You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (8)
Developer's Application (598)
Acceptance (12)
Pre Examination (134)
- All Documents
- Additional Submissions (31)
- Appointment of Examining Authority (2)
- Certificates of Compliance (2)
- Compulsory Acquisition Information (1)
- Hearing Agenda (4)
- Hearing Notice (2)
- Other Documents (3)
- Procedural Deadline A (5)
- Procedural Deadline C (35)
- Procedural Decisions (8)
- + Recording of preliminary meeting (9)
- Response to Rule 9 (28)
- s56 notification (s56) (1)
- Unaccompanied Site Inspection (3)
Examination (2714)
- All Documents
- Accompanied Site Inspections 1 and 2 (ASI1 & ASI2) (1)
- Additional Submissions (75)
- Deadline 1 (394)
- Deadline 10 (75)
- Deadline 11 (195)
- Deadline 12 (130)
- Deadline 13 (136)
- Deadline 2 (166)
- Deadline 3 (170)
- Deadline 4 (186)
- Deadline 5 (177)
- Deadline 6 (218)
- Deadline 7 (97)
- Deadline 8 (252)
- Deadline 9 (163)
- Examination Library (1)
- Hearing Agenda (22)
- Hearing Notice (4)
- Other Documents (26)
- Preliminary meeting note (1)
- Procedural Decisions (36)
- + Recording of hearing (182)
- Report on the Implications for European Sites (RIES) (2)
- Unaccompanied Site Inspection (5)
Decision (269)
- All Documents
- Development Consent Order as made (1)
- Habitats Regulations Assessment (1)
- Notification of Decision to Accept Application (2)
- Other Documents (6)
- Recommendation Report (3)
- Secretary of State Consultation (104)
- Secretary of State Consultation 2 (151)
- Secretary of State Decision letter and Statement of Reasons (approved) (1)
Decided (6)
- EN010078- Regulation 32 Transboundary Screening
- Regulation 32 - Transboundary consulation response from the Netherlands
- Regulation 32 - Transboundary consulation response from France
- Regulation 32 - Transboundary consulation response from Denmark
- Regulation 32 - Transboundary consulation response from Sweden
- 180629 Regulation 32 London Gazette Notice
Source | Description |
---|---|
Other |
Alan Thomas (PDF, 99 KB)
Deadline 3 Submission - Post hearing Submission
|
Other |
Aldeburgh Society (PDF, 232 KB)
Deadline 3 Submission
|
Other |
Nicholas Thorp on behalf of Beach View Holiday Park (PDF, 188 KB)
Deadline 3 Submission - Post hearing submission
|
Other |
Beverly Strowger (PDF, 159 KB)
Deadline 3 Submission
|
Other |
David Steen (PDF, 88 KB)
Deadline 3 Submission - Post hearing Submission
|
Other |
Defence Infrastructure Organisation (PDF, 335 KB)
Deadline 3 Submission - Updated Safeguarding Position of the Ministry of Defence
|
Other |
East Anglia TWO Limited (PDF, 11 MB)
Deadline 3 Submission - 8.10 EA2 Outline Access Management Plan - Version 02
|
Other |
East Anglia TWO Limited (PDF, 256 KB)
Deadline 3 Submission - 6.3.6.4 EA2 Environmental Statement Appendix 6.4 Cumulative Project Description (Tracked) - Version 2
|
Other |
East Anglia TWO Limited (PDF, 4 MB)
Deadline 3 Submission - 8.11 EA2 Outline Travel Plan - Version 02
|
Other |
East Anglia TWO Limited (PDF, 3 MB)
Deadline 3 Submission - 5.3.2 EA2 Habitat Regulations Assessment - Appendix 2 - Information to Support AA Report - Screening Matrices (Tracked) - Version 03
|
Other |
