The projects listed are those:
- Where the developer has advised the Planning Inspectorate in writing that they intend to submit an application to us in the future
- Where an application has already been made to the Planning Inspectorate and is undergoing the development consent process
- Where a proposal has been decided.
Withdrawn projects are displayed for a period of time before they are removed from the website.
Use the table below to find projects by stage or type. Alternatively, use the map by clicking on the markers to go to the project page. A list of key events and deadlines for all projects is available on our event list page.
Project | Developer | Stage | Last updated | Project Type |
---|---|---|---|---|
A38 Derby Junctions | Highways England | Decided | 2024-02-08 16:16:40 | Transport |
A46 Newark Bypass | National Highways | Examination | 2024-10-10 13:06:12 | Transport |
Beacon Fen Energy Park | Beacon Fen Energy Park Limited | Pre Application | 2024-06-18 10:06:55 | Energy |
Boston Alternative Energy Facility (BAEF) | Alternative Use Boston Projects Limited | Decided | 2024-04-16 09:05:38 | Energy |
Cottam Solar Project | Cottam Solar Project Limited | Decided | 2024-09-06 11:07:14 | Energy |
Daventry International Rail Freight Terminal | Rugby Radio Station Ltd Partnership & Prologis UK | Decided | 2024-02-08 16:16:41 | Transport |
East Midlands Gateway Rail Freight Interchange | Roxhill (Kegworth) Limited | Decided | 2024-02-08 16:16:42 | Transport |
East Northants Resource Management Facility | Augean PLC | Decided | 2024-03-07 11:06:13 | Waste |
East Northants Resource Management Facility Western Extension | Augean South Limited | Decided | 2024-02-08 16:20:11 | Waste |
Fosse Green Energy | Fosse Green Energy Limited | Pre Application | 2024-11-06 16:07:43 | Energy |
Gate Burton Energy Park | Gate Burton Energy Park Ltd | Decided | 2024-07-19 12:05:49 | Energy |
Great North Road Solar Park | Elements Green Trent Limited | Pre Application | 2024-01-16 18:05:36 | Energy |
Green Hill Solar Farm | Green Hill Solar Farm Limited | Pre Application | 2024-11-19 08:05:36 | Energy |
Grimsby to Walpole | National Grid Electricity Transmission | Pre Application | 2024-03-07 12:14:55 | Energy |
Heckington Fen Solar Park | Ecotricity (Heck Fen Solar) Limited | Decision | 2024-10-11 14:06:02 | Energy |
Hinckley National Rail Freight Interchange | Tritax Symmetry (Hinckley) Limited | Decision | 2024-09-10 13:06:46 | Transport |
Lincolnshire Reservoir | Anglian Water | Pre Application | 2024-11-12 09:06:11 | Water |
Mallard Pass Solar Project | Mallard Pass Solar Farm Limited | Decided | 2024-07-15 12:00:27 | Energy |
Northampton Gateway Rail Freight Interchange | Roxhill Developments Limited | Decided | 2024-02-08 16:16:42 | Transport |
Oaklands Farm Solar Park | Oaklands Farm Solar Limited | Examination | 2024-07-10 11:06:01 | Energy |
One Earth Solar Farm | One Earth Solar Farm | Pre Application | 2024-01-18 14:48:25 | Energy |
Outer Dowsing Offshore Wind (Generating Station) | GT R4 Limited (trading as Outer Dowsing Offshore Wind) | Examination | 2024-10-10 12:05:37 | Energy |
Springwell Solar Farm | Springwell Energy Farm Limited | Acceptance | 2024-11-20 22:07:35 | Energy |
Steeple Renewables Project | Renewable Energy Solutions (RES) | Pre Application | 2024-08-29 18:06:11 | Energy |
Temple Oaks Renewable Energy Park | Ridge Clean Energy Limited | Pre Application | 2024-01-16 18:05:23 | Energy |
Tillbridge Solar Project | Tillbridge Solar Limited | Examination | 2024-10-16 14:05:48 | Energy |
