Hornsea Project Three Offshore Wind Farm

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (9)

Developer's Application (183)

Acceptance (10)

Pre Examination (18)

Examination (1029)

Decision (152)

Decided (62)

Date

SourceDescription
Other
Department of Energy Security and Net Zero (PDF, 175 KB)
Secretary of State Decision Letter - 17 April 2023
Other
Department of Energy Security and Net Zero (PDF, 121 KB)
The Hornsea Three Offshore Wind (Amendment) Order 2023
Other
RSPB (PDF, 292 KB)
Response to the Secretary of State's letter of 3 March 2023
Other
East Suffolk Council (PDF, 130 KB)
Response to the Applicant's Kittiwake Implementation and Monitoring Plan
Other
Marine Management Organisation (PDF, 652 KB)
Response to the Applicant's Kittiwake Implementation and Monitoring Plan
Other
Natural England (PDF, 131 KB)
Response to the Applicant's Kittiwake Implementation and Monitoring Plan
Other
Department for Energy Security and Net Zero (PDF, 145 KB)
Letter clarifying typographical error within letter issued on 21 December 2022
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 58 MB)
Regulation 7A Consultation and Publicity Statement
Other
Marine Management Organisation (MMO) (PDF, 894 KB)
Comments on the representations received in relation to the Non-Material Change Application
Other
Natural England (PDF, 105 KB)
Comments on the representations received in relation to the Non-Material Change Application
Other
RSPB (PDF, 351 KB)
Comments on the representations received in relation to the Non-Material Change Application
Other
The Crown Estate (PDF, 82 KB)
Comments on the representations received in relation to the Non-Material Change Application
Other
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 145 KB)
Secretary of State Letter Inviting Comments
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Kittiwake Implementation and Monitoring Plan (KIMP)
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 605 KB)
Site Selection Narrative Report
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 129 KB)
Cover Letter
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Kittiwake Implementation and Monitoring Plan - Design Report - Appendix 2: Supporting Design Information
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Kittiwake Implementation and Monitoring Plan - Design Report - Appendix 1 : Pattern Book
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 251 KB)
Kittiwake Implementation and Monitoring Plan (KIMP) - Appendix A- Design Report
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 279 KB)
Draft DCO Amendment Order
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 62 KB)
Validation Email - SI Validation
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 153 KB)
Regulation 7(3) - Letter from BEIS
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 201 KB)
Regulation 6 Notice
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 267 KB)
Regulation 7 Notice
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Application Cover Letter
Other
Department for Business, Energy & Industrial Strategy (BEIS) (PDF, 159 KB)
Non-material change consultation notice letter to applicant - 21 December 2022
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 283 KB)
Letter to the Secretary of State for Business, Energy and Industrial Strategy - 8 November 2022
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 348 KB)
List of consultees from applicant
Other
Department for Business, Energy & Industrial Strategy (BEIS) (PDF, 214 KB)
APPROVAL OF SANDBANK IMPLEMENTATION PLAN UNDER PART 2 OF SCHEDULE 14 TO THE ORDER
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 612 KB)
Response to the Sandbank Implementation Plan consultation - Request for Further Information: Change log
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Response to the Sandbank Implementation Plan consultation - Sandbank Implementation Plan North Norfolk Sandbanks and Saturn Reef SAC
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 220 KB)
Response to the Sandbank Implementation Plan consultation - Cover Letter
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Response to the Sandbank Implementation Plan consultation - Sandbank Implementation Plan Wash and North Norfolk Coast SAC
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Response to the Sandbank Implementation Plan consultation - Appendix 1: Marine Debris Removal Campaign: Desktop Study
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to the Sandbank Implementation Plan consultation - Appendix 2: Environmental Monitoring Plan for Impacts Associated with Cable Protection
Other
JNCC and Natural England (PDF, 97 KB)
Response to the Sandbank Implementation Plan consultation - Cover Email
Other
JNCC and Natural England (PDF, 3 MB)
Response to the Sandbank Implementation Plan consultation - Appendix 2 - Detailed comments on the Sand Bank Implementation Plans and associated documents
Other
JNCC and Natural England (PDF, 329 KB)
Response to the Sandbank Implementation Plan consultation - Appendix 1 - Assessment of SBIP against best practice guidance for developing compensatory measures in relation to Marine Protected Areas
Other
JNCC and Natural England (PDF, 294 KB)
Response to the Sandbank Implementation Plan consultation - Cover Letter
Other
Marine Management Organisation (PDF, 2 MB)
Response to the Sandbank Implementation Plan consultation
Other
JNCC and Natural England (PDF, 108 KB)
Response to letter from Secretary of State dated 03 December 2021
Other
Department for Business, Energy & Industrial Stratergy (BEIS) (PDF, 142 KB)
Letter inviting comments on the Sandbank Implementation Plans
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Appendix 1 - Marine Debris Removal Campaign - Desktop Study
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Appendix 3 - Disposal Technical Study
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 81 KB)
Cover Letter
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Benthic Compensation Consultation Summary
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Sandbank Implementation Plan NNSSR SAC
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Sandbank Implementation Plan WNNC SAC
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 356 KB)
Appendix 2 - Environmental Monitoring Plan for Impacts Associated with Cable Protection
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 296 KB)
Approval letters - Plan for Work of the Offshore Ornithology Engagement Group (OOEG) signed by Natural England - Paragraph 2 of Part 1 of Schedule 14
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 324 KB)
Approval Letters - Plan of Work for Offshore Ornithology Engagement Group
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 316 KB)
Approval letters - Plan for Work of the Steering Group signed by Marine Management Organisation - Paragraph 10 of Part 2 of Schedule 14
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 289 KB)
Approval letters - Plan for Work of the Offshore Ornithology Engagement Group (OOEG) signed by Royal Society for the Protection of Birds - Paragraph 2 of Part 1 of Schedule 14
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 318 KB)
Approval letters - Plan for work of the Steering Group signed by Natural England - Paragraph 10 of Part 2 of Schedule 14
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 186 KB)
Approval letters - Approval of Plan of Work under Paragraph 10 of Part 2 of Schedule 14 to the Order
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 309 KB)
Approval letters - Plan for Work of the Steering Group signed by the Joint Nature Conservation Committee - Paragraph 10 of Part 2 of Schedule 14
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 186 KB)
Approval letters - Approval of Plan of Work issued under Paragraph 2 of Part 1 of Schedule 14 to the Order
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 338 KB)
Approval letters - Plan of Work for Benthic Compensation Steering Group
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 297 KB)
Approval letters - Plan for Work of the Offshore Ornithology Engagement Group (OOEG) signed by Marine Management Organisation - Paragraph 2 of Part 1 of Schedule 14
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 188 KB)
Approval Letters - Cover Letter
Other
Correction Notice (PDF, 145 KB)
Other
Correction Order (PDF, 102 KB)
Other
Development Consent Order as Made by the Secretary of State (PDF, 3 MB)
Other
Habitats Regulation Assessment (PDF, 2 MB)
Other
Notification of Decision Letter (PDF, 125 KB)
Other
Post-examination Submissions (PDF, 7 MB)
Other
Regulation 23 Notice - Notification of Decision Letter (PDF, 65 KB)
Other
Secretary of State Decision Letter (PDF, 541 KB)
Other
Cawston Parish Council (PDF, 119 KB)
Comments on Responses to the Secretary of State Consultation 3 received on 2 November 2020
Other
Marine Management Organisation (PDF, 201 KB)
Comments on Responses to the Secretary of State Consultation 3 received on 2 November 2020
Other
Natural England (PDF, 515 KB)
Comments on Responses to the Secretary of State Consultation 3 received on 2 November 2020
Other
Royal Society of the Protection of Birds (PDF, 382 KB)
Comments on Responses to the Secretary of State Consultation 3 received on 2 November 2020
Other
The Wildlife Trusts (PDF, 119 KB)
Comments on Responses to the Secretary of State Consultation 3 received on 2 November 2020
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 87 KB)
Comments on Responses to the Secretary of State Consultation 3 received on 2 November 2020
Other
Cawston Parish Council (PDF, 102 KB)
Response to the Secretary of State’s Minded to Approve Letter
Other
Lord Tebbit (PDF, 1 MB)
Response to the Secretary of State’s Minded to Approve Letter
Other
Norfolk County Council (PDF, 214 KB)
Response to the Secretary of State’s Minded to Approve Letter
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Response to the Secretary of State’s Minded to Approve Letter Annex 3 to Appendix 2: Kittiwake Artificial Nest Provisioning: Site Selection and the Pathway to Securement
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Response to the Secretary of State’s Minded to Approve Letter Appendix 3: Supporting Evidence for Kittiwake Prey Resource
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Response to the Secretary of State’s Minded to Approve Letter Appendix 5: Record of Consultation
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Response to the Secretary of State’s Minded to Approve Letter Appendix 6 : Outline Construction Traffic Management Plan (clean)
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 597 KB)
Response to the Secretary of State’s Minded to Approve Letter Appendix 2: Kittiwake Compensation Plan
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 575 KB)
Response to the Secretary of State’s Minded to Approve Letter Appendix 1: Compensatory Measures
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Response to the Secretary of State’s Minded to Approve Letter Annex 2 to Appendix 2: Kittiwake Artificial Nest Provisioning: Ecological Evidence
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Response to the Secretary of State’s Minded to Approve Letter - Joint response on behalf of Orsted Hornsea Project Three and Kellas North Sea 2 Limited Agreement in Principle dated 20th July 2017 Hornsea Three Response to Representation
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 742 KB)
Response to the Secretary of State’s Minded to Approve Letter Appendix 7: Updated Response to Norfolk Boreas Deadline 16 Submission - Technical Note
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Response to the Secretary of State’s Minded to Approve Letter Appendix 4: Compensation Measures Funding Statement
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 143 KB)
Response to the Secretary of State’s Minded to Approve Letter Cover Letter
Other
Orsted Hornsea Project Three (UK) Ltd (PDF, 420 KB)
Response to the Secretary of State’s Minded to Approve Letter Appendix 2 Annex 1: Outline Kittiwake Implementation and Monitoring Plan
Other
Secretary of State for Business, Energy and Industrial Strategy (BEIS) (PDF, 690 KB)
Correspondence with Ørsted
Other
Valerie Stubbs on behalf of Weybourne Parish Council (PDF, 133 KB)
Response to the Secretary of State’s Minded to Approve Letter
Other
Leigh Day on behalf of The Wildlife Trusts (PDF, 339 KB)
Letter to the Secretary of State
Other
Secretary of State for Business, Energy and Industrial Strategy (BEIS) (PDF, 316 KB)
Correspondence with Ørsted
Other
Kellas North Sea 2 Limited (Kellas) (PDF, 3 MB)
Comments on the DCO application
Other
Secretary of State for Business, Energy and Industrial Strategy (BEIS) (PDF, 94 KB)
Request to the Applicant for comments regarding the letter from Kellas
Other
Secretary of State for Business, Energy and Industrial Strategy (BEIS) (PDF, 154 KB)
Response to the Applicant’s letter, dated 7 July 2020
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 102 KB)
Applicant’s letter to Secretary of State for Business, Energy and Industrial Strategy (BEIS), dated 6 July 2020
Other
Habitats Regulation Assessment (PDF, 1 MB)
Other
Post Examination Correspondence Log (PDF, 19 MB)
Other
Recommendation Report (PDF, 6 MB)
Other
Secretary of State for Business, Energy and Industrial Strategy (BEIS) (PDF, 434 KB)
Minded to Approve letter
Other
Text of the Order which the Secretary of State is minded to make (PDF, 3 MB)
Other
Eastern Inshore Fisheries and Conservation Authority (PDF, 270 KB)
Response to Secretary of State Consultation 3
Other
GTC (PDF, 2 MB)
Response to Secretary of State Consultation 3
Other
Jonas Seafood Ltd (PDF, 163 KB)
Response to Secretary of State Consultation 3
Other
Marine Management Organisation (PDF, 298 KB)
Response to Secretary of State Consultation 3
Other
Ministry of Defence (MOD) (PDF, 33 KB)
Response to Secretary of State Consultation 3
