Documents Published By Stage
Pre Application (7)
Developer's Application (109)
- All Documents
- Application Form (6)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (2)
- Drawings (3)
- Environmental Statement (63)
- Other Documents (9)
- Plans (4)
- Reports (19)
Acceptance (19)
Pre Examination (20)
Examination (448)
- All Documents
- Accompanied Site Inspection (1)
- Additional Submission (1)
- Additional Submissions (30)
- Deadline 1 (2)
- Deadline 2 (111)
- Deadline 3 (54)
- Deadline 4 (42)
- Deadline 5 (41)
- Deadline 6 (9)
- Deadline 7 (30)
- Deadline 7a (6)
- Deadline 8 (40)
- Deadline 8a (23)
- Deadline 8b (30)
- Hearing Agenda (3)
- Other Documents (2)
- Preliminary Meeting (1)
- Procedural Decisions (13)
- Recording of Hearing (7)
- Recording of Preliminary Meeting (1)
- Unaccompanied Site Inspection (1)
Decision (0)
Decided (0)
Transboundary Documents
Source | Description |
---|---|
Other | Network Rail Additional Submission - Accepted at the discretion of the Examining Authority - Withdrawal of objection letter |
Other | |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority 8.02.99 Cover Letter |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority 8.02.101 Applicant's response to Greenwich-Bexley Environment Alliance Deadline 8b Submission |
Other | Cory Riverside Energy Additional Submission - Accepted at the discretion of the Examining Authority 1.3 Guide to the Application (Revision 10) |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority 8.02.100 Applicant's response to Greater London Authority's Deadline 8b Submission |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority 8.02.102 Applicant's response to Mrs Margaret J White's Deadline 8b Submission |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority 8.01.16 Statement of Common Ground: Greater London authority |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority 8.02.103 Applicant's response to London Borough of Bexley's Deadline 8b Submission |
Other | Southern Gas Networks plc (SGN) Additional Submission – Accepted at the discretion of the Examining Authority Withdrawal of objection letter |
Other | Eversheds Sutherland (International) LLP on behalf of National Grid Electricity Transmission Plc Additional Submission – Accepted at the discretion of the Examining Authority Withdrawal of objection |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority 1.3 Guide to the Application (Revision 10) (with track changes) |
Other | Network Rail Late Deadline 8b submission - Accepted at the discretion of the Examining Authority. Comments on the Applicants draft Development Consent Order (DCO) submitted at deadline 8a |
Other | Greater London Authority Deadline 8b Submission - App C TFL Bus mitigation process |
Other | Cory Riverside Energy Deadline 8b Submission - 8.02.98 Position Statement in respect of land acquisition between the Applicant and London Borough of Bexley |
Other | Greater London Authority Deadline 8b Submission - Comments on the Applicants Final draft Development Consent Order (DCO) |
Other | Cory Riverside Energy Deadline 8b Submission - 3.3 Schedule of Changes (Rev 3) |
Other | Greater London Authority Deadline 8b Submission - App A DCO mark-up |
Other | Cory Riverside Energy Deadline 8b Submission - 3.1 Draft Development Consent Order (DCO) (with track changes) |
Other | Cory Riverside Energy Deadline 8b Submission - 8.01.14 Statement of Common Ground (SoCG) between the Applicant and London Borough of Bexley |
Other | Greater London Authority Deadline 8b Submission - App D Silvertown Tunnel DCO |
Other | Cory Riverside Energy Deadline 8b Submission - 8.02.93 S.106 Agreement (Final draft, not signed) |
Other | Cory Riverside Energy Deadline 8b Submission - 3.2 Draft DCO Explanatory Memorandum (Rev 4) |
Other | Greater London Authority Deadline 8b Submission - App B BC DCO |
Other | Cory Riverside Energy Deadline 8b Submission - Draft Development Consent Order (DCO) Validation Report |
Other | Cory Riverside Energy Deadline 8b Submission - 8.02.95 Applicant's response to London Borough of Bexley's Deadline 8 and Deadline 8A Submissions |
Other | Cory Riverside Energy Deadline 8 Submission - 3.2 Draft DCO Explanatory Memorandum (Rev 4) (with track changes) |
Other | Eversheds Sutherland (International) LLP on behalf of Thames Water Utilities Limited Deadline 8b Submission - Comments on the Applicants Final draft DCO |
Other | Cory Riverside Energy Deadline 8b Submission - 8.02.96 Applicant's response to Friends of Crossness Nature Reserve's Deadline 8 Submission |
Other | Cory Riverside Energy Deadline 8b Submission - 8.02.92 Applicant's Closing Statement |
Other | Cory Riverside Energy Deadline 8b Submission - 1.3 Guide to the Application (Rev 9) |
Other | Greenwich-Bexley Environment Alliance Deadline 8b Submission - Comments on any additional information/submissions received by the previous deadline |
Other | Mrs Margaret J White Deadline 8b Submission - Comments on any additional information/submissions received by the previous deadline |
Other | Cory Riverside Energy Deadline 8b Submission - 8.01.15 Statement of Common Ground (SoCG) in respect of land acquisition between the Applicant and Kent County Council |
Other | Cory Riverside Energy Deadline 8b Submission - 8.02.91 Cover Letter |
Other | Cory Riverside Energy Deadline 8b Submission - 3.1 Draft Development Consent Order (DCO) |
Other | Tozers Solicitors LLP on behalf of Landsul Limited and Munster Joinery (U.K) Limited Deadline 8b Submission - Withdrawal letter |
Other | London Borough of Bexley Deadline 8b Submission - Comments on any additional information/submissions received by the previous deadline |
Other | Cory Riverside Energy Deadline 8b Submission - 8.02.97 Applicant's response to Greater London Authority's Deadline 8 and Deadline 8A Submissions |
Other | Cory Riverside Energy Deadline 8b Submission - 8.02.94 Applicant's response to Bexley Natural Environment Forum's Deadline 8 Submission |
Other | Cory Riverside Energy Deadline 8b Submission - 1.3 Guide to the Application (Rev 9) (with track changes) |
Other | Winckworth Sherwood LLP on behalf of Port of London Authority Deadline 8b Submission - Comments on the Applicants Final draft Development Consent Order (DCO) |
Other | Cory Riverside Energy Deadline 8a Submission - 6.3 Appendix L to B1 Outline Construction Traffic Management Plan (CTMP) (Rev 6) (with track changes) |
Other | Cory Riverside Energy Deadline 8a Submission - 3.3 Draft Development Consent Order (DCO) Schedule of Changes (Rev 2) |
Other | Cory Riverside Energy Deadline 8a Submission - 3.1 Draft Development Consent Order (DCO) (Rev 4) |
Other | Cory Riverside Energy Deadline 8a Submission - 3.1 Draft Development Consent Order (DCO) (Rev4) (with track changes) |
Other | Cory Riverside Energy Deadline 8a Submission - 3.3 Draft Development Consent Order (DCO) Schedule of Changes (Rev 2) (with tracked changes) |
Other | Cory Riverside Energy Deadline 8a Submission - 3.2 Draft Development Consent Order (DCO) Explanatory Memorandum (Rev 3) |
Other | London Borough of Bexley Deadline 8a Submission - Comments on any additional information/submissions received by the previous deadline |
Other | Cory Riverside Energy Deadline 8a Submission - 8.02.45 Protective Provisions Summary (Rev 1) |
Other | Cory Riverside Energy Deadline 8a Submission - 1.3 Guide to the Application (Rev 8) |
Other | Greater London Authority Deadline 8a Submission - Appendix B - Response to Applicant's proposed removal of suggested Development Consent Order (DCO) Requirements 15: Emission Limits Work Number 1A |
Other | Cory Riverside Energy Deadline 8a Submission - 6.3 Appendix M to B1 Outline Operational Worker Travel Plan (OWTP) (Rev 1) |
Other | Cory Riverside Energy Deadline 8a Submission - 6.3 Appendix M to B1 Outline Operational Worker Travel Plan (OWTP) (Rev 1) (with track changes) |
Other | Cory Riverside Energy Deadline 8a Submission - 3.2 Draft Development Consent Order (DCO) Explanatory Memorandum (Rev 3) (with tracked changes) |
