Source | Description |
---|---|
Other |
Notification of the appointment of Examining Authority (PDF, 134 KB)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
6.2 Environmental Statement Volume 2 - Appendix 6.6 - LVIA Viewpoint Correspondence - Subject to acceptance at the discretion of the Examining Authority
|
Other |
Mallard Pass Solar Farm Limited (PDF, 59 KB)
Section 56 Notice
|
Other |
Examination Library (PDF, 193 KB)
|
Other |
Lincolnshire County Council (PDF, 316 KB)
Adequacy of Consultation Representation
|
Other |
North East Lincolnshire Council (PDF, 175 KB)
Adequacy of Consultation Representation
|
Other |
North Northamptonshire Council (PDF, 238 KB)
Adequacy of Consultation Representation
|
Other |
Notification of Decision to Accept Application (PDF, 155 KB)
|
Other |
Rutland County Council (PDF, 459 KB)
Adequacy of Consultation Representation
|
Other |
Section 51 advice to the Applicant (PDF, 170 KB)
|
Other |
Section 55 Checklist (PDF, 316 KB)
|
Other |
South Kesteven District Council (PDF, 577 KB)
Adequacy of Consultation Representation
|
Other |
Mallard Pass Solar Farm Limited (PDF, 440 KB)
6.1 Environmental Statement Volume 1 - Chapter 9: Highways and Access
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
6.2 Environmental Statement Volume 2 Appendix 10.4: Noise and Vibration - Baseline Noise Survey
|
Other |
Mallard Pass Solar Farm Limited (PDF, 361 KB)
6.2 Environmental Statement Volume 2 Appendix 14.1: Socio-Economics - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 4.2: Stage 2 Concept Masterplan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 34 MB)
5.2 Consultation Report - Appendices 5-6
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
1.4 Section 55 - Acceptance of Application Checklist
|
Other |
Mallard Pass Solar Farm Limited (PDF, 365 KB)
6.2 Environmental Statement Volume 2 Appendix 11.1: Water Resources and Ground Conditions - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 312 KB)
6.2 Environmental Statement Volume 2 Appendix 12.3: Land Use and Soils - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 418 KB)
4.1 Statement of Reasons
|
Other |
Mallard Pass Solar Farm Limited (PDF, 380 KB)
6.2 Environmental Statement Volume 2 Appendix 12.2: Land Use and Soils - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 9 MB)
6.2 Environmental Statement Volume 2 Appendix 12.8: Land Use and Soils - Construction Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 37 MB)
2.3 Illustrative/Indicative Layout Plans - Single Axis Tracker String
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
2.7 Traffic Regulation Measures Plans - Temporary Measures
|
Other |
Mallard Pass Solar Farm Limited (PDF, 35 MB)
6.2 Environmental Statement Volume 2 Appendix 11.6: Water Resources and Ground Conditions - Surface Water Drainage Strategy
|
Other |
Mallard Pass Solar Farm Limited (PDF, 922 KB)
6.2 Environmental Statement Volume 2 Appendix 7.6: Ecology and Biodiversity - Biodiversity Net Gain Metric
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
2.7 Traffic Regulation Measures Plans - Temporary Measures
|
Other |
Mallard Pass Solar Farm Limited (PDF, 7 MB)
2.1 Land Plans
|
Other |
Mallard Pass Solar Farm Limited (PDF, 19 MB)
5.2 Consultation Report - Appendices 9-13
|
Other |
Mallard Pass Solar Farm Limited (PDF, 6 MB)
2.5 Hedgerows Plans
|
Other |
Mallard Pass Solar Farm Limited (PDF, 16 MB)
Figure 5.1(b): Single Axis Tracker String Inverter Illustrative Development Layout
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
1.1 Covering Letter
|
Other |
Mallard Pass Solar Farm Limited (PDF, 349 KB)
6.2 Environmental Statement Volume 2 Appendix 1.1: Statement of Competence
|
Other |
Mallard Pass Solar Farm Limited (PDF, 283 KB)
6.2 Environmental Statement Volume 2 Appendix 9.3: Highways and Access - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 24 MB)