East Anglia TWO Limited (PDF, 3 MB)
Deadline 3 Submission - 5.3.2 EA2 Habitat Regulations Assessment - Appendix 2 - Information to Support AA Report - Screening Matrices - Version 03
|
Other |
East Anglia TWO Limited (PDF, 184 KB)
Deadline 3 Submission - 8.13 EA2 Offshore In-principle Monitoring Plan - Version 2
|
Other |
East Anglia TWO Limited (PDF, 186 KB)
Deadline 3 Submission - 8.14 EA2 Draft Marine Mammal Mitigation Protocol (tracked) - Version 2
|
Other |
East Anglia TWO Limited (PDF, 633 KB)
Deadline 3 Submission - 8.17 EA2 In Principle Southern North Sea Special Area of Conservation Site Integrity Plan (tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 213 KB)
Deadline 3 Submission - 8.13 EA2 Offshore In-principle Monitoring Plan (tracked) - Version 2
|
Other |
East Anglia TWO Limited (PDF, 24 MB)
Deadline 3 Submission - 8.5 EA2 Outline Written Scheme of Investigation Archaeology and Cultural Heritage (Onshore) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 181 KB)
Deadline 3 Submission - 6.3.6.3 EA2 Environmental Statement Appendix 6.3 Relationship of Offshore Plans Secured by the DCO - Version 2
|
Other |
East Anglia TWO Limited (PDF, 14 MB)
Deadline 3 Submission - 8.9 EA2 Outline Construction Traffic Management Plan - Version 02
|
Other |
East Anglia TWO Limited (PDF, 101 KB)
Deadline 3 Submission - ExA.AS-14.D3.V1 EA1N&EA2 Deadline 3 Onshore Ecology Clarification Note - Version 01
|
Other |
East Anglia TWO Limited (PDF, 2 MB)
Deadline 3 Submission - 3.1 EA2 Draft Development Consent Order - Version 03
|
Other |
East Anglia TWO Limited (PDF, 43 MB)
Deadline 3 Submission - 2.6 EA2 Permanent Stopping up of PRoW Plan
|
Other |
East Anglia TWO Limited (PDF, 48 MB)
Deadline 3 Submission - 2.3.2 EA2 Works Plans (onshore)
|
Other |
East Anglia TWO Limited (PDF, 237 KB)
Deadline 3 Submission - 8.4 EA2 Outline Public Rights of Way Strategy (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 23 MB)
Deadline 3 Submission - 8.7 EA2 Outline Landscape and Ecological Management Strategy (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 35 MB)
Deadline 3 Submission - ExA.AS-16 3.1.D3.V1 EA1N&EA2 Updated Photomontages Clarification Note Appendix 3 - Viewpoint 1 - Version 01
|
Other |
East Anglia TWO Limited (PDF, 428 KB)
Deadline 3 Submission - 8.12 EA2 Outline Offshore Operations and Maintenance Plan - Version 02
|
Other |
East Anglia TWO Limited (PDF, 442 KB)
Deadline 3 Submission - 1.6 Guide to the Application - Version 04
|
Other |
East Anglia TWO Limited (PDF, 14 MB)
Deadline 3 Submission - ExA.AS-15.D3.V1 EA1N&EA2 Deadline 3 Air Quality Clarification Note - Version 01
|
Other |
East Anglia TWO Limited (PDF, 5 MB)
Deadline 3 Submission - 8.11 EA2 Outline Travel Plan (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 45 MB)
Deadline 3 Submission - 2.5 EA2 Temporary Stopping up of PRoW Plan
|
Other |
East Anglia TWO Limited (PDF, 398 KB)
Deadline 3 Submission - 8.1 EA2 Outline Code of Construction Practice (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 29 MB)
Deadline 3 Submission - 8.9 EA2 Outline Construction Traffic Management Plan (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 376 KB)
