Hornsea Project Three Offshore Wind Farm

You can filter the results to show only the items that match your interest.

Date

SourceDescription
Other
Size: 136 KB
Secretary of State Consultation 2
Letter from the Secretary of State - 8 October 2019
Other
Size: 91 KB
Ørsted Hornsea Project Three (UK) Ltd
Further supporting material to the Secretary of State Consultation Two
Other
Size: 657 KB
The Royal Society for the Protection of Birds
Supporting Material to Secretary of State Consultation two
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Supporting Material to Secretary of State Consultation two
Other
Size: 163 KB
Secretary of State Consultation 2
Letter from the Secretary of State - 27 September 2019
Other
Size: 119 KB
The Ministry of Defence
Response to The Secretary of State for Business, Energy and Industrial Strategy’s request for further comments
Other
Size: 164 KB
Secretary of State Consultation
Letter from the Secretary of State 10 July 2019
Other
N/A
Royal Society for Protection Birds
Deadline 10 Submission - RSPB Deadline 10 Submissions - Please see REP10-056 a-h of Examination Library for individual documents
Other
N/A
The Wildlife Trusts
Deadline 4 Submission - Supporting evidence 1 - Please see REP4120 a-d of the Examining Library to see individual documents
Other
N/A
The Wildlife Trusts
Deadline 4 Submission - Supporting evidence 2 - Please see REP4-121 a-c for individual documents
Other
N/A
Whale and Dolphin Conservation
Deadline 4 Submission - Responses to further information requested by the Examining Authority - Please see REP4-118a-g of the Examination Library for individual documents
Other
N/A
Note of Unaccompanied Site Inspection on 4, 5 and 13 March 2019
Other
N/A
Royal Society for the Protection of Birds
Deadline 10 Submission - Appendix C - Contracts for Difference Draft Budget Notice for the Third Allocation Round
Other
N/A
The Wildlife Trusts
Deadline 4 Submission - TWT response to Examiner's questions: supporting information 1 - Cover Email
Other
N/A
The Wildlife Trusts
Deadline 4 Submission - TWT response to Examiner's questions: supporting information 2
Other
Size: 497 KB
Royal Society for the Protection of Birds
Deadline 10 Submission - Submission on alternative solutions, imperative reasons of overriding public interest and compensation
Other
Size: 825 KB
Royal Society for the Protection of Birds
Deadline 10 Submission - Appendix F - Hornsea Two - Final submission on alternative solutions under the Habitats Regulations for the Royal Society for the Protection of Birds
Other
Size: 537 KB
Royal Society for the Protection of Birds
Deadline 10 Submission - Appendix E - SMartWind - Appendix J - Response to the Royal Society for the Protection of Birds Written Representation
Other
Size: 10 MB
Royal Society for the Protection of Birds
Deadline 10 Submission - Appendix A- Offshore Energy Strategy Strategic Environmental Assessment - Consultation Feedback
Other
Size: 2 MB
Royal Society for the Protection of Birds
Deadline 10 Submission - Appendix B - Managing Natura 2000 sites
Other
Size: 7 MB
Royal Society for the Protection of Birds
Deadline 10 Submission - Appendix D - Written Representation for the Royal Society for the Protection of Birds
Other
Size: 203 KB
Royal Society for the Protection of Birds
Deadline 10 - Further Submission
Other
Size: 4 MB
The Wildlife Trusts
Deadline 4 Submission - Marine Mammal noise exposure Criteria Initial Scientific Recommendations
Other
Size: 6 MB
The Wildlife Trusts
Deadline 4 Submission - Technical Guidance for Assessing the Effects of Anthropogenic Sound on Marine Mammal Hearing (Version 2.0)
Other
Size: 304 KB
The Wildlife Trusts
Deadline 4 Submission - Revised Approach to the Management of Commercial Fisheries in European Marine sites: Overarching Policy and Delivery Document
Other
Size: 7 MB
The Wildlife Trusts
Deadline 4 Submission - The identification of discrete and persistent areas of relatively high harbour porpoise density in the wider UK marine area
Other
Size: 974 KB
The Wildlife Trusts
Deadline 4 Submission - Temporary shift in masked hearing thresholds in a harbour porpoise (Phocoena phocoena) after exposure to seismic airgun stimuli
Other
Size: 642 KB
The Wildlife Trusts
Deadline 4 Submission - Guiding Principles for assessing the impact of underwater noise
Other
Size: 1 MB
Whale and Dolphin Conservation
Deadline 4 Submission - Renewable Energy - Ecological and economic cost benefit analysis of offshore wind energy
Other
Size: 923 KB
Whale and Dolphin Conservation
Deadline 4 Submission - Response to “Resilience of harbor porpoises to anthropogenic disturbance: Must they really feed continuously?”
Other
Size: 2 MB
Whale and Dolphin Conservation
Deadline 4 Submission - High rates of vessel noise disrupt foraging in wild harbour porpoises (Phocoena phocoena)
Other
Size: 6 MB
Whale and Dolphin Conservation
Deadline 4 Submission - Written Questions Response
Other
Size: 355 KB
Whale and Dolphin Conservation
Deadline 4 Submission - Negative long term effects on harbour porpoises from a large scale offshore wind farm in the Baltic—evidence of slow recovery
Other
Size: 2 MB
Whale and Dolphin Conservation
Deadline 4 Submission - Responses of harbour porpoises to pile driving at the Horns Rev 2 offshore wind farm in the Danish North Sea
Other
Size: 511 KB
Whale and Dolphin Conservation
Deadline 4 Submission - Impacts of offshore wind farm construction on harbour porpoises: acoustic monitoring of echo location activity using porpoise detectors (T-PODs)
Other
N/A
Eversheds Sutherland (International) LLP on behalf of Shell UK Limited
Deadline 10 submission - Written Representation
Other
N/A
Spirit Energy
Deadline 10 Submission - Supplementary Position Statement in Light of Simulator Trial Results – Accepted at the discretion of the Examining Authority
Other
N/A
Maritime and Coastguard Agency
Deadline 10 Submission - Further Submission
Other
N/A
Notification of completion of the Examining Authority's Examination
Other
N/A
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission -Appendix 7 to Deadline 10 submission - Fisheries Coexistence and Liaison Plan
Other
Size: 3 MB
Ray & Diane Pearce
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
N/A
Cawston Parish Council
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 19 KB
Nicola Banham
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 6 MB
Judy Holland
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 15 KB
Polly Brockis
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
N/A
Phil and Amelia Whiting
Deadline 10 Submission - Post Hearing Submission
Other
N/A
Steffan Aquarone
Deadline 10 Submission - Post Hearing Submission
Other
N/A
Trinity House
Deadline 10 submission - Written Representation to Examining Authority
Other
N/A
Guy Pitcher
Deadline 10 Submission - Post Hearing Submission
Other
Size: 231 KB
Polly Brockis
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 16 KB
Steve and Joanne Harding
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
N/A
Addleshaw Goddard LLP on behalf Network Rail
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 484 KB
Tony Barnett
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Broadland District Council - Accepted at the discretion of the Examining Authority
Other
N/A
The Crown Estate Commissioners
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
N/A
Oulton Parish Council
Deadline 10 Submission - Post Hearing Submission
Other
N/A
Steffan Aquarone
Deadline 10 Submission - Additional Post Hearing Submission
Other
Size: 4 MB
Ray Pearce and Diane Pearce
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 1 MB
Karen Hamilton at Brodies LLP on behalf of Spirit Energy
Deadline 10 Submission - Protective Provisions and Area Plan
Other
N/A
Norfolk County Council
Deadline 10 Submission - Response to Examining Authority's Written Questions
Other
Size: 15 KB
Nicola Banham
Deadline 10 Submission - Response to Deadline 10 - Accepted at the discretion of the Examining Authority
Other
N/A
Oulton Parish Council
Deadline 10 Submission - Written submission of Oral Representation - Accepted at the discretion of the Examining Authority
Other
N/A
Maritime and Coastguard Agency
Deadline 10 Submission - Response to Examining Authority's Written Questions
Other
Size: 278 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Revised Hierarchy of Management Plans
Other
Size: 465 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Applicant's Final Statement of Commonality of Statements of Common Ground (SoCG)
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 10 to Deadline 10 submission - Applicant's response to Natural England's Deadline 9 submission (Ornithology)
Other
Size: 503 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Joint Statement made by Applicant and Spirit Energy
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Development Consent Order Comparisons (Deadline 10 version against Deadline 9 version)
Other
Size: 330 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 2 to Deadline 10 submission - Benthic Impacts Control Plan
Other
Size: 43 KB
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc
Deadline 10 Submission - Protective Provisions
Other
Size: 413 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 3 to Deadline 10 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
Other
Size: 168 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Position statement for Network Rail
Other
Size: 271 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Covering Letter to Deadline 10 submission
Other
Size: 214 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Written Summary of Applicant's Oral case put at Further Compulsory Acquisition Hearing
Other
Size: 390 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 4 to Deadline 10 submission - Applicant's response to Spirit Energy Matters Not Agreed at deadline 9
Other
Size: 470 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Offshore Ecology Matters Closing Legal Submission on behalf of the Applicant
Other
Size: 274 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 1 to Deadline 10 submissions - Summary Statement on MCA and the Array Development Principles
Other
Size: 17 KB
Graham and Emily Whiteley
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 775 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Applicant's Final Guide to the Application
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Final Draft Development Consent Order (Clean)
Other
Size: 476 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 5 to Deadline 10 submission - Aviation Summary Statement
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Schedule of Changes DCO and DML (From DL9 to DL10)
Other
Size: 19 KB
Andrew Mildinhall
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 602 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Maritime Coastguard Agency
Other
Size: 16 KB
Cliver Searson and Nicola Tanner
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 208 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Written Summary of Applicant's oral case put at Issue Specific Hearing 10
Other
Size: 111 KB
Chris and Helen Monk
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 302 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Letter of No Impediment - Great Crested Newt mitigation licence application
Other
Size: 58 KB
Dota Williams
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 390 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and NFFO and VisNed
Other
Size: 20 MB
Ørsted Hornsea Project Three (UK) Ltd
D9_HOW03_Appendix 20_OCTMP_clean description: Deadline 10 Submission – Updated version of Ørsted Hornsea Project Three (UK) Ltd’s Deadline 9 Submission Appendix 20 - Outline Construction Traffic Management Plan – Clean (REP9-048)