6.2 Environmental Statement Volume 2 Appendix 12.4: Land Use and Soils - Agricultural Land Classification Survey
|
Other |
Mallard Pass Solar Farm Limited (PDF, 30 MB)
Figure 5.1(d): Single Axis Tracker Central Inverter Illustrative Development Layout
|
Other |
Mallard Pass Solar Farm Limited (PDF, 53 MB)
2.3 Illustrative/Indicative Layout Plans - Single Axis Tracker Central
|
Other |
Mallard Pass Solar Farm Limited (PDF, 807 KB)
Figure 5.3(c): Illustrative Elevations of Container Solar Station for String Inverters
|
Other |
Mallard Pass Solar Farm Limited (PDF, 318 KB)
6.1 Environmental Statement Volume 1 - Chapter 3: Description of Order limits
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
Draft Development Consent Order (SI Template compliant version)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 11 MB)
6.1 Environmental Statement Volume 1 - Chapter 5: Project Description
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
6.1 Environmental Statement Volume 1 - Chapter 15: Other Environmental Topics
|
Other |
Mallard Pass Solar Farm Limited (PDF, 558 KB)
6.1 Environmental Statement Volume 1 - Chapter 4: Alternatives and Design Development
|
Other |
Mallard Pass Solar Farm Limited (PDF, 9 MB)
2.2 Work Plans
|
Other |
Mallard Pass Solar Farm Limited (PDF, 12 MB)
5.1 Consultation Report
|
Other |
Mallard Pass Solar Farm Limited (PDF, 21 MB)
5.2 Consultation Report - Appendices 1-4
|
Other |
Mallard Pass Solar Farm Limited (PDF, 80 MB)
6.2 Environmental Statement Volume 2 Appendix 8.5: Cultural Heritage - Geophysical Survey Report
|
Other |
Mallard Pass Solar Farm Limited (PDF, 355 KB)
6.2 Environmental Statement Volume 2 Appendix 9.1: Highways and Access - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
4.3 Book of Reference
|
Other |
Mallard Pass Solar Farm Limited (PDF, 473 KB)
6.2 Environmental Statement Volume 2 Appendix 2.3: Scoping Opinion Response Matrix
|
Other |
Mallard Pass Solar Farm Limited (PDF, 759 KB)
6.2 Environmental Statement Volume 2 Appendix 6.2: Landscape and Visual - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 451 KB)
6.1 Environmental Statement Volume 1 - Chapter 10: Noise and Vibration
|
Other |
Mallard Pass Solar Farm Limited (PDF, 13 MB)
Figure 6.8.1: Photograph Panel 1 Representative Viewpoint 1
|
Other |
Mallard Pass Solar Farm Limited (PDF, 787 KB)
6.1 Environmental Statement Volume 1 - Chapter 14: Socio-Economics
|
Other |
Mallard Pass Solar Farm Limited (PDF, 318 KB)
3.3 Consents and Licenses required under other legislation
|
Other |
Mallard Pass Solar Farm Limited (PDF, 440 KB)
6.2 Environmental Statement Volume 2 Appendix 7.3: Ecology and Biodiversity - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
4.4 Schedule of Negotiations and Powers Sought
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 6.2: Non-Statutory Landscape Sites
|
Other |
Mallard Pass Solar Farm Limited (PDF, 8 MB)
Figure 9.2: Link Overview
|
Other |
Mallard Pass Solar Farm Limited (PDF, 345 KB)
6.1 Environmental Statement Volume 1 - Chapter 0: Glossary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 454 KB)
6.1 Environmental Statement Volume 1 - Chapter 2: Overview of Environmental Impact Assessment (EIA) Process
|
Other |
Mallard Pass Solar Farm Limited (PDF, 17 MB)
6.4 Environmental Statement - Non-Technical Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 18 MB)
Figure 6.8.13: Photograph Panel 13 Representative Viewpoint 1
|
Other |
Mallard Pass Solar Farm Limited (PDF, 8 MB)
Figure 6.9.F: Photograph Panel F Illustrative Viewpoint F
|
Other |
Mallard Pass Solar Farm Limited (PDF, 76 KB)
Figure 7.7: CONFIDENTIAL - Locations of badger setts
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1,016 KB)
2.8 Claimed Public Right of Way Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 714 KB)
6.2 Environmental Statement Volume 2 Appendix 15.1: Other Environmental Topics - Air Quality Monitoring Data
|
Other |
