East Anglia TWO Offshore Windfarm

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (8)

Developer's Application (598)

Acceptance (12)

Pre Examination (134)

Examination (2714)

Decision (269)

Decided (1)

Date

SourceDescription
Other
Recording of Preliminary Meeting - Part 2 (Session 1) - 06 October 2020 (Document 4 KB)
Other
Recording of Preliminary Meeting - Part 2 (Session 2) - 06 October 2020 (Document 4 KB)
Other
Recording of Preliminary Meeting - Part 2 (Session 3) - 06 October 2020 (Document 4 KB)
Other
Detailed Agenda for Preliminary Meeting Part 2 - 06 October 2020 (PDF, 158 KB)
Other
Alan Cardy (PDF, 106 KB)
Procedural Deadline C - Open Floor Hearings
Other
Alan Collett (PDF, 96 KB)
Procedural Deadline C - Open Floor Hearings
Other
Angela Mallinson (PDF, 99 KB)
Procedural Deadline C - Open Floor Hearings
Other
Annabel Chamberlain (PDF, 80 KB)
Procedural Deadline C - Open Floor Hearings
Other
Chris Sneath (PDF, 89 KB)
Procedural Deadline C - Open Floor Hearings
Other
Christine Laschet (PDF, 106 KB)
Procedural Deadline C - Open Floor Hearings
Other
Christopher Lewis (PDF, 94 KB)
Procedural Deadline C - Open Floor Hearings
Other
Colin Chamberlain (PDF, 119 KB)
Procedural Deadline C - Open Floor Hearings
Other
David Steen (PDF, 81 KB)
Procedural Deadline C - Open Floor Hearings
Other
East Anglia TWO Limited (PDF, 267 KB)
Procedural Deadline C - Submission of Oral Case - Preliminary Meeting (Part 1) on 16 September 2020
Other
East Suffolk Council (PDF, 212 KB)
Procedural Deadline C - Confirmation of attendance at Preliminary Meeting Part 2
Other
Fiona Cramb (PDF, 115 KB)
Procedural Deadline C - Open Floor Hearings
Other
Glynis Robertson (PDF, 142 KB)
Procedural Deadline C - Written submissions following Preliminary Meetings on Wednesday 16 September 2020
Other
Helen Cook (PDF, 117 KB)
Procedural Deadline C - Open Floor Hearings
Other
Henrietta Palmer (PDF, 145 KB)
Procedural Deadline C - Open Floor Hearings
Other
Iain Brown (PDF, 133 KB)
Procedural Deadline C - Open Floor Hearings
Other
John Walker (PDF, 97 KB)
Procedural Deadline C - Open Floor Hearings
Other
Lawrence Mallinson (PDF, 255 KB)
Procedural Deadline C - Open Floor Hearings
Other
Luigi Beltrandi (PDF, 84 KB)
Procedural Deadline C - Open Floor Hearings
Other
Melissa Baker (PDF, 89 KB)
Procedural Deadline C - Open Floor Hearings
Other
Michael Laschet (PDF, 96 KB)
Procedural Deadline C - Open Floor Hearings
Other
Michael Lewis (PDF, 120 KB)
Procedural Deadline C - Open Floor Hearings
Other
Mya Manakides (PDF, 98 KB)
Procedural Deadline C - Open Floor Hearings
Other
Nicholas Thorp  (PDF, 47 KB)
Procedural Deadline C - Written submissions following Preliminary Meetings on Wednesday 16 September 2020
Other
Pat Dorcey (PDF, 99 KB)
Procedural Deadline C - Open Floor Hearings
Other
Piers Sturridge (PDF, 97 KB)
Procedural Deadline C - Open Floor Hearings
Other
Michael Mahony on behalf of Substation Action Save East Suffolk (SASES) (PDF, 140 KB)
Procedural Deadline C - Written submissions etc following Preliminary Meetings on Wednesday 16 September 2020
Other
Suffolk County Council (PDF, 155 KB)
Procedural Deadline C - Written submissions following Preliminary Meetings on Wednesday 16 September 2020
Other
Suffolk Energy Action Solutions (SEAS) (PDF, 252 KB)
Procedural Deadline C - Written submissions following Preliminary Meetings on Wednesday 16 September 2020
Other
Suffolk Energy Action Solutions (SEAS) (PDF, 114 KB)
Procedural Deadline C - Confirmation of attendance at Preliminary Meeting Part 2
Other
Suffolk Energy Action Solutions (SEAS) (PDF, 173 KB)
Procedural Deadline C - Open Floor Hearings
Other
Susan Osben (PDF, 72 KB)
Procedural Deadline C - Open Floor Hearings
Other
Tessa Wojtczak (PDF, 242 KB)
Procedural Deadline C - Written submissions following Preliminary Meetings on Wednesday 16 September 2020
Other
Tony Morley (PDF, 98 KB)
Procedural Deadline C - Matters from the Preliminary Meeting (Part 1) on 16 September 2020
Other
Tony Morley (PDF, 180 KB)
Procedural Deadline C - Open Floor Hearings
Other
Agendas for Open Floor Hearings 1, 2 and 3 (OFHs 1, 2 and 3) (PDF, 226 KB)
Other
Preliminary Meeting Part 1 (Session 1) - Transcript - 16 September 2020 (PDF, 166 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Preliminary Meeting Part 1 (Session 2) - Transcript - 16 September 2020 (PDF, 123 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Preliminary Meeting Part 1 (Session 3) - Transcript - 16 September 2020 (PDF, 171 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Tingey v SoSHCLG & Horsham DC Judgement (PDF, 318 KB)
Referenced by the Examining Authority during the Preliminary Meeting on 16 September 2020
Other
Recording of Preliminary Meeting - Part 1 (Session 1) - 16 September 2020 (Document 4 KB)
Other
Recording of Preliminary Meeting - Part 1 (Session 2) - 16 September 2020 (Document 4 KB)
Other
Recording of Preliminary Meeting - Part 1 (Session 3) - 16 September 2020 (Document 4 KB)
Other
Agenda for Preliminary Meeting Part 1 (PDF, 146 KB)
Other
East Anglia TWO Limited (PDF, 119 KB)
Rule 13 Notice. Notification of Open Floor Hearings
Other
East Anglia TWO Limited (PDF, 588 KB)