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 9 to Deadline 10 submission - Hornsea Project Two Kittiwake Collision Risk
Other
Size: 329 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Applicant's Commentary to Matters Raised at the Open Floor Hearing on 25 March 2019
Other
Size: 209 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 6 to Deadline 10 submission - Summary Statement on Shipping and Navigation
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Applicants Statement of Case
Other
Size: 266 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Appendix 8 to Deadline 10 submission - Final Agreed Layout Development Principles
Other
Size: 20 MB
Ørsted Hornsea Project Three (UK) Ltd
D9_HOW03_Appendix 21_OCTMP_tracked description: Deadline 10 Submission – Updated version of Ørsted Hornsea Project Three (UK) Ltd’s Deadline 9 Submission Appendix 21 - Outline Construction Traffic Management Plan – Tracked Changes (REP9-049)
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 10 Submission - Development Consent Order Comparisons (Deadline 10 version against Application version)
Other
N/A
Cllr Graham Everett
Deadline 10 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 114 KB
Other
audio recording
Size: 19 MB
Recording of Further Compulsory Acquisition Hearing - 26 March 2019
Other
audio recording
Size: 31 MB
Recording of Further Issue Specific Hearing - 26 March 2019
Other
audio recording
Size: 83 MB
Recording of Open Floor Hearing 3 - 25 March 2019
Other
Size: 15 KB
Darren Hilldrup
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
Other
Size: 14 KB
David Vince & Nicola Draycott
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
Other
Size: 15 KB
Mark Daniels
Deadline 9 Submission - Response to Deadline 9 - Accepted at the discretion of the Examining Authority
Other
Size: 702 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
Other
Size: 10 MB
Brodies LLP on behalf of Spirit Energy
Deadline 9 Submission - Appendix 4 - Areas of Agreement on J6A Data Set Analysis
Other
Size: 7 MB
Brodies LLP on behalf of Spirit Energy
Deadline 9 Submission - Response to Deadline 9
Other
Size: 2 MB
Brodies LLP on behalf of Spirit Energy
Deadline 9 Submission - Appendix 2 - GCA Final Report 25 March 2019
Other
Size: 8 MB
Brodies LLP on behalf of Spirit Energy
Deadline 9 Submission - Appendix 3 - Spirit Energy Note on Impact of Matters Not Agreed
Other
Size: 7 MB
Brodies LLP on behalf of Spirit Energy
Deadline 9 Submission - Appendix 1 - Sworn Statement by Rune Boge
Other
Size: 363 KB
The Royal Society for the Protection of Birds
Deadline 9 Submission - Response to Deadline 9
Other
Size: 838 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Reasons - Clean
Other
Size: 869 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Reasons - Tracked Changes
Other
Size: 268 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Updated Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd. and Natural England
Other
Size: 8 MB
Brodies LLP on behalf of Spirit Energy
Deadline 9 Submission - Appendix 6 - Sworn Statutory Declaration
Other
Size: 11 MB
Brodies LLP on behalf of Spirit Energy
Deadline 9 Submission - Appendix 5 - Markham Treaty (UK version) dated 26 May 1992
Other
Size: 157 KB
Oulton Parish Council
Deadline 9 Submission - Response to Deadline 9
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Revised Crown Land Plan
Other
Size: 638 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and the Marine Management Organisation
Other
Size: 489 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three UK) Ltd.,The Wildlife Trusts and Norfolk Wildlife Trust
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Schedule of Changes Development Consent Order and Deemed Marine Licences
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Revised Draft Development Consent Order – Clean
Other
Size: 376 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three and Trinity House
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Revised Special Category Land Plan (Onshore and Offshore)
Other
Size: 431 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and Historic England
Other
Size: 524 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Norfolk County Council
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd and Norfolk Vanguard Ltd and Norfolk Boreas Ltd
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Size: 369 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Applicant’s Final Statement of Commonality of Statements of Common Ground (SoCG)
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Cover Letter
Other
Size: 22 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 9 - Revised Streets Plan
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Book of Reference (Tracked changes)
Other
Size: 6 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Applicant Responses to the Examining Authority's Further Information - Rule 17
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Book of Reference - Clean
Other
Size: 458 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Explanatory Memorandum to Development Consent Order
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Guide to the Application
Other
Size: 509 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Position Statements for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
Other
Size: 371 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Draft Statement of Common Ground between Hornsea Project Three and the Royal Society for the Protection of Birds
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
Other
Size: 430 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Applicant's Compulsory Acquisition (CA) Schedule
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 33 - Outline Landscape Plan - Clean
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 4 - Revised Location Plan (Onshore)
Other
Size: 19 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 6 - Revised Works Plan (Onshore)
Other
Size: 396 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 39 - In-Principle Monitoring Plan
Other
Size: 18 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 8 - Revised Access to Works Plan (Onshore)
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 29 -Revised Offshore Works Plan
Other
Size: 19 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 37 - Outline Ecological Management Plan -Tracked Changes
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 32 - Outline Landscape Plan (tracked change)
Other
Size: 21 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 5 -Revised Order Limits and Grid Coordinates Plan (Onshore)
Other
Size: 16 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 36 - Outline Code of Construction Practice - Clean
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 30 - Revised Offshore Order Limits and Grid Coordinates Plan
Other
Size: 19 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 38 - Outline Ecological Management Plan - Clean
Other
Size: 16 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 35 - Outline Code of Construction Practice (tracked changes)
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 18 - Langston et al., 2013
Other
Size: 331 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 19 - Response to Examining Authority's FQ3.1 Rule 17 Collision Risk Modelling
Other
Size: 271 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 16 - Applicant's position in relation to displacement impacts
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 20 - Outline Construction Traffic Management Plan - Clean
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 15 - Wakefield et al., 2017
Other
Size: 227 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 2 - Final Agreed Layout Development Principles
Other
Size: 917 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 24 - Natural England Deadline 6 submission for Hornsea Project Two
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 28 - Revised Offshore Indicative Extent Of Marine Licences
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 17 - Pearson et al., 1968
Other
Size: 335 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 22 - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 26 - Safety Justification for Single Line of Orientation Layout
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 25 - Final Statement on Areas of agreement on the J6A data set analysis
Other
Size: 22 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 13 - Revised Tree Preservation Order and Hedgerow Plan
Other
Size: 18 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 11 - Revised Historic or Scheduled Monument Sites Plan (Onshore)
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 27 - Revised Offshore Historic Environment Plan
Other
Size: 346 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Annex A - Schedule of Objection to Granting of Compulsory Acquisition Powers
Other
Size: 19 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 12 - Revised Statutory and Non-Statutory Nature Conservation Sites plan (Onshore)
Other
Size: 312 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 1 - Applicant’s response to Spirit Energy’s submission at Deadline 7
Other
Size: 300 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Book of Reference - Schedule of Changes (between Deadline 4 and Deadline 9)
Other
Size: 368 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 23 - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
Other
Size: 23 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Land Plan (Onshore)
Other
Size: 19 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 10 - Revised Public Rights of Way Plan (Onshore)
Other
Size: 19 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 14 - Revised Onshore Limits of Deviation Plan
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 3 - Revised Location Plan Offshore and Onshore
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 34 - Updated Offshore Outline Written Scheme of Investigation
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 9 Submission - Appendix 21 - Outline Construction Traffic Management Plan – Tracked Changes
Other
Size: 3 MB
Natural England
Deadline 9 Submission - Correction to REP7-078
Other
Size: 3 MB
Natural England
Deadline 9 Submission - Natural England’s Response to Rule 17 Letter dated 21 March 2019 (ExA Q F6.1)
Other
Size: 3 MB
Natural England
Deadline 9 Submission - Natural England’s Comments on the Applicants D7 submissions
Other
Size: 5 MB
Natural England
Deadline 9 Submission - Offshore Register Entry for the SNS SAC (Citation)
Other
Size: 4 MB
Natural England
Deadline 9 Submission - SNS SAC Draft Conservation Objectives and Advice on Activities
Other
Size: 941 KB
Marine Management Organisation
Deadline 9 Submission - Response to Deadline 9
Other
Size: 308 KB
National Farmers Union and Land Interest Group
Deadline 9 Submission - Response to Deadline 9
Other
Size: 9 MB
Addleshaw Goddard LLP on behalf of Network Rail
Deadline 9 Submission - Letter to the Examining Authority
Other
Size: 4 MB
Natural England
Deadline 9 Submission - Natural England’s Response to Rule 17 Letter dated 19 March 2019 (ExA Qs F4.1, F4.2, F4.3)
Other
Size: 114 KB
Norfolk County Council
Deadline 9 Submission - Response to further information requested by the Examining Authority
Other
Size: 3 MB
Natural England
Deadline 9 Submission - Comments on the Examining Authority's Rule 17 letter to the Applicant dated 19th March 2019 (ExA Q F3.1)
Other
audio recording
Size: 42 MB
Recording of Open Floor Hearing 2 - 28 January 2019