Mallard Pass Solar Farm Limited (PDF, 330 KB)
6.2 Environmental Statement Volume 2 Appendix 7.1: Ecology and Biodiversity - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 238 KB)
6.2 Environmental Statement Volume 2 Appendix 8.3: Cultural Heritage - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.3: Phase 1 habitats plan (Map 3 of 3)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 511 KB)
6.2 Environmental Statement Volume 2 Appendix 10.1: Noise and Vibration - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
Figure 5.9: Illustrative Fencing and Access Gate Elevation
|
Other |
Mallard Pass Solar Farm Limited (PDF, 21 MB)
Figure 6.9.D: Photograph Panel D Illustrative Viewpoint D
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
6.2 Environmental Statement Volume 2 Appendix 6.5: Landscape and Visual - Amenity and Recreation Assessment
|
Other |
Mallard Pass Solar Farm Limited (PDF, 265 KB)
6.2 Environmental Statement Volume 2 Appendix 9.5: Highways and Access - Baseline Flows
|
Other |
Mallard Pass Solar Farm Limited (PDF, 391 KB)
6.2 Environmental Statement Volume 2 Appendix 17.1: Summary of Effects - Mitigation Schedule
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
7.4 Grid Connection Statement
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1,020 KB)
6.1 Environmental Statement Volume 1 - Chapter 7: Ecology and Biodiversity
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 5.7: Indicative Cable Crossing Locations
|
Other |
Mallard Pass Solar Farm Limited (PDF, 28 MB)
Figure 6.10(e): Photomontage E
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 3.2: Field Numbering System
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 5.10: Solar PV Site Access Locations
|
Other |
Mallard Pass Solar Farm Limited (PDF, 426 KB)
6.1 Environmental Statement Volume 1 - Chapter 1: Introduction
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 1.1: Order limits
|
Other |
Mallard Pass Solar Farm Limited (PDF, 971 KB)
Figure 5.6: Illustrative Cable Trench Section
|
Other |
Mallard Pass Solar Farm Limited (PDF, 862 KB)
6.1 Environmental Statement Volume 1 - Chapter 6: Landscape and Visual
|
Other |
Mallard Pass Solar Farm Limited (PDF, 664 KB)
6.1 Environmental Statement Volume 1 - Chapter 8: Cultural Heritage
|
Other |
Mallard Pass Solar Farm Limited (PDF, 374 KB)
6.2 Environmental Statement Volume 2 Appendix 12.5: Land Use and Soils - Agricultural Land Classification Measurements
|
Other |
Mallard Pass Solar Farm Limited (PDF, 33 MB)
6.2 Environmental Statement Volume 2 Appendix 15.2: Other Environmental Topics - Arboricultural Impact Assessment
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
Figure 11.3: Illustration of Superficial Geology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 9 MB)
Figure 6.9.C: Photograph Panel C Illustrative Viewpoint C
|
Other |
Mallard Pass Solar Farm Limited (PDF, 603 KB)
7.7 Outline Operational Environmental Management Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 24 MB)
6.2 Environmental Statement Volume 2 Appendix 2.2: Scoping Opinion
|
Other |
Mallard Pass Solar Farm Limited (PDF, 533 KB)
6.2 Environmental Statement Volume 2 Appendix 6.1: Landscape and Visual - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 328 KB)
4.2 Funding Statement
|
Other |
Mallard Pass Solar Farm Limited (PDF, 396 KB)
6.2 Environmental Statement Volume 2 Appendix 2.4: Cumulative Long List
|
Other |
Mallard Pass Solar Farm Limited (PDF, 412 KB)
6.2 Environmental Statement Volume 2 Appendix 6.3: Landscape and Visual - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
Figure 5.3(b): Illustrative Elevations of a Cabinet Solar Station
|
Other |
Mallard Pass Solar Farm Limited (PDF, 69 MB)
6.2 Environmental Statement Volume 2 Appendix 7.4: Ecology and Biodiversity - Baseline Report
|
Other |
Mallard Pass Solar Farm Limited (PDF, 15 MB)