Deadline 3 Submission - 8.1 EA2 Outline Code of Construction Practice - Version 02
|
Other |
East Anglia TWO Limited (PDF, 1 MB)
Deadline 3 Submission - 8.6 EA2 Outline Written Scheme of Investigation Archaeology and Cultural Heritage (Offshore) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 203 KB)
Deadline 3 Submission - ExA.AS-12.D3.V1 EA1N&EA2 Construction in Proximity to Properties - Version 01
|
Other |
East Anglia TWO Limited (PDF, 998 KB)
Deadline 3 Submission - 6.3.6.2 EA2 Environmental Statement Appendix 6.2 Relationship of Onshore Plans Secured by the DCO - Version 2
|
Other |
East Anglia TWO Limited (PDF, 24 MB)
Deadline 3 Submission - 8.5 EA2 Outline Written Scheme of Investigation Archaeology and Cultural Heritage (Onshore) (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 177 KB)
Deadline 3 Submission - 8.14 EA2 Draft Marine Mammal Mitigation Protocol - Version 2
|
Other |
East Anglia TWO Limited (PDF, 24 MB)
Deadline 3 Submission - ExA.AS-16 3.2.D3.V1 EA1N&EA2 Updated Photomontages Clarification Note Appendix 3 - Viewpoint 2 - Friston, Church Road (Figure 29.14-Update) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 1 MB)
Deadline 3 Submission - 3.1 EA2 Draft Development Consent Order (tracked) - Version 03
|
Other |
East Anglia TWO Limited (PDF, 510 KB)
Deadline 3 Submission - 4.3.1 EA2 Book of Reference Schedule of Changes - Version 03
|
Other |
East Anglia TWO Limited (PDF, 499 KB)
Deadline 3 Submission - 3.1.1 EA2 Schedule of Changes to the Draft Development Consent Order - Version 02
|
Other |
East Anglia TWO Limited (PDF, 18 MB)
Deadline 3 Submission - ExA.AS-1.D3.V1 EA2 Outline Operational Drainage Management Plan - Version 01
|
Other |
East Anglia TWO Limited (PDF, 243 KB)
Deadline 3 Submission - ExA.AS-10.D3.V1 EA1N&EA2 Onshore Cable Route Works Programme Clarification Note - Version 01
|
Other |
East Anglia TWO Limited (PDF, 2 MB)
Deadline 3 Submission - 4.3 EA2 Book of Reference - Version 05
|
Other |
East Anglia TWO Limited (PDF, 348 KB)
Deadline 3 Submission - 8.4 EA2 Outline Public Rights of Way Strategy - Version 02
|
Other |
East Anglia TWO Limited (PDF, 25 MB)
Deadline 3 Submission - 8.7 EA2 Outline Landscape and Ecological Management Strategy - Version 02
|
Other |
East Anglia TWO Limited (PDF, 1 MB)
Deadline 3 Submission - 8.6 EA2 Outline Written Scheme of Investigation Archaeology and Cultural Heritage (Offshore) (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 237 KB)
Deadline 3 Submission - 6.3.6.4 EA2 Environmental Statement Appendix 6.4 Cumulative Project Description - Version 2
|
Other |
East Anglia TWO Limited (PDF, 391 KB)
Deadline 3 Submission - 8.12 EA2 Outline Offshore Operations and Maintenance Plan (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 3 MB)
Deadline 3 Submission - ExA.AS-11.D3.V1 EA1N&EA2 Onshore Substations Update Clarification Note - Version 01
|
Other |
East Anglia TWO Limited (PDF, 5 MB)
Deadline 3 Submission - ExA.AS-13.D3.V1 EA1N&EA2 Effects on Supporting Habitats of Outer Thames Estuary SPA - Version 01
|
Other |
East Anglia TWO Limited (PDF, 11 MB)
Deadline 3 Submission - 8.10 EA2 Outline Access Management Plan (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 625 KB)