Other | Cory Riverside Energy Deadline 8a Submission - 8.02.90 Applicant's response to LBB's comments on the draft Development Consent Order (DCO) from Deadline 7 |
Other | Cory Riverside Energy Deadline 8a Submission - 1.3 Guide to the Application (Rev 8) - (Tracked Changes) |
Other | Cory Riverside Energy Deadline 8a Submission - 7.5 Outline Code of Construction Practice (Rev 5) (with track changes) |
Other | Cory Riverside Energy Deadline 8a Submission - Validation Report 01.10.19 |
Other | Cory Riverside Energy Deadline 8a Submission - 6.3 Appendix L to B1 Outline Construction Traffic Management Plan (CTMP) (Rev 6) |
Other | Greater London Authority Deadline 8a Submission - Response to any further information requested by the ExA |
Other | Cory Riverside Energy Deadline 8a Submission - Deadline 8a Submission Letter |
Other | Cory Riverside Energy Deadline 8a Submission - 7.5 Outline Code of Construction Practice (Rev 5) |
Other | Greater London Authority Deadline 8a Submission - Comments on any additional information/submissions received by the previous deadline |
Other | Cory Riverside Energy Deadline 8a Submission - 8.02.89 Applicant's response to GLA's comments on the draft Development Consent Order (DCO) from Deadline 7 and 7a |
Other | Greater London Authority Additional Submission – Accepted at the discretion of the Examining Authority. Appendix B to GLA’s Deadline 7 Submission. DEFRA carbon modelling report |
Other | |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.75 Deadline 8 Submission Letter |
Other | Cory Riverside Energy Deadline 8 Submission - 6.3 ES Appendix L to B.1 Outline Construction Traffic Management Plan (CTMP (Rev 5) |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.80 Applicant's response to London Borough of Bexley Deadline 7 Submission |
Other | Cory Riverside Energy Deadline 8 Submission - 4.3 Book of Reference (Rev 3) (with track changes) |
Other | Cory Riverside Energy Deadline 8 Submission - 1.3 Guide to the Application (Rev 7) (with track changes). |
Other | Bexley Natural Environment Forum Deadline 8 Submission - Comments on Doc 8.02.71 Environment Bank Site Selection for Biodiversity Offsetting Report |
Other | Greater London Authority Deadline 8 Submission - Appendix 3 - DECC Approval Explanatory Memorandum |
Other | London Borough of Bexley Deadline 8 Submission - Written summary of oral submissions from Issue Specific Hearing 3 (ISH3) on the draft Development Consent Order (DCO) |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.81 Applicant's response to Thames Water Utilities Ltd Deadline 7 Submission |
Other | Port of London Authority Deadline 8 Submission - Late Submission accepted at the discretion of the Examining Authority - Comments on any additional information/submissions received by previous deadline |
Other | Cory Riverside Energy Deadline 8 Submission - 1.3 Guide to the Application (Rev 7) |
Other | Cory Riverside Energy Deadline 8 Submission - 5.3 Grid Connection Statement (Rev 2) |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.77 Oral Summaries for the Issue Specific Hearing on draft DCO ISH3 (19 September 2019) |
Other | Cory Riverside Energy Deadline 8 Submission - 7.5 Outline Code of Construction Practice (Rev 4) |
Other | Cory Riverside Energy Deadline 8 Submission - 6.3 ES Appendix L to B.1 Outline Construction Traffic Management Plan (CTMP (Rev 5) (with track Changes) |
Other | Friends of Crossness Nature Reserve Deadline 8 Submission - Comments on any additional information/submissions received by previous deadline |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.86 Supplementary Note to the Temporary Jetty Outage Review |
Other | Cory Riverside Energy Deadline 8 Submission - 5.3 Grid Connection Statement (Rev 2) (with track changes) |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.22 Land Negotiations Summary (Rev 3) |
Other | Cory Riverside Energy Deadline 8 Submission - 7.6 Outline Biodiversity Landscape Mitigation Strategy (Rev 4) (with track changes) |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.78 Applicant's response to Greater London Authority's Deadline 7 and 7A Submissions |
Other | Greater London Authority Deadline 8 Submission - Appendix 4 - Planning Permission Conditions |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.87 Applicant's response to Friends of Crossness Nature Reserve Submission |
Other | Cory Riverside Energy Deadline 8 Submission - 8.01.13 Statement of Common Ground (SoCG) Kent County Council (Rev 2) |
Other | Thames Water Utilities Limited Deadline 8 Submission - Annex A - Agreed Protective provisions |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.83 Applicant's update on Environmental Permit Determination |
Other | Eversheds Sutherland LLP on behalf of National Grid Deadline 8 Submission - Response to Deadline 8 – Comments on Applicant’s draft Development Consent Order (DCO) |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.82 Applicant's response to Mrs Margaret J White Deadline 7 Submission |
Other | London Borough of Bexley Deadline 8 Submission - Comments on any additional information/submissions received by the previous deadline |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.79 Applicant's response to East London Waste Authority Deadline 7 Submission |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.85 Maximum Throughput Carbon Assessment Note |
Other | Cory Riverside Energy Deadline 8 Submission - 7.6 Outline Biodiversity Landscape Mitigation Strategy (Rev 4) |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.84 Applicant's response to London Borough of Bexley Deadline 7A Submission |
Other | Cory Riverside Energy Deadline 8 Submission - 4.3 Book of Reference (Rev 3) |
Other | Greater London Authority Deadline 8 Submission - Post Hearing Submission |
Other | Cory Riverside Energy Deadline 8 Submission - 7.5 Outline Code of Construction Practice (Rev 4) (with track changes) |
Other | Thames Water Utilities Limited Deadline 8 Submission - Submission of comments on the draft Development Consent Order (DCO) and comments on any additional information/submissions received by previous deadline |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.56 REP and RRRF Application Boundaries Plan (Rev 1) |
Other | Greater London Authority Deadline 8 Submission - Appendix 2 - Secretary of State (SoS) RRRF Decision Letter |
Other | Cory Riverside Energy Deadline 8 Submission - 8.02.76 Oral Summaries for the Compulsory Acquisition Hearing CAH2 (18 September 2019) |
Other | |
Other | |
Other | |
Other | Thames Water Utilities Limited Additional Submission – Accepted at the discretion of the Examining Authority. Letter to the Examining Authority concerning attendance at Issue Specific Hearing 3 (ISH3) |
Other | Thames Water Utilities Limited Additional Submission – Accepted at the discretion of the Examining Authority. Annex A Protective Provisions |
Other | Friends of Crossness Nature Reserve Additional Submission - Accepted at the discretion of the Examining Authority. Comments on the draft Development Consent Order (DCO) |
Other | Western Riverside Waste Authority Additional Submission – Withdrawal Letter - Accepted at the discretion of the Examining Authority - Submission Withdrawn via email on 16 09 19 |
Other | SAS Depot Limited Additional Submission – Letter of withdrawal - Accepted at the discretion of the Examining Authority - Submission withdrawn via email on 17 09 19 |
Other | Maz Mohammad Additional Submission – Acceptance of Option Agreement and Withdrawal of Relevant Representation letter - Accepted at the discretion of the Examining Authority - Submission withdrawn via email on 17 09 19 |
Other | Creekside Developments (Kent) Limited Additional Submission – Letter of withdrawal - Accepted at the discretion of the Examining Authority - Submission withdrawn via email on 17 09 19 |
Other | London Borough of Bexley Deadline 7a Submission - Responses to any further information requested by the ExA |
Other | Cory Riverside Energy Deadline 7a Submission - 8.02.70 Applicant's response to Air Quality Matters with track changes (this document supersedes the document submitted for Deadline 7 Submission REP7-018) |