Triton Knoll Electrical System | Triton Knoll Offshore Wind Farm Limited | Decided | 2024-01-30 10:00:23 | Energy |
Triton Knoll Offshore Wind Farm | Triton Knoll Offshore Wind Farm Limited | Decided | 2024-01-26 14:42:39 | Energy |
West Burton Solar Project | West Burton Solar Project Limited | Decision | 2024-11-06 14:06:19 | Energy |
A12 Chelmsford to A120 Widening Scheme | National Highways | Decided | 2024-09-18 18:05:46 | Transport |
A14 Cambridge to Huntingdon Improvement Scheme | Highways England | Decided | 2024-01-26 17:25:57 | Transport |
A428 Black Cat to Caxton Gibbet Road Improvement scheme | Highways England | Decided | 2024-02-08 16:20:10 | Transport |
A47 - A11 Thickthorn Junction | Highways England | Decided | 2024-02-08 16:20:10 | Transport |
A47 Blofield to North Burlingham | Highways England | Decided | 2024-02-08 16:20:10 | Transport |
A47 North Tuddenham to Easton | Highways England | Decided | 2024-11-20 16:05:18 | Transport |
A47 Wansford to Sutton | Highways England | Decided | 2024-02-08 16:20:10 | Transport |
Bramford to Twinstead | National Grid Electricity Transmission | Decided | 2024-09-12 16:07:55 | Energy |
Cambridge Waste Water Treatment Plant Relocation | Anglian Water Services Limited | Decision | 2024-10-10 17:05:38 | Waste Water |
East Anglia ONE North Offshore Windfarm | East Anglia ONE North Limited | Decided | 2024-02-08 16:16:42 | Energy |
East Anglia ONE Offshore Windfarm | East Anglia One Ltd | Decided | 2024-01-26 14:42:40 | Energy |
East Anglia THREE Offshore Wind Farm | East Anglia THREE Limited | Decided | 2024-01-31 16:00:57 | Energy |
East Anglia TWO Offshore Windfarm | East Anglia TWO Limited | Decided | 2024-02-08 16:16:42 | Energy |
East Park Energy | BSSL Cambsbed 1 Limited | Pre Application | 2024-05-30 15:05:52 | Energy |
East West Rail - Bedford to Cambridge and Western improvements | East West Railway Company Limited | Pre Application | 2024-08-22 15:06:25 | Transport |
Fens Reservoir | Anglian Water and Cambridge Water | Pre Application | 2024-05-30 14:07:22 | Water |
Five Estuaries Offshore Wind Farm | Five Estuaries Offshore Wind Farm Ltd | Examination | 2024-09-19 16:00:31 | Energy |
Galloper Offshore Wind Farm | Galloper Wind Farm Ltd | Decided | 2024-01-26 11:10:32 | Energy |
Great Yarmouth Third River Crossing | Norfolk County Council | Decided | 2024-02-19 18:00:16 | Transport |
Hornsea Project Three Offshore Wind Farm | Orsted Hornsea Project Three (UK) Ltd | Decided | 2024-02-08 16:16:40 | Energy |
Ipswich Rail Chord | Network Rail | Decided | 2024-02-08 16:16:41 | Transport |
Kings Lynn B Connection Project | National Grid | Decided | 2024-02-08 16:16:41 | Energy |
Kingsway Solar Farm | Kingsway Solar Farm Limited | Pre Application | 2024-08-30 17:06:50 | Energy |
Lake Lothing Third Crossing | Suffolk County Council | Decided | 2024-02-08 16:16:43 | Transport |
LionLink Multi-Purpose Interconnector | National Grid Interconnector Holdings Limited | Pre Application | 2024-02-20 12:04:53 | Energy |
London Luton Airport Expansion | London Luton Airport Limited | Decision | 2024-09-12 14:07:40 | Transport |
Longfield Solar Farm | Longfield Solar Energy Farm Limited | Decided | 2024-02-08 16:20:11 | Energy |
M1 Junction 10a Grade Separation - Luton | Luton Borough Council | Decided | 2024-01-26 11:10:33 | Transport |
Medworth Energy from Waste Combined Heat and Power Facility | Medworth CHP Limited | Decided | 2024-02-29 11:08:16 | Energy |
Meridian Solar Farm | Meridian Solar Farm Ltd | Pre Application | 2024-03-07 12:14:55 | Energy |
Millbrook Power | Millbrook Power Limited | Decided | 2024-09-06 15:47:38 | Energy |
