Sunnica Energy Farm

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (8)

Developer's Application (268)

Acceptance (23)

Pre Examination (448)

Examination (1334)

Decision (146)

Decided (0)

Date

SourceDescription
Other
Adrian Beaumont (PDF, 131 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Anne Noble (PDF, 76 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Brenda Knowles (PDF, 128 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Brian Challis (PDF, 98 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Carey Girling (PDF, 94 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Cecelia and Mark Hawley (PDF, 87 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Celia Clarke (PDF, 94 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Chris Lee-McCloud (PDF, 103 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Clare Cambridge (PDF, 108 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Coral Fuller (PDF, 104 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Diana and Geoffrey Jones (PDF, 99 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Doreen Carrington (PDF, 93 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Fergus Wright (PDF, 84 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Freckenham Parish Council (PDF, 110 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Grace Piletto (PDF, 115 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Graham Reeve (PDF, 96 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
I E Attree (PDF, 99 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Isleham Parish Council (PDF, 516 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Isleham Society (PDF, 102 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
J Malkin (PDF, 95 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Jeanne Winter (PDF, 138 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Jenny White (PDF, 89 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Jessica Wright (PDF, 147 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Joanne & Ted Ward (PDF, 91 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
John Bridges (PDF, 131 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
John Fleet (PDF, 93 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
John James (PDF, 95 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
John Tapster (PDF, 117 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Karin Dobbie (PDF, 96 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Leila Hindmarsh (PDF, 81 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Lesley Gross (PDF, 87 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Liam MacGillivray (PDF, 92 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Linda Dunbavin (PDF, 88 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Linda Homan (PDF, 182 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Louize Hurst (PDF, 93 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Lucinda Wright (PDF, 136 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Margaret Cornell (PDF, 88 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Marie Shortland (PDF, 108 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Mark Goldsack (PDF, 92 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Martin Attree (PDF, 96 KB)
Response to the Secretary of State’s Consultation of 1st September 2023 - Accepted at the discretion of Secretary of State
Other
Mike Mingay (PDF, 82 KB)
Response to the Secretary of State’s Consultation of 1st September 2023 - Non Interested Party submission accepted at the discretion of Secretary of State
Other
Peter Knowles (PDF, 150 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Rebecca Dunlop (PDF, 82 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Richard Hurlock (PDF, 90 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Richard Last (PDF, 88 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Robert Dorman (PDF, 82 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Sam Lee-McCloud (PDF, 109 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Sarah Gillett (PDF, 97 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Sian Chilcott (PDF, 113 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Simon Stafford (PDF, 94 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Stuart & Sue Hall (PDF, 95 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
Sunnica Ltd (PDF, 771 KB)
Response to the Secretary of State’s Consultation of 1 September 2023 - 6.2 Appendix 16C: Framework Construction Environmental Management Plan (tracked)
Other
Sunnica Ltd (PDF, 35 MB)
Response to the Secretary of State’s Consultation of 1 September 2023 - 6.2 Appendix 10I: Outline Landscape and Ecology Management Plan (tracked [REDACTED]
Other
Sunnica Ltd (PDF, 771 KB)
Response to the Secretary of State’s Consultation of 1 September 2023 - 6.2 Appendix 16C: Framework Construction Environmental Management Plan (clean)
Other
Sunnica Ltd (PDF, 35 MB)
Response to the Secretary of State’s Consultation of 1 September 2023 - 6.2 Appendix 10I: Outline Landscape and Ecology Management Plan (clean) [REDACTED]
Other
Sunnica Ltd (PDF, 203 KB)