Other | Cory Riverside Energy Deadline 7a Submission - 8.02.70 Applicant's response to Air Quality Matters (this document supersedes the document submitted for Deadline 7 Submission REP7-018) |
Other | Greater London Authority Deadline 7a Submission - Comments on any additional information/submissions received by previous deadline |
Other | Cory Riverside Energy Deadline 7a Submission - Cover Letter |
Other | Cory Riverside Energy Deadline 7a Submission - 8.2.74 Applicant's response to the ExA's rule 17 Letter on 30 August 2019 |
Other | |
Other | Thames Water Utilities Limited Deadline 7 Submission - Submission of Comments on behalf of Interested Party Thames Water Utilities Limited |
Other | Thames Water Utitlities Limited Deadline 7 Submission - Annex A - Protective Provisions |
Other | Cory Riverside Energy Deadline 7 Submission - 1.3 Guide to the Application (Rev 6) (with track changes) |
Other | Western Riverside Waste Authority - WITHDRAWN Deadline 7 Submission - Responses to any further information requested by the Examining Authority - Submission withdrawn via email on 05 09 19 |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.70 Applicant's response to Air Quality Matters |
Other | London Borough of Bexley Deadline 7 Submission - Appendix B Draft DCO Explanatory Memorandum (Rev 2 with LBB comments) |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.67 Applicant's response to Greater London Authority Deadline 5 and 6 Submissions |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.42 Anaerobic Digestion Facility Emissions Mitigation Note (Rev 1) (with track changes) |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.63 Deadline 7 Submission Letter |
Other | Cory Riverside Energy Deadline 7 Submission - 8.01.12 Statement of Common Ground Kent County Council (Rev 2) |
Other | Cory Riverside Energy Deadline 7 Submission - 6.2 ES Figure 7.8 Predicted Hourly NO2 Concentrations (Rev 2) |
Other | London Borough of Bexley Deadline 7 Submission - Appendix A Draft DCO (Rev 3 with LBB track changes) |
Other | Cory Riverside Energy Deadline 7 Submission - 7.6 Outline Biodiversity Landscape Mitigation Strategy (Rev 3) |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.69 Applicant's response to Arriva London Deadline 5 Submission |
Other | Cory Riverside Energy Deadline 7 Submission - 6.2 ES Figure 7.10 Predicted Daily NOx Concentrations (Rev 2) |
Other | Cory Riverside Energy Deadline 7 Submission - 1.3 Guide to the Application (Rev 6) |
Other | East London Waste Authority Deadline 7 Submission - Responses to any further information requested by the Examining Authority |
Other | Cory Riverside Energy Deadline 7 Submission - 6.2 ES Figure 7.9 Predicted Annual Mean NOx Concentrations (Rev 2) |
Other | Mrs Margaret J White Deadline 7 Submission - Comments on any additional information/submissions received by previous deadline |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.66 Applicant's response to London Borough of Bexley Deadline 5 Submission |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.68 Applicant's response to Countryside Properties and L&Q New Homes Deadline 5 Submission |
Other | Greater London Authority Deadline 7 Submission - Appendix A: Schedule 1 GLA response to Applicant's submissions at Deadline 5 |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.65 Applicant's response to Thames Water Utilities Limited Deadline 5 Submission |
Other | Greater London Authority Deadline 7 Submission - Deadline 7 Covering Letter |
Other | Cory Riverside Energy Deadline 7 Submission - 7.6 Outline Biodiversity Landscape Mitigation Strategy (Rev 3) (with track changes) |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.71 Environment Bank Site Selection for Biodiversity Offsetting Report |
Other | London Borough of Bexley Deadline 7 Submission - Comments on additional information/submissions received at Deadline 5 and 6 |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.64 Applicant's response to Mrs Margaret J White Additional Submission (09 August 2019) |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.42 Anaerobic Digestion Facility Emissions Mitigation Note (Rev 1) |
Other | Cory Riverside Energy Deadline 7 Submission - 8.02.72 Applicant's response to London Borough of Bromley Deadline 5 Submission |
Other | |
Other | |
Other | London Borough of Bromley Additional Submission – Accepted at the discretion of the Examining Authority |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority. Summary of Consultation and Update on Statement of Common Ground between the Applicant and Greater London Authority |
Other | Arriva London Deadline 5 Submission - Comments on any additional information/submissions received by previous deadline |
Other | Cory Riverside Energy Deadline 6 Submission - 8.02.60 Applicant's Response to the Examining Authority's Further Written Questions |
Other | Greater London Authority Deadline 6 Submission - Response to Examining Authority's Further Written Questions |
Other | Cory Riverside Energy Deadline 6 Submission - 8.02.61 Applicant's Response to the Examining Authority's Rule 17 letter on Changes to the Application |
Other | Cory Riverside Energy Deadline 6 Submission - 1.3 Guide to the Application (Rev 5) |
Other | Cory Riverside Energy Deadline 6 Submission - Outline Biodiversity Landscape Mitigation Strategy (OBLEMS) (Rev2) |
Other | Cory Riverside Energy Deadline 6 Submission - 1.3 Guide to the Application (Rev 5) - Tracked Changes |
Other | Cory Riverside Energy Deadline 6 Submission - 8.02.59 Submission Letter |
Other | London Borough of Havering Deadline 6 Submission - Response to Examining Authority's Further Written Questions |
Other | Cory Riverside Energy Deadline 6 Submission - Outline Biodiversity Landscape Mitigation Strategy (OBLEMS) (Rev 2) - with Track Changes |
Other | Rule 13 - Notification of Hearings Notification of Issue Specific Hearing 3 (ISH3) and Compulsory Acquisition Hearing 2 (CAH2) |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.57 Applicant's response to Southern Gas Networks Deadline 4 Submission |
Other | Western Riverside Waste Authority - WITHDRAWN Deadline 5 Submission - Responses to any further information requested by the Examining Authority - Submission withdrawn via email on 14 08 19 |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.22 Land Negotiations Summary (Rev 2) |
Other | Cory Riverside Energy Deadline 5 Submission - 3.2 Draft DCO Explanatory Memorandum (Rev 2) |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.54 Applicants response to comments on the draft DCO |
Other | Cory Riverside Energy Deadline 5 Submission - 3.2 Draft DCO Explanatory Memorandum (Rev 2) (with track changes) |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.47 Applicant's response to Chris Rose Deadline 4 Submission |
Other | Cory Riverside Energy Deadline 5 Submission - 3.1 Draft DCO (Rev 3) |
Other | Thames Water Utilities Limited Deadline 5 Submission - Any additional information / submissions received by previous deadline and notification of a wish to speak at and attend the Compulsory Acquisition Hearing |
Other | Friends of Crossness Nature Reserve Deadline 5 Submission - Comments on additional information received by the previous deadline |
Other | Cory Riverside Energy Deadline 5 Submission - 8.01.10 Statement of Common Ground Transport for London (Draft). |
Other | LB Bexley Deadline 5 Submission - Deadline 5 Submissions |
Other | Cory Riverside Energy Deadline 5 Submission - 3.3 Draft DCO Schedule of Changes (Rev 1) |
Other | Cory Riverside Energy Deadline 5 Submission - 1.3 Guide to the Application (Rev 4) (with track changes) |
Other | LB Bexley Deadline 5 Submission - Appendix A |
Other | Greater London Authority Deadline 5 Submission - Schedule 2 - GLA comments on document 8.02.36, “Applicant's response to London Borough of Bexley Deadline 3 Submission" |
Other | Greater London Authority Deadline 5 Submission - Schedule 1 - response to Applicant document 8.02.35, “Applicant Response to the GLA’s Deadline 3 Submissions” |