Other
Natasha and Steven Hall  (PDF, 99 KB)
Response to Secretary of State Consultation 3
Other
National Farmers Union (PDF, 208 KB)
Response to Secretary of State Consultation 3
Other
NATS Safeguarding (PDF, 431 KB)
Response to Secretary of State Consultation
Other
Natural England (PDF, 1 MB)
Response to Secretary of State Consultation 3
Other
Norfolk County Council (PDF, 363 KB)
Response to Secretary of State Consultation 3
Other
Norfolk Ind.Fishermans Association (PDF, 81 KB)
Response to Secretary of State Consultation 3
Other
The Coal Authority (PDF, 180 KB)
Response to Secretary of State Consultation 3
Other
The Royal Society for the Protection of Birds (PDF, 620 KB)
Response to Secretary of State Consultation 3
Other
The Wildlife Trusts (PDF, 401 KB)
Response to Secretary of State Consultation 3
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 265 KB)
Response to Secretary of State Consultation 3 - Certificate of compliance with regulation 17(3)(a) to (h)
Other
Anglian Water Services Limited (PDF, 158 KB)
Response to Secretary of State Consultation 2
Other
Cawston Parish Council (PDF, 190 KB)
Response to Secretary of State Consultation 2
Other
Eastern Inshore Fisheries Conservation Authority (PDF, 270 KB)
Response to Secretary of State Consultation 2 - Request for information on compensatory measures
Other
Eastern Inshore Fisheries Conservation Authority (PDF, 220 KB)
Response to Secretary of State Consultation 2
Other
Norfolk County Council (PDF, 149 KB)
Response to Secretary of State Consultation 2
Other
The Royal Society for the Protection of Birds (RSPB) (PDF, 774 KB)
Response to Secretary of State Consultation 2
Other
Tristan Folland (PDF, 213 KB)
Response to Secretary of State Consultation 2
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 41 Network Options Assessment 2018-19
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 48 Cost of Energy Review
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 40 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 24 ETI marine energy
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 218 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 29 Hinkley Point C On in 2026 - Reuters
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 50 Haas Setting With the Sun
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 444 KB)
Response to Secretary of State Consultation 2 - Appendix 2A - Sandbanks Compensation Strategy
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 42 The Integration of Renewable Electricity Sources
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 513 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 28 BEIS-RAB model for nuclear consultation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 112 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 36 How Hydrogen is Made (2015) - Union of Concerned Scientists
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 51 ofg1190 decarbonisation action plan web
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 265 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 14 NPS for Networks
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,011 KB)
Response to Secretary of State Consultation 2 - Appendix 2 - Compensatory Measures
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 266 KB)
Response to Secretary of State Consultation 2 - Appendix 13 - Markham’s Triangle Exclusion Zone Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 71 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 31 Sizewell C nuclear power to come on stream in 2031 - Business - The Times
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 275 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 46 Renewable and Low Carbon Energy
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 446 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 32 Wylfa Suspension - Construction Index
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 03 CCC Net Zero The UKs contribution to stopping global warming
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 464 KB)
Response to Secretary of State Consultation 2 - Appendix 14, Annex 53 Queens Speech December 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 562 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 09 lazards levelized cost of energy version-130
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 22 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 39 The Grid Code url
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 136 KB)
Response to Secretary of State Consultation 2 - DCO Validation Email
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 500 KB)
Response to Secretary of State Consultation 2 - Appendix 1 Annex A - Case Law, Guidance & Previous Decisions on Alternative Solutions
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 315 KB)
Response to Secretary of State Consultation 2 - Appendix 1 Annex D - IROPI Case Studies
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 444 KB)
Response to Secretary of State Consultation 2 - Appendix 14, Annex 08 Energy UK position paper on Offshore Wind Market Development and Cost Reduction Background - 13 February 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 288 KB)
Response to Secretary of State Consultation 2 - Appendix 7 - In-Principle Southern North Sea SAC Site Integrity Plan (Updated February 2020)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 93 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 12 TEC Register 02 01 20
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 20 CCC Net Zero Technical report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 06 fes-2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 04 fes interactive version
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 409 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 15 Drax Re-Powering Decision Letter of 4 October 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 34 ANT Summary Report with Peer Review
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 49 tce r4 information memorandum
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 05 Nuclear Power in a Low Carbon UK
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 416 KB)
Response to Secretary of State Consultation 2 - Appendix 11 - Draft Development Consent Order Schedule of Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 211 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 10 CfD Register as at 01-11-2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 22 BEIS ccus business models consultation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 990 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 19 BEIS Offshore wind Sector Deal
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 296 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 38 Reuters Denmark Sources Record 47% of Power From Wind in 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Response to Secretary of State Consultation 2 - Appendix 9 - Draft Development Consent Order (Tracked Change Version)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 438 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 02 1940 nps renewable energy
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 37 ResPublica Report Expanding Horizons The Role for New Nuclear in the UKs Energy Mix
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 35 Atkins Engineering Net Zero Technical Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Response to Secretary of State Consultation 2 - Appendix 4 and Annexes - Post Examination Mitigation and Project Envelope Modifications
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 11 UK-LCTP (The UK Low Carbon Transition Plan)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 52 Petrol and diesel car sales ban brought forward to 2035 - BBC News
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 344 KB)
Response to Secretary of State Consultation 2 - Appendix 2B - Kittiwake Compensation Strategy
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 44 SOF 2016 - Full Interactive Document
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Response to Secretary of State Consultation 2 - DCO Validation Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 18 CCC-2019 Progress in reducing UK emissions
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Response to Secretary of State Consultation 2 - Appendix 5 - Updated MCZ Assessment Environmental Statement: Volume 5, Annex 2.3 - Marine Conservation Zone Assessment
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 79 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 25 Swansea Lagoon Rejection - Guardian
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 425 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 27 What Hampers Energy System Transformations - The Case of Smart Grids
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 30
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 380 KB)
Response to Secretary of State Consultation 2 - Applicant’s Summary Submission Determination of Hornsea Project Three
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 858 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 43 System Needs and Product Strategy - Final
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 13 Analysing Major Challenges of Wind and Solar Variability in Power Systems
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 522 KB)
Response to Secretary of State Consultation 2 - Appendix 3 - Marine Conservation Zones: MCZ Derogation Case
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 40 SOF 2014 Final
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 278 KB)
Secretary of State Consultation 2 - Appendix 14 Annex 33 Government Statement on Wylfa Suspension
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Response to Secretary of State Consultation 2 - Appendix 10 - Draft Development Consent Order (Clean)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 382 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 54 Lightsource BP Reactive Power - Solar Power Portal Nov 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 302 KB)
Response to Secretary of State Consultation 2 - Appendix 3A - Cromer Shoal Chalk Beds MCZ In Principle MEEB Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 16 clean growth strategy correction April 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 863 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 47 DE-rating factor methodology for RES in CM
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 284 KB)
Response to Secretary of State Consultation 2 - Appendix 1 Annex B - Law and Policy Update
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 721 KB)
Response to Secretary of State Consultation 2 - Appendix 6 - Outline Cable Specification and Installation Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 257 KB)
Response to Secretary of State Consultation 2 - Appendix 14 - Supporting Reference Material to Appendix 1, Annex C - Statement of Need
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 91 KB)
Response to Secretary of State Consultation 2
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 691 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 01 1938 overarching nps for energy
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Response to Secretary of State Consultation 2 - Appendix 1 Annex C - Statement of Need - Planning Act 2008
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 45 System Operability Framework (SOF) 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 161 KB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 17 Carbon Brief 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 56 GCC Global Status Report 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 1-Shadow HRA Derogation Case
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 21 National Grid UK Future Energy Scenarios 2012
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 26
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 258 KB)
Response to Secretary of State Consultation 2 - Appendix 8 - Record of Consultation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 23
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Response to Secretary of State Consultation 2 -Appendix 14 Annex 07 Harnessing the electric vehicle revolution
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 148 KB)
Response to Secretary of State Consultation 2 - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Response to Secretary of State Consultation 2 - Appendix 14 Annex 55 Whole-system cost of variable renewables in future GB electricity system
Other
Secretary of State Consultation 2 (PDF, 112 KB)
Letter from the Secretary of State - 17 December 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 70 KB)
Request for Extension Consultation Letter
Other
Secretary of State Consultation 2 (PDF, 136 KB)
Letter from the Secretary of State - 8 October 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 91 KB)
Further supporting material to the Secretary of State Consultation Two
Other
Secretary of State Consultation 2 (PDF, 163 KB)
Letter from the Secretary of State - 27 September 2019
Other
The Royal Society for the Protection of Birds (PDF, 657 KB)
Supporting Material to Secretary of State Consultation two
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Supporting Material to Secretary of State Consultation two
Other
The Ministry of Defence (PDF, 119 KB)
Response to The Secretary of State for Business, Energy and Industrial Strategy’s request for further comments
Other
Secretary of State Consultation (PDF, 164 KB)
Letter from the Secretary of State 10 July 2019
Other
Note of Unaccompanied Site Inspection on 4, 5 and 13 March 2019 (Document N/A)
Other
Royal Society for Protection Birds (Document N/A)
Deadline 10 Submission - RSPB Deadline 10 Submissions - Please see REP10-056 a-h of Examination Library for individual documents