Other
Size: 6 MB
Natural England
Deadline 8 Submission - Annex 2.2A - Accepted at the discretion of the Examining Authority
Other
Size: 126 KB
Trinity House
Deadline 8 Submission - Written Representation
Other
Size: 116 KB
Phil Daniels
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Size: 868 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
Other
Size: 200 KB
Oulton Parish Council
Deadline 8 Submission - Comments to Deadline 7 Submissions
Other
Size: 257 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Statement of Common Ground between Hornsea Project Three and Natural England for Offshore Ornithology
Other
Size: 168 KB
Revd Helen Rengert
Deadline 8 Submission - Written Submission - Accepted at the discretion of the Examining Authority
Other
Size: 678 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Guide to the Application
Other
Size: 410 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Forestry Commission Letter – Consent pursuant to Section 135 of the Planning Act 2008
Other
Size: 387 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Applicant’s Statement of Commonality of Statements of Common Ground (SoCG)
Other
Size: 163 KB
Public Health England
Deadline 8 Submission - Response to Consultation
Other
Size: 223 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Cover Letter
Other
Size: 18 KB
Helen & Chris Monk
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Size: 16 KB
Graham Whiteley
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Appendix 2 to Deadline 8 submission – MMO’s Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Other
Size: 2 MB
Richard Buxton Solicitors on behalf of Mulbarton Parish Council
Deadline 8 Submission - Written Representation
Other
Size: 16 KB
Elliot & Amanda Marks
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Size: 139 KB
David Vince & Nicola Draycott
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Cover Email
Other
Size: 41 KB
Alison and Michael Barrett
Deadline 8 Submission - Response to Deadline 8 - Accepted at the discretion of the Examining Authority
Other
Size: 341 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 8 Submission - Appendix 1 to Deadline 8 submission - Applicant’s Comments on Natural England’s response to the Rule 17 (REP7-064)
Other
Size: 54 KB
Mulbarton Parish Council
Deadline 8 Submission - Written Representation
Other
Size: 109 KB
Request for Further Information - Rule 17
Other
Size: 592 KB
Ørsted Hornsea Project Three (UK) Ltd
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 81 KB
Rule 17 - 19 March 2019 Request for further information to Natural England
Other
Size: 107 KB
Other
Size: 79 KB
Rule 17 - 19 March 2019 Request for further information to Norfolk County Council
Other
Size: 206 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 44 - Areas of agreement on the J6A data analysis
Other
Size: 208 KB
Trinity House
Deadline 7 Submission - Post Hearing Submission to ISH 8
Other
Size: 127 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 15 Annex A Data - Population Estimates and Densities
Other
Size: 155 KB
Polly Brockis
Deadline 7 Submission - Post hearing Submission - Accepted at the Discretion of the Examining Authority
Other
Size: 1 MB
The Royal Society for the Protection of Birds
Deadline 7 Submission - Response to Deadline 7
Other
Size: 552 KB
V. I. Purdy
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the Discretion of the Examining Authority
Other
Size: 45 KB
Peter Crossley
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 15 Annex A Data - Raw Data
Other
Size: 4 MB
Oulton Parish Council
Deadline 7 Submission - Post Hearing Submission
Other
Size: 1 MB
Trinity House
Deadline 7 Submission - Post Hearing Submission to ISH 9
Other
Size: 778 KB
V.I.Purdy
Deadline 7 Submission - Further Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Statement of Common Ground between Orsted Hornsea Project Three (UK) Ltd. and Eastern Inshore Fisheries and Conservation Authority
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 17 - Newell et al., 1998
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 27 - Development of the Cawston Traffic Intervention Scheme
Other
Size: 700 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
Other
Size: 574 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 8
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and South Norfolk Council
Other
Size: 226 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 43 - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
Other
Size: 674 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 7
Other
Size: 271 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 9
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Highways England
Other
Size: 191 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 20 - Protocol S1 - Alerstam et al., 2007
Other
Size: 15 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 8 - East Anglia Three Evidence Plan (Meeting 6)
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Revised Draft Development Consent Order - Clean
Other
Size: 161 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Applicant’s Response to IPs DL6 DCO Comments
Other
Size: 737 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 5 - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
Other
Size: 24 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 9 - Norfolk Vanguard Ornithology Technical Appendix
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Size: 512 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Guide to the Application
Other
Size: 322 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Applicant’s Statement of Commonality of Statements of Common Ground (SoCG)
Other
Size: 304 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 42 - Position statement in relation to the Radar Early Warning System at J6A platform
Other
Size: 662 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Applicants Comments on the Report on the Implications for European Sites (RIES)
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Cover Letter
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 6 - Jenkins et al., 2015
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 7 - Cook et al., 2012
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Schedule of Changes Development Consent Order and Deemed Marine Licences
Other
Size: 522 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Broadland District Council
Other
Size: 713 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 4 - Outline Cable Specification and Installation Plan
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 35 - Spirit Energy Protective Provisions
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 32 - Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
Other
Size: 284 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 40 - Ornithology roadmap with Natural England for the examination phase (ver.D)
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 30 - Aviation Workshop Draft Minutes – Helicopter Operators
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 34 - Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 41 - Outline Code of Construction Practice
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 36 - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 37 - East Anglia Three HRA
Other
Size: 180 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 31 - Applicant’s response to Examining Authority's Rule 17 to Maritime & Coastguard Agency
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 38 - Neart na Gaoithe HRA
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 33 - Le et al., 2014
Other
Size: 255 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 23 - Updated Layout Development Principles
Other
Size: 400 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 3 - In-Principle Monitoring Plan
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 26 - Construction Traffic Noise and Vibration Assessment for Cawston Village
Other
Size: 19 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 2- Outline Ecological Management Plan
Other
Size: 18 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 25 - Outline Construction Traffic Management Plan
Other
Size: 471 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 24 - Construction Traffic Noise Assessment Clarification Note
Other
Size: 175 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 22 - Position Statement on Turbulence
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 21 - Appendix B
Other
Size: 155 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 19 - Foden et al 2009
Other
Size: 1,020 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 29 - Aviation Meeting Minutes – CHC Helicopter Operator
Other
Size: 443 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 28 - Cumulative Link Impact Assessment relating to Traffic- Oulton and Cawston
Other
Size: 192 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 18 - Desprez 2000
Other
Size: 368 KB
North Norfolk District Council
Deadline 7 Submission - Post Hearing Submission to ISH 9
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 15 - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
Other
Size: 192 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 12 - Position Statement on Ornithology Mitigation Options
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 1 - Outline Landscape Plan
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Summary of Natural England’s Advice on North Norfolk Sand Banks and Saturn Reef SAC
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 13 - Collision Risk Estimates for Mitigation Scenarios
Other
Size: 16 KB
Nicola Banham
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Size: 337 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 16 - Newell et al., 2004
Other
Size: 47 KB
Nicola Stokes
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Summary of Natural England’s Advice on The Wash and North Norfolk Coast SAC
Other
Size: 173 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 10 - Chamberlain et al. 2006
Other
Size: 1,019 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 21 - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
Other
Size: 259 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 7 Submission - Appendix 11 - Furness et al., 2013
Other
Size: 13 MB
Natural England
Deadline 7 Submission - SNCB response to MSS Avoidance Rate Report
Other
Size: 426 KB
Natural England
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES)
Other
Size: 16 MB
Natural England
Deadline 7 Submission - Non-breeding season populations of seabirds in UK waters
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Annex D - Note on Small Scale Impact
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Annex E - Ornithology Response
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Summary of Natural England’s Advice on Cromer Shoal Chalk Beds MCZ
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Response to Rule 17 Questions
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Natural England & JNCC joint Technical Guidance Note - Marine Buffers and Margins
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Annex C - Cable Protection Advice Note
Other
Size: 15 MB
Natural England
Deadline 7 Submission - JNCC Report 598
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Summary of Natural England’s Advice on Markham’s Triangle pMCZ
Other
Size: 1 MB
Marine Management Organisation
Deadline 7 Submission- Response to Deadline 7
Other
Size: 546 KB
Maritime & Coastguard Agency
Deadline 7 Submission - Responses to the Examining Authority’s request for further information
Other