Response to the Secretary of State’s Consultation of 1 September 2023 - Response to responses received in respect of a request for information.
Other
The Jockey Club (PDF, 268 KB)
Response to the Secretary of State’s Consultation of 1st September 2023
Other
A G Wright & Son (Farms) Ltd (PDF, 11 MB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Alan Richardson (PDF, 172 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Andrew Geddes (PDF, 301 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Anne Noble (PDF, 907 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Annette Flindall (PDF, 138 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Anthony Hollyer (PDF, 232 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Archie Wright (PDF, 85 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Cambridgeshire & Peterborough Combined Authority (PDF, 183 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Cambs CC, E Cambs CC, Suffolk CC, W Suffolk CC (PDF, 116 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Catherine Durance (PDF, 82 KB)
Response to the Secretary of State’s Consultation of 14 August 2023 - Non Interested Party submission accepted at the discretion of Secretary of State
Other
Catherine Judkins (PDF, 122 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Chippenham Parish Council (PDF, 181 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Chippenham Parish Council (PDF, 206 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Chris Ashcroft (PDF, 188 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Christopher J Corbin (PDF, 184 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Claire Mills (PDF, 103 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Cllrs Anna Bailey, Julia Huffer, Kelli Pettit (PDF, 203 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Denis Field (PDF, 113 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Donald & Marie MacBean (PDF, 91 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Dr J A and Mrs S M Bruton (PDF, 113 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Edmund Fordham (PDF, 606 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Emma Ryan (PDF, 132 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Evelyn Graham (PDF, 89 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Fiona Maxwell (PDF, 81 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Friends of Isleham Nature Reserves (PDF, 76 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Geraldine Ciantar (PDF, 96 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Helen Faulkner (PDF, 102 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Hugh Anderson (PDF, 127 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Ian Garget (PDF, 102 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Isabel Cross (PDF, 136 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Isobel Newport-Mangell (PDF, 170 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Jack Smith (PDF, 173 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Jane Grant (PDF, 93 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Jane Leitch (PDF, 175 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Jennifer Hall (PDF, 98 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
John Bridges (PDF, 97 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
John Leitch (PDF, 183 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Justin Fuga (PDF, 142 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Katherine Stewart (PDF, 80 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Linda Homan (PDF, 592 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Louise Andreasen (PDF, 84 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Marianne Corbin (PDF, 153 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Matt Hancock MP & Lucy Frazer MP (PDF, 6 MB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Maxine Casey (PDF, 108 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Mike Alder (PDF, 84 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Mrs D C Ray (PDF, 102 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Mrs E M Garget (PDF, 106 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Neal Entwistle (PDF, 102 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Newmarket Horseman's Group (PDF, 125 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Nick Harvey (PDF, 94 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Nicole Langstaff (PDF, 208 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Parish & Town Councils' Alliance (PDF, 148 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Peter Maxwell (PDF, 82 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
R Turner & Sons (PDF, 833 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Red Lodge Parish Council (PDF, 159 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Richard Radcliffe (PDF, 88 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Robin Grant (PDF, 91 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Rosalind Hammill (PDF, 96 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Samantha Munro (PDF, 141 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Sandie Geddes (PDF, 541 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Say No To Sunnica Action Group Ltd (PDF, 236 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Say No to Sunnica Action Group Ltd (PDF, 2 MB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Snailwell Parish Council (PDF, 171 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Suzanne Morse (PDF, 103 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Tim Wood (PDF, 90 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Worlington Parish Council (PDF, 130 KB)