Other
Royal Society for the Protection of Birds (Document N/A)
Deadline 10 Submission - Appendix C - Contracts for Difference Draft Budget Notice for the Third Allocation Round
Other
The Wildlife Trusts (Document N/A)
Deadline 4 Submission - TWT response to Examiner's questions: supporting information 2
Other
The Wildlife Trusts (Document N/A)
Deadline 4 Submission - TWT response to Examiner's questions: supporting information 1 - Cover Email
Other
The Wildlife Trusts (Document N/A)
Deadline 4 Submission - Supporting evidence 2 - Please see REP4-121 a-c for individual documents
Other
The Wildlife Trusts (Document N/A)
Deadline 4 Submission - Supporting evidence 1 - Please see REP4120 a-d of the Examining Library to see individual documents
Other
Whale and Dolphin Conservation (Document N/A)
Deadline 4 Submission - Responses to further information requested by the Examining Authority - Please see REP4-118a-g of the Examination Library for individual documents
Other
Royal Society for the Protection of Birds (PDF, 497 KB)
Deadline 10 Submission - Submission on alternative solutions, imperative reasons of overriding public interest and compensation
Other
Royal Society for the Protection of Birds (PDF, 203 KB)
Deadline 10 - Further Submission
Other
Royal Society for the Protection of Birds (PDF, 7 MB)
Deadline 10 Submission - Appendix D - Written Representation for the Royal Society for the Protection of Birds
Other
Royal Society for the Protection of Birds (PDF, 2 MB)
Deadline 10 Submission - Appendix B - Managing Natura 2000 sites
Other
Royal Society for the Protection of Birds (PDF, 10 MB)
Deadline 10 Submission - Appendix A- Offshore Energy Strategy Strategic Environmental Assessment - Consultation Feedback
Other
Royal Society for the Protection of Birds (PDF, 537 KB)
Deadline 10 Submission - Appendix E - SMartWind - Appendix J - Response to the Royal Society for the Protection of Birds Written Representation
Other
Royal Society for the Protection of Birds (PDF, 825 KB)
Deadline 10 Submission - Appendix F - Hornsea Two - Final submission on alternative solutions under the Habitats Regulations for the Royal Society for the Protection of Birds
Other
The Wildlife Trusts (PDF, 7 MB)
Deadline 4 Submission - The identification of discrete and persistent areas of relatively high harbour porpoise density in the wider UK marine area
Other
The Wildlife Trusts (PDF, 304 KB)
Deadline 4 Submission - Revised Approach to the Management of Commercial Fisheries in European Marine sites: Overarching Policy and Delivery Document
Other
The Wildlife Trusts (PDF, 642 KB)
Deadline 4 Submission - Guiding Principles for assessing the impact of underwater noise
Other
The Wildlife Trusts (PDF, 974 KB)
Deadline 4 Submission - Temporary shift in masked hearing thresholds in a harbour porpoise (Phocoena phocoena) after exposure to seismic airgun stimuli
Other
The Wildlife Trusts (PDF, 6 MB)
Deadline 4 Submission - Technical Guidance for Assessing the Effects of Anthropogenic Sound on Marine Mammal Hearing (Version 2.0)
Other
The Wildlife Trusts (PDF, 4 MB)
Deadline 4 Submission - Marine Mammal noise exposure Criteria Initial Scientific Recommendations
Other
Whale and Dolphin Conservation (PDF, 511 KB)
Deadline 4 Submission - Impacts of offshore wind farm construction on harbour porpoises: acoustic monitoring of echo location activity using porpoise detectors (T-PODs)
Other
Whale and Dolphin Conservation (PDF, 2 MB)
Deadline 4 Submission - Responses of harbour porpoises to pile driving at the Horns Rev 2 offshore wind farm in the Danish North Sea
Other
Whale and Dolphin Conservation (PDF, 355 KB)
Deadline 4 Submission - Negative long term effects on harbour porpoises from a large scale offshore wind farm in the Baltic—evidence of slow recovery
Other
Whale and Dolphin Conservation (PDF, 6 MB)
Deadline 4 Submission - Written Questions Response
Other
Whale and Dolphin Conservation (PDF, 2 MB)
Deadline 4 Submission - High rates of vessel noise disrupt foraging in wild harbour porpoises (Phocoena phocoena)
Other
Whale and Dolphin Conservation (PDF, 923 KB)
Deadline 4 Submission - Response to “Resilience of harbor porpoises to anthropogenic disturbance: Must they really feed continuously?”
Other
Whale and Dolphin Conservation (PDF, 1 MB)
Deadline 4 Submission - Renewable Energy - Ecological and economic cost benefit analysis of offshore wind energy
Other
Eversheds Sutherland (International) LLP on behalf of Shell UK Limited (Document N/A)
Deadline 10 submission - Written Representation
Other
Maritime and Coastguard Agency (Document N/A)
Deadline 10 Submission - Further Submission
Other
Notification of completion of the Examining Authority's Examination (Document N/A)
Other
Spirit Energy (Document N/A)
Deadline 10 Submission - Supplementary Position Statement in Light of Simulator Trial Results – Accepted at the discretion of the Examining Authority
Other
Ørsted Hornsea Project Three (UK) Ltd (Document N/A)
Deadline 10 Submission -Appendix 7 to Deadline 10 submission - Fisheries Coexistence and Liaison Plan
Other
Addleshaw Goddard LLP on behalf Network Rail (Document N/A)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Andrew Mildinhall (PDF, 19 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Cawston Parish Council (Document N/A)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Chris and Helen Monk (PDF, 111 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Cliver Searson and Nicola Tanner (PDF, 16 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Cllr Graham Everett (Document N/A)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Dota Williams (PDF, 58 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Graham and Emily Whiteley (PDF, 17 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Guy Pitcher (Document N/A)
Deadline 10 Submission - Post Hearing Submission
Other
Judy Holland (PDF, 6 MB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Karen Hamilton at Brodies LLP on behalf of Spirit Energy (PDF, 1 MB)
Deadline 10 Submission - Protective Provisions and Area Plan
Other
Maritime and Coastguard Agency (Document N/A)
Deadline 10 Submission - Response to Examining Authority's Written Questions
Other
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc (PDF, 43 KB)
Deadline 10 Submission - Protective Provisions
Other
Nicola Banham (PDF, 15 KB)
Deadline 10 Submission - Response to Deadline 10 - Accepted at the discretion of the Examining Authority
Other
Nicola Banham (PDF, 19 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Norfolk County Council (Document N/A)
Deadline 10 Submission - Response to Examining Authority's Written Questions
Other
Oulton Parish Council (Document N/A)
Deadline 10 Submission - Written submission of Oral Representation - Accepted at the discretion of the Examining Authority
Other
Oulton Parish Council (Document N/A)
Deadline 10 Submission - Post Hearing Submission
Other
Phil and Amelia Whiting (Document N/A)
Deadline 10 Submission - Post Hearing Submission
Other
Polly Brockis (PDF, 231 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Polly Brockis (PDF, 15 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Ray & Diane Pearce (PDF, 3 MB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Ray Pearce and Diane Pearce (PDF, 4 MB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Steffan Aquarone (Document N/A)
Deadline 10 Submission - Additional Post Hearing Submission
Other
Steffan Aquarone (Document N/A)
Deadline 10 Submission - Post Hearing Submission
Other
Steve and Joanne Harding (PDF, 16 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
The Crown Estate Commissioners (Document N/A)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Tony Barnett (PDF, 484 KB)
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Trinity House (Document N/A)
Deadline 10 submission - Written Representation to Examining Authority
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Broadland District Council - Accepted at the discretion of the Examining Authority
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 10 Submission - Appendix 10 to Deadline 10 submission - Applicant's response to Natural England's Deadline 9 submission (Ornithology)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 465 KB)
Deadline 10 Submission - Applicant's Final Statement of Commonality of Statements of Common Ground (SoCG)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 390 KB)
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and NFFO and VisNed
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 302 KB)
Deadline 10 Submission - Letter of No Impediment - Great Crested Newt mitigation licence application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 208 KB)
Deadline 10 Submission - Written Summary of Applicant's oral case put at Issue Specific Hearing 10
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 602 KB)
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Maritime Coastguard Agency
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 10 Submission - Schedule of Changes DCO and DML (From DL9 to DL10)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 476 KB)
Deadline 10 Submission - Appendix 5 to Deadline 10 submission - Aviation Summary Statement
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 10 Submission - Final Draft Development Consent Order (Clean)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 775 KB)
Deadline 10 Submission - Applicant's Final Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 274 KB)
Deadline 10 Submission - Appendix 1 to Deadline 10 submissions - Summary Statement on MCA and the Array Development Principles
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 470 KB)
Deadline 10 Submission - Offshore Ecology Matters Closing Legal Submission on behalf of the Applicant
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 390 KB)
Deadline 10 Submission - Appendix 4 to Deadline 10 submission - Applicant's response to Spirit Energy Matters Not Agreed at deadline 9
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 214 KB)
Deadline 10 Submission - Written Summary of Applicant's Oral case put at Further Compulsory Acquisition Hearing
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 271 KB)
Deadline 10 Submission - Covering Letter to Deadline 10 submission
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 168 KB)
Deadline 10 Submission - Position statement for Network Rail
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 413 KB)
Deadline 10 Submission - Appendix 3 to Deadline 10 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 330 KB)
Deadline 10 Submission - Appendix 2 to Deadline 10 submission - Benthic Impacts Control Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 10 Submission - Development Consent Order Comparisons (Deadline 10 version against Deadline 9 version)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 503 KB)
Deadline 10 Submission - Joint Statement made by Applicant and Spirit Energy
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 10 Submission - Development Consent Order Comparisons (Deadline 10 version against Application version)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
D9_HOW03_Appendix 21_OCTMP_tracked description: Deadline 10 Submission – Updated version of Ørsted Hornsea Project Three (UK) Ltd’s Deadline 9 Submission Appendix 21 - Outline Construction Traffic Management Plan – Tracked Changes (REP9-049)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 266 KB)
Deadline 10 Submission - Appendix 8 to Deadline 10 submission - Final Agreed Layout Development Principles
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 10 Submission - Applicants Statement of Case
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 209 KB)
Deadline 10 Submission - Appendix 6 to Deadline 10 submission - Summary Statement on Shipping and Navigation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 329 KB)
Deadline 10 Submission - Applicant's Commentary to Matters Raised at the Open Floor Hearing on 25 March 2019
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 10 Submission - Appendix 9 to Deadline 10 submission - Hornsea Project Two Kittiwake Collision Risk
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
D9_HOW03_Appendix 20_OCTMP_clean description: Deadline 10 Submission – Updated version of Ørsted Hornsea Project Three (UK) Ltd’s Deadline 9 Submission Appendix 20 - Outline Construction Traffic Management Plan – Clean (REP9-048)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 278 KB)
Deadline 10 Submission - Revised Hierarchy of Management Plans
Other
Rule 17 - 29 March 2019 Request for further information to Ørsted Hornsea Project Three (UK) Ltd (PDF, 114 KB)
Other
Recording of Further Compulsory Acquisition Hearing - 26 March 2019 (PDF, 31 KB)
Other
Recording of Further Issue Specific Hearing - 26 March 2019 (PDF, 31 KB)
Other
Recording of Open Floor Hearing 3 - 25 March 2019 (PDF, 31 KB)
Other
Darren Hilldrup (PDF, 15 KB)
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
Other
David Vince & Nicola Draycott (PDF, 14 KB)
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
Other
Marine Management Organisation (PDF, 941 KB)
Deadline 9 Submission - Response to Deadline 9
Other
Mark Daniels (PDF, 15 KB)
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
Other
National Farmers Union and Land Interest Group (PDF, 308 KB)
Deadline 9 Submission - Response to Deadline 9
Other
Natural England (PDF, 3 MB)
Deadline 9 Submission - Comments on the Examining Authority's Rule 17 letter to the Applicant dated 19th March 2019 (ExA Q F3.1)
Other
Natural England (PDF, 4 MB)
Deadline 9 Submission - Natural England’s Response to Rule 17 Letter dated 19 March 2019 (ExA Qs F4.1, F4.2, F4.3)
Other
Natural England (PDF, 4 MB)
Deadline 9 Submission - SNS SAC Draft Conservation Objectives and Advice on Activities
Other
Natural England (PDF, 5 MB)
Deadline 9 Submission - Offshore Register Entry for the SNS SAC (Citation)