Size: 18 KB
Mr Stephen & Mrs Clare Brown
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Size: 43 KB
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc
Deadline 7 Submission - Response to Deadline 7
Other
Size: 294 KB
Natural England
Deadline 7 Submission - Annex B - Sabellaria Spinulosa Advice Note
Other
Size: 17 KB
DLA Piper UK LLP on behalf of National Grid Electricity Transmission Plc and National Grid Gas Plc
Deadline 7 Submission - Protective Provisions
Other
Size: 1,004 KB
Mulbarton Parish Council
Deadline 7 Submission - Onshore Substation – Option E
Other
Size: 1 MB
Marine Management Organisation
Deadline 7 Submission - Comments on the Report on the Implications for European Sites (RIES) and comment on the Examining Authority’s Schedule of Changes to the draft Development Consent Order (DCO)
Other
Size: 12 MB
Natural England
Deadline 7 Submission - Annex A - Further Advice on REP5 -010 Preliminary Trenching Assessment (PTA)
Other
Size: 15 KB
Mike Linley
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Size: 117 KB
Elliot and Amanda Marks
Deadline 7 Submission - Response to Deadline 7 All Things Nice Cawston - Accepted at the Discretion of the Examining Authority
Other
Size: 366 KB
Helen & Chris Monk
Deadline 7 Submission - Response to the Outline CMTP and Appendix 25 - Accepted at the discretion of the Examining Authority
Other
Size: 14 KB
Heidi Hobday
Deadline 7 Submission - Response to Deadline 7 - Accepted at the Discretion of the Examining Authority
Other
Size: 423 KB
CPRE Norfolk
Deadline 7 Submission - Response to Deadline 7 - Including supportive material
Other
Size: 78 KB
John Bentley
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Size: 16 KB
Frances L. Rossington
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Size: 5 MB
Cawston Parish Council
Deadline 7 Submission - Post Hearing Submission and Written Submission of Oral Case - ISH 9
Other
Size: 5 MB
Cawston Parish Council
Deadline 7 Submission - Response to ISH9 - Traffic Impacts Action Point 14
Other
Size: 46 KB
Eastern Power Networks plc
Deadline 7 Submission - Protective Provisions
Other
Size: 18 KB
Kate Wyatt
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Size: 8 MB
Cawston Parish Council
Deadline 7 Submission - Evidence of No Passing Places for HGVs in Central Cawston
Other
Size: 15 KB
Claire Gray
Deadline 7 Submission - Response to Deadline 7 - Accepted at the discretion of the Examining Authority
Other
Size: 7 MB
Cawston Parish Council
Deadline 7 Submission - Comments on Revised Draft Traffic Management Plan
Other
Size: 6 MB
Brodies LLP on behalf of Spirit Energy
Deadline 7 Submission - Appendix 3 - DNV GL Technical Note
Other
Size: 421 KB
Broadland District Council
Deadline 7 Submission - Post Hearing Submission
Other
Size: 7 MB
Cawston Parish Council
Deadline 7 Submission - Cawston HGV Traffic Diversion Proposal
Other
Size: 1 MB
Brodies LLP on behalf of Spirit Energy
Deadline 7 Submission - Post Hearing Submission to ISH 8
Other
Size: 3 MB
Broadland District Council
Deadline 7 Submission - Statement of Common Ground between Hornsea Project Three UK) Ltd. and Broadland District Council
Other
Size: 82 KB
Andy and Clare Parle
Deadline 7 Submission - Post Hearing Submission - Accepted at the discretion of the Examining Authority
Other
Size: 5 MB
Cawston Parish Council
Deadline 7 Submission - Chairman's Response to ISH9 Agenda Item 5G
Other
Size: 5 MB
Cawston Parish Council
Deadline 7 Submission - Engagement with Ørsted on Traffic in Cawston - Agreement , Disagreement and Suggestions for Management and Mitigation
Other
Size: 43 KB
DLA Piper UK LLP on behalf of Cadent Gas Limited
Deadline 7 Submission - Protective Provisions
Other
Size: 4 MB
Brodies LLP on behalf of Spirit Energy
Deadline 7 Submission - Appendix 4 - Aviation Slides
Other
Size: 2 MB
Broadland District Council
Deadline 7 Submission - Appendix A to Broadland District Council's Statement of Common Ground
Other
Size: 15 KB
Agenda for Open Floor Hearing 3
Other
Size: 15 KB
Agenda for Further Issue Specific Hearing
Other
Size: 16 KB
Agenda for Further Compulsory Acquisition Hearing
Other
audio recording
Size: 308 MB
Recording of Issue Specific Hearing 9 (ISH9) - 8 March 2019
Other
audio recording
Size: 345 MB
Recording of Issue Specific Hearing 8 (ISH8) - 7 March 2019
Other
audio recording
Size: 182 MB
Recording of Issue Specific Hearing 7 (ISH7) - 6 March 2019
Other
Size: 119 KB
Rule 17 - 6 March 2019 Request for further information to Natural England
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Post hearing submission
Other
Size: 135 KB
Variation to Timetable - Rule 8(3) , Rule 13 - Notification of Hearings
Other
Other
Size: 21 KB
Agenda for Issue Specific Hearing 7: Offshore ecology - Wednesday 6 March
Other
Other
Size: 86 KB
Notification of Procedural Decision
Rule 17 - 26 February 2019 Request for further information from the Maritime and Coastguard Agency
Other
Size: 100 KB
Notification of Procedural Decision
The Examining Authority's schedule of changes to the draft Development Consent Order
Other
Size: 927 KB
Report on the Implications of European Sites (RIES)
Issued by the Examining Authority - 21 February 2019
Other
Size: 52 KB
Accompanied Site Inspection Itinerary - 5 March 2019
Other
Size: 208 KB
South Norfolk Council, North Norfolk District Council and Broadland District Council
Deadline 6 Submission - Revised version of the applicant’s Outline Landscape Plan requested by the Examining Authority
Other
Size: 15 KB
Helen & Chris Monk
Deadline 6 Submission - Suggested Location for Accompanied Site Inspection - Accepted at the discretion of the Examining Authority
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission -Revised Draft Development Consent Order - Clean
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Statement of Commonality of Statements of Common Ground (SoCG)
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Written summary of Applicant’s oral case put at Issue Specific Hearing 6 (30th Jan 2019)
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Written summary of Applicant’s oral case put at Issue Specific Hearing 5 (29th Jan 2019)
Other
Size: 48 KB
Oulton Parish Council
Deadline 6 Submission - Response to Deadline 6
Other
Size: 20 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 25 - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Guide to the Application
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Schedule of Changes - Development Consent Order and Deemed Marine Licences
Other
Size: 6 MB
The Royal Society for the Protection of Birds
Deadline 6 Submission - Appendix 3.2 - Collision Risk Modelling: update and clarification
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Written summary of Applicant’s oral case put at Compulsory Acquisition Hearing (31st Jan 2019)
Other
Size: 3 MB
The Royal Society for the Protection of Birds
Deadline 6 Submission - Written Submission
Other
Size: 58 KB
Weybourne Parish Council
Deadline 6 Submission - Response to Deadline 6
Other
Size: 283 KB
The Wildlife Trusts
Deadline 6 Submission - Post-hearing submission and further comments
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Size: 447 KB
Trinity House
Deadline 6 Submission - Written Representation for Issue Specific Hearing 6 - Draft Development Consent Order
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 5 - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 7 - Johnson and Cook 2016
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 6 - Offshore ornithology Hearing Clarifications-cumulative and in combination assessment methods and age class data
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 31 - CIGRE Report 2009 - Service Experience of HV Underground and Submarine Cable Systems
Other
Size: 16 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 8 -Smart Wind and Forewind 2014 Report
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Application for Non-material amendments including Additional Land
Other
Size: 27 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 3a - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Cover Letter
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 30 - Outline Onshore Written Scheme of Investigation
Other
Size: 15 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 3b - Annex A - Hornsea Three Highway Intervention Schemes
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 9 - Trinder M., 2017
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Commentary on progress made with Spirit Energy at Deadline 6
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 4 - Rock Protection Decommissioning Methods
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Applicant's comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 21 - Brassuer et al., 2015
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 28 - Position of the Applicant in relation to collision risk modelling
Other
Size: 16 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 26 - Outline Ecological Management Plan
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 29 - Applicants interpretation of Natural England’s position in relation to collision risk modelling
Other
Size: 21 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 24 - Proposed Use of Temporary Working Areas for Micrositing - Implications for Environmental Statement
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 22 - Marine Mammal Hearing Clarifications
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 27 - Forsythe et al., 1995
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 3 - Outline Construction Traffic Management Plan
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 20 - Graham et al., 2018
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 2 - Outline Code of Construction Practice
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 19 - Alerstam et al., 2007
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 23 - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Other
Size: 622 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 17 - Garthe et al., 1999
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 13 - Ornithology roadmap with Natural England for the examination phase (ver.C)
Other
Size: 167 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 18 - Duant et al 2002
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 1 -Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
Other
Size: 18 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 11 - Aitken et al., 2014
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 15 - Pennycuick 1997
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 16 - Johnston et al., 2014 with Corrigendum
Other
Size: 15 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 12 - Preliminary Trenching Assessment
Other
Size: 3 MB
Natural England
Deadline 6 Submission - Written summary of Representations made at ISH6 DCO Hearing
Other
Size: 3 MB
North Norfolk District Council
Deadline 6 Submission - Post hearing submission - Issue Specific Hearing on 30 January 2019
Other
Size: 39 KB
Addleshaw Goddard LLP on behalf of Network Rail
Deadline 6 Submission - Response to Item 11(c) of the Agenda
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 14 - Warwick-Evans et al., 2018
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 6 Submission - Appendix 10 -Horsewill and Robinson 2015
Other
Size: 3 MB
Natural England
Deadline 6 Submission - ISH6 Annex B- Natural England’s Comments on REP4-023 Code of Construction Practice Rev.2
Other
Size: 2 MB
Natural England
Deadline 6 Submission - ISH 5 Annex D- Natural England Comments on REP4-012 pg 43 onwards Applicants response to ExA Q2.2.46 in relation to MEEB.