Nautilus Interconnector | National Grid Ventures | Pre Application | 2024-11-13 15:05:16 | Energy |
Norfolk Boreas | Norfolk Boreas Limited | Decided | 2024-02-08 16:16:43 | Energy |
Norfolk Vanguard | Norfolk Vanguard Limited | Decided | 2024-02-08 16:16:42 | Energy |
North Falls Offshore Wind Farm | North Falls Offshore Wind Farm Ltd | Pre Examination | 2024-10-24 15:06:04 | Energy |
Norwich Northern Distributor Road (NDR) | Norfolk County Council | Decided | 2024-01-26 11:10:34 | Transport |
Norwich to Tilbury | National Grid Electricity Transmission (NGET) | Pre Application | 2024-05-02 10:06:14 | Energy |
Palm Paper 3 CCGT Power station Kings Lynn | Palm Paper Ltd | Decided | 2024-02-08 16:16:41 | Energy |
Progress Power Station | Progress Power Limited | Decided | 2024-02-09 13:00:34 | Energy |
Rivenhall IWMF and Energy Centre | Indaver Rivenhall Ltd | Decision | 2024-10-02 18:07:03 | Energy |
Rookery South Energy from Waste Generating Station | Covanta Rookery South Limited | Decided | 2024-01-26 17:25:56 | Energy |
Rosefield Solar Farm | Rosefield Energy Farm Limited | Pre Application | 2024-01-18 14:48:25 | Energy |
Sheringham and Dudgeon Extension Projects | Equinor | Decided | 2024-04-17 20:07:38 | Energy |
Sunnica Energy Farm | Sunnica Ltd | Decided | 2024-08-08 11:07:17 | Energy |
The Sizewell C Project | NNB Generation Company (SZC) Limited | Decided | 2024-08-29 18:05:34 | Energy |
Woodside Link Houghton Regis Bedfordshire | Central Bedfordshire Council | Decided | 2024-02-08 16:16:40 | Transport |
Expansion of Heathrow Airport (Third Runway) | Heathrow Airport Limited | Pre Application | 2023-12-15 15:00:58 | Transport |
North London (Electricity Line) Reinforcement | National Grid | Decided | 2024-02-08 16:16:41 | Energy |
North London Heat and Power Project | North London Waste Authority | Decided | 2024-01-26 17:25:56 | Energy |
Riverside Energy Park | Cory Riverside Energy | Decided | 2024-02-08 16:20:09 | Energy |
Silvertown Tunnel | Transport for London | Decided | 2024-01-26 14:42:40 | Transport |
Teddington Direct River Abstraction (TDRA) | Thames Water Utilities Limited | Pre Application | 2024-03-07 12:14:55 | Water |
Thames Tideway Tunnel | Thames Water | Decided | 2024-01-26 14:42:41 | Waste Water |
A1 Birtley to Coal House Improvement Scheme | Highways England | Decided | 2024-02-08 16:20:09 | Transport |
A1 in Northumberland - Morpeth to Ellingham | Highways England | Decided | 2024-06-16 20:02:20 | Transport |
A19 / A184 Testos Junction Improvement | Highways England | Decided | 2024-01-26 17:25:58 | Transport |
A19 Downhill Lane Junction Improvement | Highways England | Decided | 2024-02-08 16:16:43 | Transport |
A19/A1058 Coast Road Junction Improvement | Highways Agency | Decided | 2024-01-26 11:10:34 | Transport |
Byers Gill Solar | RWE Renewables UK Solar and Storage Limited | Examination | 2024-07-24 11:00:21 | Energy |
H2Teesside | H2 Teesside Limited | Examination | 2024-11-08 11:06:07 | Energy |
Lighthouse Green Fuels Project | Lighthouse Green Fuels Limited | Pre Application | 2024-09-05 09:06:31 | Energy |
Morpeth Northern Bypass | Northumberland County Council | Decided | 2024-02-09 13:00:21 | Transport |
Port Blyth New Biomass Plant | North Blyth Energy Ltd | Decided | 2024-02-08 16:16:41 | Energy |
Tees CCPP | Sembcorp Utilities (UK) Limited | Decided | 2024-09-06 16:06:32 | Energy |
Teesside Flexible Regas Port | Teesside Flexible Regas Port Limited | Pre Application | 2024-08-12 12:08:50 | Energy |