Other
Natural England (PDF, 3 MB)
Deadline 9 Submission - Natural England’s Comments on the Applicants D7 submissions
Other
Natural England (PDF, 3 MB)
Deadline 9 Submission - Natural England’s Response to Rule 17 Letter dated 21 March 2019 (ExA Q F6.1)
Other
Natural England (PDF, 3 MB)
Deadline 9 Submission - Correction to REP7-078
Other
Addleshaw Goddard LLP on behalf of Network Rail (PDF, 9 MB)
Deadline 9 Submission - Letter to the Examining Authority
Other
Norfolk County Council (PDF, 114 KB)
Deadline 9 Submission - Response to further information requested by the Examining Authority
Other
Oulton Parish Council (PDF, 157 KB)
Deadline 9 Submission - Response to Deadline 9
Other
Recording of Open Floor Hearing 2 - 28 January 2019 (PDF, 31 KB)
Other
Brodies LLP on behalf of Spirit Energy (PDF, 11 MB)
Deadline 9 Submission - Appendix 5 - Markham Treaty (UK version) dated 26 May 1992
Other
Brodies LLP on behalf of Spirit Energy (PDF, 8 MB)
Deadline 9 Submission - Appendix 6 - Sworn Statutory Declaration
Other
Brodies LLP on behalf of Spirit Energy (PDF, 7 MB)
Deadline 9 Submission - Appendix 1 - Sworn Statement by Rune Boge
Other
Brodies LLP on behalf of Spirit Energy (PDF, 8 MB)
Deadline 9 Submission - Appendix 3 - Spirit Energy Note on Impact of Matters Not Agreed
Other
Brodies LLP on behalf of Spirit Energy (PDF, 2 MB)
Deadline 9 Submission - Appendix 2 - GCA Final Report 25 March 2019
Other
Brodies LLP on behalf of Spirit Energy (PDF, 7 MB)
Deadline 9 Submission - Response to Deadline 9
Other
Brodies LLP on behalf of Spirit Energy (PDF, 10 MB)
Deadline 9 Submission - Appendix 4 - Areas of Agreement on J6A Data Set Analysis
Other
The Royal Society for the Protection of Birds (PDF, 363 KB)
Deadline 9 Submission - Response to Deadline 9
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 9 Submission - Appendix 21 - Outline Construction Traffic Management Plan – Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 9 Submission - Appendix 34 - Updated Offshore Outline Written Scheme of Investigation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 9 Submission - Appendix 3 - Revised Location Plan Offshore and Onshore
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 14 - Revised Onshore Limits of Deviation Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 10 - Revised Public Rights of Way Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 23 MB)
Deadline 9 Submission - Land Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 368 KB)
Deadline 9 Submission - Appendix 23 - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Book of Reference - Schedule of Changes (between Deadline 4 and Deadline 9)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 312 KB)
Deadline 9 Submission - Appendix 1 - Applicant’s response to Spirit Energy’s submission at Deadline 7
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 12 - Revised Statutory and Non-Statutory Nature Conservation Sites plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Annex A - Schedule of Objection to Granting of Compulsory Acquisition Powers
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Appendix 27 - Revised Offshore Historic Environment Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 9 Submission - Appendix 11 - Revised Historic or Scheduled Monument Sites Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 22 MB)
Deadline 9 Submission - Appendix 13 - Revised Tree Preservation Order and Hedgerow Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 9 Submission - Appendix 25 - Final Statement on Areas of agreement on the J6A data set analysis
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 9 Submission - Appendix 26 - Safety Justification for Single Line of Orientation Layout
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 335 KB)
Deadline 9 Submission - Appendix 22 - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 9 Submission - Appendix 17 - Pearson et al., 1968
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Appendix 28 - Revised Offshore Indicative Extent Of Marine Licences
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 917 KB)
Deadline 9 Submission - Appendix 24 - Natural England Deadline 6 submission for Hornsea Project Two
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 227 KB)
Deadline 9 Submission - Appendix 2 - Final Agreed Layout Development Principles
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Appendix 15 - Wakefield et al., 2017
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 9 Submission - Appendix 20 - Outline Construction Traffic Management Plan - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 271 KB)
Deadline 9 Submission - Appendix 16 - Applicant's position in relation to displacement impacts
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 331 KB)
Deadline 9 Submission - Appendix 19 - Response to Examining Authority's FQ3.1 Rule 17 Collision Risk Modelling
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 9 Submission - Appendix 18 - Langston et al., 2013
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 9 Submission - Appendix 35 - Outline Code of Construction Practice (tracked changes)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 38 - Outline Ecological Management Plan - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 9 Submission - Appendix 30 - Revised Offshore Order Limits and Grid Coordinates Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 9 Submission - Appendix 36 - Outline Code of Construction Practice - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 9 Submission - Appendix 5 -Revised Order Limits and Grid Coordinates Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 9 Submission - Appendix 32 - Outline Landscape Plan (tracked change)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 9 Submission - Appendix 37 - Outline Ecological Management Plan -Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 9 Submission - Appendix 29 -Revised Offshore Works Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 9 Submission - Appendix 8 - Revised Access to Works Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 396 KB)
Deadline 9 Submission - Appendix 39 - In-Principle Monitoring Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 6 Submission - Appendix 6 - Revised Works Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 9 Submission - Appendix 4 - Revised Location Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 9 Submission - Appendix 33 - Outline Landscape Plan - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Applicant's Compulsory Acquisition (CA) Schedule
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 371 KB)
Deadline 9 Submission - Draft Statement of Common Ground between Hornsea Project Three and the Royal Society for the Protection of Birds
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 509 KB)
Deadline 9 Submission - Position Statements for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 458 KB)
Deadline 9 Submission - Explanatory Memorandum to Development Consent Order
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Book of Reference - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 9 Submission - Applicant Responses to the Examining Authority's Further Information - Rule 17
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 9 Submission - Book of Reference (Tracked changes)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 22 MB)
Deadline 9 Submission - Appendix 9 - Revised Streets Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 9 Submission - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 369 KB)
Deadline 9 Submission - Applicant’s Final Statement of Commonality of Statements of Common Ground (SoCG)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 9 Submission - Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd and Norfolk Vanguard Ltd and Norfolk Boreas Ltd
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 524 KB)
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Norfolk County Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 431 KB)
Deadline 9 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and Historic England
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 9 Submission - Revised Special Category Land Plan (Onshore and Offshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 376 KB)
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three and Trinity House
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 9 Submission - Revised Draft Development Consent Order – Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 9 Submission - Schedule of Changes Development Consent Order and Deemed Marine Licences
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 489 KB)
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three UK) Ltd.,The Wildlife Trusts and Norfolk Wildlife Trust
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 638 KB)
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and the Marine Management Organisation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 9 Submission - Revised Crown Land Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 268 KB)
Deadline 9 Submission - Updated Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd. and Natural England
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 869 KB)
Deadline 9 Submission - Statement of Reasons - Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 838 KB)
Deadline 9 Submission - Statement of Reasons - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 702 KB)
Deadline 9 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
Other
Natural England (PDF, 6 MB)
Deadline 8 Submission - Annex 2.2A - Accepted at the discretion of the Examining Authority
Other
Alison and Michael Barrett (PDF, 41 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
David Vince & Nicola Draycott (PDF, 139 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Elliot & Amanda Marks (PDF, 16 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Graham Whiteley (PDF, 16 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Helen & Chris Monk (PDF, 18 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Mulbarton Parish Council (PDF, 54 KB)
Deadline 8 Submission - Written Representation
Other
Richard Buxton Solicitors on behalf of Mulbarton Parish Council (PDF, 2 MB)
Deadline 8 Submission - Written Representation
Other
Oulton Parish Council (PDF, 200 KB)
Deadline 8 Submission - Comments to Deadline 7 Submissions
Other
Phil Daniels (PDF, 116 KB)
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Public Health England (PDF, 163 KB)
Deadline 8 Submission - Response to Consultation
Other
Revd Helen Rengert (PDF, 168 KB)
Deadline 8 Submission - Written Submission - Accepted at the discretion of the Examining Authority
Other
Trinity House (PDF, 126 KB)
Deadline 8 Submission - Written Representation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 341 KB)
Deadline 8 Submission - Appendix 1 to Deadline 8 submission - Applicant’s Comments on Natural England’s response to the Rule 17 (REP7-064)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 8 Submission - Cover Email
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 8 Submission - Appendix 2 to Deadline 8 submission – MMO’s Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 223 KB)
Deadline 8 Submission - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 387 KB)
Deadline 8 Submission - Applicant’s Statement of Commonality of Statements of Common Ground (SoCG)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 410 KB)
Deadline 8 Submission - Forestry Commission Letter – Consent pursuant to Section 135 of the Planning Act 2008
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 678 KB)
Deadline 8 Submission - Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 257 KB)
Deadline 8 Submission - Statement of Common Ground between Hornsea Project Three and Natural England for Offshore Ornithology
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 868 KB)
Deadline 8 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
Other
Request for Further Information - Rule 17 (PDF, 109 KB)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 592 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Rule 17 - 19 March 2019 Request for further information to Natural England (PDF, 81 KB)
Other
Rule 17 - 19 March 2019 Request for further information to Norfolk County Council (PDF, 79 KB)
Other
Rule 17 - 19 March 2019 Request for further information to Ørsted Hornsea Project Three (UK) Ltd (PDF, 107 KB)
Other
Agenda for Further Compulsory Acquisition Hearing (PDF, 16 KB)
Other
Agenda for Further Issue Specific Hearing (PDF, 15 KB)
Other
Agenda for Open Floor Hearing 3 (PDF, 15 KB)
Other
Andy and Clare Parle (PDF, 82 KB)
Deadline 7 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Broadland District Council (PDF, 2 MB)
Deadline 7 Submission - Appendix A to Broadland District Council's Statement of Common Ground
Other
Broadland District Council (PDF, 3 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three UK) Ltd. and Broadland District Council
Other
Broadland District Council (PDF, 421 KB)
Deadline 7 Submission - Post Hearing Submission
Other
DLA Piper UK LLP on behalf of Cadent Gas Limited (PDF, 43 KB)
Deadline 7 Submission - Protective Provisions
Other
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Engagement with Ørsted on Traffic in Cawston - Agreement , Disagreement and Suggestions for Management and Mitigation
Other
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Chairman's Response to ISH9 Agenda Item 5G
Other
Cawston Parish Council (PDF, 7 MB)
Deadline 7 Submission - Cawston HGV Traffic Diversion Proposal
Other
Cawston Parish Council (PDF, 7 MB)
Deadline 7 Submission - Comments on Revised Draft Traffic Management Plan
Other
Cawston Parish Council (PDF, 8 MB)
Deadline 7 Submission - Evidence of No Passing Places for HGVs in Central Cawston
Other
