Eggborough CCGT

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (6)

Developer's Application (124)

Acceptance (16)

Pre Examination (6)

Examination (173)

Decision (13)

Decided (0)

Date

SourceDescription
Other
Department for Business, Energy and Industrial Strategy (PDF, 82 KB)
Correction Order - December 2018
Other
Development Consent Order as Made by the Secretary of State (PDF, 467 KB)
Other
Habitats Regulations Assessment (PDF, 444 KB)
Other
Post-examination Submissions (PDF, 564 KB)
Other
Recommendation Report (PDF, 2 MB)
Other
Regulation 23 Notice - Notification of Decision Letter (PDF, 159 KB)
Other
Secretary of State Decision Letter (PDF, 315 KB)
Other
Dalton Warner Davis on behalf of Eggborough Power Limited (PDF, 224 KB)
Response to the Crown Estate's Letter dated 20 August 2018
Other
The Crown Estate (PDF, 101 KB)
Response to the Department of Business, Energy and Industrial Strategy request for further comments on 1 August 2018
Other
Secretary of State Consultation (PDF, 79 KB)
Letter from the Secretary of State dated 1 August 2018
Other
Dalton Warner Davis (PDF, 112 KB)
Response to the Department of Business, Energy and Industrial Strategy request for information on 9 July 2018
Other
The Crown Estate (PDF, 753 KB)
Response to the Department of Business, Energy and Industrial Strategy request for information on 9 July 2018
Other
Department for Business, Energy & Industrial Strategy (PDF, 87 KB)
Letter from the Secretary of State - 9th July 2018
Other
Notifcation of Completion of the Examining Authority's Examination (PDF, 98 KB)
Section 99 Notification of Completion of ExA Examination
Other
Eggborough Power Limited (PDF, 368 KB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority - Application Guide - Rev.10.0 (End of Examination Version)
Other
Canal and River Trust (PDF, 511 KB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 2 MB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 2 MB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 803 KB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 419 KB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 110 KB)
Covering Letter
Other
Eggborough Power Limited (PDF, 1 MB)
2.1 Draft Development Consent Order (DCO) - Rev. 7.0
Other
Eggborough Power Limited (PDF, 6 MB)
9.8 Section 106 Planning Agreement with Selby District Council and Yorkshire Wildlife Trust - Biodiversity enhancement - Rev. 3.0 (Final Version)
Other
Eggborough Power Limited (PDF, 234 KB)
7.9 Statement of Common Ground (SoCG) with National Grid Gas Plc (NGG) and National Grid Electricity Transmission Plc (NGET) - Rev. 3.0
Other
Eggborough Power Limited (PDF, 791 KB)
2.14 Draft DCO - Comparison to Deadline 8 Version
Other
Eggborough Power Limited (PDF, 404 KB)
Planning Performance Agreement with Selby District Council - Discharge of requirements - Rev. 1.0 (Final Version)
Other
Eggborough Power Limited (PDF, 269 KB)
1.2 Application Guide (Rev. 9.0)
Other
Eggborough Power Limited (PDF, 33 KB)
9.9 Compulsory Acquisition Update
Other
Eggborough Power Limited (PDF, 731 KB)
7.1 Statement of Common Ground (SoCG) with North Yorkshire County Council (NYCC) and Selby District Council (SDC) - Rev. 5.0
Other
Eggborough Power Limited (PDF, 999 KB)
9.13 Section 106 Planning Agreement with Selby District Council - Demolition of coal station - Rev. 2.0 (Final Version)
Other
Shakespeare Martineau on behalf of National Grid Plc (PDF, 823 KB)
Other
Eggborough Power Limited (PDF, 3 MB)
7.11 Statement of Common Ground (SoCG) with the Yorkshire Wildlife Trust
Other
Eggborough Power Limited (PDF, 110 KB)
Covering Letter
Other
Eggborough Power Limited (PDF, 490 KB)
1.2 Application Guide (Rev. 8.0)
Other
Eggborough Power Limited (PDF, 12 MB)
5.10 Indicative Landscape and Biodiversity Strategy (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 538 KB)
2.13 Explanatory Note on Changes to Draft DCO
Other
Eggborough Power Limited (PDF, 836 KB)
2.12 Draft DCO - Comparison against Deadline 6 Version
Other
Eggborough Power Limited (PDF, 1 MB)
2.1 Draft Development Consent Order (DCO) - Rev. 6.0
Other
Eggborough Power Limited (PDF, 1 MB)
7.10 Statement of Common Ground with the Marine Management Organisation (MMO) - Rev. 4.0
Other
Marine Management Organisation (MMO) (PDF, 202 KB)
Submission for Deadline 8
Other
Examining Authority's Draft Development Consent Order (DCO) issued on 19 February 2018 (PDF, 235 KB)
Examining Authority's Draft Development Consent Order (DCO) issued on 19 February 2018
Other
Eggborough Power Limited (PDF, 247 KB)
1.2 Application Guide (Rev. 7.0)
Other
Eggborough Power Limited (PDF, 561 KB)
7.1 Statement of Common Ground with North Yorkshire County Council (NYCC) and Selby District Council (SDC) - Rev. 4
Other
Eggborough Power Limited (PDF, 221 KB)
9.15 Comments on Report on Implications for European Sites (RIES)
Other
Eggborough Power Limited (PDF, 531 KB)
4.14 Indicative Deemed Marine Licence Coordinates Plans (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 1 MB)
7.10 Statement of Common Ground with the Marine Management Organisation (MMO) - Rev. 4.0
Other
Marine Management Organisation (MMO) (PDF, 215 KB)
Submission for Deadline 7