Response to the Secretary of State’s Consultation of 14 August 2023
Other
Yvonne Batchelor (PDF, 92 KB)
Response to the Secretary of State’s Consultation of 14 August 2023 - Non Interested Party submission accepted at the discretion of Secretary of State
Other
Cambridgeshire County Council (PDF, 365 KB)
Response to the Secretary of State’s letter of 23 August 2023
Other
Historic England (PDF, 146 KB)
Response to the Secretary of State’s letter of 23 August 2023
Other
Suffolk County Council (PDF, 72 KB)
Response to the Secretary of State’s letter of 23 August 2023
Other
Sunnica Ltd (PDF, 181 KB)
Response to the Secretary of State’s letter of 23 August 2023 - Removal of objection letter from FHPUT
Other
Sunnica Ltd (PDF, 190 KB)
Response to the Secretary of State’s letter of 23 August 2023
Other
Sunnica Ltd (PDF, 2 MB)
Response to the Secretary of State’s letter of 23 August 2023 - Revised Draft DCO (Rev 6) (Tracked)
Other
Sunnica Ltd (PDF, 2 MB)
Response to the Secretary of State’s letter of 23 August 2023 - Removal of objection letter Tilbrook
Other
Sunnica Ltd (PDF, 2 MB)
Response to the Secretary of State’s letter of 23 August 2023 - Revised Draft DCO (Rev 6) (Clean)
Other
Sunnica Ltd (PDF, 321 KB)
Response to the Secretary of State’s letter of 23 August 2023 - 4.3 Schedule of Changes to Book of Reference (Rev 7)
Other
Sunnica Ltd (PDF, 21 MB)
Response to the Secretary of State’s letter of 23 August 2023 - 2.1 Land and Crown Land Plans (Rev 7)
Other
Sunnica Ltd (PDF, 4 MB)
Response to the Secretary of State’s letter of 23 August 2023 - 4.3 Book of Reference (parts 1 to 5) (Rev 9) (Clean)
Other
Sunnica Ltd (PDF, 4 MB)
Response to the Secretary of State’s letter of 23 August 2023 - 4.3 Book of Reference (parts 1 to 5) (Rev 9) (Tracked)
Other
Department for Energy Security and Net Zero (PDF, 176 KB)
Letter from Secretary of State dated 23 August 2023 to the Applicant, Historic England, Suffolk County Council and Cambridge County Council
Other
Natural England (PDF, 142 KB)
Response to Secretary of State’s letter of 27 July 2023
Other
Sunnica Ltd (PDF, 219 KB)
Response to Secretary of State’s letter of 27 July 2023
Other
Sunnica Ltd (PDF, 58 MB)
Response to Secretary of State’s letter of 27 July 2023 - Deed of Obligation dated 28 March 2023
Other
Sunnica Ltd (PDF, 694 KB)
Response to Secretary of State’s letter of 27 July 2023 - British Society of Soil Science guidance note
Other
Sunnica Ltd (PDF, 34 KB)
Response to Secretary of State’s letter of 27 July 2023 - Natural England Predictive BMV map explanatory note
Other
Sunnica Ltd (PDF, 3 MB)
Response to Secretary of State’s letter of 27 July 2023 - Letter to Secretary of State dated 26 June 2023
Other
Say No To Sunnica (PDF, 2 MB)
Letter from Say No To Sunnica to the Department for Energy Security and Net Zero 25 July 2023 including cover letter from Lucy Frazer MP and Matt Hancock MP and accompanying letter from Natural England
Other
Say No To Sunnica (PDF, 8 MB)
Plans 1 – 4 accompanying Say No To Sunnica’s Letter to the Department for Energy Security and Net Zero 25 July 2023
Other
Department for Energy Security and Net Zero (PDF, 144 KB)
Letter from Secretary of State dated 27 July 2023
Other
Relevant Representations Examination Library (PDF, 570 KB)
Other
A G Wright and Son Farm Ltd (PDF, 4 MB)
Deadline 11 Submission - Response to Request for Further Information from Examining Authority
Other
Alan B Smith (PDF, 4 MB)
Deadline 11 Submission - Comments on submissions received by Deadline 10
Other
Anne Noble (PDF, 1,003 KB)
Deadline 11 Submission - Comments on submissions received by Deadline 10
Other
Annette Flindall (PDF, 90 KB)
Deadline 11 Submission - Comments on any further information received
Other
Cambridgeshire County Council, East Cambridgeshire District Council, Suffolk County Council and West Suffolk Council (PDF, 104 KB)
Deadline 11 Submission - Comments on submissions received by Deadline 10
Other
Catherine Judkins (PDF, 2 KB)
Deadline 11 Submission - Comments on any further information received
Other
CPRE Cambridgeshire and Peterborough (PDF, 14 MB)
Deadline 11 Submission - Comments on any further information received
Other
Dr Edmund Fordham (PDF, 139 KB)
Deadline 11 Submission - Reply to Request for Further Information from Examining Authority
Other
Bryan Cave Leighton Paisner on behalf of HPUT A Limited and HPUT B Limited (PDF, 1 MB)
Deadline 11 Submission - Comments on any further information received
Other
Jack Smith (PDF, 2 KB)
Deadline 11 Submission
Other
Justin Fuga (PDF, 2 KB)
Deadline 11 Submission - Comments on any further information received
Other
Nicole Langstaff (PDF, 2 KB)