The Net Zero Teesside Project | Net Zero Teesside Power Limited “NZT Power” and Net Zero North Sea Storage Limited “NZNS Storage” | Decided | 2024-04-03 16:54:01 | Energy |
VPI Immingham OCGT | VPI Immingham B Ltd | Decided | 2024-02-08 16:16:43 | Energy |
West Burton C power station | EDF Energy (Thermal Generation) Limited | Decided | 2024-02-08 16:16:43 | Energy |
York Potash Harbour Facilities Order | York Potash Ltd | Decided | 2024-03-07 11:07:02 | Transport |
A556 Knutsford to Bowdon Scheme | Highways Agency | Decided | 2024-01-26 11:10:33 | Transport |
A57 Link Roads (previously known as Trans Pennine Upgrade Programme) | Highways England | Decided | 2024-02-08 16:20:09 | Transport |
A585 Windy Harbour to Skippool Improvement Scheme | Highways England | Decided | 2024-02-08 16:20:09 | Transport |
A66 Northern Trans-Pennine Project | National Highways | Decided | 2024-03-07 18:04:52 | Transport |
Burbo Bank Extension offshore wind farm | DONG Energy Burbo Extension (UK) Ltd. | Decided | 2024-02-08 16:16:40 | Energy |
Dean Moor Solar Farm | FVS Dean Moor | Pre Application | 2024-08-01 10:07:27 | Energy |
Frodsham Solar Project | Frodsham Solar Ltd | Pre Application | 2024-11-06 15:06:09 | Energy |
Heysham to M6 Link Road | Lancashire County Council | Decided | 2024-01-26 11:10:33 | Transport |
Hynet North West Hydrogen Pipeline | Cadent Gas Limited | Pre Application | 2024-03-04 11:06:44 | Energy |
Keuper Gas Storage Project | Keuper Gas Storage Limited | Decided | 2024-08-20 10:07:01 | Energy |
M60/M62/M66 Simister Island | National Highways | Examination | 2024-09-17 14:06:02 | Transport |
Morecambe Offshore Windfarm Generation Assets | Morecambe Offshore Windfarm Ltd. | Examination | 2024-10-23 23:05:08 | Energy |
Morgan and Morecambe Offshore Wind Farms Transmission Assets | Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited | Pre Examination | 2024-11-20 17:05:56 | Energy |
Morgan Offshore Wind Project Generation Assets | Morgan Offshore Wind Limited | Examination | 2024-09-10 11:06:01 | Energy |
Preesall Saltfield Underground Gas Storage | Halite Energy Group Ltd | Decided | 2024-02-08 16:16:41 | Energy |
Walney Extension Offshore Wind Farm | DONG Energy Walney Extension (UK) Ltd | Decided | 2024-01-26 14:42:40 | Energy |
Whitemoss Landfill Western Extension | Whitemoss Landfill Limited | Decided | 2024-01-26 14:42:40 | Waste |
AQUIND Interconnector | AQUIND Limited | Decision | 2024-03-05 15:06:22 | Energy |
Botley West Solar Farm | Photovolt Development Partners (PVDP) on behalf of SolarFive Ltd | Acceptance | 2024-11-15 18:05:56 | Energy |
Cleve Hill Solar Park | Cleve Hill Solar Park Ltd | Decided | 2024-02-08 16:20:09 | Energy |
Cory Decarbonisation Project | Cory Environmental Holdings Limited (CEHL) | Examination | 2024-11-19 12:06:23 | Energy |
Gatwick Airport Northern Runway | Gatwick Airport Limited | Recommendation | 2024-08-28 08:06:41 | Transport |
Hampshire Water Transfer and Water Recycling Project | Southern Water Services Limited | Pre Application | 2024-01-15 18:05:11 | Water |
Kemsley Paper Mill (K4) CHP Plant | DS Smith Paper Ltd | Decided | 2024-09-06 16:07:30 | Energy |
Kentish Flats Extension | Vattenfall | Decided | 2024-02-08 16:16:40 | Energy |
Lower Thames Crossing | National Highways | Decision | 2024-06-07 16:08:48 | Transport |
M20 Junction 10A | Highways England | Decided | 2024-01-26 11:10:33 | Transport |
M25 junction 10/A3 Wisley interchange improvement | Highways England | Decided | 2024-02-08 16:20:09 | Transport |
M25 junction 28 improvements | Highways England | Decided | 2024-04-15 19:06:14 | Transport |