Other | Greater London Authority Deadline 5 Submission - Cover Note |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.53 Update on Environment Bank Site Selection Progress |
Other | Cory Riverside Energy Deadline 5 Submission - 3.1 Draft DCO (Rev 3) (with track changes) |
Other | Greater London Authority Deadline 5 Submission - Schedule 4 - GLA comments on new relevant documents submitted by the Applicant |
Other | Cory Riverside Energy Deadline 5 Submission - 8.01.11 Statement of Common Ground Environment Agency |
Other | Cory Riverside Energy Deadline 5 Submission - 7.5 Outline Code of Construction Practice (Rev 3) |
Other | Cory Riverside Energy Deadline 5 Submission - 6.3 Appendix L to B1 Outline Construction Traffic Management Plan (Rev 4) (with track changes) |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.48 Applicant's response to Friends of Crossness Deadline 4 Submission |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.52 Applicant's response to Environment Agency Deadline 4 Submission |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.45 Protective Provisions Summary |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.56 REP and RRRF Application Boundaries Plan |
Other | Cory Riverside Energy Deadline 5 Submission - 1.3 Guide to the Application (Rev 4) |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.58 Metropolitan Open Land Plan |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.44 Deadline 5 Submission Letter |
Other | Cory Riverside Energy Deadline 5 Submission - 7.5 Outline Code of Construction Practice (Rev 3) (with track changes). |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.55 Pre-Commencement Plan |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.50 Applicant's response to Thames Water Deadline 4 Submission |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.46 Applicants response to GLA Deadline 4 Submisison |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.51 Applicant's response to London Borough of Bexley Deadline 4 Submission |
Other | Countryside Properties (UK) Ltd Deadline 5 Submission from non-IP – accepted at the discretion of the Examining Authority. Response to further information requested by the Examining Authority |
Other | Cory Riverside Energy Deadline 5 Submission - 8.02.49 Applicant's response to Ralph Todd Deadline 4 Submission |
Other | Greater London Authority Deadline 5 Submission - Schedule 3 - GLA’s comments on London Borough of Bexley comments on the Applicant’s revised draft DCO submitted at Deadline 3 |
Other | Cory Riverside Energy Deadline 5 Submission - 6.3 Appendix L to B1 Outline Construction Traffic Management Plan (Rev 4) |
Other | Mrs Margaret J White Additional submission – Accepted at the discretion of the Examining Authority |
Other | |
Other | SAS Depot Limited Additional Submission – Accepted at the discretion of the Examining Authority – Confirmation of agreement with joint statement between the Applicant and SAS Depot Limited |
Other | Southern Gas Networks plc (SGN) Additional Submission – Accepted at the discretion of the Examining Authority – SGNs preferred protective provisions |
Other | |
Other | |
Other | Cory Riverside Energy Additional Submission – Accepted at the discretion of the Examining Authority – Joint statement between the Applicant and SAS Depot Limited |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.43 Applicants response to Cheryl Osborne Deadline 3 Submission |
Other | Greater London Authority Deadline 4 Submission - Deadline 4 Final Report |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.38 Applicant's response to Landsul and Munster Joinery Deadline 3 Submission |
Other | Greater London Authority Deadline 4 Submission - Appendix 4 - RRRF Development Consent Order |
Other | Chris Rose Deadline 4 Submission - Response to further information requested by the Examining Authority |
Other | Cory Riverside Energy Deadline 4 Submission - 5.3 Grid Connection Statement (Rev 1) (with track changes) |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.41 Analysis of Metropolitan Open Land (MOL) in respect of the Proposed Development |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.39 Applicant's response to Thames Water's Written Summary of Oral Submissions Made at Hearings |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.33 Applicants response to Creek Side Developments Deadline 3 Submission |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.37 Applicants response to Western Riverside Waste Authority Deadline 3 Submission |
Other | Govia Thameslink Railway Deadline 4 Submission - No comments on scheme |
Other | Cory Riverside Energy Deadline 4 Submission - 6.3 Appendix L to B1 Outline CTMP (Rev 3) (Clean) |
Other | Cory Riverside Energy Deadline 4 Submission - 1.3 Guide to the Application (Rev 3) (with track changes) |
Other | Port of London Authority Deadline 4 Submission - Clarification of position in regards to the application |
Other | Ralph Todd on behalf of Friends of Crossness Nature Reserve Deadline 4 Submission - Response to Applicant's Written Representations |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.22 Land Negotiations Summary (Rev 1) |
Other | Greater London Authority Deadline 4 Submission - Appendix 5 - Congenital Anomalies paper within Environment International Journal (2019) |
Other | Cory Riverside Energy Deadline 4 Submission - 4.3 Book of Reference (Rev 2) |
Other | Marine Management Response Deadline 4 Submission - Response to further information requested by the Examining Authority |
Other | Western Riverside Waste Authority - WITHDRAWN Deadline 4 Submission - Joint statement between the applicant and Western Riverside Waste Authority - Submission withdrawn via email on 23 07 19 |
Other | Port of London Authority Deadline 4 Submission - Update on position in regards to the application |
Other | Cory Riverside Energy Deadline 4 Submission - Joint Statement between the Applicant and Western Riverside Waste Authority |
Other | Cory Riverside Energy Deadline 4 Submission - 5.3 Grid Connection Statement (Rev 1) |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.40 Effect of Interconnectors on Riverside Energy Park (REP) Carbon Assessment |
Other | Eversheds Sutherland on behalf of Thames Water Utilities Limited Deadline 4 Submission - Response to further information requested by the Examining Authority |
Other | Cory Riverside Energy Deadline 4 Submission - 1.3 Guide to the Application (Rev 3) |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.36 Applicant's response to London Borough of Bexley Deadline 3 Submission |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.42 Anaerobic Digestion Facility Emissions Mitigation Note |
Other | Cory Riverside Energy Deadline 4 Submission - 6.3 Appendix L to B1 Outline Construction Traffic Management Plan (CTMP) (Rev 3) (with track changes) |
Other | Ralph Todd Deadline 4 Submission - Response to Written Representations |
Other | Greater London Authority Deadline 4 Submission - Appendix 1 - GLA Correspondence with Peabody |
Other | Cory Riverside Energy Deadline 4 Submission - 4.3 Book of Reference (Rev 2) (with track changes) |
Other | Environment Agency Deadline 4 Submission - Response to further information requested by the Examining Authority |
Other | Eversheds Sutherland on behalf of Thames Water Utilities Limited Deadline 4 Submission - Comments on revised draft DCO submitted at Deadline 3 and any additional information/submissions received by previous deadline |
Other | Cory Riverside Energy Deadline 4 Submission - 2.1 Land Plans (Rev 2) |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.34 Applicants response to Cllr Dave Putson Deadline 3 Submission |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.35 Applicants response to Greater London Authority Deadline 3 Submission |
Other | Greater London Authority Deadline 4 Submission - Appendix 2 - Climate Change and Energy Policy since 2008 |
Other | Greater London Authority Deadline 4 Submission - Appendix 3 - Climate Change Act (2008) |
Other | Cory Riverside Energy Deadline 4 Submission - 8.02.32 Deadline 4 Submission Letter |