Other
Natural England (PDF, 3 MB)
Submission for Deadline 7
Other
Eggborough Power Limited (PDF, 252 KB)
7.11 Updated Draft Statement of Common Ground (SoCG) with the Yorkshire Wildlife Trust (Rev.3.0)
Other
Eggborough Power Limited (PDF, 488 KB)
1.2 Application Guide (Rev.6.0)
Other
Eggborough Power Limited (PDF, 869 KB)
2.10 Draft Development Consent Order (DCO) - Comparison to Deadline 5 Version
Other
Eggborough Power Limited (PDF, 299 KB)
2.11 Explanatory Note on Changes to Draft Development Consent Order (DCO)
Other
Eggborough Power Limited (PDF, 6 MB)
4.2 Updated Land Plans (Rev.3.0)
Other
Eggborough Power Limited (PDF, 346 KB)
Covering Letter
Other
Eggborough Power Limited (PDF, 1 MB)
2.1 Updated Draft Development Consent Order (DCO) - Rev. 5.0
Other
Wardhadaway on behalf of Canal and River Trust (PDF, 2 MB)
Submission for Deadline 6
Other
Report on the Implications for European Sites (RIES) (PDF, 494 KB)
Issued by the Examining Authority - 25 January 2018
Other
Request for Further Information - Rule 17 (PDF, 77 KB)
Other
Eggborough Power Limited (PDF, 172 KB)
Deadline 5 Submission - 9.14 Correction to Applicant’s Response to Deadline 3 Submissions
Other
Eggborough Power Limited (PDF, 959 KB)
Deadline 5 Submission - 9.13 Draft Section 106 Planning Agreement with Selby District Council – Demolition of the existing coal-fired power station
Other
Eggborough Power Limited (PDF, 7 MB)
Deadline 5 Submission - Cover Email
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 5 Submission - 2.1 Updated Draft DCO (Rev. 4.0)
Other
Eggborough Power Limited (PDF, 267 KB)
Deadline 5 Submission - 1.2 Application Guide (Rev. 5.0)
Other
Eggborough Power Limited (PDF, 346 KB)
Deadline 5 Submission - 9.11 Applicant’s Responses to the Examining Authority’s (‘ExA’s’) Further Written Questions
Other
Eggborough Power Limited (PDF, 3 MB)
Deadline 5 Submission - 9.12 Response to the ExA’s Request for Further Information on Habitats Regulations Assessment (including Appendix 1)
Other
Eggborough Power Limited (PDF, 864 KB)
Deadline 5 Submission - 2.8 Draft DCO – Comparison to Deadline 3 Version
Other
Eggborough Power Limited (PDF, 326 KB)
Deadline 5 Submission - 2.9 Explanatory Note on Changes to Draft DCO
Other
North Yorkshire County Council (PDF, 107 KB)
Deadline 5 Submission - Letter to PINS
Other
North Yorkshire County Council and Selby District Council (PDF, 295 KB)
Deadline 5 Submission - Response to ExA Written Questions
Other
The Environment Agency (PDF, 39 KB)
Deadline 5 Submission - Response to ExA Written Questions
Other
Eggborough Power Limited (PDF, 321 KB)
Deadline 4 Submission - 9.10 Applicant’s Response to Deadline 3 Submissions (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 5 MB)
Deadline 4 Submission - Covering Email
Other
Eggborough Power Limited (PDF, 33 KB)
Deadline 4 Submission - 9.9 Compulsory Acquisition Update (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 1,009 KB)
Deadline 4 Submission - 7.10 Statement of Common Ground with the Marine Management Organisation (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 3 MB)
Deadline 4 Submission - 9.8 Draft Section 106 Agreement with Selby District Council and the Yorkshire Wildlife Trust (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 262 KB)
Deadline 4 Submission - 1.2 Application Guide (Rev. 4.0)
Other
Eggborough Power Limited (PDF, 351 KB)
Deadline 4 Submission - 7.9 Statement of Common Ground with National Grid Gas Plc & National Grid Electricity Transmission Plc (Rev. 2.0)
Other
Marine Management Organisation (PDF, 217 KB)
Submission for Deadline 4 and 5
Other
North Yorkshire County Council (PDF, 61 KB)
Deadline 4 Submission
Other
Further Written Questions (PDF, 92 KB)
Further Written Questions
Other
Hensall Parish Council (PDF, 15 KB)
Late Deadline 3 Submission - Accepted at the discretion of the Examining Authority
Other
Rule 8(3) and Rule 17 Letter (PDF, 143 KB)
Other
Canal and River Trust (PDF, 640 KB)
Deadline 3 Submission - Code of Practice Part 1
Other
Canal and River Trust (PDF, 819 KB)
Deadline 3 Submission - Code of Practice Part 2
Other
Canal and River Trust (PDF, 913 KB)
Deadline 3 Submission - Covering Letter
Other
Canal and River Trust (PDF, 47 KB)
Deadline 3 Submission - Protective Provisions
Other
Canal and River Trust (PDF, 817 KB)
Deadline 3 Submission - Code of Practice Part 3
Other
Eggborough Power Limited (PDF, 861 KB)
Deadline 3 Submission - 2.6 Draft DCO Comparison to Deadline 2 Version (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 49 KB)
Deadline 3 Submission - 9.6 Appendix 1
Other
Eggborough Power Limited (PDF, 263 KB)
Deadline 3 Submission - 1.2 Application Guide (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 6 MB)
Deadline 3 Submission - 9.7 Demolition of the Existing Coal-Fired Power Station, including Appendices 1 and 2
Other
Eggborough Power Limited (PDF, 314 KB)
Deadline 3 Submission - 9.5 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on the Draft DCO held on 23 November 2017
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 3 Submission - 2.1 Updated Draft DCO (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 331 KB)