M3 Junction 9 Improvement | National Highways | Decided | 2024-05-17 14:06:52 | Transport |
M4 Junctions 3 to 12 Smart Motorway | Highways Agency (now Highways England) | Decided | 2024-01-31 16:00:51 | Transport |
Manston Airport | RiverOak Strategic Partners Ltd | Decided | 2024-02-28 11:06:17 | Transport |
Navitus Bay Wind Park | Navitus Bay Development Limited | Decided | 2024-01-26 11:10:32 | Energy |
Oxfordshire Strategic Rail Freight Interchange | Oxfordshire Railfreight Limited | Pre Application | 2024-02-08 11:00:21 | Transport |
Rampion 2 Offshore Wind Farm | Rampion Extension Development Limited | Decision | 2024-11-06 10:06:09 | Energy |
Rampion Offshore Wind Farm | E.ON Climate and Renewables | Decided | 2024-01-26 11:10:32 | Energy |
Richborough Connection Project | National Grid | Decided | 2024-01-26 17:25:57 | Energy |
River Thames Scheme | The Environment Agency and Surrey County Council | Pre Application | 2023-12-21 12:10:57 | Water |
Sea Link | National Grid Electricity Transmission | Pre Application | 2024-05-29 12:09:20 | Energy |
Slough Multifuel Extension Project | SSE Slough Multifuel Limited | Decided | 2024-02-14 09:50:49 | Energy |
South East Strategic Reservoir Option (SESRO) | Thames Water Utilities Limited | Pre Application | 2024-01-18 14:48:26 | Water |
Southampton to London Pipeline Project | Esso Petroleum Company, Limited | Decided | 2024-02-19 17:48:17 | Energy |
Stonestreet Green Solar | EPL 001 Limited | Examination | 2024-11-19 12:06:29 | Energy |
Thanet Extension Offshore Wind Farm | Vattenfall Wind Power Limited | Decided | 2024-02-08 16:16:43 | Energy |
Thurrock Flexible Generation Plant | Thurrock Power Ltd | Decided | 2024-02-08 16:20:11 | Energy |
Tilbury2 | Port of Tilbury London Limited | Decided | 2024-09-06 15:41:43 | Transport |
Wheelabrator Kemsley Generating Station (K3) and Wheelabrator Kemsley North (WKN) Waste to Energy Facility | WTI/EFW Holdings Ltd | Decided | 2024-02-08 16:16:42 | Energy |
A30 Chiverton to Carland Cross Scheme | Highways England | Decided | 2024-02-08 16:16:43 | Transport |
A30 Temple to Higher Carblake Improvement | Cornwall Council | Decided | 2024-01-26 11:10:33 | Transport |
A303 Sparkford to Ilchester Dualling | Highways England | Decided | 2024-02-08 16:20:10 | Transport |
A303 Stonehenge | Highways England | Decided | 2024-02-19 17:56:48 | Transport |
A417 Missing Link | Highways England | Decided | 2024-04-15 20:07:30 | Transport |
Hinkley Point C Connection | National Grid | Decided | 2024-01-26 11:10:33 | Energy |
Hinkley Point C New Nuclear Power Station | NNB Generation Company Limited | Decided | 2024-01-26 11:10:32 | Energy |
Hinkley Point C New Nuclear Power Station Material Change 1 | NNB Generation Company (HPC) Limited | Pre Application | 2024-05-01 16:07:36 | Energy |
Lime Down Solar Project | Lime Down Solar Park Limited | Pre Application | 2024-03-25 16:06:47 | Energy |
M5 Junction 10 Improvements Scheme | Gloucestershire County Council | Examination | 2024-10-22 10:06:06 | Transport |
Portishead Branch Line - MetroWest Phase 1 | North Somerset Council | Decided | 2024-02-08 16:16:41 | Transport |
Xlinks Morocco-UK Power Project | Xlinks 1 Limited | Acceptance | 2024-11-21 11:07:20 | Energy |
Abergelli Power | Abergelli Power Limited | Decided | 2024-01-04 11:00:24 | Energy |
Awel y Môr Offshore Wind Farm | Awel y Môr Offshore Wind Farm Limited | Decided | 2024-03-07 11:05:51 | Energy |
Brechfa Forest Connection | Western Power Distribution (South Wales) plc | Decided | 2023-06-05 12:18:08 | Energy |