6.2 Environmental Statement Volume 2 Appendix 8.6: Cultural Heritage - Interim Trial Trenching Summary Report
|
Other |
Mallard Pass Solar Farm Limited (PDF, 19 MB)
Figure 6.8.18: Photograph Panel 18 Representative Viewpoint 18
|
Other |
Mallard Pass Solar Farm Limited (PDF, 9 MB)
Figure 6.8.6B: Photograph Panel 6B Representative Viewpoint 6B
|
Other |
Mallard Pass Solar Farm Limited (PDF, 116 MB)
6.2 Environmental Statement Volume 2 Appendix 11.4: Water Resources and Ground Conditions - Baseline Data
|
Other |
Mallard Pass Solar Farm Limited (PDF, 307 KB)
6.2 Environmental Statement Volume 2 Appendix 12.1: Land Use and Soils - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 19 MB)
Figure 6.8.2: Photograph Panel 2 Representative Viewpoint 2
|
Other |
Mallard Pass Solar Farm Limited (PDF, 18 MB)
Figure 6.8.6A: Photograph Panel 6A Representative Viewpoint 6A
|
Other |
Mallard Pass Solar Farm Limited (PDF, 18 MB)
5.2 Consultation Report - Appendices 7-8
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
Figure 5.5: Illustrative Onsite Substation Layout
|
Other |
Mallard Pass Solar Farm Limited (PDF, 14 MB)
Figure 6.8.14: Photograph Panel 14 Representative Viewpoint 14
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
Figure 11.5: Private Water Supplies
|
Other |
Mallard Pass Solar Farm Limited (PDF, 594 KB)
1.2 Guide to the Application
|
Other |
Mallard Pass Solar Farm Limited (PDF, 425 KB)
3.2 Explanatory Memorandum
|
Other |
Mallard Pass Solar Farm Limited (PDF, 306 KB)
6.2 Environmental Statement Volume 2 Appendix 5.1: Project Parameters
|
Other |
Mallard Pass Solar Farm Limited (PDF, 20 MB)
Figure 6.8.17: Photograph Panel 17 Representative Viewpoint 17
|
Other |
Mallard Pass Solar Farm Limited (PDF, 22 MB)
Figure 6.8.20: Photograph Panel 20 Representative Viewpoint 20
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
1.3 Application Form
|
Other |
Mallard Pass Solar Farm Limited (PDF, 6 MB)
2.4 Access and Rights of Way Plans
|
Other |
Mallard Pass Solar Farm Limited (PDF, 406 KB)
6.2 Environmental Statement Volume 2 Appendix 10.2: Noise and Vibration - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
6.2 Environmental Statement Volume 2 Appendix 10.5: Noise and Vibration - Noise Modelling
|
Other |
Mallard Pass Solar Farm Limited (PDF, 12 MB)
Figure 6.9.B: Photograph Panel 22 Illustrative Viewpoint B
|
Other |
Mallard Pass Solar Farm Limited (PDF, 11 MB)
Figure 6.9.E: Photograph Panel E Illustrative Viewpoint E
|
Other |
Mallard Pass Solar Farm Limited (PDF, 263 KB)
6.2 Environmental Statement Volume 2 Appendix 8.1: Cultural Heritage - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 15 MB)
6.2 Environmental Statement Volume 2 Appendix 11.5: Water Resources and Ground Conditions - Flood Risk Assessment
|
Other |
Mallard Pass Solar Farm Limited (PDF, 7 MB)
Figure 7.1: Statutory and Non-Statutory Nature Conservation Designations Plan (Map 1 of 2)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.6: Breeding bird indicative territories (Map 2 of 6)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 279 KB)
6.2 Environmental Statement Volume 2 Appendix 14.3: Socio-Economics - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 8 MB)
6.2 Environmental Statement Volume 2 Appendix 15.3: Glint and Glare Study
|
Other |
Mallard Pass Solar Farm Limited (PDF, 646 KB)
7.5 Statutory Nuisance Statement
|
Other |
Mallard Pass Solar Farm Limited (PDF, 51 MB)
7.3 Design and Access Statement
|
Other |
Mallard Pass Solar Farm Limited (PDF, 18 MB)
Figure 6.8.4: Photograph Panel 4 Representative Viewpoint 4
|
Other |
Mallard Pass Solar Farm Limited (PDF, 356 KB)
6.2 Environmental Statement Volume 2 Appendix 9.2: Highways and Access - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 370 KB)
6.2 Environmental Statement Volume 2 Appendix 11.3: Water Resources and Ground Conditions - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 870 KB)