Deadline 3 Submission - 9.8 Draft Section 106 Agreement with Selby District Council and the Yorkshire Wildlife Trust
Other
Eggborough Power Limited (PDF, 470 KB)
Deadline 3 Submission - 9.4 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on Environmental Matters held on 22 November 2017
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 3 Submission - 7.3 Statement of Common Ground with the Environment Agency (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 529 KB)
Deadline 3 Submission - 9.3 Applicant’s Comments on the Local Impact report, Written Representations and Responses to the ExA’s First Written Questions
Other
Eggborough Power Limited (PDF, 11 MB)
Deadline 3 Submission - Covering Email
Other
Eggborough Power Limited (PDF, 479 KB)
Deadline 3 Submission - 7.1 Updated Draft Statement of Common Ground with North Yorkshire County Council and Selby District Council (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 245 KB)
Deadline 3 Submission - 9.6 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on Compulsory Acquisition on 23 November 2017
Other
Eggborough Power Limited (PDF, 307 KB)
Deadline 3 Submission - 2.7 Explanatory Note on Changes to Draft DCO (Deadline 3) (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 341 KB)
Deadline 3 Submission - 7.11 Updated Draft Statement of Common Ground with the Yorkshire Wildlife Trust (Rev. 2.0)
Other
Marine Management Organisation (PDF, 214 KB)
Deadline 3 Submission - MMO Response to Deadline 3
Other
National Grid (PDF, 1 MB)
Deadline 3 Submission - Letter from National Grid
Other
North Yorkshire County Council and Selby District Council (PDF, 54 KB)
Deadline 3 Submission - Letter to ExA
Other
Yorkshire Wildlife Trust (PDF, 2 MB)
Deadline 3 Submission - Wet Woodland Creation Map Lower Aire
Other
Yorkshire Wildlife Trust (PDF, 2 MB)
Deadline 3 Submission - Working with Natural Processes- Using the Evidence Base
Other
Yorkshire Wildlife Trust (PDF, 371 KB)
Deadline 3 Submission - Project Summary - Working with Natural Processes
Other
Yorkshire Wildlife Trust (PDF, 4 MB)
Deadline 3 Submission - Response to ExA's Written Questions
Other
Action Points from Issue Specific Hearing on Environmental Matters (PDF, 52 KB)
22 November 2017
Other
Recording of Compulsory Acquisition Hearing (PDF, 31 KB)
23 November 2017
Other
Recording of Issue Specific Hearing on Environmental Matters - Part 1 (PDF, 31 KB)
22 November 2017
Other
Recording of Issue Specific Hearing on Environmental Matters - Part 2 (PDF, 31 KB)
22 November 2017
Other
Recording of Issue Specific Hearing on Environmental Matters - Part 3 (PDF, 31 KB)
22 November 2017
Other
Recording of Issue Specific Hearing on the draft DCO (PDF, 31 KB)
23 November 2017
Other
Response to Mr R Tams to a request to be an interested party (PDF, 126 KB)
3 October 2017
Other
Accompanied Site Inspection Itinerary (PDF, 51 KB)
21 November 2017
Other
Agenda for Issue Specific Hearings and Compulsory Acquisition Hearing (PDF, 50 KB)
Hearings on 22 and 23 November 2017
Other
Eggborough Power Limited (PDF, 5 MB)
Accompanied Site Inspection Route
Other
Hensall Parish Council (PDF, 17 KB)
Deadline 2 Submission
Other
Canal and River Trust (PDF, 667 KB)
Deadline 2 Submission - Written Representation and Response to ExA's Written Questions
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 2 Submission - 9.2 Comments on Relevant Representations, including Appendix 1
Other
Eggborough Power Limited (PDF, 9 MB)
Deadline 2 Submission - 9.1 Appendix 14 Part 2 of 2
Other
Eggborough Power Limited (PDF, 136 KB)
Deadline 2 Submission - 9.1 Appendix 9
Other
Eggborough Power Limited (PDF, 874 KB)
Deadline 2 Submission - 2.4 – Draft DCO – Comparison to Submission Version (May 2017) (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 217 KB)
Deadline 2 Submission - 2.5 Explanatory Note on Changes to Draft DCO (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 272 KB)
Deadline 2 Submission - 9.1 Appendix 10
Other
Eggborough Power Limited (PDF, 5 MB)
Deadline 2 Submission - 9.1 Appendix 2
Other
Eggborough Power Limited (PDF, 643 KB)
Deadline 2 Submission - 9.1 Appendix 7
Other
Eggborough Power Limited (PDF, 202 KB)
Deadline 2 Submission - 9.1 Appendix 5
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 2 Submission - 9.1 Applicant’s Responses to the Examining Authority’s First Written Questions
Other
Eggborough Power Limited (PDF, 179 KB)
Deadline 2 Submission - 9.1 Appendix 6
Other
Eggborough Power Limited (PDF, 2 MB)
Deadline 2 Submission - 9.1 Appendix 11
Other
Eggborough Power Limited (PDF, 2 MB)
Deadline 2 Submission - 2.1 Updated Draft DCO (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 433 KB)
Deadline 2 Submission - 7.5 Statement of Common Ground with The Coal Authority (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 253 KB)
Deadline 2 Submission - 1.2 Application Guide (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 33 KB)
Deadline 2 Submission - 3.1 Book of Reference (Parts 1-5) (Track Change Version) (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 912 KB)
Deadline 2 Submission - 9.1 Appendix 12
Other
Eggborough Power Limited (PDF, 2 MB)
