Brechfa Forest West Wind Farm
Enquiry
I would be grateful for the views of the Commission on the following points:-
(i)
that Works No?s 1 to 7 may be considered to be an integral element of the proposed generating station and may be incorporated within the description of the authorised development for the purposes of Part 1 of Schedule 1 to the Order; and
(ii)
that Works No?s 8 and 9 should be subject to a separate application for planning consent.
Is the Western Mail a national newspaper for the purposes of regulation 4 of the IPA Applications regulations?
See Eversheds letter attachment 1
Advice given
At acceptance stage the Commissioner will need to be satisfied that the test in s55 3 (c) is met i.e. that development consent is required for any of the development to which the application relates. Consent is required for development that is or forms part of an NSIP (s.31).
In Wales only development associated with underground gas storage facilities that meet all the criteria in s.17(3) of the 2008 Planning Act (?the Act?) can be incorporated in a DCO as associated development (s.115 (2) and (4)).
See the whole response at the following link attachment 2