Other
Size: 3 MB
Natural England
Deadline 6 Submission - Written Submission of Representations at Issue Specific Hearing 5 - Offshore Ecology
Other
Size: 3 MB
Natural England
Deadline 6 Submission - ISH6 Annex A -Natural England’s Comments on the Applicant’s Proposed DML appeal conditions
Other
Size: 41 KB
DLA Piper UK LLP on behalf of National Grid
Deadline 6 Submission - Response to Deadline 6
Other
Size: 3 MB
Natural England
Deadline 6 Submission - ISH 5 Appendix C- Natural England Comments on REP5 – 011- Appendix 3 Cable Specification Installation Plan (CSIP)
Other
Size: 2 MB
Natural England
Deadline 6 Submission - ISH5 Annex F - Natural England’s Response to the Applicant’s response to ExA Q2.2.25
Other
Size: 2 MB
Natural England
Deadline 6 Submission - ISH 5 Annex E- Natural England’s comments on REP3 – 024 Appendix 15 The Wash and North Norfolk Coast (W&NNC) SAC In-combination Assessment
Other
Size: 3 MB
Natural England
Deadline 6 Submission - ISH 5 Annex B - Natural England’s comments on REP5 – 010 Preliminary Trenching Assessment (PTA)
Other
Size: 2 MB
Natural England
Deadline 6 Submission - ISH5 Annex A - Natural England’s Comments on REP 4-097 Biotope Clarification paper as requested at ISH 5
Other
Size: 3 MB
Natural England
Deadline 6 Submission - ISH5 Annex G- Natural England’s Comments on the Applicant’s response to ExA Q2.2.38
Other
Size: 2 MB
Natural England
Deadline 6 Submission - ISH 5 Annex H - Natural England’s Response to REP5-014
Other
Size: 2 MB
Marine Management Organisation
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
Other
Size: 887 KB
National Farmers Union And The Land Interest Group
Deadline 6 Submission - Written submission - Issue Specific Hearing – Draft Development Consent Order - Wednesday 30th January 2019
Other
Size: 145 KB
N2RS
Deadline 6 Submission - Concerns about Public Engagement and Observations on the Current Project Design
Other
Size: 64 KB
N2RS
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
Other
Size: 975 KB
National Farmers Union And The Land Interest Group
Deadline 6 Submission - Written submission - Issue Specific Hearing - Compulsory Acquisition - Thursday 31st January 2019
Other
Size: 5 MB
Mulbarton Parish Council
Deadline 6 Submission - Response to Deadline 6
Other
Size: 1,008 KB
Bidwells LLP on behalf of Mr Kemp
Deadline 6 Submission - Post hearing submission
Other
Size: 303 KB
Historic England
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases
Other
Size: 44 KB
DLA Piper UK LLP on behalf of Cadent Gas Limited
Deadline 6 Submission - Response to Deadline 6
Other
Size: 135 KB
N2RS
Deadline 6 Submission - Local cumulative environmental impact assessments of the cable route on landscape, tourism, traffic and recreation
Other
Size: 2 MB
Marine Management Organisation
Deadline 6 Submission - Written Representation
Other
Size: 803 KB
Maritime & Coastguard Agency
Deadline 6 Submission - Report following aviation trials and exercises in relation to offshore wind farms
Other
Size: 951 KB
Maritime & Coastguard Agency
Deadline 6 Submission - Responses to the applicants comments on representations made by Maritime & Coastguard Agency at deadline 4.
Other
audio recording
Size: 238 MB
Recording of Compulsory Acquisition Hearing 1 (CAH1) - 31 January 2019
Other
audio recording
Size: 246 MB
Recording of Issue Specific Hearing 6 (ISH6) - 30 January 2019
Other
audio recording
Size: 390 MB
Recording of Issue Specific Hearing 5 (ISH5) - 29 January 2019
Other
Size: 96 KB
Other
Size: 1 MB
Marine Management Organisation
Deadline 5 Submission - Late Submission
Other
Size: 107 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 10 - Habitats and Wild Birds Directives: guidance on the application of article
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 12 - Ornithology roadmap with Natural England for the examination phase (ver.B)
Other
Size: 1 MB
Brodies LLP on behalf of Spirit Energy
Deadline 5 Submission - Comments on the Applicant’s responses to the Examining Authority’s Written Questions and Appendices
Other
Size: 20 MB
The Royal Society for the Protection of Birds
Deadline 5 Submission and Appendices
Other
Size: 16 KB
Oulton Parish Council
Deadline 5 Submission
Other
Size: 259 KB
Trinity House
Deadline 5 Submission - Response to Examining Authority’s Further Written Questions
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Cover Letter
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Guide to the Application
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Position Statement between: Hornsea Project Three (UK) Ltd. and Shell UK Ltd
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 7 - Aircraft Management Guidelines
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 9 - Summary of Array Layout Position and Applicants response to Interested Parties answers to Examining Authority's Q2.5.1, Q2.5.6 and Q2.5.7
Other
Size: 27 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 8 - Main Construction Compound Access Strategy VISSIM Modelling Update
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Statement of Commonality of Statements of Common Ground
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 6 - Apportioning Immature Auks to Colonies
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Statement of Common Ground between Hornsea Project Three and Maritime and Coastguard Agency
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd. and North Norfolk District Council
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Comments on Interested Parties’ Responses to the Examining Authority's Second Written Questions submitted at Deadline 4
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 13 - Statement of Experience - Anatec Ali MacDonald, John Beattie, and Samantha Westwood
Other
Size: 4 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 14 - Beatrice A Platform Helideck Information Plate
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 5 - Confirmation of migratory seabirds considered in migratory collision risk modelling
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 11 - MarESA Summaries EpusOborApri and PoVen biotopes
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 4 - Second Issue Specific Hearing clarifications in relation to offshore ornithology
Other
Size: 1 MB
Natural England
Deadline 5 Submission - Updated Appendix 3 to Natural England's written summary on ISH 2 Ornithology
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 2 - Preliminary Trenching Assessment
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 3 - Outline Cable Specification and Installation Plan
Other
Size: 15 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 5 Submission - Appendix 1 - Appendix G to the Transport Assessment
Other
Size: 3 MB
Mulbarton Parish Council
Deadline 5 Submission - Map of the Norwich Southern Bypass Protection Zone (NSBPZ)
Other
Size: 42 KB
Proposed provisions checklist
Other
Other
Size: 84 KB
Notification of Procedural Decision - Rule 9
Other
Size: 6 MB
Natural England
Deadline 4 Submission - Late Submission - Cruise report for the surveys undertaken
Other
Size: 65 KB
Hearing Agenda for Issue Specific Hearing 6
Issue Specific Hearing 6: The draft Development Consent Order - Wednesday 30 January
Other
Size: 47 KB
Hearing Agenda for Open Floor Hearing
Open Floor Hearing - Monday 28 January 2019
Other
Size: 51 KB
Itinerary for Accompanied Site Inspection (ASI)
Accompanied Site Inspection (ASI) - Monday 28 January 2019
Other
Size: 65 KB
Hearing Agenda for Compulsory Acquisition Hearing
Compulsory Acquisition Hearing - Thursday 31 January 2019
Other
Size: 90 KB
Hearing Agenda for Issue Specific Hearing 5
Issue Specific Hearing 5: Offshore ecology - Tuesday 29 January 2019
Other
Size: 3 MB
Ray Pearce
Deadline 4 Submission - Late Submission accepted at the discretion of the Examining Authority's discretion
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 4 Outline Landscape Management Plan
Other
Size: 659 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 3 Outline Construction Traffic Management Plan
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 2 Outline Code of Construction Practice
Other
Size: 713 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 6 Moray West OWF Application
Other
Size: 563 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 5 Design Objectives and Principles for the HVDC Converter/HVAC Substation and HVAC Booster Station Buildings
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 1 Outline Ecological Management Plan
Other
Size: 249 KB
Natural England
Deadline 4 Submission - Reef polygon and point layers
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Late Submission - Book of Reference - Clean
Other
Size: 7 MB
Natural England
Deadline 4 Submission - Raw GIS data delivered from the CEND 22/13 survey
Other
Size: 20 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 91 - Statutory and Non-Statutory Nature Conservation Sites (Onshore)
Other
Size: 25 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 86 - Works Plan (Onshore)
Other
Size: 4 MB
Brodies LLP on behalf of Spirit Energy
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and Appendix
Other
Size: 24 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 93 - Onshore Limits of Deviation Plan
Other
Size: 21 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 92 - Tree Preservation Order and Hedgerow Plan
Other
Size: 121 KB
South Norfolk Council
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Size: 710 KB
The Wildlife Trusts
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 16 - Cook et al., 2014
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 23 - Welcker et al., 2017
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and the Marine Management Organisation
Other
Size: 106 KB
The Crown Estate
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Commonality of Statements of Common Ground
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Revised Draft Development Consent Order – Tracked Changes
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Reasons - Clean
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 29 - Supplementary advice on Conservation Objectives for NNSSR SAC, JNCC 2017
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Norfolk County Council
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Highways England
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 18 - Garthe and Huppop 2004
Other
Size: 27 KB
Oulton Parish Council
Deadline 4 Submission
Other
Size: 30 MB
Royal Society for the Protection of Birds
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and appendices
Other
Size: 6 MB
Whale and Dolphin Conservation
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Revised Draft Development Consent Order
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Common Ground between Ørsted Hornsea Project Three (UK) Ltd and Norfolk Vanguard Ltd and Norfolk Boreas Ltd
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Reasons - Tracked Changes
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Schedule of Changes - Development Consent Order and Deemed Marine Licences
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Statement of Common Ground between Hornsea Project Three(UK) Ltd. and South Norfolk Council
Other
Size: 18 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 85B - Land Plan - Onshore
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Cover Letter
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Guide to the Application
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 90 - Historic and Scheduled Monument Sites Plan (Onshore)
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 83 - Location Plan (Onshore)
Other