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Response to ISH9 - Traffic Impacts Action Point 14
Other
Cawston Parish Council (PDF, 5 MB)
Deadline 7 Submission - Post Hearing Submission and Written Submission of Oral Case - ISH 9
Other
Claire Gray (PDF, 15 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
CPRE Norfolk (PDF, 423 KB)
Deadline 7 Submission - Response to Deadline 7 - Including supportive material
Other
Eastern Power Networks plc (PDF, 46 KB)
Deadline 7 Submission - Protective Provisions
Other
Elliot and Amanda Marks (PDF, 117 KB)
Deadline 7 Submission - Response to Deadline 7 All Things Nice Cawston - Accepted at the Discretion of the Examining Authority
Other
Frances L. Rossington (PDF, 16 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Heidi Hobday (PDF, 14 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Helen & Chris Monk (PDF, 366 KB)
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
Other
John Bentley (PDF, 78 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Kate Wyatt (PDF, 18 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Marine Management Organisation (PDF, 1 MB)
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES) and comment on the Examining Authority’s Schedule of Changes to the draft Development Consent Order (DCO)
Other
Marine Management Organisation (PDF, 1 MB)
Deadline 7 Submission- Response to Deadline 7
Other
Maritime & Coastguard Agency (PDF, 546 KB)
Deadline 7 Submission - Responses to the Examining Authority’s request for further information
Other
Mike Linley (PDF, 15 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Mr Stephen & Mrs Clare Brown (PDF, 18 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Mulbarton Parish Council (PDF, 1,004 KB)
Deadline 7 Submission - Onshore Substation – Option E
Other
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc (PDF, 43 KB)
Deadline 7 Submission - Response to Deadline 7
Other
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc and National Grid Gas Plc (PDF, 17 KB)
Deadline 7 Submission - Protective Provisions
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex A - Further Advice on REP5 -010 Preliminary Trenching Assessment (PTA)
Other
Natural England (PDF, 294 KB)
Deadline 7 Submission - Annex B - Sabellaria Spinulosa Advice Note
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on Markham’s Triangle pMCZ
Other
Natural England (PDF, 15 MB)
Deadline 7 Submission - JNCC Report 598
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex C - Cable Protection Advice Note
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Natural England & JNCC joint Technical Guidance Note - Marine Buffers and Margins
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Response to Rule 17 Questions
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on Cromer Shoal Chalk Beds MCZ
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex E - Ornithology Response
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Annex D - Note on Small Scale Impact
Other
Natural England (PDF, 16 MB)
Deadline 7 Submission - Non-breeding season populations of seabirds in UK waters
Other
Natural England (PDF, 426 KB)
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES)
Other
Natural England (PDF, 13 MB)
Deadline 7 Submission - SNCB response to MSS Avoidance Rate Report
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on The Wash and North Norfolk Coast SAC
Other
Natural England (PDF, 12 MB)
Deadline 7 Submission - Summary of Natural England’s Advice on North Norfolk Sand Banks and Saturn Reef SAC
Other
Nicola Banham (PDF, 16 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Nicola Stokes (PDF, 47 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
North Norfolk District Council (PDF, 368 KB)
Deadline 7 Submission - Post Hearing Submission to ISH 9
Other
Oulton Parish Council (PDF, 4 MB)
Deadline 7 Submission - Post Hearing Submission
Other
Peter Crossley (PDF, 45 KB)
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Polly Brockis (PDF, 155 KB)
Deadline 7 Submission - Post hearing Submission - Accepted at the Discretion of the Examining Authority
Other
Brodies LLP on behalf of Spirit Energy (PDF, 4 MB)
Deadline 7 Submission - Appendix 4 - Aviation Slides
Other
Brodies LLP on behalf of Spirit Energy (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission to ISH 8
Other
Brodies LLP on behalf of Spirit Energy (PDF, 6 MB)
Deadline 7 Submission - Appendix 3 - DNV GL Technical Note
Other
The Royal Society for the Protection of Birds (PDF, 1 MB)
Deadline 7 Submission - Response to Deadline 7
Other
Trinity House (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission to ISH 9
Other
Trinity House (PDF, 208 KB)
Deadline 7 Submission - Post Hearing Submission to ISH 8
Other
V. I. Purdy (PDF, 552 KB)
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the Discretion of the Examining Authority
Other
V.I.Purdy (PDF, 778 KB)
Deadline 7 Submission - Further Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 259 KB)
Deadline 7 Submission - Appendix 11 - Furness et al., 2013
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,019 KB)
Deadline 7 Submission - Appendix 21 - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 173 KB)
Deadline 7 Submission - Appendix 10 - Chamberlain et al. 2006
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 337 KB)
Deadline 7 Submission - Appendix 16 - Newell et al., 2004
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 13 - Collision Risk Estimates for Mitigation Scenarios
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 7 Submission - Appendix 1 - Outline Landscape Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 192 KB)
Deadline 7 Submission - Appendix 12 - Position Statement on Ornithology Mitigation Options
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 15 - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 192 KB)
Deadline 7 Submission - Appendix 18 - Desprez 2000
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 443 KB)
Deadline 7 Submission - Appendix 28 - Cumulative Link Impact Assessment relating to Traffic- Oulton and Cawston
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1,020 KB)
Deadline 7 Submission - Appendix 29 - Aviation Meeting Minutes – CHC Helicopter Operator
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 155 KB)
Deadline 7 Submission - Appendix 19 - Foden et al 2009
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 21 - Appendix B
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 175 KB)
Deadline 7 Submission - Appendix 22 - Position Statement on Turbulence
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 471 KB)
Deadline 7 Submission - Appendix 24 - Construction Traffic Noise Assessment Clarification Note
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 7 Submission - Appendix 25 - Outline Construction Traffic Management Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 19 MB)
Deadline 7 Submission - Appendix 2- Outline Ecological Management Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 26 - Construction Traffic Noise and Vibration Assessment for Cawston Village
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 400 KB)
Deadline 7 Submission - Appendix 3 - In-Principle Monitoring Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 255 KB)
Deadline 7 Submission - Appendix 23 - Updated Layout Development Principles
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 33 - Le et al., 2014
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 38 - Neart na Gaoithe HRA
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 180 KB)
Deadline 7 Submission - Appendix 31 - Applicant’s response to Examining Authority's Rule 17 to Maritime & Coastguard Agency
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 37 - East Anglia Three HRA
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 36 - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 7 Submission - Appendix 41 - Outline Code of Construction Practice
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 34 - Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Appendix 30 - Aviation Workshop Draft Minutes – Helicopter Operators
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 284 KB)
Deadline 7 Submission - Appendix 40 - Ornithology roadmap with Natural England for the examination phase (ver.D)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 32 - Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 35 - Spirit Energy Protective Provisions
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 713 KB)
Deadline 7 Submission - Appendix 4 - Outline Cable Specification and Installation Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 522 KB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Broadland District Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Schedule of Changes Development Consent Order and Deemed Marine Licences
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Appendix 7 - Cook et al., 2012
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 6 - Jenkins et al., 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 662 KB)
Deadline 7 Submission - Applicants Comments on the Report on the Implications for European Sites (RIES)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 304 KB)
Deadline 7 Submission - Appendix 42 - Position statement in relation to the Radar Early Warning System at J6A platform
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 322 KB)
Deadline 7 Submission - Applicant’s Statement of Commonality of Statements of Common Ground (SoCG)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 512 KB)
Deadline 7 Submission - Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 7 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 7 Submission - Appendix 9 - Norfolk Vanguard Ornithology Technical Appendix
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 737 KB)
Deadline 7 Submission - Appendix 5 - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 161 KB)
Deadline 6 Submission - Applicant’s Response to IPs DL6 DCO Comments
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Revised Draft Development Consent Order - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 8 - East Anglia Three Evidence Plan (Meeting 6)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 7 Submission - Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 191 KB)
Deadline 7 Submission - Appendix 20 - Protocol S1 - Alerstam et al., 2007
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Highways England
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 271 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 9
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 674 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 7
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 226 KB)
Deadline 7 Submission - Appendix 43 - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and South Norfolk Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 574 KB)
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 8
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 700 KB)
Deadline 7 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 7 Submission - Appendix 27 - Development of the Cawston Traffic Intervention Scheme
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Appendix 17 - Newell et al., 1998
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 7 Submission - Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd. and Eastern Inshore Fisheries and Conservation Authority
Other
Ørsted Hornsea Project Three (UK) Ltd (ZIP, 4 MB)
Deadline 7 Submission - Appendix 15 Annex A Data - Raw Data
Other
Ørsted Hornsea Project Three (UK) Ltd (ZIP, 127 KB)
Deadline 7 Submission - Appendix 15 Annex A Data - Population Estimates and Densities
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 206 KB)
Deadline 7 Submission - Appendix 44 - Areas of agreement on the J6A data analysis
Other
Recording of Issue Specific Hearing 7 (ISH7) - 6 March 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 8 (ISH8) - 7 March 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 9 (ISH9) - 8 March 2019 (PDF, 31 KB)
Other
Rule 17 - 6 March 2019 Request for further information to Natural England (PDF, 119 KB)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 6 Submission - Post hearing submission
Other
Variation to Timetable - Rule 8(3) , Rule 13 - Notification of Hearings (PDF, 135 KB)
Other
Agenda for Issue Specific Hearing 7: Offshore ecology - Wednesday 6 March (PDF, 21 KB)
Other
Other
Other
Notification of Procedural Decision (PDF, 100 KB)
The Examining Authority's schedule of changes to the draft Development Consent Order
Other
Notification of Procedural Decision (PDF, 86 KB)
Rule 17 - 26 February 2019 Request for further information from the Maritime and Coastguard Agency
Other
Report on the Implications of European Sites (RIES) (PDF, 927 KB)
Issued by the Examining Authority - 21 February 2019
Other
Accompanied Site Inspection Itinerary - 5 March 2019 (PDF, 52 KB)
Other
Helen & Chris Monk (PDF, 15 KB)
Deadline 6 Submission - Suggested Location for Accompanied Site Inspection - Accepted at the discretion of the Examining Authority
Other
South Norfolk Council, North Norfolk District Council and Broadland District Council (PDF, 208 KB)
Deadline 6 Submission - Revised version of the applicant’s Outline Landscape Plan requested by the Examining Authority
Other
DLA Piper UK LLP on behalf of Cadent Gas Limited (PDF, 44 KB)
Deadline 6 Submission - Response to Deadline 6
Other
Historic England (PDF, 303 KB)
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
Other
Marine Management Organisation (PDF, 2 MB)
Deadline 6 Submission - Written Representation
Other
Marine Management Organisation (PDF, 2 MB)
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
Other
Maritime & Coastguard Agency (PDF, 951 KB)
Deadline 6 Submission - Responses to the applicants comments on representations made by Maritime & Coastguard Agency at deadline 4.