Procedural Deadline A - Response to the Rule 6 letter of 16 July 2020 and submissions on Preliminary Meeting Procedural Matters
Other
Marine Management Organisation (PDF, 484 KB)
Procedural Deadline A - Response to the Rule 6 letter of 16 July 2020 and submissions on Preliminary Meeting Procedural Matters
Other
Natural England (PDF, 3 MB)
Procedural Deadline A - Response to the Rule 6 letter of 16 July 2020 and submissions on Preliminary Meeting Procedural Matters
Other
Report of procedural submissions from persons attending the Preliminary Meeting (PDF, 382 KB)
Other
Report of procedural submissions from persons not attending the Preliminary Meeting (PDF, 876 KB)
Other
Note of Unaccompanied Site Inspection (USI3) - Undertaken on 13 and 14 August 2020 (PDF, 2 MB)
Other
Note from Unaccompanied Site Inspection (USI2) - Undertaken on 15 and 16 July 2020 (PDF, 574 KB)
Other
Frequently Asked Questions (FAQs) (PDF, 442 KB)
Version 2
Other
Rule 6 Letter (PDF, 603 KB)
Other
Notice of Appointment of Examining Authority (PDF, 87 KB)
Other
East Anglia TWO Limited (PDF, 2 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Volume 4: Landowners - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 2 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Volume 2: Individual Stakeholders - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 1 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Appendix 4: Offshore Ornithology Precaution Note - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 9 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Appendix 3: Fish and Shellfish Ecology Clarification Note - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 719 KB)
Additional Submission – Cover Letter - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 565 KB)
Additional Submission - Statement of Common Ground with East Suffolk Council and Suffolk County Council - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 2 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Appendix 7:Offshore Windfarm Visibility and Visual Impact Threshold Distances (2012) Journal Article - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 3 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Appendix 2: Wave Climatology Clarification Note - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 325 KB)
Additional Submission - Statement of Common Ground with Maritime and Coastguard Agency - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 7 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Appendix 5: Outer Thames Estuary Cabling Note - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 217 KB)
Additional Submission - Applicant's Comments on Relevant Representations - Appendix 1: Marine Policy Clarification Note - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 198 KB)
Additional Submission - Statement of Common Ground with Rijkswaterstaat - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 517 KB)
Additional Submission - Applicant's Comments on Relevant Representations - Appendix 8:JNCC (2020) Guidance for Assessing the Significance of Noise Disturbance Against Conservation Objectives of Harbour Porpoise SACs - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 2 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Appendix 6: East Anglia TWO Disposal Site Locations (Windfarm Site) - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 199 KB)
Additional Submission - Statement of Common Ground with East Suffolk Internal Drainage Board - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 226 KB)
Additional Submission - Statement of Common Ground with Ministry of Defence - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 473 KB)
Additional Submission - Statement of Common Ground with Marine Management Organisation - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 894 KB)
Additional Submission - Statement of Common Ground with Diamond Transmission Partners - Galloper OFTO Offshore Cable Interactions - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 221 KB)
Additional Submission - Applicant's Comments on Relevant Representations - Volume 1: Introduction - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 191 KB)
Additional Submission - Statement of Common Ground with Trinity House - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 4 MB)
Additional Submission - Applicant's Comments on Relevant Representations - Volume 3: Technical Stakeholders - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 380 KB)
Additional Submission - Statement of Common Ground with Royal Society for the Protection of Birds - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 342 KB)
Additional Submission - Statement of Common Ground with Eastern Inshore Fisheries and Conservation Authority - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 345 KB)
Additional Submission - Statement of Common Ground with Environment Agency - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Anglia TWO Limited (PDF, 218 KB)
Additional Submission - Statement of Common Ground with NATS (En Route) plc (NATS) - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