Deadline 3 Submission - 8.17 EA2 In Principle Southern North Sea Special Area of Conservation Site Integrity Plan - Version 02
|
Other |
East Anglia TWO Limited (PDF, 143 KB)
Deadline 3 Submission - ExQ1.3.4 EA2 PA2008 s127 Statutory Undertakers’ Land or Rights - Version 03
|
Other |
East Anglia TWO Limited (PDF, 312 KB)
Deadline 3 Submission - ExA.AS-5.D3.V2 EA2 Outline Fisheries Liaison and Coexistence Plan - Version 002
|
Other |
East Anglia TWO Limited (PDF, 14 MB)
Deadline 3 Submission - ExA.AS-16 3.6.D3.V1 EA1N&EA2 Updated Photomontages Clarification Note Appendix 3 - CHVP5 PRoW at Woodside Farm (Appendix 24.7, Figure 10-Update) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 2 MB)
Deadline 3 Submission - ExA.HA.D3.V1 EA1N&EA2 Applicants Responses to Hearings Action Points (ISH1, CAH1, ISH2) - Version 01
|
Other |
East Anglia TWO Limited (PDF, 243 KB)
Deadline 3 Submission - ExA.SoCG-10.D3.V3 EA1N&EA2 Draft Statement of Common Ground with the Ministry of Defence - Version 03
|
Other |
East Anglia TWO Limited (PDF, 38 MB)
Deadline 3 Submission - ExA.AS-16 3.5.D3.V1 EA1N&EA2 Updated Photomontages Clarification Note Appendix 3 - CHVP4 PRoW to East of Little Moor Farm (Appendix 24.7, Figure 8-Update) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 93 KB)
Deadline 3 Submission - ExQ1.3.5 EA2 PA2008 s138 Statutory Undertakers Apparatus etc. (Tracked) - Version 03
|
Other |
East Anglia TWO Limited (PDF, 82 KB)
Deadline 3 Submission - ExA.AS-21.D3.V1 EA2 Offshore Commitments - Version 01
|
Other |
East Anglia TWO Limited (PDF, 216 KB)
Deadline 3 Submission - ExQ1.3.4 EA2 PA2008 s127 Statutory Undertakers’ Land or Rights (Tracked) - Version 03
|
Other |
East Anglia TWO Limited (PDF, 429 KB)
Deadline 3 Submission - ExA.SoCG-36.D3.V2 EA1N&EA2 Draft Statement of Common Ground with Historic England (Offshore) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 58 KB)
Deadline 3 Submission - ExA.AS-22.D3.V1 EA2 Best Practice Protocol for Minimising Disturbance to Red-Throated Diver - Version 1
|
Other |
East Anglia TWO Limited (PDF, 269 KB)
Deadline 3 Submission - ExA.SN1.D3.V1 EA1N&EA2 Written Summary of Oral Case (ISH1) -Version 01
|
Other |
East Anglia TWO Limited (PDF, 268 KB)
Deadline 3 Submission - ExA.AS-5.D3.V2 EA2 Outline Fisheries Liaison and Coexistence Plan (Tracked) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 44 MB)
Deadline 3 Submission - 2.10 EA2 Important Hedgerows and Tree Preservation Order Plan
|
Other |
East Anglia TWO Limited (PDF, 332 KB)
Deadline 3 Submission - ExA.AS-6.D3.V1 EA1N&EA2 Deadline 3 Project Update Note - Version 01
|
Other |
East Anglia TWO Limited (PDF, 178 KB)
Deadline 3 Submission - ExA.AS-24.D3.V1 EA1N&EA2 Sizewell Mitigation Land Clarification Note - Version 01
|
Other |
East Anglia TWO Limited (PDF, 314 KB)
Deadline 3 Submission - ExA.SoCG-34.D3.V2 EA1N&EA2 Draft Statement of Common Ground with RSPB (Offshore) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 820 KB)
Deadline 3 Submission - ExA.AS-17.D3.V1 EA1N&EA2 Applicants' Comments on MMO Deadline 2 Submissions - Version 1
|
Other |
East Anglia TWO Limited (PDF, 5 MB)