Deadline 2 Submission - 4.3 Crown Land Plan (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 84 KB)
Deadline 2 Submission - Covering Email
Other
Eggborough Power Limited (PDF, 193 KB)
Deadline 2 Submission - 9.1 Appendix 1
Other
Eggborough Power Limited (PDF, 358 KB)
Deadline 2 Submission - 4.14 Deemed Marine Licence Coordinates Plan (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 86 KB)
Deadline 2 Submission - 9.1 Appendix 8
Other
Eggborough Power Limited (PDF, 256 KB)
Deadline 2 Submission - 5.4 Other Consents and Licences (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 505 KB)
Deadline 2 Submission - 7.1 Draft Statement of Common Ground with North Yorkshire County Council and Selby District Council (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 263 KB)
Deadline 2 Submission - 7.11 Draft Statement of Common Ground with the Yorkshire Wildlife Trust (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 9 MB)
Deadline 2 Submission - 9.1 Appendix 14 Part 1 of 2
Other
Eggborough Power Limited (PDF, 768 KB)
Deadline 2 Submission - 9.1 Appendix 3
Other
Eggborough Power Limited (PDF, 11 MB)
Deadline 2 Submission - 4.2 Land Plans (Key Plan and Sheets 1-4) (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 250 KB)
Deadline 2 Submission - 9.1 Appendix 13
Other
Eggborough Power Limited (PDF, 206 KB)
Deadline 2 Submission - 9.1 Appendix 4
Other
Environment Agency (PDF, 302 KB)
Deadline 2 Submission - Written Representation and Response to ExA's Written Questions
Other
National Grid Plc (PDF, 26 KB)
Deadline 2 Submission - Response to ExA's Written Questions
Other
National Grid Plc (PDF, 1,023 KB)
Deadline 2 Submission - Written Representation
Other
North Yorkshire County Council and Selby District Council (PDF, 521 KB)
Deadline 2 Submission - Joint Local Impact Report
Other
North Yorkshire County Council and Selby District Council (PDF, 376 KB)
Deadline 2 Submission - Joint Response to ExA's Written Questions
Other
North Yorkshire County Council and Selby District Council (PDF, 44 KB)
Deadline 2 Submission - Cover letter
Other
North Yorkshire County Council and Selby District Council (PDF, 205 KB)
Deadline 2 Submission - Joint Written Representation
Other
The Marine Management Organisation (MMO) (PDF, 344 KB)
Deadline 2 Submission
Other
Yorkshire Wildlife Trust (PDF, 537 KB)
Deadline 2 Submission - Response to ExA's Written Questions
Other
Notification of Hearing and Accompanied Site Inspection for November 2017 (PDF, 162 KB)
Other
North Yorkshire County Council and Selby District Council (PDF, 186 KB)
Response to letter of 11 October received from the Applicant. Late Submission for Deadline 1 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 1 MB)
7.10 Statement of Common Ground between Eggborough Power Limited and the Marine Management Organisation (MMO) (Revision 2.0)
Other
Eggborough Power Limited (PDF, 310 KB)
7.7 Statement of Common Ground between Eggborough Power Limited and Natural England (Revision 1.0)
Other
Eggborough Power Limited (PDF, 337 KB)
7.6 Statement of Common Ground between Eggborough Power Limited and Canal and River Trust (Revision 2.0)
Other
Eggborough Power Limited (PDF, 583 KB)
7.8 Statement of Common Ground between Eggborough Power Limited and The Civil Aviation Authority (Revision 2.0)
Other
Eggborough Power Limited (PDF, 418 KB)
7.5 Statement of Common Ground between Eggborough Power Limited and The Coal Authority (Revision 3.0)
Other
Eggborough Power Limited (PDF, 442 KB)
7.3 Statement of Common Ground between Eggborough Power Limited and Environment Agency (Revision 2.0)
Other
Eggborough Power Limited (PDF, 112 KB)
Covering Letter for Deadline 1 Submissions
Other
Eggborough Power Limited (PDF, 483 KB)
7.4 Statement of Common Ground between Eggborough Power Limited and Historic England (Revision 4.0)
Other
Eggborough Power Limited (PDF, 252 KB)
7.9 Statement of Common Ground between Eggborough Power Limited and National Grid Gas PLC (NGG) and National Grid Electricity Transmission Plc (NGET) (Revision 2.0)
Other
Eggborough Power Limited (PDF, 3 MB)
7.2 Statement of Common Ground between Eggborough Power Limited and Highways England (Revision 3.0 )
Other
Hensall Parish Council (PDF, 224 KB)
Notification of wish to be considered as an Interested Party
Other
Martineau on behalf of National Grid Plc (PDF, 1 MB)
Response to Rule 8 letter
Other
Response to Mr R Tams to a request to be an interested party (PDF, 86 KB)
9 October 2017
Other
The Marine Management Organisation (MMO) (PDF, 196 KB)
Submission for Deadline 1
Other
Note of Unaccompanied Site Inspection - 26 September 2017 (PDF, 60 KB)
Other
Preliminary Meeting Note (PDF, 61 KB)
Other
Recording of Preliminary Meeting (PDF, 31 KB)
Other
Rule 8 Letter (PDF, 166 KB)
Other
Written Questions (PDF, 267 KB)
Other
Examination Library (PDF, 469 KB)
Other
Eggborough Power Limited (PDF, 335 KB)
Additional Submission - Comments on draft Examination Timetable accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 33 KB)
Additional Submission - 3.1 Updated Book of Reference version 2. Accepted at the discretion of the Examining Authority
Other