Brechfa Forest West Wind Farm | RWE Npower Renewables | Decided | 2020-01-22 17:30:45 | Energy |
Clocaenog Forest Wind Farm | RWE npower renewables | Decided | 2020-01-22 17:30:45 | Energy |
Connah’s Quay Low Carbon Power Project | Uniper UK Limited | Pre Application | 2024-11-13 13:06:11 | Energy |
Future Energy Llanwern Solar Project | Future Energy Llanwern Limited | Pre Application | 2024-10-17 11:06:37 | Energy |
Glyn Rhonwy Pumped Storage | Snowdonia Pumped Hydro Limited | Decided | 2024-03-07 11:06:05 | Energy |
Green Gen Vyrnwy Frankton | Green Gen Cymru | Pre Application | 2024-03-07 11:07:44 | Energy |
Hirwaun Power Station | Hirwaun Power Limited | Decided | 2024-03-07 11:07:08 | Energy |
HyNet Carbon Dioxide Pipeline | Liverpool Bay CCS Limited | Decided | 2024-03-20 16:05:59 | Energy |
Internal Power Generation Enhancement for Port Talbot Steelworks | Tata Steel UK limited | Decided | 2021-03-09 10:13:23 | Energy |
Maen Hir Solar and Energy Storage Project | Lightsource bp | Pre Application | 2024-09-30 15:08:23 | Energy |
Mona Offshore Wind Farm | Mona Offshore Wind Limited | Examination | 2024-07-17 10:00:20 | Energy |
Mynydd y Gwynt Wind Farm | Mynydd y Gwynt Ltd | Decided | 2021-03-04 08:44:52 | Energy |
North Wales Wind Farms Connection | SP MANWEB | Decided | 2024-03-07 11:06:40 | Energy |
South Hook Combined Heat & Power Station | QPI Global Ventures Ltd | Decided | 2020-09-30 12:00:13 | Energy |
SP Mid Wales (Electricity) Connections Project (SP Manweb) | SP Manweb | Pre Application | 2024-03-07 11:06:55 | Energy |
Tidal Lagoon Cardiff | Tidal Lagoon Power | Pre Application | 2024-03-07 11:05:30 | Energy |
Tidal Lagoon Swansea Bay | Tidal Lagoon (Swansea Bay) PLC | Decided | 2024-03-07 11:06:27 | Energy |
Wrexham Energy Centre | Wrexham Power Limited | Decided | 2023-06-05 13:40:08 | Energy |
A46 Coventry Junctions (Walsgrave) | National Highways | Acceptance | 2024-11-14 16:05:56 | Transport |
M42 Junction 6 Improvement | Highways England | Decided | 2024-02-08 16:16:43 | Transport |
M54 to M6 Link Road | Highways England | Decided | 2024-02-08 16:20:10 | Transport |
Meaford Energy Centre | Meaford Energy Limited | Decided | 2024-01-26 14:42:40 | Energy |
Redditch Branch Enhancement Scheme | Network Rail | Decided | 2024-01-26 11:10:34 | Transport |
Reinforcement to North Shropshire Electricity Distribution Network | SP Manweb | Decided | 2024-02-08 16:16:40 | Energy |
Stafford Area Improvements - Norton Bridge Railway | Network Rail | Decided | 2024-03-07 11:05:37 | Transport |
West Midlands Interchange | Four Ashes Limited | Decided | 2024-02-08 16:16:42 | Transport |
Willington C Gas Pipeline | RWE npower | Decided | 2024-01-26 11:10:33 | Energy |
A160 - A180 Port of Immingham Improvement | Highways Agency | Decided | 2024-01-26 14:42:40 | Transport |
A63 Castle Street Improvement-Hull | Highways England | Decided | 2024-02-08 16:16:40 | Transport |
Able Marine Energy Park | Able Humber Ports Ltd | Decided | 2024-07-10 13:07:00 | Transport |
Able Marine Energy Park Material Change 1 | Able Humber Ports Ltd | Pre Application | 2024-02-29 11:34:40 | Transport |
Able Marine Energy Park Material Change 2 | Able Humber Ports Ltd | Decided | 2024-02-29 11:56:18 | Transport |
Aldbrough Hydrogen Storage | Aldbrough Hydrogen Storage Limited | Pre Application | 2024-06-17 20:07:22 | Energy |
Continental Link Multi-Purpose Interconnector | National Grid Ventures | Pre Application | 2024-04-17 14:06:14 | Energy |
Dogger Bank Creyke Beck | Forewind | Decided | 2024-01-26 11:10:32 | Energy |