Deadline 3 Submission - ExA.AS-3.D3.V1 EA2 Outline Watercourse Crossing Method Statement - Version 01
|
Other |
East Anglia TWO Limited (PDF, 337 KB)
Deadline 3 Submission - ExA.SoCG-35.D3.V1 Draft Statement of Common Ground with East Suffolk Council and Suffolk County Council (Human Health) - Version 01
|
Other |
East Anglia TWO Limited (PDF, 33 MB)
Deadline 3 Submission - ExA.AS-16 3.4.D3.V1 EA1N&EA2 Updated Photomontages Clarification Note Appendix 3 - CHVP3 PRoW Between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 516 KB)
Deadline 3 Submission - ExA.SN3.D3.V1 EA1N&EA2 Written Summary of Oral Case (ISH2) - Version 01
|
Other |
East Anglia TWO Limited (PDF, 91 KB)
Deadline 3 Submission - ExQ1.3.5 EA2 PA2008 s138 Statutory Undertakers Apparatus etc - Version 03
|
Other |
East Anglia TWO Limited (PDF, 353 KB)
Deadline 3 Submission - ExA.SoCG-25.D3.V2 EA1N&EA2 Draft Statement of Common Ground with the Commercial Fisheries Working Group - Version 02
|
Other |
East Anglia TWO Limited (PDF, 841 KB)
Deadline 3 Submission - ExA.AS18-D3.V1 EA1N&EA2 Applicants' Comments on Natural England’s Deadline 2 Submissions - Version 1
|
Other |
East Anglia TWO Limited (PDF, 457 KB)
Deadline 3 Submission - ExA.AS-7.D3.V1 EA2 HRA Derogation Case - Version 1
|
Other |
East Anglia TWO Limited (PDF, 151 KB)
Deadline 3 Submission - ExA.AS-25.D3.V1 EA1N&EA2 Applicants’ Further Response to ExA WQ1.9.10 Agricultural Losses Note - Version 01
|
Other |
East Anglia TWO Limited (PDF, 248 KB)
Deadline 3 Submission - ExA.AS-2.D3.V1 EA2 Outline Port Construction Traffic Management and Travel Plan - Revision 01
|
Other |
East Anglia TWO Limited (PDF, 255 KB)
Deadline 3 Submission - ExQ1.3.2 EA2 Schedule of CA and TP Objections - Version 03
|
Other |
East Anglia TWO Limited (PDF, 244 KB)
Deadline 3 Submission - ExA.AS-23.D3.V1 EA1N&EA2 Applicants' Comments on SEAS Deadline 1 Submissions (Habitats & Biodiversity). - Version 1
|
Other |
East Anglia TWO Limited (PDF, 390 KB)
Deadline 3 Submission - ExQ1.3.2 EA2 Schedule of CA and TP Objections (Tracked) - Version 03
|
Other |
East Anglia TWO Limited (PDF, 2 MB)
Deadline 3 Submission - ExA.AS-19.D3.V1 EA1N&EA2 Applicants' Response to Appendix 4 of the Local Impact Report - Version 01
|
Other |
East Anglia TWO Limited (PDF, 165 KB)
Deadline 3 Submission - Cover Letter
|
Other |
East Anglia TWO Limited (PDF, 2 MB)
Deadline 3 Submission - ExA.AS-20.D3.V1 EA1N&EA2 Applicants' Comments on SASES' Deadline 1 Submissions - Version 01
|
Other |
East Anglia TWO Limited (PDF, 7 MB)
Deadline 3 Submission - ExA.AS-16.D3.V1 EA1N&EA2 Updated Photomontages Clarification Note - Version 01
|
Other |
East Anglia TWO Limited (PDF, 474 KB)
Deadline 3 Submission - ExA.SN2.D3.V1 EA1N&EA2 Written Summary of Oral Case (CAH1) - Version 01
|
Other |
East Anglia TWO Limited (PDF, 21 MB)
Deadline 3 Submission - ExA.AS-16 3.3.D3.V1 EA1N&EA2 Updated Photomontages Clarification Note Appendix 3 - Viewpoint 9 - B1121 Aldeburgh Road, south of Friston (Figure 29.21-Update) - Version 02
|
Other |
East Anglia TWO Limited (PDF, 3 MB)
Deadline 3 Submission - ExA.AS-4.D3.V1 EA1N&EA2 Displacement of red-throated divers in the Outer Thames Estuary SPA - Version 01
|
Other |