Other | London Borough of Bexley Deadline 4 Submission - Comments on revised draft DCO submitted at Deadline 3 and any additional information/submissions received by Deadline 3 |
Other | Ralph Todd on behalf of Friends of Crossness Nature Reserve Deadline 4 Submission - Response to further information requested by the Examining Authority |
Other | |
Other | Cheryl Osborne Additional Submission - Accepted at the discretion of the Examining Authority |
Other | Knights Solicitors on behalf of Wernick & Sons (Holdings) Limited Withdrawal of Wernick & Sons (Holdings) Limited Relevant Representation in respect to the DCO application |
Other | Knights Solicitors on behalf of Wernick Event Hire Limited Withdrawal of Wernick Event Hire Limited Relevant Representation in respect to the DCO application - See original submission via letter on 04 February 2019 |
Other | |
Other | |
Other | Greater London Authority Deadline 3 Submission - Appendix 3 |
Other | Cllr Dave Putson Deadline 3 Submission - Post Hearing Submission |
Other | Landsul Limited and Munster Joinery (U.K) Limited Deadline 3 Submission - Letter to Examinng Authority |
Other | Greater London Authority Deadline 3 Submission - Appendix 2a |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.30 Letter to Ingrebourne |
Other | Port of London Authority Deadline 3 Submission - Update on Statement of Common Ground negotiations |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.31 Temporary Jetty Outage Review. |
Other | Greater London Authority Deadline 3 Submission - Appendix 2b |
Other | Western Riverside Waste Authority - WITHDRAWN Deadline 3 Submission - 1. Written Summary of Oral Submissions made at the Compulsory Acquisition Hearing on 6 and 7 June 2019 - Submission withdrawn via email on 20 06 19 |
Other | Creek Side Developments (Kent) Limited - WITHDRAWN Deadline 3 Submission - Response to comments on Relevant Representations - Submission withdrawn via email on 20 06 19 |
Other | Greater London Authority Deadline 3 Submission - Post Hearing Written Submission of Oral Case |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.29 Middleton Jetty Ops Review Workshop Note |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.27 Post Hearing Note on Public Health and Evidence |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.26 Clarification on Above Ordnance Datum and Above Ground Level. |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.25 Biodiversity Offset Delivery Framework |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.10 Report on Shading Effects to Crossness Local Nature Reserve (Rev 1). |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.22 Land Negotiations Summary |
Other | Cory Riverside Energy Deadline 3 Submission - 8.01.09 Statement of Common Ground with Dartford Borough Council. |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.16 Applicants response to the Local Impact Report by Kent County Council and Dartford Borough Council |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.17 Applicants response to the Local Impact Report by London Borough Bexley |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.13 Deadline 3 Submission Letter |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.18 Applicants response to the Local Impact Report by London Borough Havering |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.15 Applicants response to the Local Impact Report by Greater London Authority |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.10 Report on Shading Effects to Crossness Local Nature Reserve (Rev 1) (with track changes). |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.14 Applicants responses to Written Representations |
Other | Thames Water Utilities Limited Deadline 3 Submission - Post hearing submissions including written submissions of oral case |
Other | Cory Riverside Energy Deadline 3 Submission - 7.5 Outline Code of Construction Practice (Rev 2). |
Other | Cory Riverside Energy Deadline 3 Submission - 8.01.08 Statement of Common Ground with London Borough of Barking and Dagenham |
Other | Western Riverside Waste Authority - WITHDRAWN Deadline 3 Submission - Comments on the Applicant's response to Relevant Representations and the Examining Authority's Written Questions - Submission withdrawn via email on 20 06 19 |
Other | Cory Riverside Energy Deadline 3 Submission - 3.2 Explanatory Memorandum (Rev 1). |
Other | Cory Riverside Energy Deadline 3 Submission - 6.3 Appendix L to B1 Outline Construction Traffic Management Plan (Rev 2) (with track changes) |
Other | Cory Riverside Energy Deadline 3 Submission - 7.6 Outline Biodiversity Landscape Mitigation Strategy (Rev 1). |
Other | Greater London Authority Deadline 3 Submission - GLA's comments on other documents Prepared by the Applicant |
Other | Greater London Authority Deadline 3 Submission - GLA's comments on Applicant's Response to Examining Authority's Written Questions |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.20 Oral summary from the Issue Specific Hearing on the draft Development Consent Order |
Other | Cory Riverside Energy Deadline 3 Submission - 3.1 Draft Development Consent Order (Rev 2) (with track changes). |
Other | London Borough of Bexley Deadline 3 Submission - Comments on any additional information/submissions received by Deadline 2 and post-hearing submissions including written submissions of oral case |
Other | Cory Riverside Energy Deadline 3 Submission - 6.2 Figure 7.5 Contour Nickel (Rev 2). |
Other | Cory Riverside Energy Deadline 3 Submission - 3.1 Draft Riverside Energy Park Development Consent Order (Rev 2) |
Other | Cory Riverside Energy Deadline 3 Submission - 1.3 Guide to Application (Rev 2) (with track changes). |
Other | Cory Riverside Energy Deadline 3 Submission - 6.3 Appendix L to B.1 Outline Construction Traffic Management Plan |
Other | Greater London Authority Deadline 3 Submission - GLA's comments on Relevant Local Impact Report and Written Representations |
Other | Cory Riverside Energy Deadline 3 Submission - 6.2 Figure 7.5 Contour Nickel (Rev 2) (with track changes). |
Other | Greater London Authority Deadline 3 Submission - GLA's comments on Applicants's response to GLA's Relevant Representations (RR) |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.21 Oral summary from the Compulsory Acquisition Hearing |
Other | Thames Water Utilities Limited Deadline 3 Submission - Post hearing submissions including written submissions of oral case |
Other | Cory Riverside Energy Deadline 3 Submission - 7.6 Outline Biodiversity Landscape Mitigation Strategy (Rev 1) (with track changes). |
Other | Cory Riverside Energy Deadline 3 Submission - 7.5 Outline Code of Construction Practice (Rev 2) (with track changes). |
Other | Cory Riverside Energy Deadline 3 Submission - 8.02.19 Oral summary from the Issue Specific Hearing on Environmental Matters |
Other | Cory Riverside Energy Deadline 3 Submission - 8.01.07: Statement of Common Ground between the Applicant and Port of London Authority |
Other | Western Riverside Waste Authority - WITHDRAWN Deadline 3 Submission - RRRL Protective Provisions - WRWA Proposed Amendments - Tracked Changes - Submission withdrawn via email on 20 06 19 |
Other | Cory Riverside Energy Deadline 3 Submission - 3.3 Draft Development Consent Order Schedule of Changes |
Other | Cory Riverside Energy Deadline 3 Submission - 3.2 Explanatory Memorandum (Rev 1) (with track changes). |
Other | Cory Riverside Energy Deadline 3 Submission - 1.3 Guide to Application (Rev 2). |
Other | Western Riverside Waste Authority - WITHDRAWN Additional submission – Accepted at the discretion of the Examining Authority - Western Riverside Waste Authority - Legal Submissions Submission withdrawn via email on 11 06 19 |
Other | Western Riverside Waste Authority - WITHDRAWN Additional Submission - Accepted at the discretion of the Examining Authority - Preliminary Submissions Annex - Wood Technical Note - Submission withdrawn via email on 11 06 19 |