Other
Maritime & Coastguard Agency (PDF, 803 KB)
Deadline 6 Submission - Report following aviation trials and exercises in relation to offshore wind farms
Other
Bidwells LLP on behalf of Mr Kemp (PDF, 1,008 KB)
Deadline 6 Submission - Post hearing submission
Other
Mulbarton Parish Council (PDF, 5 MB)
Deadline 6 Submission - Response to Deadline 6
Other
N2RS (PDF, 135 KB)
Deadline 6 Submission - Local cumulative environmental impact assessments of the cable route on landscape, tourism, traffic and recreation
Other
N2RS (PDF, 64 KB)
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
Other
N2RS (PDF, 145 KB)
Deadline 6 Submission - Concerns about Public Engagement and Observations on the Current Project Design
Other
National Farmers Union And The Land Interest Group (PDF, 975 KB)
Deadline 6 Submission - Written submission - Issue Specific Hearing - Compulsory Acquisition - Thursday 31st January 2019
Other
National Farmers Union And The Land Interest Group (PDF, 887 KB)
Deadline 6 Submission - Written submission - Issue Specific Hearing – Draft Development Consent Order - Wednesday 30th January 2019
Other
DLA Piper UK LLP on behalf of National Grid (PDF, 41 KB)
Deadline 6 Submission - Response to Deadline 6
Other
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH 5 Annex H - Natural England’s Response to REP5-014
Other
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH5 Annex G- Natural England’s Comments on the Applicant’s response to ExA Q2.2.38
Other
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH5 Annex A - Natural England’s Comments on REP 4-097 Biotope Clarification paper as requested at ISH 5
Other
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH 5 Annex B - Natural England’s comments on REP5 – 010 Preliminary Trenching Assessment (PTA)
Other
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH 5 Annex E- Natural England’s comments on REP3 – 024 Appendix 15 The Wash and North Norfolk Coast (W&NNC) SAC In-combination Assessment
Other
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH5 Annex F - Natural England’s Response to the Applicant’s response to ExA Q2.2.25
Other
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH 5 Appendix C- Natural England Comments on REP5 – 011- Appendix 3 Cable Specification Installation Plan (CSIP)
Other
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH6 Annex A -Natural England’s Comments on the Applicant’s Proposed DML appeal conditions
Other
Natural England (PDF, 3 MB)
Deadline 6 Submission - Written Submission of Representations at Issue Specific Hearing 5 - Offshore Ecology
Other
Natural England (PDF, 2 MB)
Deadline 6 Submission - ISH 5 Annex D- Natural England Comments on REP4-012 pg 43 onwards Applicants response to ExA Q2.2.46 in relation to MEEB.
Other
Natural England (PDF, 3 MB)
Deadline 6 Submission - ISH6 Annex B- Natural England’s Comments on REP4-023 Code of Construction Practice Rev.2
Other
Natural England (PDF, 3 MB)
Deadline 6 Submission - Written summary of Representations made at ISH6 DCO Hearing
Other
Addleshaw Goddard LLP on behalf of Network Rail (PDF, 39 KB)
Deadline 6 Submission - Response to Item 11(c) of the Agenda
Other
North Norfolk District Council (PDF, 3 MB)
Deadline 6 Submission - Post hearing submission - Issue Specific Hearing on 30 January 2019
Other
Oulton Parish Council (PDF, 48 KB)
Deadline 6 Submission - Response to Deadline 6
Other
The Royal Society for the Protection of Birds (PDF, 3 MB)
Deadline 6 Submission - Written Submission
Other
The Royal Society for the Protection of Birds (PDF, 6 MB)
Deadline 6 Submission - Appendix 3.2 - Collision Risk Modelling: update and clarification
Other
The Wildlife Trusts (PDF, 283 KB)
Deadline 6 Submission - Post-hearing submission and further comments
Other
Trinity House (PDF, 447 KB)
Deadline 6 Submission - Written Representation for Issue Specific Hearing 6 - Draft Development Consent Order
Other
Weybourne Parish Council (PDF, 58 KB)
Deadline 6 Submission - Response to Deadline 6
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 6 Submission - Appendix 10 -Horsewill and Robinson 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 6 Submission - Appendix 14 - Warwick-Evans et al., 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 6 Submission - Appendix 12 - Preliminary Trenching Assessment
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Appendix 16 - Johnston et al., 2014 with Corrigendum
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 6 Submission - Appendix 15 - Pennycuick 1997
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 6 Submission - Appendix 11 - Aitken et al., 2014
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Appendix 1 -Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 167 KB)
Deadline 6 Submission - Appendix 18 - Duant et al 2002
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 6 Submission - Appendix 13 - Ornithology roadmap with Natural England for the examination phase (ver.C)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 622 KB)
Deadline 6 Submission - Appendix 17 - Garthe et al., 1999
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Appendix 23 - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 6 Submission - Appendix 19 - Alerstam et al., 2007
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Appendix 2 - Outline Code of Construction Practice
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 6 Submission - Appendix 20 - Graham et al., 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Appendix 3 - Outline Construction Traffic Management Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 6 Submission - Appendix 27 - Forsythe et al., 1995
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Appendix 22 - Marine Mammal Hearing Clarifications
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 6 Submission - Appendix 24 - Proposed Use of Temporary Working Areas for Micrositing - Implications for Environmental Statement
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 6 Submission - Appendix 29 - Applicants interpretation of Natural England’s position in relation to collision risk modelling
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 6 Submission - Appendix 26 - Outline Ecological Management Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 6 Submission - Appendix 28 - Position of the Applicant in relation to collision risk modelling
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 21 - Brassuer et al., 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 4 - Rock Protection Decommissioning Methods
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Commentary on progress made with Spirit Energy at Deadline 6
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 9 - Trinder M., 2017
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 6 Submission - Appendix 3b - Annex A - Hornsea Three Highway Intervention Schemes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 6 Submission - Appendix 30 - Outline Onshore Written Scheme of Investigation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 27 MB)
Deadline 6 Submission - Appendix 3a - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 6 Submission - Application for Non-material amendments including Additional Land
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 6 Submission - Appendix 8 -Smart Wind and Forewind 2014 Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 31 - CIGRE Report 2009 - Service Experience of HV Underground and Submarine Cable Systems
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 6 Submission - Appendix 6 - Offshore ornithology Hearing Clarifications-cumulative and in combination assessment methods and age class data
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 6 Submission - Appendix 7 - Johnson and Cook 2016
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 6 Submission - Appendix 5 - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Written summary of Applicant’s oral case put at Compulsory Acquisition Hearing (31st Jan 2019)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 6 Submission - Schedule of Changes - Development Consent Order and Deemed Marine Licences
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
Deadline 6 Submission - Appendix 25 - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Written summary of Applicant’s oral case put at Issue Specific Hearing 5 (29th Jan 2019)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Written summary of Applicant’s oral case put at Issue Specific Hearing 6 (30th Jan 2019)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 6 Submission - Statement of Commonality of Statements of Common Ground (SoCG)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 6 Submission -Revised Draft Development Consent Order - Clean
Other
Recording of Compulsory Acquisition Hearing 1 (CAH1) - 31 January 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 5 (ISH5) - 29 January 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 6 (ISH6) - 30 January 2019 (PDF, 31 KB)
Other
Rule 13 - Notification of Hearings And Rule 16 - Notification of Accompanied Site Inspection (PDF, 96 KB)
Other
Marine Management Organisation (PDF, 1 MB)
Deadline 5 Submission - Late Submission
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 107 KB)
Deadline 5 Submission - Appendix 10 - Habitats and Wild Birds Directives: guidance on the application of article
Other
Mulbarton Parish Council (PDF, 3 MB)
Deadline 5 Submission - Map of the Norwich Southern Bypass Protection Zone (NSBPZ)
Other
Natural England (PDF, 1 MB)
Deadline 5 Submission - Updated Appendix 3 to Natural England's written summary on ISH 2 Ornithology
Other
Other
Notification of Procedural Decision - Rule 9 (PDF, 84 KB)
Other
Oulton Parish Council (PDF, 16 KB)
Deadline 5 Submission
Other
Proposed provisions checklist (PDF, 42 KB)
Other
Brodies LLP on behalf of Spirit Energy (PDF, 1 MB)
Deadline 5 Submission - Comments on the Applicant’s responses to the Examining Authority’s Written Questions and Appendices
Other
The Royal Society for the Protection of Birds (PDF, 20 MB)
Deadline 5 Submission and Appendices
Other
Trinity House (PDF, 259 KB)
Deadline 5 Submission - Response to Examining Authority’s Further Written Questions
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 5 Submission - Appendix 1 - Appendix G to the Transport Assessment
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Appendix 3 - Outline Cable Specification and Installation Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 5 Submission - Appendix 2 - Preliminary Trenching Assessment
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Appendix 4 - Second Issue Specific Hearing clarifications in relation to offshore ornithology
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 5 MB)
Deadline 5 Submission - Appendix 11 - MarESA Summaries EpusOborApri and PoVen biotopes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Appendix 5 - Confirmation of migratory seabirds considered in migratory collision risk modelling
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 14 - Beatrice A Platform Helideck Information Plate
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 13 - Statement of Experience - Anatec Ali MacDonald, John Beattie, and Samantha Westwood
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 4 Submission - Comments on Interested Parties’ Responses to the Examining Authority's Second Written Questions submitted at Deadline 4
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Statement of Common Ground between Hornsea Project Three and Maritime and Coastguard Agency
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 6 - Apportioning Immature Auks to Colonies
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Statement of Commonality of Statements of Common Ground
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 27 MB)
Deadline 5 Submission - Appendix 8 - Main Construction Compound Access Strategy VISSIM Modelling Update
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 9 - Summary of Array Layout Position and Applicants response to Interested Parties answers to Examining Authority's Q2.5.1, Q2.5.6 and Q2.5.7
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 2 MB)
Deadline 5 Submission - Appendix 7 - Aircraft Management Guidelines
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 5 Submission - Position Statement between: Hornsea Project Three (UK) Ltd. and Shell UK Ltd
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 5 Submission - Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 5 Submission - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 4 MB)
Deadline 5 Submission - Appendix 12 - Ornithology roadmap with Natural England for the examination phase (ver.B)
Other
Hearing Agenda for Compulsory Acquisition Hearing (PDF, 65 KB)
Compulsory Acquisition Hearing - Thursday 31 January 2019
Other
Hearing Agenda for Issue Specific Hearing 5 (PDF, 90 KB)
Issue Specific Hearing 5: Offshore ecology - Tuesday 29 January 2019
Other
Hearing Agenda for Issue Specific Hearing 6 (PDF, 65 KB)
Issue Specific Hearing 6: The draft Development Consent Order - Wednesday 30 January
Other
Hearing Agenda for Open Floor Hearing (PDF, 47 KB)
Open Floor Hearing - Monday 28 January 2019
Other
Itinerary for Accompanied Site Inspection (ASI) (PDF, 51 KB)