East Anglia TWO Limited (PDF, 17 MB)
Deadline 3 Submission - ExA.AS-9.D3.V1 EA1N&EA2 Traffic and Transport Clarification Note for Deadline 3 - Version 01
|
Other |
East Anglia TWO Limited (PDF, 121 KB)
Deadline 3 Submission - ExA.AS-8.D.V1 EA2 HRA Compensatory Measures - Version 1
|
Other |
Naomi Goold on behalf of East Suffolk Council (PDF, 176 KB)
Deadline 3 Submission - Response to Additional Information Submitted by Applicants at Deadline 2
|
Other |
Naomi Goold on behalf of East Suffolk Council (PDF, 4 MB)
Deadline 3 Submission - Summary of Oral Case from ISH1 and ISH2
|
Other |
Naomi Goold on behalf of East Suffolk Council (PDF, 4 MB)
Deadline 3 Submission - Notification of wish to speak at Issue Specific Hearings
|
Other |
Elizabeth Thomas (PDF, 238 KB)
Deadline 3 Submission - Post hearing Submission
|
Other |
Fiona Cramb (PDF, 118 KB)
Deadline 3 Submission
|
Other |
Mike Chaplin on behalf of Friston Parish Council (PDF, 125 KB)
Deadline 3 Submission
|
Other |
Friston Parochial Church Council (PDF, 251 KB)
Deadline 3 Submission - Post hearing Submission
|
Other |
Historic England (PDF, 71 KB)
Deadline 3 Submission - Deadline Response
|
Other |
Historic England (PDF, 161 KB)
Deadline 3 Submission - Copy of 2018 advice - Annex to Deadline Response
|
Other |
Ian Cook (PDF, 97 KB)
Deadline 3 Submission
|
Other |
Jocelyn Bond (PDF, 209 KB)
Deadline 3 Submission
|
Other |
Louise Chadwick (PDF, 123 KB)
Deadline 3 Submission - Post hearing submission
|
Other |
Luigi Beltrandi and Mya Manakides (PDF, 112 KB)
Deadline 3 Submission
|
Other |
Marine Management Organisation (PDF, 965 KB)
Deadline 3 Submission - Deadline Response
|
Other |
Michael Mahony (PDF, 65 KB)
Deadline 3 Submission - Request to Speak at Compulsory Acquisition Hearing
|
Other |
Mike Lewis (PDF, 86 KB)
Deadline 3 Submission
|
Other |
National Grid Electricity System Operator Limited (PDF, 395 KB)
Deadline 3 Submission - Post hearing submission
|
Other |
National Grid Electricity Transmission Plc (PDF, 613 KB)
Deadline 3 Submission - Responses to any further information requested by the ExA for this deadline
|
Other |
National Grid Ventures (PDF, 580 KB)
Deadline 3 Submission - Post hearing Submission
|
Other |
Natural England (PDF, 331 KB)
Deadline 3 Submission – Response to Request to Attend Issue Specific Hearings
|
Other |
Natural England (PDF, 60 KB)
Deadline 3 Submission - Appendix B2 - Comments on ISAA - Addendum for Marine Mammals [REP1-038]
|
Other |
Natural England (PDF, 311 KB)
Deadline 3 Submission - Response to Issue Specific Hearing 1 Action Points
|
Other |
Natural England (PDF, 741 KB)
Deadline 3 Submission - Appendix I1c - Risk and Issues Log
|
Other |
Natural England (PDF, 133 KB)
Deadline 3 Submission - Appendix D2 - Comments to Sizewell C Cumulative Impact Assessment [REP2-010]
|
Other |
Natural England (PDF, 193 KB)
Deadline 3 Submission - Appendix A11 - Offshore Ornithology Update
|
Other |
Natural England (PDF, 143 KB)
Deadline 3 Submission - Appendix E3 - Comments to Effects with Regard to SCHAONB and Accordance with NPS Policy [REP2-008]
|
Other |
Natural England (PDF, 68 KB)
Deadline 3 Submission - Cover Letter
|
Other |
Natural England (PDF, 75 KB)