Other | Western Riverside Waste Authority - WITHDRAWN Additional Submission - Accepted at the discretion of the Examining Authority - Correspondence - WRWA to Cory Environmental 04.06.19 - Submission withdrawn via email on 11 06 19 |
Other | Western Riverside Waste Authority - WITHDRAWN Additional Submission - Accepted at the discretion of the Examining Authority - Preliminary Submissions on Protective Provisions - Submission withdrawn via email on 11 06 19 |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | Thurrock Borough Council Additional submission – Accepted at the discretion of the Examining Authority - Response to s56 - Dated: 07/02/2019 |
Other | |
Other | |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 3 Project and Site Description (Rev 1) |
Other | Greater London Authority Deadline 2 Submission - Written Representation |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 4.3 Book of Reference (Rev 1) (with track changes) |
Other | Environment Agency Deadline 2 Submission - Written Representation |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.11 Great Crested Newt HSI and eDNA Survey 2019 |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Summary Written Representation - Submission withdrawn via email on 22 05 19 |
Other | Eversheds Sutherland (International) LLP on behalf of Thames Water Utilities Limited - WITHDRAWN Deadline 2 Submission - Written Representation - Submission withdrawn via email on 22 05 19 |
Other | Knights Solicitors on behalf of SAS Depot Limited - WITHDRAWN Deadline 2 Submission - Written Representation - Submission withdrawn via email on 22 05 19 |
Other | East London Waste Authority Deadline 2 Submission - Written Representation - Appendix 1 |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 2.3 Access and Rights of Way Plans (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 3.1 Draft Development Consent Order (Rev 1) |
Other | Rt Hon Jon Cruddas MP Deadline 2 Submission - Petition |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 3.1 Draft Development Consent Order (Rev 1) (with track changes) |
Other | East London Waste Authority Deadline 2 Submission - Written Representation |
Other | Rt Hon Jon Cruddas MP Deadline 2 Submissions - Written Representation |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 5.4.1 Combined Heat and Power Supplementary Report |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Submission withdrawn via email on 22 05 19 |
Other | Eversheds Sutherland on behalf of National Grid Electricity Transmission Plc Deadline 2 Submission - Written Representation |
Other | Greater London Authority Deadline 2 Submission - Summary of Written Representation |
Other | East London Waste Authority Deadline 2 Submission - Written Representation - Appendix 2 |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 7.2.1 Supplementary Report to the Project and its Benefits Report |
Other | RT Hon Teresa Pearce MP Deadline 2 Submission - Written Representation Summary |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - Land Plans |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 2.2 Work Plans (Rev 1) |
Other | Dave Putson Councillor Belvedere Ward (Labour) Deadline 2 Submission - Email Submission |
Other | Dave Putson Councillor Belvedere Ward (Labour) Deadline 2 Submission - Written Representation |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 4.1 Statement of Reasons (Rev 1) (track changes) |
Other | Winckworth Sherwood LLP on behalf of Port of London Authority Deadline 2 Submission - Written Representation |
Other | Friends of Crossness Nature Reserve Deadline 2 Submission - Written Submission |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.12 Night-time Construction Noise Impact Validation Assessment |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 1.3 Guide to the Application (Rev 1) |
Other | RT Hon Teresa Pearce MP Deadline 2 Submission - Written Representation |
Other | London Borough of Tower Hamlets Deadline 2 Submission - Written Representation |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 4.3 Book of Reference (Rev 1) |
Other | Mrs Margaret J White Deadline 2 Submission - Written Representation |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 3 Project and Site Description (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 4.1 Statement of Reasons (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.10 Report on Shading Effects to Crossness |
Other | Greater London Authority Deadline 2 Submission - Appendix 1 to Written Representation |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Annex 6 - Submission withdrawn via email on 22 05 19 |
Other | Barbara Fairbairn Deadline 7 Submission - Written Representation |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Annex 1 - Submission withdrawn via email on 22 05 19 |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Annex 7 - Submission withdrawn via email on 22 05 19 |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 1.3 Guide to the Application (Rev 1) (with Track Changes) |
Other | Womble Bond Dickinson (UK) LLP on behalf of Network Rail Deadline 2 Submission - Summary Written Representation |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Annex 4 - Submission withdrawn via email on 22 05 19 |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Annex 5 - Submission withdrawn via email on 22 05 19 |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority -WITHDRAWN Deadline 2 Submission - Written Representation - Annex 8 - Submission withdrawn via email on 22 05 19 |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Annex 9 - Submission withdrawn via email on 22 05 19 |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Annex 3 - Submission withdrawn via email on 22 05 19 |
Other | Womble Bond Dickinson (UK) LLP on behalf of Network Rail Deadline 2 Submission - Written Representation |
Other | Shakespeare Martineau on behalf of Western Riverside Waste Authority - WITHDRAWN Deadline 2 Submission - Written Representation - Annex 2 - Submission withdrawn via email on 22 05 19 |
Other | Greater London Authority Deadline 2 Submission - Appendix 2 - Written Representation |
Other | London Borough of Bexley Deadline 2 Submission - Written Representation |
Other | Greater London Authority Deadline 2 Submission - Local Impact Report |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.04 Applicant responses to ExA First Written Questions |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.08 Carbon Assessment |
Other | Greenwich-Bexley Environment Alliance Deadline 2 Submission - Written Representation |
Other | London Borough of Bexley Deadline 2 Submission - Appendix 1 to Written Representation (track changed DCO) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - Appendix L - Outline CTMP - (Rev 1 ) (with track changes) |
Other | Greater Local Authority Deadline 2 Submission - Summary Local Impact Report |
Other | London Borough of Havering Deadline 2 Submission - Local Impact Report |
Other | London Borough of Havering Deadline 2 Submission - Summary of Local Impact Report |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.06 Environmental Permit and Air Quality Note |
Other | Kent County Council and Dartford Borough Council Deadline 2 Submission - Local Impact Report |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - Appendix L - Outline CTMP - (Rev 1) |
Other | Knights Solicitors on behalf of S Wernick and Son (Holdings) Ltd and Wernick Event Hire Ltd - WITHDRAWN Deadline 2 Submission - Email to the Examining Authority (ExA) - Submission withdrawn via email on 22 05 19 |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.09 Biodiversity Accounting Report |
Other | London Borough of Bexley Deadline 2 Submission - Local Impact Report |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.05 Clarifications and Corrections Report |
