 462 KB)
Deadline 1 Submission - Guidelines for the Ship/Installation Collision Avoidance
|
Other |
Spirit Energy (PDF, 309 KB)
Deadline 1 Submission - Navigational Safety Within Marine
Spatial Planning
|
Other |
Spirit Energy (PDF, 520 KB)
Deadline 1 Submission - Written Representation
|
Other |
Spirit Energy (PDF, 22 KB)
Deadline 1 Submission - Press Release
|
Other |
Spirit Energy (PDF, 5 MB)
Deadline 1 Submission - White Paper Offshore Wind Energy
|
Other |
Spirit Energy (PDF, 30 KB)
Deadline 1 Submission - Annex to Written Representation
|
Other |
Spirit Energy (PDF, 1,019 KB)
Deadline 1 Submission - Cover Letter
|
Other |
Spirit Energy (PDF, 18 KB)
Deadline 1 Submission - Summary of Written Representation
|
Other |
Spirit Energy (PDF, 129 KB)
Deadline 1 Submission - Petroleum Act 1998 c. 17 - Part I Petroleum
|
Other |
Spirit Energy (PDF, 268 KB)
Deadline 1 Submission - Offshore Installations and Pipeline Works (Management and Administration) Regulations 1995/738
|
Other |
Spirit Energy (PDF, 105 KB)
Deadline 1 Submission - Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995/743
|
Other |
Spirit Energy (PDF, 52 KB)
Deadline 1 Submission - Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations 2015/398
|
Other |
Spirit Energy (PDF, 99 KB)
Deadline 1 Submission -The Maximising Economic Recovery Strategy For The UK
|
Other |
Spirit Energy (PDF, 32 KB)
Deadline 1 Submission - Petroleum Act 1987 c. 12 - Part III
|
Other |
Spirit Energy (PDF, 279 KB)
Deadline 1 Submission - Oil and Gas Clause in Crown Estate leases
|
Other |
Spirit Energy (PDF, 744 KB)
Deadline 1 Submission - Overarching National Policy Statement for Energy (EN-1)
|
Other |
Spirit Energy (PDF, 297 KB)
Deadline 1 Submission - National Policy Statement for Renewable Energy Infrastructure (EN-3)
|
Other |
Spirit Energy (PDF, 46 KB)
Deadline 1 Submission - Health and Safety at Work etc. Act 1974 c. 37
|
Other |
Spirit Energy (PDF, 540 KB)
Deadline 1 Submission - Human Element Guidance - Part 1 - Fatigue and Fitness For Duty: Statutory Duties, Causes Of Fatigue And Guidance On Good Practice
|
Other |
Spirit Energy (PDF, 503 KB)
Deadline 1 Submission - Safety of Navigation: Offshore Renewable Energy Installations (OREIs) - Guidance on UK Navigational Practice, Safety and Emergency Response
|
Other |
Spirit Energy (PDF, 5 MB)
Deadline 1 Submission - Guidelines for Offshore Marine
Operations
|
Other |
Spirit Energy (PDF, 316 KB)
Deadline 1 Submission - Letter - Major Accident Hazard - Potential for Structural Failure of Offshore Installations Due to Collision With Attending Vessels
|
Other |
Spirit Energy (PDF, 4 MB)
Deadline 1 Submission - Health and Safety Offshore Technology Report
|
Other |
Swardeston Parish Council (PDF, 24 KB)
Deadline 1 Submission - Comments on RR-035
|
Other |
Swardeston Parish Council (PDF, 82 KB)
Deadline 1 Submission - Comments on RR-052
|
Other |
Swardeston Parish Council (PDF, 23 KB)
Deadline 1 Submission - Comments on RR-054
|
Other |
Swardeston Parish Council (PDF, 20 KB)
Deadline 1 Submission - Notification of wish to attend an Accompanied Site Inspection (ASI)
|
Other |
Taylor Wimpey (East Anglian) Ltd (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
The National Trust (PDF, 165 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
The National Trust (PDF, 2 MB)
Deadline 1 Submission - Written Representation
|
Other |
The Rampton Property Trust (PDF, 214 KB)
Deadline 1 Submission - Written Representation
|
Other |
The Trustee of the H G Back Settlement (PDF, 214 KB)
Deadline 1 Submission - Written Representation
|
Other |
The Trustees of the B E Brooks 1983 Settlement (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
The Trustees of the B E Bulwer-Long Settlement (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |
The Wildlife Trusts (PDF, 312 KB)
Deadline 1 Submission - Written Representation
|
Other |
The Wildlife Trusts (PDF, 705 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
Trinity House (PDF, 216 KB)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
|
Other |
Trustees Educational Foundation of Alderman John Norman (PDF, 260 KB)
Deadline 1 Submission - Written Representation
|
Other |