Deadline 3 Submission - Appendix A10 - Comments on Assessment of FFC SPA and Gannet PVA [REP2-006]
|
Other |
Nicholas Thorp (PDF, 50 KB)
Deadline 3 Submission - Post hearing submission
|
Other |
Nicola Fulford (PDF, 101 KB)
Deadline 3 Submission - Post hearing Submission
|
Other |
Richard Reeves (PDF, 217 KB)
Deadline 3 Submission - Post hearing Submission
|
Other |
Rosamond Castle (PDF, 97 KB)
Deadline 3 Submission
|
Other |
Rt Hon Dr Thérèse Coffey MP (PDF, 324 KB)
Deadline 3 Submission - Post hearing submission
|
Other |
Save Our Sandlings (PDF, 1 MB)
Deadline 3 Submission - Post hearing Submission
|
Other |
SEAS (Suffolk Energy Action Solutions) (PDF, 401 KB)
Deadline 3 Submission - Late Submission - Response to the East of England Energy Group’s (EEEGR) letter to PINS - Accepted at the discretion of the Examining Authority
|
Other |
SEAS (Suffolk Energy Action Solutions) (PDF, 269 KB)
Deadline 3 Submission - Late Submission - Appendix 1 to SEAS late submission: Letter in support of East Anglia One North & East Anglia Two from East of England Energy Group’s (EEEGR) - Accepted at the discretion of the Examining Authority
|
Other |
Sheridan Steen (PDF, 378 KB)
Deadline 3 Submission - Post hearing Submission
|
Other |
Simon Fulford (PDF, 100 KB)
Deadline 3 Submission - Post hearing submission
|
Other |
Sizewell C (PDF, 1 MB)
Deadline 3 Submission - Update on the Statement of Common Ground
|
Other |
Stephen Dorcey (PDF, 94 KB)
Deadline 3 Submission
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 351 KB)
Deadline 3 Submission - Appendix 2 thereto - Redacted CION assessment document for EA2 (version 2.0 - 09/10/17) - Leiston
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 127 KB)
Deadline 3 Submission - Appendix 1 to Annex A - letter from Brian Cave Leighton Paisner to Save our Sandlings dated 24 November 2020
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 53 KB)
Deadline 3 Submission - Post ISH2 Submissions
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 215 KB)
Deadline 3 Submission - Response to ISH2 Action Points (including Appendix 1 thereto containing an updated schedule of related projects)
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 281 KB)
Deadline 3 Submission - Appendix 2 to Annex B - Ofgem letter to Mr Halford dated 28 May 2019
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 172 KB)
Deadline 3 Submission - Annex D - Landscape Briefing Note 3 prepared by Michelle Bolger
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 290 KB)
Deadline 3 Submission - Annex A - SASES Written Summary of Submissions on Cumulative Impact
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 223 KB)
Deadline 3 Submission - Annex B - SASES Written Summary of submissions on site selection
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 297 KB)
Deadline 3 Submission - Appendix 3 to Annex B - Ofgem letter to SASES dated 30 January 2020
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 104 KB)
Deadline 3 Submission - Appendix 3 thereto - Supplementary Submission on Applicants’ Clarification Note - Noise And Vibration prepared by Rupert Taylor
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 244 KB)