6.2 Environmental Statement Volume 2 Appendix 12.6: Land Use and Soils - Farm Interviews
|
Other |
Mallard Pass Solar Farm Limited (PDF, 22 MB)
7.11 Outline Construction Traffic Management Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 39 MB)
Figure 6.10(b): Photomontage B
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 6.3: Natural England National Character Area Profiles
|
Other |
Mallard Pass Solar Farm Limited (PDF, 41 MB)
2.3 Illustrative/Indicative Layout Plans - Fixed South Facing Central
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
3.1 Draft Development Consent Order (dDCO)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 6.12: Cumulative Schemes and Zone of Visual Influence (ZVI)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.2: Ponds within 500m of the Order limits
|
Other |
Mallard Pass Solar Farm Limited (PDF, 277 KB)
6.2 Environmental Statement Volume 2 Appendix 8.2: Cultural Heritage - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 324 KB)
6.2 Environmental Statement Volume 2 Appendix 11.2: Water Resources and Ground Conditions - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 13 MB)
Figure 6.9.A: Photograph Panel A Illustrative Viewpoint A
|
Other |
Mallard Pass Solar Farm Limited (PDF, 896 KB)
Figure 5.3(a): Illustrative Elevations of Container Solar Station
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 5.8: Cable Crossing Options of the East Coast Main Line
|
Other |
Mallard Pass Solar Farm Limited (PDF, 11 MB)
6.2 Environmental Statement Volume 2 Appendix 12.7: Land Use and Soils - British Society of Soil Science 'Extract'
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
Figure 6.7: Visual Receptor Groups (VRG) and Zone of Visual Influence (ZVI), Representative Viewpoints and Illustrative Viewpoints and Visual Receptor Groups
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 6.5: Access and Recreation
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.6: Breeding bird indicative territories (Map 6 of 6)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 11.4: Flood Risk Map
|
Other |
Mallard Pass Solar Farm Limited (PDF, 408 KB)
6.1 Environmental Statement Volume 1 - Chapter 16: Interactions of Effects and Summary of Cumulative Effects
|
Other |
Mallard Pass Solar Farm Limited (PDF, 269 KB)
6.2 Environmental Statement Volume 2 Appendix 9.6: Highways and Access - Construction Traffic Impact Assessment
|
Other |
Mallard Pass Solar Farm Limited (PDF, 294 KB)
6.2 Environmental Statement Volume 2 Appendix 10.3: Noise and Vibration - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.6: Breeding bird indicative territories (Map 5 of 6)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 7 MB)
Figure 8.1: Statutory and Non-Statutory Historic Environment Designations Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 18 MB)
Figure 6.8.12: Photograph Panel 12 Representative Viewpoint 12
|
Other |
Mallard Pass Solar Farm Limited (PDF, 688 KB)
7.8 Outline Decomissioning Environmental Management Plan (inc restoration)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 2.2: Cumulative Developments Shortlisted for Cumulative Effects Assessment (450k)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 10 MB)
Figure 6.8.10: Photograph Panel 10 Representative Viewpoint 10
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.5: Water vole evidence
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
Figure 12.1: Agricultural Land Classification Results
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
6.2 Environmental Statement Volume 2 Appendix 6.4: Landscape and Visual - Residential Visual Amenity Assessment
|
Other |
Mallard Pass Solar Farm Limited (PDF, 414 KB)
6.2 Environmental Statement Volume 2 Appendix 7.5: Ecology and Biodiversity - Shadow Habitat Regulations Assessment
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 6.4: Local Landscape Character Areas