Joint Nature Conservation Committee (PDF, 356 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Northern Gas Networks (PDF, 2 MB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Rule 6 Letter (PDF, 167 KB)
Other
Dalton Warner Davis (PDF, 190 KB)
Certificate of Compliance with Regulation 13
Other
Dalton Warner Davis (PDF, 230 KB)
Certificates of compliance cover letter
Other
Dalton Warner Davis (PDF, 195 KB)
Certificate of Compliance with Section 56 of The Planning Act 2008
Other
Dalton Warner Davis (PDF, 248 KB)
Applicant’s response to post-Acceptance s51 advice dated 27 June 2017
Other
Dalton Warner Davis (PDF, 33 KB)
Certificate of Compliance with Section 59 of The Planning Act 2008
Other
Notice of the Appointment of the Examining Authority (PDF, 56 KB)
Other
City of Bradford Metropolitan District Council (PDF, 153 KB)
Adequacy of Consultation Representation
Other
Cumbria County Council (PDF, 36 KB)
Adequacy of Consultation Representation
Other
Doncaster Metropolitan Borough Council (PDF, 117 KB)
Adequacy of Consultation Representation
Other
Durham County Council (PDF, 70 KB)
Adequacy of Consultation Representation
Other
East Riding of Yorkshire Council (PDF, 14 KB)
Adequacy of Consultation Representation
Other
Harrogate Borough Council (PDF, 40 KB)
Adequacy of Consultation Representation
Other
Leeds City Council (PDF, 151 KB)
Adequacy of Consultation Representation
Other
North York Moors National Park Authority (PDF, 116 KB)
Adequacy of Consultation Representation
Other
North Yorkshire County Council and Selby District Council (PDF, 87 KB)
Joint Adequacy of Consultation Representation
Other
Redcar and Cleveland Borough Council (PDF, 40 KB)
Adequacy of Consultation Representation
Other
Stockton Borough Council (PDF, 39 KB)
Adequacy of Consultation Representation
Other
Wakefield Metropolitan District Council (PDF, 181 KB)
Adequacy of Consultation Representation
Other
Notification of Decision to Accept Application (PDF, 115 KB)
Other
Section 51 advice following issue of acceptance decision (PDF, 83 KB)
Other
Section 55 Acceptance of Application Checklist (PDF, 204 KB)
Other
6.3.18 Figure 8.4 - Abnormal Operational Process Contribution to Short-Term NO2 Concentration - Final - May 2017 (PDF, 3 MB)
Figure 8.4 - Abnormal Operational Process Contribution To Short-Term NO2 Concentration
Other
6.3.19 Figure 9.1 - Baseline Noise Monitoring Locations and Sensitive Noise Receptors - Final - May 2017 (PDF, 1 MB)
Figure 9.1 - Baseline Noise Monitoring Locations and Noise Sensitive Receptors
Other
6.2.5 - ES Chapter 5 - Final - May 2017 (PDF, 424 KB)
Chapter 5 - Construction Programme and Management
Other
6.3.33 Figure 16.37 - 16.54 - Photomontages - Final - May 2017 (PDF, 51 MB)
Figure 16.37-16.54 - Photomontages
Other
6.3.6 Figure 4.2 - Indicative Railway Arrangement - Final - May 2017 (PDF, 344 KB)
Figure 4.2 - Indicative Railway Arrangement
Other
6.3.35 Figure 20.1 - Other Developments Considered for Cumulative Impact Assessment - Final - May 2017 (PDF, 2 MB)
Figure 20.1 - Other Developments Considered for Cumulative Impact Assessment
Other
6.3.8 Figure 4.4 - Above Ground Installation - Final - May 2017 (PDF, 90 KB)
Figure 4.4 - Above Ground Installation
Other
6.3.9 Figure 5.1 - Gas Connection Pipeline construction methods - Final - May 2017 (PDF, 778 KB)
Figure 5.1 - Gas Connection Pipeline Construction Methods
Other
6.4.21 - Appendix 14A - Transport Assessment - Final - May 2017 (PDF, 38 MB)
Appendix 14A - Transport Assessment
Other
6.4.14 - Appendix 10G - Fish Survey Report - Final - May 2017 (PDF, 2 MB)
Appendix 10G - Fish Survey Report
Other
6.4.11 - Appendix 10D - Mammal Survey Report - Final - May 2017 (PDF, 14 MB)
Appendix 10D - Mammal Survey Report
Other
6.4.19 - Appendix 13A - Gazetteer of Cultural Heritage Assets - Final - May 2017 (PDF, 433 KB)
Appendix 13A - Gazetteer of Cultural Heritage Assets
Other
6.4.2 - Appendix 1B - Environmental Impact Assessment Scoping Opinion - Final - May 2017 (PDF, 6 MB)
Appendix 1B - Environmental Impact Assessment Scoping Opinion
Other
6.2 - Environmental Statement - Volume 1 (Main Report) - Final - May 2017 (PDF, 570 KB)
Environmental Statement - Volume 1 (Main Report) for the Eggborough CCGT project
Other
6.2.11 - ES Chapter 11 - Final - May 2017 (PDF, 818 KB)
Chapter 11 - Water Resources, Flood Risk and Drainage
Other
6.2.14 - ES Chapter 14 - Final - May 2017 (PDF, 613 KB)
Chapter 14 - Traffic and Transportation
Other
6.3.5 Figure 4.1b - Indicative Concept Layout (Multi Shaft Single Shaft) for the Proposed Development - Final - May 2017 (PDF, 466 KB)
Figure 4.1b - Indicative Concept Layout (Multi shaft + Single Shaft) for the Proposed Development with the Existing Coal-Fired Power Station Site.pdf
Other
6.2.19 - ES Chapter 19 - Final - May 2017 (PDF, 544 KB)
Chapter 19 - Human Health
Other
1.3 - Application Form - Final - May 2017 (PDF, 336 KB)
Application Form for the Eggborough CCGT project
Other
6.3.34 Figure 16.55 - Landscape and Biodiversity Plan - Final - May 2017 (PDF, 1 MB)
Figure 16.55 - Landscape and Biodiversity Plan
Other
6.3.31 Figure 16.7 - Viewpoint Locations - Final - May 2017 (PDF, 5 MB)
Figure 16.7 - Viewpoint Locations
Other
6.3.23 Figure 13.2 - Location of Non-Designated Heritage Assets within the 1 km Study Area - Final - May 2017 (PDF, 2 MB)