Size: 21 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 88 - Streets Plan
Other
Size: 25 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 85C - Land Plan - Onshore
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Book of Reference - Schedule of Changes
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Application for non-material amendments including Additional Land
Other
Size: 24 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 84 - Onshore Order Limits
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 78 - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 9 - Booth et al., 2017
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Comments on Written Representations and Responses submitted by Interested Parties at Deadline 3
Other
Size: 20 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 87 - Access to Works Plan (Onshore)
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 8 - Natural England Letter of No Impediment (Badger Licence)
Other
Size: 21 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 89 - Public Rights of Way Plan (Onshore)
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Book of Reference (Tracked changes)
Other
Size: 17 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 85A - Land Plan - Onshore
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Hearing Speaker Biographies and Statement of Experience
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 11 - Nabe-Nielsen et al., 2018
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 77 - Detailed response to the Examining Authority's Q2.2.3
Other
Size: 16 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 81 - Proposed Minor Amendments Comparison Plan
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 76 - HeliOffshore 2017
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 82 - Location Plan Offshore and Onshore
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 68 - East Anglia Three HRA Report
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 69 - Norfolk Vanguard Offshore Ornithology Chapter
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 71 - Natural England Response to Hornsea Two Deadline 5
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 60 - Draft CfD Budget Notice
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 75 - Energy Voice, 2018
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 59 - Fisheries Coexistence and Liaison Plan
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 64 - Dogger Bank Creyke Beck Examining Authority's Recommendation Report
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 72 - Hornsea Project Three Aviation Team
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 57 - Helideck Certificates for Chiswick and Grove Platforms
Other
Size: 17 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 7- HGV Haul Road Reduction Report
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 66 - Hornsea Project Two Examining Authority's Recommendation Report
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 55 - Updated Layout Development Principles
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 70 - Inch Cape Scoping Opinion (Ornithology)
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 53 - Illustrative cable trench cross sections for ducted installation In response to Examining Authority's Q2.1.3
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 63 - Detailed response to the Examining Authority's Q2.2.7 and Q2.2.44
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 73 - Detailed response to the Examining Authority's Q2.2.30 and Q2.2.39
Other
Size: 23 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 52 - Nuon/Vattenfall Report 2017
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 54 - List of Aviation Assumptions Used in Assessments
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 56 - Manwell et al., 2009
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 62 - Detailed response to the Examining Authority's Q2.2.34
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 58 - Indicative Array Layout Based on +-150m Development Lanes
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 74 - Anatec Report (2016)
Other
Size: 157 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 51 - Defra MCZ Guidance 2010
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 65 - Dogger Bank Creyke HRA Report
Other
Size: 15 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 67 - Hornsea Project Two HRA Report
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 45 - Detailed response to the Examining Authority's Q2.2.65
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 36 - Aitchinson 2012
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 46 - In-Principle Southern North Sea SCI Site Integrity Plan: V2.0
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 40 - Chris McDermott, IEMA Quality Mark Article
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 43 - Outline Skills and Employment Plan Attachment to the Q2.10.1
Other
Size: 17 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 38 - Regeneris Consulting and The Tourism Company Report, 2014
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 48 - Detailed response to the Examining Authority's Q2.9.3
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 42 - Regeneris Consulting Report, 2016
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 37 - Riddington et al., 2008
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 44 - Detailed response to the Examining Authority's Q2.2.68
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 34 - Noise Clarifications
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 41 - Regeneris Consulting Report, 2015
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 49 - Roulund et al., 2019a
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 50 - Roulund et al., 2019b
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 47 - In-Principle Monitoring Plan V3.0
Other
Size: 21 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 39 - Environmental Resources Management Report, 2014
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 32 - Further Design Development of Option 1:Passing Places at the Main Construction Compound
Other
Size: 467 KB
Historic England
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 31 - List of Aviation Assumptions
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 24 - Cook et al., 2018
Other
Size: 265 KB
Norfolk County Council
Deadline 4 Submission - Response Examining Authority's Written Question 2.9.3
Other
Size: 24 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 33 - Main Construction Compound Access Strategy VISSIM Modelling
Other
Size: 3 MB
Marine Management Organisation
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 28 - Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
Other
Size: 13 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 13 - Wisniewska et al., 2016
Other
Size: 411 KB
North Norfolk District Council
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Size: 14 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 26 - Sotheran et al., 2017
Other
Size: 8 MB
DLA Piper UK LLP on behalf of Cadent Gas Limited
Deadline 4 Submission - Written Submission and appendices
Other
Size: 1 MB
National Federation of Fishermen's Organisations
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 submission - Appendix 17 - Dierschke and Garthe 2006
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 19 - Lawson et al., 2016
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 14 - Bowgen and Cook, 2018
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 30 - Detailed response to the Examining Authority's Q2.2.20
Other
Size: 271 KB
Norfolk County Council
Deadline 3 Submission - Response Examining Authority's Written Question 2.13.10
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 12 - Scheidat et al., 2011
Other
Size: 5 MB
Natural England
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions, Further information requested by the Examining Authority and Appendix
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Annex A – Schedule of Objection to Granting of Compulsory Acquisition Powers
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 25 - Parry 2015
Other
Size: 320 KB
Norfolk County Council
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
Other
Size: 270 KB
Norfolk County Council
Deadline 4 Submission - Response Examining Authority's Written Question 2.1.11
Other
Size: 87 KB
DLA Piper UK LLP on behalf of National Grid
Deadline 4 Submission - Written Submission
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 10 - Brandt et al., 2018
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 27 - Pennycuick et al., 1987
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 22 - Desholm 2005
Other
Size: 584 KB
Highways England
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 20 - Masden 2015
Other
Size: 16 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 15 - Furness 2015
Other
Size: 6 MB
Marine Management Organisation
Deadline 4 Submission - A synthesis of current knowledge on the genesis of the Great Yarmouth and Norfolk Bank Systems - Cooper 2008
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 4 Submission - Appendix 21 - Wade et al., 2016
Other
Size: 408 KB
Maritime & Coastguard Agency
Deadline 4 Submission - Response to the Examining Authority’s Further Written Questions and further information requested by the Examining Authority
Other
Size: 236 KB
Natural England
Deadline 3 Submission - Late submission
Other
Size: 553 KB
Further Written Questions
Other
Size: 136 KB
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix G - Map of the UK exclusive economic zone
Other
Size: 60 KB
Joanna Church on behalf of Richard Bacon MP
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 58 KB
Scottish Natural Heritage
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 38 KB
Corpusty & Saxthorpe Parish Council
Deadline 3 Submission - Post hearing submission - Late Submission
Other
Size: 38 KB
Edgefield Parish Council
Deadline 3 Submission - Post hearing submission - Late Submission
Other
Size: 1 MB
National Farmers Union and Land Interest Group
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 7 December 2018
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix N - Maritime and Coastguard Agency MGN 543
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix F - The exclusive economic zone order 2013
Other
Size: 10 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix Y - AviateQ International Limited report
Other
Size: 10 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix H - MCA - Methodology for assessing the marine navigational safety & emergency response risks of offshore renewable energy installations
Other
Size: 2 MB
National Farmers Union and Land Interest Group
Deadline 3 Submission - Construction Environmental Management Plan - Supporting Material of Written Submission to Issue Specific Hearing - 6 December 2018
Other
Size: 9 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix C - Maritime and Coastguard Agency MGN 372
Other
Size: 9 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix D - Planning Commission advice note 9 - Rochdale Envelope
Other
Size: 801 KB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Cover Letter
Other
Size: 23 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix L - CAA CAP1234 Safety review of offshore public transport helicopter operations in support of the exploitation of oil and gas - Progress report
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix M - CAA CAP764 Policy and guidelines on wind turbines
Other
Size: 1 MB
National Farmers Union and Land Interest Group