Deadline 3 Submission - Annex C - SASES Written Summary of Submissions on Design & Rochdale Envelope
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 155 KB)
Deadline 3 Submission - Cover Letter
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 5 MB)
Deadline 3 Submission - Cover Email
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 351 KB)
Deadline 3 Submission -Appendix 1 to Annex B - Redacted CION assessment document for EA2 (version 2.0 - 09/10/17) - Leiston
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 328 KB)
Deadline 3 Submission - Appendix 2 thereto - Landscape Briefing Note 4 prepared by Michelle Bolger
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 167 KB)
Deadline 3 Submission - Comments on Applicants’ Deadline 2 Submissions including Appendix 1 thereto
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 1 MB)
Deadline 3 Submission - comments on the Applicants’ Deadline 2 submissions - Appendix 4 thereto - Flood Risk Related Comments on Deadline 2 Submissions prepared by GWP Consultants
|
Other |
Substation Action Save East Suffolk (SASES) (PDF, 302 KB)
Deadline 3 Submission - Appendix 3 thereto - Redacted CION assessment document for EA2 (version 2.0 -18/08/16) – Bramford
|
Other |
Suffolk County Council (PDF, 544 KB)
Deadline 3 Submission - Highways Comments
|
Other |
Suffolk County Council (PDF, 540 KB)
Deadline 3 Submission - Archaeology Comments
|
Other |
Suffolk County Council (PDF, 411 KB)
Deadline 3 Submission - Cover Letter
|
Other |
Suffolk County Council (PDF, 552 KB)
Deadline 3 Submission - Written Summary of Oral Case
|
Other |
Suffolk County Council (PDF, 542 KB)
Deadline 3 Submission - Floods Comments
|
Other |
Suffolk County Council (PDF, 586 KB)
Deadline 3 Submission - Notification on Attendance for future hearings
|
Other |
Suffolk Energy Action Solutions (SEAS) (PDF, 149 KB)
Deadline 3 Submission - Response to Applicant’s Oral Landfall Representation
|
Other |
Suffolk Energy Action Solutions (SEAS) (PDF, 175 KB)
Deadline 3 Submission - Response to OFGEM at Issue Specific Hearing
|
Other |
Suffolk Energy Action Solutions (SEAS) (PDF, 189 KB)
Deadline 3 Submission - Additional comments on NGET and NGESO non attendance at Issue Specific Hearings 1 & 2
|
Other |
Suffolk Energy Action Solutions (SEAS) (PDF, 792 KB)
Deadline 3 Submission - Post hearing Submission on Habitats and Biodiversity
|
Other |
Suffolk Energy Action Solutions (SEAS) (PDF, 99 KB)
Deadline 3 Submission - Notification of wish to speak at Issue Specific Hearings
|
Other |
Suffolk Energy Action Solutions (SEAS) (PDF, 575 KB)
Deadline 3 Submission - Responses to any further information requested by the ExA for this deadline
|
Other |
Tessa Wojtczak (PDF, 8 MB)
Deadline 3 Submission
|
Other |
The Wildlife Trusts (PDF, 1 MB)
Deadline 3 Submission - Summary of Oral Submission and Comments on the Addendum for Marine Mammals [REP1-038]
|
Other |
TJ Haworth-Culf (PDF, 234 KB)
Deadline 3 Submission
|
Other |
Tony Morley (PDF, 98 KB)
Deadline 3 Submission
|
Other |
Trinity House (PDF, 191 KB)
Deadline 3 Submission - Request to Attend Issue Specific Hearings
|
Other |
William Halford (PDF, 1 MB)
Deadline 3 Submission
|