Figure 13.2 - Location of Non-Designated Heritage Assets within the 1 km Study Area
Other
6.3.20 Figure 11.1 - Watercourses within the Study Area - Final - May 2017 (PDF, 2 MB)
Figure 11.1 - Watercourses within the Study Area
Other
6.3.22 Figure 13.1 - Location of Designated Heritage Assets within the 5 km Study Area - Final - May 2017 (PDF, 2 MB)
Figure 13.1 - Location of Designated Heritage Assets within the 5 km Study Area
Other
2.3 - Draft DCO - Comparisons to Model Provisions version - Final - May 2017 (PDF, 1 MB)
Draft DCO - Comparison to Model Provisions Version document for the Eggborough CCGT project
Other
6.4.22 - Appendix 15A - Agricultural Land Classification Soil Survey - Final - May 2017 (PDF, 4 MB)
Appendix 15A - Agricultural Land Classification Soil Survey Report
Other
6.4.25 - Appendix 16C - Potential Viewpoints - Final - May 2017 (PDF, 413 KB)
Appendix 16C - Potential Viewpoints Locations
Other
6.2.4 - ES Chapter 4 - Final - May 2017 (PDF, 606 KB)
Chapter 4 - The Proposed Development
Other
6.4.24 - Appendix 16B - NYCC Consultation Summary - Final - May 2017 (PDF, 552 KB)
Appendix 16B - North Yorkshire County Council Consultation
Other
6.2.3 - ES Chapter 3 - Final - May 2017 (PDF, 454 KB)
Chapter 3 - Description of the Site
Other
6.3.21 Figure 12.1 Environmental database features - Final - May 2017 (PDF, 2 MB)
Figure 12.1 - Environmental database features
Other
6.4.10 - Appendix 10C - Preliminary Ecological Appraisal - Final - May 2017 (PDF, 19 MB)
Appendix 10C - Preliminary Ecological Appraisal
Other
6.2.21 - ES Chapter 21 - Final - May 2017 (PDF, 471 KB)
Chapter 21 - Summary of Significant Effects
Other
6.4.13 - Appendix 10F - River Corridor and Aquatic Macrophyte Survey Report - Final - May 2017 (PDF, 3 MB)
Appendix 10F - River Corridor and Aquatic Macrophyte Survey Report
Other
6.4.16 - Appendix 11A - Flood Risk Assessment - Final - May 2017 (PDF, 27 MB)
Appendix 11A - Flood Risk Assessment
Other
6.4.18 - Appendix 12B - Groundsure Report - Part 2 - Final - May 2017 (PDF, 45 MB)
Appendix 12B – Groundsure Report
Other
6.4.20 - Appendix 13B Geophysical Survey Report - Final - May 2017 (PDF, 45 MB)
Appendix 13B - Geophysical Survey Report
Other
6.2.15 - ES Chapter 15 - Final - May 2017 (PDF, 649 KB)
Chapter 15 - Land Use, Agriculture and Socio-economics
Other
6.2.2 - ES Chapter 2 - Final - May 2017 (PDF, 459 KB)
Chapter 2 - Assessment Methodology
Other
6.2.20 - ES Chapter 20 - Final - May 2017 (PDF, 693 KB)
Chapter 20 - Cumulative and Combined Effects
Other
6.4.1 - Appendix 1A - Environmental Impact Assessment Scoping Report - Final - May 2017 (PDF, 14 MB)
Appendix 1A - Environmental Impact Assessment Scoping Report
Other
5.11 - Indicative Lighting Strategy - Final - May 2017 (PDF, 2 MB)
Indicative Lighting Strategy for the Eggborough CCGT project
Other
5.8 - Carbon Capture Readiness (CCR) Statement - Final - May 2017 (PDF, 8 MB)
Carbon Capture and Storage (CCS) & Carbon Capture Readiness (CCR) Statement for the Eggborough CCGT project
Other
6.2.18 - ES Chapter 18 - Final - May 2017 (PDF, 464 KB)
Chapter 18 - Sustainability and Climate Change
Other
6.2.12 - ES Chapter 12 - Final - May 2017 (PDF, 673 KB)
Chapter 12 - Geology, Hydrogeology and Land Contamination
Other
6.4.4 - Appendix 8A - Air Quality - Final - May 2017 (PDF, 861 KB)
Appendix 8A - Air Quality Assessment
Other
6.3.17 Figure 8.3 - Operational Process Contribution to Short-Term NO2 Concentration - Final - May 2017 (PDF, 3 MB)
Figure 8.3 - Operational Process Contribution to Short-Term NO2 Concentration
Other
6.3.12 Figure 5.4 - Indicative cofferdam arrangement (cooling water discharge point) - Final - May 2017 (PDF, 79 KB)
Figure 5.4 - Indicative cofferdam arrangement (cooling water discharge point)
Other
4.13 - Indicative Landscaping and Biodiversity Plans (Key Plan and Sheets 1-5) - Final - May 2017 (PDF, 2 MB)
Indicative Landscaping and Biodiversity Plan for the Eggborough CCGT project
Other
4.7 - Indicative Electrical Connection Works Plan - Final - May 2017 (PDF, 553 KB)
Indicative Electrical Connection Works Plan for the Eggborough CCGT project
Other
4.4 - Works Plans (Key Plan and Sheets 1 - 9) - Final - May 2017 (PDF, 9 MB)
Works Plans for the Eggborough CCGT project
Other
4.10 - Indicative Gas Supply Pipelines Connection Works Plans - Final - May 2017 (Key Plan and Sheets 1 - 7) (PDF, 3 MB)
Indicative Gas Supply and Pipelines Connection Works Plans for the Eggborough CCGT project
Other
6.4.15 - Appendix 10H - Habitats Regulations Assessment (HRA) Signposting - Final - May 2017 (PDF, 3 MB)
Appendix 10H - Habitats Regulations Assessment (HRA) Signposting - Final - May 2017
Other
6.3.14 Figure 6.2 - Gas Connection Corridor Options - Final - May 2017 (PDF, 2 MB)
Figure 6.2 - Gas Connection Corridor Options
Other
6.3 - Environmental Statement - Volume 2 (Figures) - Final - May 2017 (PDF, 519 KB)
Environmental Statement - Volume 2 (Figures) for the Eggborough CCGT project
Other
6.3.3 Figure 3.2 - Parts of the Site - Final - May 2017 (PDF, 2 MB)
Figure 3.2 - Parts of the Site (Plan) for the Eggborough CCGT project
Other