Dogger Bank D Wind Farm | Doggerbank Offshore Wind Farm Project 4 Projco Limited | Pre Application | 2024-07-21 22:04:29 | Energy |
Dogger Bank South Offshore Wind Farms | RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd | Pre Examination | 2024-10-24 12:08:08 | Energy |
Dogger Bank Teesside A / Sofia Offshore Wind Farm (formerly Dogger Bank Teesside B) - Project previously known as Dogger Bank Teesside A&B | Forewind Ltd | Decided | 2024-01-26 11:10:32 | Energy |
Drax Bioenergy with Carbon Capture and Storage Project | Drax Power Limited | Decided | 2024-08-20 10:07:09 | Energy |
Drax Re-power | Drax Power Limited | Decided | 2024-09-06 16:07:10 | Energy |
East Yorkshire Solar Farm | East Yorkshire Solar Farm Limited | Examination | 2024-05-21 12:03:43 | Energy |
Eggborough CCGT | Eggborough Power Limited | Decided | 2024-01-31 16:00:37 | Energy |
Fenwick Solar Farm | Fenwick Solar Project Limited | Pre Application | 2024-07-29 12:01:37 | Energy |
Ferrybridge Multifuel 2 (FM2) Power Station | Multifuel Energy Ltd | Decided | 2024-11-20 11:08:14 | Energy |
Helios Renewable Energy Project | Enso Green Holdings D Limited | Pre Examination | 2024-11-01 12:06:23 | Energy |
Hornsea Offshore Wind Farm (Zone 4) - Project One | SMart Wind Ltd | Decided | 2024-02-08 16:16:42 | Energy |
Hornsea Offshore Wind Farm (Zone 4) - Project Two | SMart Wind Limited | Decided | 2024-03-07 11:05:58 | Energy |
Hornsea Project Four Offshore Wind Farm | Orsted Hornsea Project Four Limited | Decided | 2024-02-08 16:20:10 | Energy |
Immingham Eastern Ro-Ro Terminal | Associated British Ports | Decided | 2024-10-04 12:00:20 | Transport |
Immingham Green Energy Terminal | Associated British Ports | Decision | 2024-11-06 16:07:38 | Transport |
Keadby 3 Carbon Capture Power Station | Keadby Generation Limited | Decided | 2024-04-16 09:05:51 | Energy |
Knottingley Power Project | Knottingley Power Limited | Decided | 2024-01-31 16:00:21 | Energy |
Little Crow Solar Park | INRG SOLAR (Little Crow) Ltd | Decided | 2024-02-08 16:20:10 | Energy |
North Doncaster Rail Chord (near Shaftholme) | Network Rail | Decided | 2024-02-08 16:16:41 | Transport |
North Humber to High Marnham | National Grid Electricity Transmission | Pre Application | 2024-01-18 14:48:26 | Energy |
North Killingholme Power Project | C.GEN Killingholme Ltd | Decided | 2024-02-09 13:00:27 | Energy |
North Lincolnshire Green Energy Park | North Lincolnshire Green Energy Park Limited | Decision | 2024-09-26 14:06:48 | Energy |
Peartree Hill Solar Farm | RWE Renewables UK Solar and Storage Limited | Pre Application | 2024-11-08 13:05:51 | Energy |
River Humber Gas Pipeline Replacement Project | National Grid | Decided | 2024-01-26 17:25:57 | Energy |
South Humber Bank Energy Centre | EP Waste Management Limited | Decided | 2024-02-08 16:20:10 | Energy |
Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) | RWE Generation UK plc | Pre Application | 2024-04-16 08:05:33 | Energy |
Thorpe Marsh Gas Pipeline | Thorpe Marsh Power Limited | Decided | 2024-01-26 17:25:57 | Energy |
Tween Bridge Solar Farm | RWE Renewables UK Solar and Storage Limited | Pre Application | 2024-07-16 11:00:33 | Energy |
Viking CCS Pipeline | Chrysaor Production (UK) Limited | Recommendation | 2024-09-27 08:06:46 | Energy |
White Rose Carbon Capture and Storage Project | Capture Power Limited | Decided | 2024-01-26 14:42:40 | Energy |
Yorkshire and Humber CCS Cross Country Pipeline | National Grid Carbon Limited | Decided | 2024-01-31 16:00:30 | Energy |
Yorkshire GREEN | National Grid Electricity Transmission (NGET) | Decided | 2024-09-06 16:06:51 | Energy |