Deadline 3 Submission - Written Submission - Open Floor Hearing 3 December 2018
Other
Size: 11 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix K - Transport committee's second report on offshore helicopter safety
Other
Size: 9 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix A - Licence P.468 Dated 15 August 1983
Other
Size: 561 KB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Post Issue Specific Hearing 1 Submissions
Other
Size: 1 MB
National Farmers Union and Land Interest Group
Deadline 3 Submission - Outline Soil Management Plan - Supporting Material of Written Submission to Issue Specific Hearing - 6 December 2018
Other
Size: 2 MB
National Farmers Union and Land Interest Group
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 6 December 2018
Other
Size: 21 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix J - East Inshore and East offshore Marine Plan
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix I - CAA CAP1145 Safety review of offshore public transport helicopter operations in support of oil and the exploitation of oil and gas
Other
Size: 20 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix W - Noble detention Marine Services - Hornsea 3 wind farm review of Marine hazards
Other
Size: 1 MB
National Farmers Union and Land Interest Group
Deadline 3 Submission - Written Submission - Issue Specific Hearing - 4 December 2018
Other
Size: 25 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix E - UK Marine Policy Statement
Other
Size: 10 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZA - Written Representation
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix R - Helioffshore safety proposals for offshore safety enhancements
Other
Size: 10 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZC - Declaration - Chiswick Grove and J6A Safety Cases
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix U - Marine Accident Investigation branch , report on the investigation of the collision between Sage Sky and Stema Barge II
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix V - Planning Inspectorate advice note 9 - Rochdale Envelope
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix P - CAA CAP1386 Safety review of offshore public transport helicopter operations in support of the exploitation of oil and gas - Progress Report
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix S - East Anglia Three offshore wind farm order 2017 No. 826 Article 3 (1) Schedule 8 Part 7
Other
Size: 18 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix O - Oil and Gas authority the maximising economic recovery strategy for the UK
Other
Size: 10 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix X - Letter from OGUK Oil and Gas Regulator
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix Q - Hornsea two offshore wind farm order 2016 No. 0000 Article 6 (1) Schedule 12 parts 8 , 9 and 10
Other
Size: 12 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix T - Markham St - 1 Decommissioning programme
Other
Size: 11 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix Z - CAA Operational manual extracts - Appendix 1 to the AviateQ International Limited Report
Other
Size: 10 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZB - Spirit Energy Proposed protective provisions
Other
Size: 7 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZE - Addendum to AviateQ International Limited Report
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZF - Legislative Framework Summary
Other
Size: 7 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZD - Addendum to Noble Denton Marine Services Report to Spirit Energy report review of marine hazards
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZK - Map showing Spirit Energy's proposed protective provisions - Hornsea and 7.5NM radius
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZI - Map showing Spirit Energy's proposed protective provisions -Hornsea and 2NM radius
Other
Size: 7 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZH - Map showing Spirit Energy's proposed protective provisions - Hornsea and all radii
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZG - Technical Note
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZJ - Map showing Spirit Energy's proposed protective provisions - Hornsea and 5NM radius
Other
Size: 6 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 14 - Markham’s Triangle PMCZ Lifetime Effects Assessment
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZN - Comprehensive Analysis of Flying Conditions (Percentage Frequency Outcome) Based on 3-hourly Weather date for J6A (1 October 2017 – 29 September 2018)
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 19 Indicative Proposed Minor Amendments to Order Limits
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 4 - Equalities Impact Assessment
Other
Size: 6 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 15 - The Wash and North Norfolk Coast SAC In-combination Assessment
Other
Size: 6 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 16 - Ornithology roadmap with Natural England for the examination phase
Other
Size: 6 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 17 - Age class data
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZL- Map showing Spirit Energy's Proposed protective provisions -Composite of Spirit Energy and Ørsted maps
Other
Size: 6 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 18 - Kuhn O et al - 2nd generation DC grid access for offshore wind farms-HVDC in an AC fashion (CIGRE 2016)
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Post Issue Specific Hearing 1 Submissions - List of Appendices
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZO - Issue Specific Hearing 1 Summary of oral evidence
Other
Size: 6 MB
Brodies Solicitors on behalf of Spirit Energy
Deadline 3 Submission - Appendix ZM - Expert Assessment of flying conditions for Ara - Sample of weather forecasts at block J-West (1 October 2017 –29 September 2018)
Other
Size: 29 KB
Oulton Parish Council
Deadline 3 Submission - Post Hearing Submission
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 12 - Collision Risk Model Band 2012
Other
Size: 9 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 10 - JNCC Report no 548 - Parsons et al. 2015
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 11 -JNCC Report no 500 - Wilson et al. 2014
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 5 - Adrian Judd, Cefas 2011
Other
Size: 6 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 7 - S. Gubbay JNCC 2007
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 13 - Figures to the Applicant’s Response to Examining Authority's Question Q1.2.46 (REP1-122)
Other
Size: 10 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 9 - McGregor et al 2018 Marine Scotland
Other
Size: 23 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 8 - Ware S.J. & Kenny A.J. 2011
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 6 - Marine Monitoring Handbook
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 4
Other
Size: 28 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 1 - Main Construction Compound Briefing Note
Other
Size: 11 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Responses to Additional Submissions by Interested Party at Deadline 1 and 2
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 3
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Cover Letter
Other
Size: 8 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Statement of Common Ground between Hornsea Project Three and the Royal Society for the Protection of Birds
Other
Size: 22 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 3 - Onshore Crossing Schedule
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Statement of Commonality of Statements of Common Ground
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Guide to the Application
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 2
Other
Size: 7 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Written summary of Applicant's oral case put at Issue Specific Hearing 1
Other
Size: 12 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 3 Submission - Appendix 2 - Indicative HVDC cable corridor cross section
Other
Size: 5 MB
Natural England
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 3
Other
Size: 3 MB
North Norfolk District Council
Deadline 3 Submission - Representations following Issue Specific Hearings
Other
Size: 5 MB
Natural England
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 1
Other
Size: 5 MB
Natural England
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 2 - Benthic
Other
Size: 5 MB
Natural England
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 2 - Benthic Annex 2 2B Response on REP2-004
Other
Size: 5 MB
Natural England
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 4
Other
Size: 7 MB
Natural England
Deadline 3 Submission - Method statement for ornithological, marine mammal and marine mega fauna survey
Other
Size: 5 MB
Natural England
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases - Issue Specific Hearing 2 Part 1 - Ornithology
Other
Size: 1,023 KB
Royal Society for the Protection of Birds
Deadline 3 Submission - Responses to further information requested by the ExA
Other
Size: 3 MB
Marine Management Organisation
Deadline 3 Submission - Annex B - Comments on In Principle Monitoring Plan
Other
Size: 1 MB
Bidwells on behalf of Sir Edward Evans-Lombe
Deadline 3 Submission - Response to Examining Authority's Written Question 1.1.12
Other
Size: 3 MB
Marine Management Organisation
Deadline 3 Submission - Example MCZ Stage 1 assessment
Other
Size: 3 MB
Marine Management Organisation
Deadline 3 Submission - Annex A -Guidance on MCZ assessments
Other
Size: 552 KB
Historic England
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases
Other
Size: 32 KB
Cadent Gas Limited
Deadline 3 Submission - Comments on revised draft DCO
Other
Size: 3 MB
Marine Management Organisation
Deadline 3 Submission - Example MCZ screening document
Other
Size: 3 MB
Marine Management Organisation
Deadline 3 Submission - Annex C - Comments on Herring Noise Contours
Other
Size: 674 KB
Royal Society for the Protection of Birds
Deadline 3 Submission - Guillemot Razorbill and Kittiwake Phenology 2016-17
Other
Size: 34 KB
DLA Piper UK LLP on behalf of National Grid
Deadline 3 Submission - Comments on revised draft DCO
Other
Size: 172 KB
Mulbarton Parish Council
Deadline 3 Submission - Submissions of oral cases
Other
Size: 310 KB
Trinity House
Deadline 3 Submission - Comments on revised draft DCO
Other
Size: 115 KB
Cawston Parish Council
Deadline 3 Submission - Post hearing submission
Other
Size: 266 KB
CPRE Norfolk
Deadline 3 Submission - Post Hearing Submission
Other
Size: 3 MB
Marine Management Organisation
Deadline 3 Submission - Post hearing submission including written submission of oral cases and comments on the revised draft DCO
Other
Size: 511 KB
Maritime & Coastguard Agency
Deadline 3 Submission - Responses to further information requested by the ExA
Other
Size: 341 KB
Oulton Parish Council
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases
Other
Size: 339 KB
Natural England
Deadline 3 Submission - Overarching concerns with project timetables
Other
Size: 1 MB
National Federation of Fisherman's Organisation
Deadline 3 Submission - Post Hearing Submission
Other
Size: 157 KB
Swardeston Parish Council
Deadline 3 Submission - Post hearing submissions
Other
Size: 320 KB
Norfolk County Council
Deadline 3 Submission - Comments on revised draft DCO
Other
Size: 830 KB
Norfolk County Council
Deadline 3 Submission - Local Impact Report Amendments
Other
audio recording
Size: 360 MB