Other | Kent County Council Deadline 2 Submission - Written Representation |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.07 Electrical Connection Progress Report |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 7 Air Quality (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.3 ES Appendix C.1 Traffic Modelling (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter Ground Conditions (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.01.03 SoCG with Environment Agency |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 9 TIVA (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 9 TVIA (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 7.5 Outline Code of Construction Practice (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 14 Socio-economics (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.6 Environmental Statement Supplementary Report |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter Transport (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 14 Socio-economics (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 5 Alternatives Considered (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 6 Transport (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.3 ES Appendix C.2 Stack Modelling (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.3 ES Appendix C.1 Traffic Modelling (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.3 ES Appendix J to B.1 (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.3 ES Appendix J to B.1 (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 7 Air Quality (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.3 ES Appendix C.3 Human Health Risk Assessment (Rev 1)(track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 12 Hydrology, Flood Risk Water Resources (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.5 Habitats Regulations Assessment (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.3 ES Appendix C.3 Human Health Risk Assessment (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.01.02 SoCG with Dartford Borough Council |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.01.05 SoCG with Natural England |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 12 Hydrology, Flood Risk Water Resources (Rev 1) (with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 18 Glossary (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 18 Glossary (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 13 Ground Conditions (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.2 Figure 7.5 Contour Nickel (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.5 Habitats Regulations Assessment (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 11 Terrestrial Biodiversity (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.03 Applicant responses to Relevant Representations |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.3 ES Appendix C.2 Stack Modelling (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.02.02 Deadline 2 Submission Letter |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 5 Alternatives Considered (Rev 1)(with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 6.1 ES Chapter 11 Terrestrial Biodiversity (Rev 1) (with track changes) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.01.04 SoCG with Kent County Council |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 7.5 Outline Code of Construction Practice (Rev 1) |
Other | Pinsent Masons LLP on behalf of Cory Riverside Energy Deadline 2 Submission - 8.01.06 SoCG with Port of London Authority |
Other | |
Other | Knights Solicitors on behalf of SAS Depot Ltd, S.Wernick & Sons (Holdings) Limited and Wernick Event Hire Limited - WITHDRAWN Deadline 1 Submission - Notification of wish to attend an Accompanied Site Inspection (ASI), suggested locations and justifications - Submission withdrawn via email on 01 05 19 |
Other | Cory Riverside Energy Deadline 1 Submission - Doc 8.02.01 Suggested Itinerary for the Accompanied Site Inspection |
Other | Cory Riverside Energy Additional submission – Accepted at the discretion of the Examining Authority. Doc 8.1.1 Statement of Common Ground (SoCG) with Historic England (signed) |
Other | Maritime and Coastguard Agency Additional Submissions - Accepted at the discretion of the Examining Authority |
Other | |
Other | |
Other | |
Other | Marine Management Organisation Additional Submission - Accepted at the discretion of the Examining Authority |
Other | |
Other | London Borough of Newham Additional Submission - Accepted at the discretion of the Examining Authority |
Other | Natural England Additional Submissions - Accepted at the discretion of the Examining Authority |
Other | Peter Brett Associates on behalf of Cory Riverside Energy Additional Submission - Accepted at the discretion of the Examining Authority |
Other | Harlaxton Engineering Services Limited Additional Submission - Accepted at the discretion of the Examining Authority |
Other | Canal River Trust Additional Submissions - Accepted at the discretion of the Examining Authority |
Other | Medway Council Additional Submission - Accepted at the discretion of the Examining Authority |
Other | Epping Forest District Council Additional Submission - Accepted at the discretion of the Examining Authority |
Other | Brentwood Borough Council Additional Submission - Accepted at the discretion of the Examining Authority |
Other | |
Other | London Borough of Newham Adequacy of Consultation Representation |
Other | Epping Forest DC Adequacy of Consultation Representation |
Other | Brentwood Borough Council Additional Submission – Accepted at the discretion of the Examining Authority |
Other | The Canal & River Trust Response from The Canal & River Trust |
Other | Natural England Response from Natural England |
Other | |
Other | |
Other | |
Other | London Borough of Bexley Additional Submission – Accepted at the discretion of the Examining Authority |
Other | ES Pipelines Limited Additional Submission – Accepted at the discretion of the Examining Authority |
Other | Peter Brett Associates LLP on behalf of Cory Riverside Energy Certificate of compliance s56 and Regulation 16 |
Other | Peter Brett Associates LLP on behalf of Cory Riverside Energy s56 compliance cover letter |
Other | Appointment of the Examining Authority Notice of appointment of the Examining Authority |
Other | Cory Riverside Energy Certificate of compliance with s56 of the Planning Act 2008. The date provided within the notice for the opening of Relevant Representations should read as 19 December 2018. |
Other | |
Other | Gravesham Borough Council Adequacy of Consultation Representation |
Other | Tower Hamlets Adequacy of Consultation Representation |
Other | East Sussex County Council Adequacy of Consultation Representation |
Other | London Borough of Lewisham Adequacy of Consultation Representation |
Other | Brentwood Borough Council Adequacy of Consultation Representation |
Other | Kent County Council Adequacy of Consultation Representation |
Other | Greater London Authority Adequacy of Consultation Representation |
Other | Dartford Borough Council Adequacy of Consultation Representation |
Other | Thurrock Council Adequacy of Consultation Representation |
Other | Royal borough of Greenwich Adequacy of Consultation Representation |
Other | Be First Adequacy of Consultation Representation |
Other | London Borough of Bexley Adequacy of Consultation Representation |
Other | Cory Riverside Energy 5.6 Statutory Nuisance Statement |
Other | Cory Riverside Energy 5.3 Electricity Grid Connection Statement |
Other | Cory Riverside Energy 5.5 Other Consents and Licences |
Other | Cory Riverside Energy 5.4 Combined Heat and Power Assessment |
Other | Cory Riverside Energy 5.2 Flood Risk Assessment |
Other | Cory Riverside Energy 5.1 Consultation Report |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - K |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - J |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - L |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - H |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - I |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - G |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - E |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - F |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - A (Part 2 of 2) |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - B |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - D |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - C |