East Suffolk Council and Suffolk County Council (PDF, 195 KB)
Additional Submission - Comments on Relevant Representations - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
Marine Management Organisation (PDF, 193 KB)
Additional Submission - Comments on Relevant Representations - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
Natural England (PDF, 28 KB)
Additional Submission - Submitted in response to the Examining Authority’s request in the Rule 9 Letter of 21 May 2020
Other
Rule 9 - Procedural Decision (PDF, 219 KB)
Other
Alan Hatfield (PDF, 137 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Alan Thomas (PDF, 178 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
East Anglia TWO Limited (PDF, 170 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
East Suffolk Council (PDF, 3 MB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Fiona Gilmore (PDF, 117 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Glynis Robertson (PDF, 133 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Glynis Robertson (PDF, 817 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Comments on the Applicant's failure to notify.
Other
Ashtons Legal on behalf of Graeme Bloomfield (PDF, 292 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Ian Culf (PDF, 157 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Jocelyn Bond (PDF, 192 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Marine Management Organisation (PDF, 139 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
National Grid Ventures on behalf of National Grid Interconnector Holdings Ltd (PDF, 281 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Natural England (PDF, 100 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Nicholas Thorp (PDF, 181 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Reydon Parish Council (PDF, 199 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
SASES (Substation Action Save East Suffolk) (PDF, 153 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
SEAS (Suffolk Energy Action Solutions) (PDF, 155 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Simon Ive (PDF, 130 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
Suffolk County Council (PDF, 114 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
T J Haworth-Culf (PDF, 245 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
East Anglia TWO Limited (PDF, 141 KB)
Additional submission – Accepted at the discretion of the Examining Authority. Response to Rule 9 and Rule 13(6) letter dated 11 March
Other
Royal Mail (PDF, 628 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Request to become an Interested Party.
Other
Tony Morley (PDF, 108 KB)
Additional Submission - Accepted at the discretion of the Examining Authority. Response to Rule 6.
Other
The Royal Society for the Protection of Birds (PDF, 150 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Michael Mahony on behalf of SASES (Substation Action Save East Suffolk) (PDF, 119 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Procedural Decision to Postpone Preliminary Meeting and Hearings (PDF, 102 KB)
Other
Arrangements for Other Persons to attend the Preliminary Meeting, and Notification of Hearings (PDF, 101 KB)
Rule 4, Rule 6, Rule 9, Rule 13
Other
East Anglia TWO Limited (PDF, 36 KB)
Hearing Notice for March 2020 Hearings
Other
Other
Agendas for March 2020 Hearings (PDF, 379 KB)
Other
Rule 6 letter - notification of the preliminary meeting and matters to be discussed (PDF, 497 KB)
Other
Snape Maltings Access, Parking and Venue (PDF, 5 MB)
Other
Cadent Gas Limited (PDF, 60 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
East Anglia TWO Limited (PDF, 4 MB)
Cover Letter
Other
East Anglia TWO Limited (PDF, 1 MB)
Section 56 Compliance Certificate
Other
East Anglia TWO Limited (PDF, 251 KB)
Additional Submission - 4.3.1 Book of Reference Schedule of Changes - Accepted at the discretion of the Examining Authority
Other
East Anglia TWO Limited (PDF, 2 MB)
Additional Submission - Book of Reference (Version 3) - Accepted at the discretion of the Examining Authority
Other
Note from Unaccompanied Site Inspection (USI1) - Undertaken on 20 and 21 January 2020 (PDF, 2 MB)
Other
East Anglia TWO Limited (PDF, 11 MB)
Additional Submission – Accepted at the discretion of the Examining Authority. Response to the Section 51 advice. 2.2 Land Plans (Onshore) (Rev. A)
Other
East Anglia TWO Limited (PDF, 3 MB)
Additional Submission – Accepted at the discretion of the Examining Authority. Response to the Section 51 advice. 2.2.1 Land Plan (Offshore) (s51 updated)
Other
East Anglia TWO Limited (PDF, 65 MB)
Additional Submission – Accepted at the discretion of the Examining Authority. Response to the Section 51 advice. 2.3.2 Works Plans (Onshore) (s51 update)
Other
East Anglia TWO Limited (PDF, 1 MB)
Additional Submission – Accepted at the discretion of the Examining Authority. Response to the Section 51 advice. 4.3 Book of Reference (Version 2)
Other
Notification of Procedural Decision - Rule 9 (PDF, 130 KB)
Other
East Anglia Two Limited (PDF, 132 KB)
Section 56 Notice
Other
Notice of Appointment of Examining Authority (PDF, 209 KB)
Other
Frequently Asked Questions (PDF, 110 KB)