Recording of Issue Specific Hearing 4 (ISH4) 07 December 2018
Other
audio recording
Size: 15 MB
Recording of Open Floor Hearing - 03 December 2018
Other
audio recording
Size: 268 MB
Recording of Issue Specific Hearing 3 (ISH3) - 06 December 2018
Other
audio recording
Size: 168 MB
Recording of Issue Specific Hearing 2 (ISH2) - 05 December 2018
Other
audio recording
Size: 95 MB
Recording of Issue Specific Hearing 1 (ISH1) - 04 December 2018
Other
Size: 7 MB
Joanna Church on behalf of Richard Bacon MP
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Longmans Software
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 81 KB
Norfolk County Council
Proposed Amendment to Requirement 15 (Surface Drainage)
Other
Size: 149 KB
Honingham Thorpe Farm
Deadline 1 Submission - Written Statement
Other
Size: 20 KB
Helen & Chris Monk
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 103 KB
Agenda for Issue Specific Hearing 3
Agenda for Issue Specific Hearing 3: The draft Development Consent Order
Other
Size: 91 KB
Agenda for Issue Specific Hearing 2
Agenda for Issue Specific Hearing 2: Offshore ecology
Other
Size: 93 KB
Agenda for Issue Specific Hearing 1
Agenda for Issue Specific Hearing 1: Alternatives/Design Flexibility; onshore ecology; navigation and other offshore operations
Other
Size: 68 KB
Agenda for Open Floor Hearing 1
Agenda for Open Floor Hearing 1
Other
Size: 106 KB
Agenda for Issue Specific Hearing 4
Agenda for Issue Specific Hearing 4: Other onshore matters
Other
Size: 535 KB
Highways England
Deadline 2 Submission - Comment On Written Statement
Other
Size: 15 KB
Natural England
Deadline 2 Submission - Comments On Responses of a Written Representation
Other
Size: 23 KB
Oulton Parish Council
Deadline 2 Submission - Comments on responses to the Examining Authority's Written Questions
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 - Applicant’s Response to Highways England Briefing Note 01A
Other
Size: 2 MB
RSPB
Deadline 2 Submission - Report on Seabird Tracking Fieldwork
Other
Size: 337 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Guide to the Application
Other
Size: 1 MB
RSPB
Deadline 2 Submission - Comments on responses to the Examining Authority's Written Questions
Other
Size: 384 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission -Draft Statement of Common Ground between Hornsea Project Three and the Royal Society for the Protection of Birds
Other
Size: 956 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and North Norfolk District Council
Other
Size: 320 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Statement of Commonality of Statements of Common Ground
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Comments on Written Representations and Responses
Other
Size: 133 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Covering Letter
Other
Size: 266 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Comments to South Norfolk Council Local Impact Report
Other
Size: 224 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Comments to Broadland District Council Local Impact Report
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 12 Memorandum of Understanding between the Hornsea Project Two and Natural England
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Registered Interest Accompanied Site Inspection
Other
Size: 288 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Comments to Norfolk County Council Local Impact Report
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Comments on Responses to the Examining Authority's Written Questions
Other
Size: 324 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Comments to North Norfolk District Council Local Impact Report
Other
Size: 406 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 9 Response to Cromer Shoal MCZ Conservation Objectives
Other
Size: 1 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 3 Addendum to Appendix 30 (REP1-156): Permanent Access Note for Onshore HVAC Booster Station
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 7 RSPB Seabird Tracking Study at the Flamborough and Filey Coast
Other
Size: 892 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 5 Seabird Flight Height Trial Report
Other
Size: 532 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 11 SAR Technical Note
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 8 Race Bank Sandwave Recovery Report
Other
Size: 5 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 4 Tree Plan
Other
Size: 779 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 2 Addendum to Appendix 29 (REP1-171): Permanent Access Note for HVDC converter/HVAC substation
Other
Size: 3 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 6 Estimating Seabird Flight Height Using LiDAR
Other
Size: 429 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 2 Submission - Appendix 1 Outline Travel Plan
Other
Size: 37 KB
No to Relay Stations
Deadline 1 Submission - Notification of wish to make oral representations at an Issue Specific Hearing
Other
Size: 74 KB
Spirit Energy
Deadline 1 Submission - Inventory of Supporting Documents For Written Representations
Other
Size: 108 KB
Procedural Decisions
Letter to Scottish Natural Heritage inviting them to become an Other Person for the purpose of the examination.
Other
Size: 118 KB
Ørsted Hornsea Project Three (UK) Ltd
Hearing Notice
Other
Size: 1,015 KB
Network Rail
Deadline 1 Submission - Written Representation
Other
Size: 260 KB
Gurloque Estate
Deadline 1 Submission - Written Representation
Other
Size: 82 KB
Brown & Co On Behalf Of Gurloque Estate
Deadline 1 Submission - Written Representation
Other
Size: 4 MB
Spirit Energy
Deadline 1 Submission - Health and Safety Offshore Technology Report
Other
Size: 316 KB
Spirit Energy
Deadline 1 Submission - Letter - Major Accident Hazard - Potential for Structural Failure of Offshore Installations Due to Collision With Attending Vessels
Other
Size: 5 MB
Spirit Energy
Deadline 1 Submission - Guidelines for Offshore Marine Operations
Other
Size: 503 KB
Spirit Energy
Deadline 1 Submission - Safety of Navigation: Offshore Renewable Energy Installations (OREIs) - Guidance on UK Navigational Practice, Safety and Emergency Response
Other
Size: 540 KB
Spirit Energy
Deadline 1 Submission - Human Element Guidance - Part 1 - Fatigue and Fitness For Duty: Statutory Duties, Causes Of Fatigue And Guidance On Good Practice
Other
Size: 46 KB
Spirit Energy
Deadline 1 Submission - Health and Safety at Work etc. Act 1974 c. 37
Other
Size: 3 MB
Brown & Co On Behalf Of S H Back
Deadline 1 Submission - Proposed Cable Route Amendments
Other
Size: 297 KB
Spirit Energy
Deadline 1 Submission - National Policy Statement for Renewable Energy Infrastructure (EN-3)
Other
Size: 744 KB
Spirit Energy
Deadline 1 Submission - Overarching National Policy Statement for Energy (EN-1)
Other
Size: 279 KB
Spirit Energy
Deadline 1 Submission - Oil and Gas Clause in Crown Estate leases
Other
Size: 32 KB
Spirit Energy
Deadline 1 Submission - Petroleum Act 1987 c. 12 - Part III
Other
Size: 99 KB
Spirit Energy
Deadline 1 Submission -The Maximising Economic Recovery Strategy For The UK
Other
Size: 52 KB
Spirit Energy
Deadline 1 Submission - Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations 2015/398
Other
Size: 105 KB
Spirit Energy
Deadline 1 Submission - Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995/743
Other
Size: 268 KB
Spirit Energy
Deadline 1 Submission - Offshore Installations and Pipeline Works (Management and Administration) Regulations 1995/738
Other
Size: 129 KB
Spirit Energy
Deadline 1 Submission - Petroleum Act 1998 c. 17 - Part I Petroleum
Other
Size: 2 MB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd. and Norfolk County Council
Other
Size: 985 KB
Greater Norwich Development Partnership
Deadline 1 Submission - Joint Core Strategy Policy for Broadland, Norwich and South Norfolk
Other
Size: 47 KB
South Norfolk Council
Deadline 1 Submission - Response to Examining Authority's Questions
Other
Size: 89 KB
Natural England
Deadline 1 Submission - Annex F: Documentation Submitted by the Applicant to Natural England Post Submission of the Relevant Representation
Other
Size: 166 KB
Natural England
Deadline 1 Submission - Annex G: Summary of Relevant Representations
Other
Size: 325 KB
Natural England
Deadline 1 Submission - Annex H: Response to Relevant Representations Submitted by Other Parties
Other
Size: 163 KB
Natural England
Deadline 1 Submission - Annex H: Summary of Written Representations
Other
Size: 388 KB
Natural England
Deadline 1 Submission - Natural England Offshore Wind Cabling: Ten Years Experience and Recommendations
Other
Size: 292 KB
Natural England
Deadline 1 Submission - Annex B: Natural England’s Detailed Comments on the Development Consent Order and Deemed Marine Licenses
Other
Size: 194 KB
Natural England
Deadline 1 Submission - Annex D1: Natural England Advice on The Wash and North Norfolk Coast SAC Clarification Note
Other
Size: 562 KB
Natural England
Deadline 1 Submission - Annex C: Natural England Detailed Advice on Ornithology
Other
Size: 405 KB
Natural England
Deadline 1 Submission - Annex A: Schedule of Natural England‘s Responses to Examining Authority‘s First Round of Written Questions
Other
Size: 558 KB
Natural England
Deadline 1 Submission - Written Representation
Other
Size: 239 KB
Natural England
Deadline 1 Submission - Annex D5: NE and JNCC comments on the Benthic Sections of the HRA revised in light of further information
Other
Size: 188 KB
Natural England
Deadline 1 Submission - Annex D3: NE and JNCC Advice on Sandwave Clearance Clarification Note and Other Relevant Documentation on Sandwave Levelling
Other
Size: 213 KB
Natural England
Deadline 1 Submission - Annex D2: Natural England and the Joint Nature Conservation Committee (JNCC) Advice on the Cable Protection Clarification Note
Other
Size: 479 KB
Natural England
Deadline 1 Submission - Annex D4: JNCC and Natural England Advice on Offshore Benthic Ecology
Other
Size: 501 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England
Other
Size: 285 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation
Other
Size: 390 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and the NFFO and VisNed
Other
Size: 489 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime and Coastguard Agency
Other
Size: 1,020 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk Vanguard Ltd and Norfolk Boreas
Other
Size: 454 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk Council
Other
Size: 619 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and the Marine Management Organisation
Other
Size: 409 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
Other
Size: 422 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
Other
Size: 475 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts and Norfolk Wildlife Trust
Other
Size: 320 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Appendix 50 Funding statement (Rev 1, track changed)
Other
Size: 247 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Appendix 51 Funding Statement (Rev 1)
Other
Size: 371 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
Other
Size: 343 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
Other
Size: 512 KB
Ørsted Hornsea Project Three (UK) Ltd
Deadline 1 Submission - Statement of Common Ground between Hornsea Three Project (UK) Ltd and Environment Agency
Other
Size: 144 KB
Anglian Water Services Ltd
Deadline 1 Submission - Written Representation
Other
Size: 164 KB
Anglian Water Services Ltd
Deadline 1 Submission - Letter To The Planning Inspectorate
Other
Size: 868 KB
Sherrill Bullimore
Deadline 1 Submission - Written Representation
Other
Size: 47 KB
Cawston Parish Council
Deadline 1 Submission - Written Representation
Other
Size: 494 KB