Other | Cory Riverside Energy 5.1 Consultation Report Appendices - A (Part 1 of 2) |
Other | Cory Riverside Energy 2.6 Illustrative Circulation Plan |
Other | Cory Riverside Energy 2.4 Illustrative Site Layout Plan |
Other | Cory Riverside Energy 2.5 Illustrative South and West Elevations |
Other | Cory Riverside Energy 2.5 Illustrative North and East Elevations |
Other | Cory Riverside Energy 2.3 Access and Public Rights of Way Plans |
Other | Cory Riverside Energy 2.1 Land Plans |
Other | Cory Riverside Energy 7.6 Outline Biodiversity and Landscape Mitigation Strategy |
Other | Cory Riverside Energy 2.2 Works Plans |
Other | Cory Riverside Energy 7.5 Outline Code of Construction Practice |
Other | Cory Riverside Energy 7.4 Design Principles |
Other | Cory Riverside Energy 7.2 The Project and its Benefits Report |
Other | Cory Riverside Energy 7.3 Design and Access Statement |
Other | Cory Riverside Energy 6.5 Habitats Regulations No Significant Effects Report |
Other | Cory Riverside Energy 7.1 Planning Statement |
Other | Cory Riverside Energy 6.4 Environmental Statement Non-Technical Summary |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices K.6 Risk of Major Accidents and Disasters |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices K.5 Statement on Aviation |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices K.2 Qualitative Greenhouse Gas Emissions Assessment |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices K.1 Health Impact Assessment |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices K.4 Operational Waste Statement |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices K.3 Outline Lighting Strategy |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices I.2 Phase 2 Ground Conditions Assessment (2018a) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices I.1 Phase 1 Ground Conditions Assessment (2018a) (Part 3 of 3) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices H.1 Water Framework Directive Compliance Statement |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices I.1 Phase 1 Ground Conditions Assessment (2018a) (Part 1 of 3) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices I.1 Phase 1 Ground Conditions Assessment (2018a) (Part 2 of 3) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.7 Designated Area Supplementary Information (Part 3 of 3) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.7 Designated Area Supplementary Information (Part 2 of 3) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.7 Designated Area Supplementary Information (Part 1 of 3) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.6 Botanical Survey Report 2018 |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.3 Terrestrial Invertebrate Survey Report 2018 |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.5 Wintering Bird Survey Report 2018 |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.4 Water Vole Survey Report 2018 |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.2 Reptile Survey Report 2018 |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices G.1 Breeding Bird Survey Report 2018 |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices F.2 Fieldwork and Updated Deposit Modelling Report |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices F.1 Archaeological Desk Based Assessment |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices E.5 Combined Cumulative Visual Effects Table |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices E.4 Visual Effects Table |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices E.2 Photo Viewpoints (Part 2 of 2) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices E.2 Photo Viewpoints (Part 1 of 2) |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices E.3 Townscape Effects Table |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices D.1 Sound Survey Results |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices E.1 Townscape and Visual Impact Assessment Methodology |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices C.2 Stack Modelling |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices C.3 Human Health Risk Assessment |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices C.1 Traffic Modelling |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices B.1 Transport Assessment |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices B.2 Navigational Risk Assessment |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices A.3 Policy Background |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices A.2 EIA Project Team Qualifications and Experience |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices A.4 Cumulative Assessment - Matrix |
Other | Cory Riverside Energy 6.3 Environmental Statement Technical Appendices A.1 Scoping Opinion and Removal of River Works Note |
Other | Cory Riverside Energy 6.2 Environmental Statement Figures (Part 4 of 6) |
Other | Cory Riverside Energy 6.2 Environmental Statement Figures (Part 6 of 6) |
Other | Cory Riverside Energy 6.2 Environmental Statement Figures (Part 5 of 6) |
Other | Cory Riverside Energy 6.2 Environmental Statement Figures (Part 3 of 6) |
Other | Cory Riverside Energy 6.2 Environmental Statement Figures (Part 2 of 6) |
Other | Cory Riverside Energy 6.2 Environmental Statement Figures (Part 1 of 6) |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 9 - Townscape and Visual Impact Assessment |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 8 - Noise and Vibration |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 7 - Air Quality |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 6 - Transport |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 5 - Alternatives Considered |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 4 - ES Assessment Methodology |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 3 - Project and Site Description |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 2 - Regulatory and Policy Background |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 18 - Glossary |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 17 - Schedule of Mitigation and Monitoring |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 16 - Summary of Findings and In-Combination Effects |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 15 - Other Considerations |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 14 - Socio-economics |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 13 - Ground Conditions |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 11 - Terrestrial Biodiversity |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 12 - Hydrology Flood Risk and Water Resources |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 10: Historic Environment |
Other | Cory Riverside Energy 6.1 Environmental Statement Chapter 1: Introduction |
Other | Cory Riverside Energy 3.2 Explanatory Memorandum |
Other | Cory Riverside Energy 4.2 Funding Statement |
Other | Cory Riverside Energy 3.1 Draft Development Consent Order |
Other | Cory Riverside Energy 1.2 The Applicant's Section 55 Checklist |
Other | Cory Riverside Energy 1.6 Project Glossary |
Other | Cory Riverside Energy 4.1 Statement of Reasons |
Other | Cory Riverside Energy 1.3 Guide to the Application |
Other | Cory Riverside Energy 1.1 Covering Letter |
Other | Cory Riverside Energy 1.5 Notices for Statutory Publicity |
Other | Cory Riverside Energy 1.4 Application Form |
Other | Cory Riverside Energy 4.3 Book of Reference |
Other | |
Other | |
Other | |
Other | |
Other | London Borough of Bexley Late scoping consultation response |
Other | Scoping Opinion Adopted by the Secretary of State on 5 January 2018 |
Other | Environment Agency Late scoping consultation response |
Other | London Borough of Havering Late scoping consultation response |
Other | Cory Environmental Holdings Ltd Scoping Report submitted to the Secretary of State on 27 November 2017. |
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.