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.4: Trees with bat roost suitability (Map 2 of 2)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.6: Breeding bird indicative territories (Map 4 of 6)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 6.11: Green Infrastructure Strategy Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 14 MB)
Figure 6.8.5: Photograph Panel 5 Representative Viewpoint 5
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 6.1: Topography
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 6.6: Zone of Theoretical Visibility Study Representative Viewpoint and Illustrative Viewpoints
|
Other |
Mallard Pass Solar Farm Limited (PDF, 21 MB)
Figure 6.8.15: Photograph Panel 15 Representative Viewpoint 15
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
Figure 7.4: Trees with bat roost suitability (Map 1 of 2)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 8 MB)
Figure 10.1: Noise Monitoring Locations
|
Other |
Mallard Pass Solar Farm Limited (PDF, 18 MB)
Figure 5.1(c): Fixed South Facing Central Inverter Illustrative Development Layout
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 5.4: Illustrative Elevations of String Inverter
|
Other |
Mallard Pass Solar Farm Limited (PDF, 9 MB)
Figure 6.8.7: Photograph Panel 7 Representative Viewpoint 7
|
Other |
Mallard Pass Solar Farm Limited (PDF, 6 MB)
Figure 7.6: Breeding bird indicative territories (Map 3 of 6)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 14 MB)
Figure 6.9.H: Photograph Panel H Illustrative Viewpoint H
|
Other |
Mallard Pass Solar Farm Limited (PDF, 7 MB)
Figure 7.3: Phase 1 habitats plan (Map 1 of 3)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 323 KB)
6.2 Environmental Statement Volume 2 Appendix 13.1: Climate Change - Policy Context
|
Other |
Mallard Pass Solar Farm Limited (PDF, 13 MB)
Figure 6.8.8: Photograph Panel 8 Representative Viewpoint 8
|
Other |
Mallard Pass Solar Farm Limited (PDF, 10 MB)
2.6 Location Order Limits and Grid Coordinates Plans
|
Other |
Mallard Pass Solar Farm Limited (PDF, 7 MB)
6.2 Environmental Statement Volume 2 Appendix 9.4: Highways and Access - Transport Assessment
|
Other |
Mallard Pass Solar Farm Limited (PDF, 225 KB)
6.2 Environmental Statement Volume 2 Appendix 13.2: Climate Change - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
7.13 Outline Water Management Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 17 MB)
7.9 Outline Landscape and Ecology Management Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 21 MB)
Figure 5.1(a): Fixed South Facing String Inverter Illustrative Development Layout
|
Other |
Mallard Pass Solar Farm Limited (PDF, 725 KB)
Figure 5.2: Illustrative Elevations for Fixed South Facing and Single Axis Tracker Arrays
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
7.1 Statement of Need
|
Other |
Mallard Pass Solar Farm Limited (PDF, 270 KB)
6.2 Environmental Statement Volume 2 Appendix 13.3: Climate Change - Consultation Summary
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 7.6: Breeding bird indicative territories (Map 1 of 6)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 6 MB)
Figure 9.1: Construction Access Routes and Restrictions
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
7.14 Outline Travel Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 45 MB)
2.3 Illustrative/Indicative Layout Plans - Fixed South Facing String
|
Other |
Mallard Pass Solar Farm Limited (PDF, 309 KB)
6.2 Environmental Statement Volume 2 Appendix 7.2: Ecology and Biodiversity - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 29 MB)
6.2 Environmental Statement Volume 2 Appendix 8.4: Cultural Heritage Impact Assessment
|
Other |
Mallard Pass Solar Farm Limited (PDF, 56 MB)
Figure 6.10(c): Photomontage C
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
6.1 Environmental Statement Volume 1 - Chapter 11: Water Resources and Ground Conditions