6.3.25 Figure 16.1 - Potential Viewpoint Locations - Final - May 2017 (PDF, 5 MB)
Figure 16.1 - Potential Viewpoint Locations
Other
4.8 - Indicative Cooling Water Connection Works Plans (Key Plan and Sheets 1 - 3) - Final - May 2017 (PDF, 3 MB)
Indicative Cooling Water Connection for the Eggborough CCGT project
Other
6.4 ES - Volume 3 (Appendices) - Final - May 2017 (PDF, 528 KB)
ES - Volume 3 (Appendices)
Other
6.3.7 Figure 4.3 - Gas Connection - Final - May 2017 (PDF, 767 KB)
Figure 4.3 - Gas Connection
Other
6.3.4 Figure 4.1a - Indicative Concept Layout (Single Shaft) for the Proposed Development - Final - May 2017 (PDF, 465 KB)
Figure 4.1a - Indicative Concept Layout (Single Shaft) for the Proposed Development with the Existing Coal-Fired Power Station Site
Other
6.4.26 - Appendix 18A - Carbon assessment - Final - May 2017 (PDF, 524 KB)
Appendix 18A - Carbon assessment
Other
6.4.23 - Appendix 16A - Landscape and Visual Impact Assessment Methodology - Final - May 2017 (PDF, 634 KB)
Appendix 16A - Landscape and Visual Impact Assessment Methodology
Other
2.1 - Draft Development Consent Order - Final - May 2017 (PDF, 1 MB)
Draft Development Consent Order for the Eggborough CCGT project
Other
2.2 - Explanatory Memorandum - Final - May 2017 (PDF, 547 KB)
Explanatory Memorandum for the Eggborough CCGT project
Other
6.2.6 - ES Chapter 6 - Final - May 2017 (PDF, 417 KB)
Chapter 6 - Need, Alternatives and Design Evolution
Other
6.3.2 Figure 3.1 - The Site Boundary Plan - Final - May 2017 (PDF, 1 MB)
Figure 3.1 - The Site Bounary Plan for the Eggborough CCGT project
Other
1.4 - Notices for Statutory Publicity - Final - May 2017 (PDF, 13 MB)
Notices for Statutory Publicity for the Eggborough CCGT project
Other
6.2.16 - ES Chapter 16 - Final - May 2017 (PDF, 956 KB)
Chapter 16 - Landscape and Visual Amenity
Other
6.2.13 - ES Chapter 13 - Final - May 2017 (PDF, 843 KB)
Chapter 13 - Cultural Heritage
Other
6.2.9 - ES Chapter 9 - Final - May 2017 (PDF, 1 MB)
Chapter 9 - Noise and Vibration
Other
6.2.8 - ES Chapter 8 - Final - May 2017 (PDF, 785 KB)
Chapter 8 - Air Quality
Other
6.2.10 - ES Chapter 10 - Final - May 2017 (PDF, 705 KB)
Chapter 10 - Ecology
Other
6.3.29 Figure 16.5 - Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present - Final - May 2017 (PDF, 3 MB)
Figure 16.5 - Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present
Other
1.2 - Application Guide - Final - May 2017 (PDF, 509 KB)
Application Guide for the Eggborough CCGT project
Other
6.2.7 - ES Chapter 7 - Final - May 2017 (PDF, 468 KB)
Chapter 7 - Legislative Context and Planning Policy Framework
Other
4.12 - Indicative Drainage Plan - Final - May 2017 (PDF, 564 KB)
Indicative Drainge Plan for the Eggborough CCGT project
Other
4.1 - Location Plan - Final - May 2017 (PDF, 2 MB)
Location Plan for the Eggborough CCGT project
Other
4.11 - Indicative Above Ground Installation Plans (Sheets 1 and 2) - Final - May 2017 (PDF, 282 KB)
Indicative Above Ground Installation Plans for the Eggborough CCGT project
Other
5.3 - Gas Connection Statement - Final - May 2017 (PDF, 1 MB)
Gas Connection and Pipeline Statement for the Eggborough CCGT project
Other
6.3.26 Figure 16.2 - Landscape Characterisation - Final - May 2017 (PDF, 2 MB)
Figure 16.2 - Landscape Characterisation
Other
6.4.8 - Appendix 10A - Legislation and Planning Policy - Final - May 2017 (PDF, 435 KB)
Appendix 10A - Legislation and Planning Policy
Other
6.3.28 Figure 16.4 - Proposed 90 m Stack Zone of Theoretical Visibility with Existing Power Station Present - Final - May 2017 (PDF, 3 MB)
Figure 16.4 - Proposed 90 m Stack Zone of Theoretical Visibility with Existing Power Station Present
Other
6.2.1 - ES Chapter 1 - Final - May 2017 (PDF, 360 KB)
Chapter 1 - Introduction
Other
6.3.10 Figure 5.2 - Gas Connection Open Cut Construction Typical Cross Section - Final - May 2017 (PDF, 156 KB)
Figure 5.2 - Gas Connection Open Cut Construction Typical Cross Section
Other
6.3.13 Figure 6.1 - Initial CCGT Site Options - Final - May 2017 (PDF, 1 MB)
Figure 6.1 - Initial CCGT Site Options
Other
6.3.16 Figure 8.2 - Operational Process Contribution to Long-Term NO2 Concentration - Final - May 2017 (PDF, 3 MB)
Figure 8.2 - Operational Process Contribution to Long-Term NO2 Concentration
Other
6.4.9 - Appendix 10B - Ecological Impact Assessment Methodology - Final - May 2017 (PDF, 439 KB)
Appendix 10B - Ecological Impact Assessment Methodology
Other
4.14 - Indicative Deemed Marine Licence Coordinates - Final - May 2017 (PDF, 98 KB)
Indicative Deemed Marine License Coordinates for the Eggborough CCGT project
Other
4.2 - Land Plans (Key Plan and Sheets 1 - 4) - Final - May 2017 (PDF, 13 MB)
Land Plans for the Eggborough CCGT project
Other
4.5 - Access and Rights of Way Plans (Key Plan and Sheets 1 - 4) - Final - May 2017 (PDF, 9 MB)
Access and Rights of Way Plans for the Eggborough CCGT project
Other
4.9 - Indicative Groundwater and Towns Water Supply Connections Works Plan - Final - May 2017 (PDF, 945 KB)
Indicative Raw and Towns Water Supply Connections Works Plans for the Eggborough CCGT project
Other
4.3 - Crown Land and Special Category Land Plan - Final - May 2017 (PDF, 2 MB)
Crown Land for the Eggborough CCGT project