Accompanied Site Inspection (ASI) - Monday 28 January 2019
Other
Natural England (PDF, 6 MB)
Deadline 4 Submission - Late Submission - Cruise report for the surveys undertaken
Other
Ray Pearce (PDF, 3 MB)
Deadline 4 Submission - Late Submission accepted at the discretion of the Examining Authority's discretion
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 3 MB)
Deadline 4 Submission - Appendix 1 Outline Ecological Management Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 563 KB)
Deadline 4 Submission - Appendix 5 Design Objectives and Principles for the HVDC Converter/HVAC Substation and HVAC Booster Station Buildings
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 713 KB)
Deadline 4 Submission - Appendix 6 Moray West OWF Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 1 MB)
Deadline 4 Submission - Appendix 2 Outline Code of Construction Practice
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 659 KB)
Deadline 4 Submission - Appendix 3 Outline Construction Traffic Management Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 4 Outline Landscape Management Plan
Other
DLA Piper UK LLP on behalf of Cadent Gas Limited (PDF, 8 MB)
Deadline 4 Submission - Written Submission and appendices
Other
Highways England (PDF, 584 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Historic England (PDF, 467 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Marine Management Organisation (PDF, 6 MB)
Deadline 4 Submission - A synthesis of current knowledge on the genesis of the Great Yarmouth and Norfolk Bank Systems - Cooper 2008
Other
Marine Management Organisation (PDF, 3 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
Other
Maritime & Coastguard Agency (PDF, 408 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
Other
National Federation of Fishermen's Organisations (PDF, 1 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
DLA Piper UK LLP on behalf of National Grid (PDF, 87 KB)
Deadline 4 Submission - Written Submission
Other
Natural England (ZIP, 7 MB)
Deadline 4 Submission - Raw GIS data delivered from the CEND 22/13 survey
Other
Natural England (Document 249 KB)
Deadline 4 Submission - Reef polygon and point layers
Other
Natural England (PDF, 5 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions, Further information requested by the Examining Authority and Appendix
Other
Norfolk County Council (PDF, 270 KB)
Deadline 4 Submission - Response Examining Authority's Written Question 2.1.11
Other
Norfolk County Council (PDF, 320 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
Other
Norfolk County Council (PDF, 265 KB)
Deadline 4 Submission - Response Examining Authority's Written Question 2.9.3
Other
Norfolk County Council (PDF, 271 KB)
Deadline 3 Submission - Response Examining Authority's Written Question 2.13.10
Other
North Norfolk District Council (PDF, 411 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Oulton Parish Council (PDF, 27 KB)
Deadline 4 Submission
Other
Royal Society for the Protection of Birds (PDF, 30 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and appendices
Other
South Norfolk Council (PDF, 121 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Brodies LLP on behalf of Spirit Energy (PDF, 4 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and Appendix
Other
The Crown Estate (PDF, 106 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
Other
The Wildlife Trusts (PDF, 710 KB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Whale and Dolphin Conservation (PDF, 6 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 3 Submission - Appendix 77 - Detailed response to the Examining Authority's Q2.2.3
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 11 - Nabe-Nielsen et al., 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 56 - Manwell et al., 2009
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 54 - List of Aviation Assumptions Used in Assessments
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 23 MB)
Deadline 4 Submission - Appendix 52 - Nuon/Vattenfall Report 2017
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 73 - Detailed response to the Examining Authority's Q2.2.30 and Q2.2.39
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Highways England
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 46 - In-Principle Southern North Sea SCI Site Integrity Plan: V2.0
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 25 MB)
Deadline 4 Submission - Appendix 86 - Works Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
Deadline 4 Submission - Appendix 91 - Statutory and Non-Statutory Nature Conservation Sites (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 3 Submission - Late Submission - Book of Reference - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 4 Submission - Appendix 93 - Onshore Limits of Deviation Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 16 - Cook et al., 2014
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 4 Submission - Appendix 92 - Tree Preservation Order and Hedgerow Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Norfolk County Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 29 - Supplementary advice on Conservation Objectives for NNSSR SAC, JNCC 2017
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Reasons - Clean
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Commonality of Statements of Common Ground
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and the Marine Management Organisation
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 23 - Welcker et al., 2017
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Hearing Speaker Biographies and Statement of Experience
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 17 MB)
Deadline 4 Submission - Appendix 85A - Land Plan - Onshore
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 4 Submission - Book of Reference (Tracked changes)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 3 Submission - Appendix 89 - Public Rights of Way Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 8 - Natural England Letter of No Impediment (Badger Licence)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 20 MB)
Deadline 4 Submission - Appendix 87 - Access to Works Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Comments on Written Representations and Responses submitted by Interested Parties at Deadline 3
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 9 - Booth et al., 2017
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 78 - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 4 Submission - Appendix 84 - Onshore Order Limits
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Application for non-material amendments including Additional Land
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 36 KB)
Deadline 4 Submission - Book of Reference - Schedule of Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 25 MB)
Deadline 4 Submission - Appendix 85C - Land Plan - Onshore
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 4 Submission - Appendix 88 - Streets Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 3 Submission - Appendix 83 - Location Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 90 - Historic and Scheduled Monument Sites Plan (Onshore)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 18 MB)
Deadline 4 Submission - Appendix 85B - Land Plan - Onshore
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three(UK) Ltd. and South Norfolk Council
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Schedule of Changes - Development Consent Order and Deemed Marine Licences
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Statement of Reasons - Tracked Changes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 66 - Hornsea Project Two Examining Authority's Recommendation Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 17 MB)
Deadline 4 Submission - Appendix 7- HGV Haul Road Reduction Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 57 - Helideck Certificates for Chiswick and Grove Platforms
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 4 Submission - Appendix 72 - Hornsea Project Three Aviation Team
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 64 - Dogger Bank Creyke Beck Examining Authority's Recommendation Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 59 - Fisheries Coexistence and Liaison Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 4 Submission - Appendix 75 - Energy Voice, 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 60 - Draft CfD Budget Notice
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 4 Submission - Appendix 71 - Natural England Response to Hornsea Two Deadline 5
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 69 - Norfolk Vanguard Offshore Ornithology Chapter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 68 - East Anglia Three HRA Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 82 - Location Plan Offshore and Onshore
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 76 - HeliOffshore 2017
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 4 Submission - Appendix 81 - Proposed Minor Amendments Comparison Plan
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 63 - Detailed response to the Examining Authority's Q2.2.7 and Q2.2.44
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 53 - Illustrative cable trench cross sections for ducted installation In response to Examining Authority's Q2.1.3
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Revised Draft Development Consent Order
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 18 - Garthe and Huppop 2004
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 36 - Aitchinson 2012
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 45 - Detailed response to the Examining Authority's Q2.2.65
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 15 MB)
Deadline 4 Submission - Appendix 67 - Hornsea Project Two HRA Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 65 - Dogger Bank Creyke HRA Report
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 157 KB)
Deadline 4 Submission - Appendix 51 - Defra MCZ Guidance 2010
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 74 - Anatec Report (2016)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 58 - Indicative Array Layout Based on +-150m Development Lanes
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 62 - Detailed response to the Examining Authority's Q2.2.34
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 43 - Outline Skills and Employment Plan Attachment to the Q2.10.1
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 17 MB)
Deadline 4 Submission - Appendix 38 - Regeneris Consulting and The Tourism Company Report, 2014
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 41 - Regeneris Consulting Report, 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 34 - Noise Clarifications
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 44 - Detailed response to the Examining Authority's Q2.2.68
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 22 - Desholm 2005
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 27 - Pennycuick et al., 1987
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 10 - Brandt et al., 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 25 - Parry 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 33 KB)
Deadline 4 Submission - Annex A – Schedule of Objection to Granting of Compulsory Acquisition Powers
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 16 MB)
Deadline 4 Submission - Appendix 15 - Furness 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 20 - Masden 2015
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 32 - Further Design Development of Option 1:Passing Places at the Main Construction Compound
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 21 MB)
Deadline 3 Submission - Appendix 39 - Environmental Resources Management Report, 2014
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 47 - In-Principle Monitoring Plan V3.0
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 50 - Roulund et al., 2019b
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 49 - Roulund et al., 2019a
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 24 MB)
Deadline 4 Submission - Appendix 33 - Main Construction Compound Access Strategy VISSIM Modelling
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 24 - Cook et al., 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 31 - List of Aviation Assumptions
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Appendix 30 - Detailed response to the Examining Authority's Q2.2.20
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 14 - Bowgen and Cook, 2018
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 19 - Lawson et al., 2016
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 submission - Appendix 17 - Dierschke and Garthe 2006
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 14 MB)
Deadline 4 Submission - Appendix 26 - Sotheran et al., 2017
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 13 - Wisniewska et al., 2016
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 28 - Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 9 MB)
Deadline 4 Submission - Appendix 21 - Wade et al., 2016