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 3.1: Extents of Order Limits, Solar PV Site, Mitigation and Enhancement Areas and Potential Highway Works
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 5.12: Locations of Primary and Secondary Temporary Construction Compounds
|
Other |
Mallard Pass Solar Farm Limited (PDF, 6 MB)
Figure 7.1: Statutory and Non-Statutory Nature Conservation Designations Plan (Map 2 of 2)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
Figure 11.1: Water Resources and Ground Conditions
|
Other |
Mallard Pass Solar Farm Limited (PDF, 342 KB)
6.2 Environmental Statement Volume 2 Appendix 14.2: Socio-Economics - Assessment Methodology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 4.1: Stage 1 Concept Masterplan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 4.3: Concept Masterplan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 21 MB)
7.12 Outline Soil Management Plan (including outline Excavated Materials Management Plan)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 5 MB)
6.1 Environmental Statement Volume 1 - Chapter 12: Land Use and Soils
|
Other |
Mallard Pass Solar Farm Limited (PDF, 307 KB)
6.1 Environmental Statement Volume 1 - Chapter 17: Summary of Significant Effects and Mitigation
|
Other |
Mallard Pass Solar Farm Limited (PDF, 19 MB)
Figure 6.8.11: Photograph Panel 11 Representative Viewpoint 11
|
Other |
Mallard Pass Solar Farm Limited (PDF, 18 MB)
6.2 Environmental Statement Volume 2 Appendix 2.1: Scoping Report
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 1.2: Administrative Boundaries
|
Other |
Mallard Pass Solar Farm Limited (PDF, 720 KB)
7.6 Outline Construction Environmental Management Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 606 KB)
6.1 Environmental Statement Volume 1 - Chapter 13: Climate Change
|
Other |
Mallard Pass Solar Farm Limited (PDF, 7 MB)
7.2 Planning Statement and Appendices
|
Other |
Mallard Pass Solar Farm Limited (PDF, 26 MB)
Figure 6.10(d): Photomontage D
|
Other |
Mallard Pass Solar Farm Limited (PDF, 15 MB)
Figure 6.8.16: Photograph Panel 16 Representative Viewpoint 16
|
Other |
Mallard Pass Solar Farm Limited (PDF, 4 MB)
Figure 6.8.19: Photograph Panel 19 Representative Viewpoint 19
|
Other |
Mallard Pass Solar Farm Limited (PDF, 15 MB)
Figure 6.8.3: Photograph Panel 3 Representative Viewpoint 3
|
Other |
Mallard Pass Solar Farm Limited (PDF, 11 MB)
Figure 6.9.G: Photograph Panel G Illustrative Viewpoint G
|
Other |
Mallard Pass Solar Farm Limited (PDF, 1 MB)
Figure 2.1: Cumulative Developments Shortlisted for Cumulative Effects Assessment (100k)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 3 MB)
Figure 5.11: Illustrative Access Track Cross Section
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
Figure 11.2: Illustration of Solid Geology
|
Other |
Mallard Pass Solar Farm Limited (PDF, 2 MB)
Figure 11.6: Water Bodies in a River Basin Management Plan
|
Other |
Mallard Pass Solar Farm Limited (PDF, 25 MB)
Figure 6.10(a): Photomontage A
|
Other |
Mallard Pass Solar Farm Limited (PDF, 7 MB)
Figure 7.3: Phase 1 habitats plan (Map 2 of 3)
|
Other |
Mallard Pass Solar Farm Limited (PDF, 301 KB)
7.10 Outline Employment, Skills and Supply Chain
|
Other |
Acknowledgement of S46 Notification (PDF, 145 KB)
|
Other |
S46 Notification (PDF, 452 KB)
|
Other |
Natural England (PDF, 265 KB)
Late response received 10 March 2022 from Natural England
|
Other |
Scoping Opinion (PDF, 24 MB)
Adopted by the Secretary of State on 18 March 2022
|
Other |
Mallard Pass Solar Farm Limited (PDF, 64 KB)
Errata Letter relating to Scoping Report
|
Other |
Mallard Pass Solar Farm Limited (PDF, 30 MB)
Appendices to Scoping Report submitted to the Secretary of State on 07 February 2022
|
Other |
Mallard Pass Solar Farm Limited (PDF, 18 MB)
Scoping Report submitted to the Secretary of State on 07 February 2022
|