Other
6.4.5 - Appendix 8B - Plume Visibility - Final - May 2017 (PDF, 353 KB)
Appendix 8B - Plume Visibility
Other
6.4.6 - Appendix 9A - Construction Noise Assessment Methodology - Final - May 2017 (PDF, 409 KB)
Appendix 9A - Construction Noise Assessment Methodology
Other
6.4.3 - Appendix 5A - Construction Environmental Management Plan (CEMP) - Final - May 2017 (PDF, 628 KB)
Appendix 5A - Construction Environment Management Plan (CEMP)
Other
6.4.27 - Appendix 21A - Commitments Register - Final - May 2017 (PDF, 551 KB)
Appendix 21A - Commitments Register
Other
6.3.15 Figure 8.1 - Air Quality Study Area and Receptor Locations - Final - May 2017 (PDF, 6 MB)
Figure 8.1 - Air Quality Study Area and Receptor Locations
Other
1.1 - Application Cover Letter - Final - May 2017 (PDF, 379 KB)
Other
6.3.1 Figure 1.1 - Site Location Plan - Final - May 2017 (PDF, 2 MB)
Figure 1.1 - Site Location Plan for the Eggborough CCGT project
Other
5.5 - Planning Statement - Final - May 2017 (PDF, 1 MB)
Planning Statement for the Eggborough CCGT project
Other
5.10 - Indicative Landscaping and Biodiversity Strategy (including Arboricultural Assessment and Landscape and Biodiversity Plan) - Final - May 2017 (PDF, 11 MB)
5.10 - Indicative Landscaping and Biodiversity Strategy (including Arboricultural Assessment and Landscape and Biodiversity Plan)
Other
6.4.12 - Appendix 10E - Great Crested Newt Survey Report - Final - May 2017 (PDF, 3 MB)
Appendix 10E - Great Crested Newt Survey Report
Other
5.6 - Design and Access Statement - Final - May 2017 (PDF, 4 MB)
Design and Access Statement for the Eggborough CCGT project
Other
6.2.17 - ES Chapter 17 - Final - May 2017 (PDF, 536 KB)
Chapter 17 - Waste Management
Other
6.4.7 - Appendix 9B - Operational Noise Information - Final - May 2017 (PDF, 400 KB)
Appendix 9B - Operational Noise Information
Other
6.3.24 Figure 15.1 - Agricultural Land Classification Soil Survey Map - Final - May 2017 (PDF, 606 KB)
Figure 15.1 – Agricultural Land Classification Soil Survey Map
Other
6.3.27 Figure 16.3 - Public Rights of Way - Final - May 2017 (PDF, 1 MB)
Figure 16.3 - Public Rights of Way
Other
6.3.30 Figure 16.6 - Above Ground Installation Zone of Theoretical Visibility - Final - May 2017 (PDF, 2 MB)
Figure 16.6 - Above Ground Installation Zone of Theoretical Visibility
Other
6.1 - Environmental Statement Non-Technical Summary - Final - May 2017 (PDF, 14 MB)
Environmental Statement Non-Technical Summary for the Eggborough CCGT project
Other
5.1 - Consultation Report - Final - May 2017 (PDF, 89 MB)
5.1 - Consultation Report
Other
5.4 - Other Consents and Licences - Final - May 2017 (PDF, 385 KB)
Other Consents and Licenses for the Eggborough CCGT project
Other
6.4.17 - Appendix 12A - Phase I Geotechnical & Geo-Environmental Site Assessment - Final - May 2017 (PDF, 14 MB)
Appendix 12A - Phase 1 Geotechnical & Geo-Environmental Site Assessment
Other
7.12 Statement of Common Ground - Sport England - Final - May 17 (PDF, 504 KB)
7.12 Statement of Common Ground - Sport England - Final - May 17
Other
5.2 - Grid Connection Statement - Final - May 2017 (PDF, 361 KB)
5.2 - Grid Connection Statement
Other
6.3.11 Figure 5.3 - Indicative cofferdam arrangement (cooling water abstraction point) - Final - May 2017 (PDF, 121 KB)
Figure 5.3 - Indicative Cofferdam Arrangement (cooling water abstraction point)
Other
3.1 - Book of Reference - Final - May 2017 (PDF, 33 KB)
Book of Reference for the Eggborough CCGT project
Other
3.3 - Funding Statement - Final - May 2017 (PDF, 11 MB)
Funding Statement
Other
3.2 - Statement of Reasons - Final - May 2017 (PDF, 879 KB)
Statement of Reasons for the Eggborough CCGT project
Other
6.4.18 - Appendix 12B - Groundsure Report - Part 1 (PDF, 39 MB)
Appendix 12B - Groundsure Report - Part 1
Other
6.3.32 Figure 16.8 - 16.36 - Photo Viewpoints - Final - May 2017 (PDF, 29 MB)
Figure 16.8-16.36 - Photo Viewpoints
Other
4.6 - Indicative Generating Station Plan (Key Plan and Sheets 1 - 6) - Final - May 2017 (PDF, 4 MB)
Indicative Generating Station Plans for the Eggborough CCGT project
Other
5.9 - Statutory Nuisance Statement - Final - May 2017 (PDF, 545 KB)
5.9 - Statutory Nuisance Statement
Other
5.7 - Combined Heat and Power Assessment - Final - May 2017 (PDF, 1 MB)
5.7 - Combined Heat and Power Assessment for the Eggborough CCGT project
Other
Section 46 - Acknowledgment of receipt of information (PDF, 119 KB)
Other
Dalton Warner Davis (PDF, 366 KB)
Section 46 - Covering letter
Other
Late Scoping Consultation Responses (PDF, 1 MB)
Scoping consultation responses for the Eggborough CCGT project received after the 28 day consultation deadline. Published on 28 September 2016.
Other
Scoping Opinion (PDF, 4 MB)
Scoping Opinion for the proposed Eggborough CCGT Project, adopted by the Secretary of State on 28 September 2016.
Other
Scoping Report (Part 2 of 2) (PDF, 10 MB)
The Applicant’s Scoping Report for Eggborough CCGT project. Submitted to the Secretary of State on 18 August 2016. (Part 2 of 2)
Other
Scoping Report (Part 1 of 2) (PDF, 6 MB)
The Applicant’s Scoping Report for Eggborough CCGT project. Submitted to the Secretary of State on 18 August 2016. (Part 1 of 2)