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 4 Submission - Appendix 70 - Inch Cape Scoping Opinion (Ornithology)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 55 - Updated Layout Development Principles
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 4 Submission - Appendix 12 - Scheidat et al., 2011
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 10 MB)
Deadline 4 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd and Norfolk Vanguard Ltd and Norfolk Boreas Ltd
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 13 MB)
Deadline 4 Submission - Appendix 37 - Riddington et al., 2008
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 40 - Chris McDermott, IEMA Quality Mark Article
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 42 - Regeneris Consulting Report, 2016
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 4 Submission - Appendix 48 - Detailed response to the Examining Authority's Q2.9.3
Other
Natural England (PDF, 236 KB)
Deadline 3 Submission - Late submission
Other
Further Written Questions (PDF, 553 KB)
Other
Rule 13 and Rule 16 - Notification of Hearings and Accompanied Site Inspection (ASI) (PDF, 136 KB)
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 6 MB)
Deadline 3 Submission - Appendix 7 - S. Gubbay JNCC 2007
Other
Cadent Gas Limited (PDF, 32 KB)
Deadline 3 Submission - Comments on revised draft DCO
Other
Cawston Parish Council (PDF, 115 KB)
Deadline 3 Submission - Post hearing submission
Other
Corpusty & Saxthorpe Parish Council (PDF, 38 KB)
Deadline 3 Submission - Post hearing submission - Late Submission
Other
CPRE Norfolk (PDF, 266 KB)
Deadline 3 Submission - Post Hearing Submission
Other
Edgefield Parish Council (PDF, 38 KB)
Deadline 3 Submission - Post hearing submission - Late Submission
Other
Historic England (PDF, 552 KB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases
Other
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Post hearing submission including written submission of oral cases and comments on the revised draft DCO
Other
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Annex C - Comments on Herring Noise Contours
Other
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Example MCZ screening document
Other
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Annex A -Guidance on MCZ assessments
Other
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Example MCZ Stage 1 assessment
Other
Marine Management Organisation (PDF, 3 MB)
Deadline 3 Submission - Annex B - Comments on In Principle Monitoring Plan
Other
Maritime & Coastguard Agency (PDF, 511 KB)
Deadline 3 Submission - Responses to further information requested by the ExA
Other
Mulbarton Parish Council (PDF, 172 KB)
Deadline 3 Submission - Submissions of oral cases
Other
National Farmers Union and Land Interest Group (PDF, 1 MB)
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 4 December 2018
Other
National Farmers Union and Land Interest Group (PDF, 2 MB)
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 6 December 2018
Other
National Farmers Union and Land Interest Group (PDF, 1 MB)
Deadline 3 Submission - Outline Soil Management Plan - Supporting Material of Written Submission to Issue Specific Hearing - 6 December 2018
Other
National Farmers Union and Land Interest Group (PDF, 1 MB)
Deadline 3 Submission - Written Submission - Open Floor Hearing 3 December 2018
Other
National Farmers Union and Land Interest Group (PDF, 2 MB)
Deadline 3 Submission - Construction Environmental Management Plan - Supporting Material of Written Submission to Issue Specific Hearing - 6 December 2018
Other
National Farmers Union and Land Interest Group (PDF, 1 MB)
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 7 December 2018
Other
National Federation of Fisherman's Organisation (PDF, 1 MB)
Deadline 3 Submission - Post Hearing Submission
Other
DLA Piper UK LLP on behalf of National Grid (PDF, 34 KB)
Deadline 3 Submission - Comments on revised draft DCO
Other
Natural England (PDF, 339 KB)
Deadline 3 Submission - Overarching concerns with project timetables
Other
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 1 - Ornithology
Other
Natural England (PDF, 7 MB)
Deadline 3 Submission - Method statement for ornithological, marine mammal and marine mega fauna survey
Other
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 4
Other
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 2 - Benthic Annex 2 2B Response on REP2-004
Other
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 2 - Benthic
Other
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 1
Other
Natural England (PDF, 5 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 3
Other
Norfolk County Council (PDF, 830 KB)
Deadline 3 Submission - Local Impact Report Amendments
Other
Norfolk County Council (PDF, 320 KB)
Deadline 3 Submission - Comments on revised draft DCO
Other
North Norfolk District Council (PDF, 3 MB)
Deadline 3 Submission - Representations following Issue Specific Hearings
Other
Oulton Parish Council (PDF, 341 KB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases
Other
Oulton Parish Council (PDF, 29 KB)
Deadline 3 Submission - Post Hearing Submission
Other
Joanna Church on behalf of Richard Bacon MP (PDF, 60 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Royal Society for the Protection of Birds (PDF, 674 KB)
Deadline 3 Submission - Guillemot Razorbill and Kittiwake Phenology 2016-17
Other
Royal Society for the Protection of Birds (PDF, 1,023 KB)
Deadline 3 Submission - Responses to further information requested by the ExA
Other
Scottish Natural Heritage (PDF, 58 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Bidwells on behalf of Sir Edward Evans-Lombe (PDF, 1 MB)
Deadline 3 Submission - Response to Examining Authority's Written Question 1.1.12
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix G - Map of the UK exclusive economic zone
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZM - Expert Assessment of flying conditions for Ara - Sample of weather forecasts at block J-West (1 October 2017 –29 September 2018)
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZO - Issue Specific Hearing 1 Summary of oral evidence
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Post Issue Specific Hearing 1 Submissions - List of Appendices
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZL- Map showing Spirit Energy's Proposed protective provisions -Composite of Spirit Energy and Ørsted maps
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZN - Comprehensive Analysis of Flying Conditions (Percentage Frequency Outcome) Based on 3-hourly Weather date for J6A (1 October 2017 – 29 September 2018)
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZJ - Map showing Spirit Energy's proposed protective provisions - Hornsea and 5NM radius
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZG - Technical Note
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 7 MB)
Deadline 3 Submission - Appendix ZH - Map showing Spirit Energy's proposed protective provisions - Hornsea and all radii
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZI - Map showing Spirit Energy's proposed protective provisions -Hornsea and 2NM radius
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZK - Map showing Spirit Energy's proposed protective provisions - Hornsea and 7.5NM radius
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 7 MB)
Deadline 3 Submission - Appendix ZD - Addendum to Noble Denton Marine Services Report to Spirit Energy report review of marine hazards
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 6 MB)
Deadline 3 Submission - Appendix ZF - Legislative Framework Summary
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 7 MB)
Deadline 3 Submission - Appendix ZE - Addendum to AviateQ International Limited Report
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix ZB - Spirit Energy Proposed protective provisions
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 11 MB)
Deadline 3 Submission - Appendix Z - CAA Operational manual extracts - Appendix 1 to the AviateQ International Limited Report
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix T - Markham St - 1 Decommissioning programme
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix Q - Hornsea two offshore wind farm order 2016 No. 0000 Article 6 (1) Schedule 12 parts 8 , 9 and 10
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix X - Letter from OGUK Oil and Gas Regulator
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 18 MB)
Deadline 3 Submission - Appendix O - Oil and Gas authority the maximising economic recovery strategy for the UK
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix S - East Anglia Three offshore wind farm order 2017 No. 826 Article 3 (1) Schedule 8 Part 7
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix P - CAA CAP1386 Safety review of offshore public transport helicopter operations in support of the exploitation of oil and gas - Progress Report
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix V - Planning Inspectorate advice note 9 - Rochdale Envelope
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix U - Marine Accident Investigation branch , report on the investigation of the collision between Sage Sky and Stema Barge II
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix ZC - Declaration - Chiswick Grove and J6A Safety Cases
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix R - Helioffshore safety proposals for offshore safety enhancements
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix ZA - Written Representation
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 25 MB)
Deadline 3 Submission - Appendix E - UK Marine Policy Statement
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 20 MB)
Deadline 3 Submission - Appendix W - Noble detention Marine Services - Hornsea 3 wind farm review of Marine hazards
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix I - CAA CAP1145 Safety review of offshore public transport helicopter operations in support of oil and the exploitation of oil and gas
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 21 MB)
Deadline 3 Submission - Appendix J - East Inshore and East offshore Marine Plan
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 561 KB)
Deadline 3 Submission - Post Issue Specific Hearing 1 Submissions
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 9 MB)
Deadline 3 Submission - Appendix A - Licence P.468 Dated 15 August 1983
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 11 MB)
Deadline 3 Submission - Appendix K - Transport committee's second report on offshore helicopter safety
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix M - CAA CAP764 Policy and guidelines on wind turbines
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 23 MB)
Deadline 3 Submission - Appendix L - CAA CAP1234 Safety review of offshore public transport helicopter operations in support of the exploitation of oil and gas - Progress report
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 801 KB)
Deadline 3 Submission - Cover Letter
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 9 MB)
Deadline 3 Submission - Appendix D - Planning Commission advice note 9 - Rochdale Envelope
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 9 MB)
Deadline 3 Submission - Appendix C - Maritime and Coastguard Agency MGN 372
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix H - MCA - Methodology for assessing the marine navigational safety & emergency response risks of offshore renewable energy installations
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 10 MB)
Deadline 3 Submission - Appendix Y - AviateQ International Limited report
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix F - The exclusive economic zone order 2013
Other
Brodies Solicitors on behalf of Spirit Energy (PDF, 12 MB)
Deadline 3 Submission - Appendix N - Maritime and Coastguard Agency MGN 543
Other
Swardeston Parish Council (PDF, 157 KB)
Deadline 3 Submission - Post hearing submissions
Other
Trinity House (PDF, 310 KB)
Deadline 3 Submission - Comments on revised draft DCO
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 12 MB)
Deadline 3 Submission - Appendix 2 - Indicative HVDC cable corridor cross section
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 1
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 2
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Guide to the Application
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Statement of Commonality of Statements of Common Ground
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 22 MB)
Deadline 3 Submission - Appendix 3 - Onshore Crossing Schedule
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 8 MB)
Deadline 3 Submission - Statement of Common Ground between Hornsea Project Three and the Royal Society for the Protection of Birds
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Cover Letter
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 7 MB)
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 3
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 11 MB)
Deadline 3 Submission - Responses to Additional Submissions by Interested Party at Deadline 1 and 2
Other
Ørsted Hornsea Project Three (UK) Ltd (PDF, 28 MB)
Deadline 3 Submission - Appendix 1 - Main Construction Compound Briefing Note
Other