Deadline 11 Submission - Comments on submissions received by Deadline 10
Other
Notification of completion of the Examining Authority’s Examination (PDF, 129 KB)
Other
Say No To Sunnica Action Group Ltd (PDF, 2 MB)
Deadline 11 Submission - Comments on any further information received
Other
Say No To Sunnica Action Group Ltd (PDF, 2 KB)
Deadline 11 Submission - Comments on any further information received
Other
Sunnica Ltd (PDF, 185 KB)
Deadline 11 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Clean)
Other
Sunnica Ltd (PDF, 262 KB)
Deadline 11 Submission - 8.49 Objections Schedule (Clean)
Other
Sunnica Ltd (PDF, 3 MB)
Deadline 11 Submission - 8.16 Statement of Common Ground with Historic England - Rev06 Final Signed
Other
Sunnica Ltd (PDF, 725 KB)
Deadline 11 Submission - 1.2 Guide to the Application – Appendix A DCO Examination Document Schedule (Tracked)
Other
Sunnica Ltd (PDF, 398 KB)
Deadline 11 Submission - Deadline 11 Cover Letter
Other
Sunnica Ltd (PDF, 245 KB)
Deadline 11 Submission -8.12 Statement of Commonality Rev 6
Other
Sunnica Ltd (PDF, 271 KB)
Deadline 11 Submission -8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Clean)
Other
Sunnica Ltd (PDF, 3 MB)
Deadline 11 Submission - 8.19 Statement of Common Ground with National Grid Electricity Transmission
Other
Sunnica Ltd (PDF, 273 KB)
Deadline 11 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Tracked)
Other
Sunnica Ltd (PDF, 342 KB)
Deadline 11 Submission - 8.49 Objections Schedule (Tracked)
Other
Sunnica Ltd (PDF, 182 KB)
Deadline 11 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Tracked)
Other
Sunnica Ltd (PDF, 59 MB)
Deadline 11 Submission - 8.125 Deed of Obligation
Other
Sunnica Ltd (PDF, 723 KB)
Deadline 11 Submission - 1.2 Guide to the Application – Appendix A DCO Examination Document Schedule (Clean)
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 11 Submission - 8.20 Statement of Common Ground with National Gas Transmission
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 11 Submission - 4.4 Schedule of Negotiations and Powers Sought (Tracked)
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 11 Submission - 8.126 Response to Rule 17 Letter - 22nd March
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 11 Submission - 4.4 Schedule of Negotiations and Powers Sought (Clean)
Other
Sunnica Ltd (PDF, 683 KB)
Deadline 11 Submission - 8.127 Summary of Agreed Position with Local Highway Authorities in relation to Protective Provisions and Side Agreements
Other
A G Wright & Son (Farms) Ltd (PDF, 1 MB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Anne Noble (PDF, 1 MB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Anne Noble (PDF, 92 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Annette Flindall (PDF, 116 KB)
Deadline 10 Submission
Other
Archie Wright (PDF, 2 KB)
Deadline 10 Submission
Other
Bruce Knight (PDF, 159 KB)
Deadline 10 Submission
Other
Cambridgeshire and Peterborough Combined Authority (PDF, 2 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Catherine Judkins (PDF, 88 KB)
Deadline 10 Submission
Other
Dr Edmund Fordham (PDF, 152 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Elizabeth Garget (PDF, 99 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Elizabeth Garget (PDF, 2 KB)
Deadline 10 Submission
Other
Fiona Maxwell (PDF, 96 KB)
Deadline 10 Submission
Other
Fordham Parish Council (PDF, 554 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Ian Garget (PDF, 98 KB)
Deadline 10 Submission
Other
Isleham Parish Council (PDF, 157 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Julia Huffer (PDF, 127 KB)
Deadline 10 Submission
Other
Linda Homan (PDF, 3 KB)
Deadline 10 Submission
Other
Louise Skole Andreasen (PDF, 2 KB)
Deadline 10 Submission
Other
Mark B Goldsack (PDF, 146 KB)
Deadline 10 Submission
Other
National Gas Transmission (NGT) (PDF, 103 KB)
Additional Submission – Withdrawal of objection - Accepted at the discretion of the Examining Authority
Other
National Grid Electricity Transmission (NGET) (PDF, 62 KB)
Additional Submission – Withdrawal of objection - Accepted at the discretion of the Examining Authority
Other
Natural England (PDF, 163 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Addleshaw Goddard LLP on behalf of Network Rail Infrastructure Limited (Network Rail) (PDF, 125 KB)
Additional Submission – Withdrawal of objection - Accepted at the discretion of the Examining Authority
Other
Nick Harvey (PDF, 157 KB)
Deadline 10 Submission
Other
R F Turner & Son (PDF, 75 KB)
Deadline 10 Submission
Other
R F Turner & Son (PDF, 1 MB)
Deadline 10 Submission
Other
Sara Caswell (PDF, 115 KB)
Deadline 10 Submission
Other
Say No To Sunnica Action Group Ltd (PDF, 167 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Say No To Sunnica Action Group Ltd (PDF, 98 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Suffolk County Council (PDF, 81 KB)
Deadline 10 Submission - Comments on submissions received by Deadline 9
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 10 Submission - 2.3 Access and Rights of Way Plans - Rev: 06
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 10 Submission - 6.3 Figure 3-2 Sunnica West Parameter Plan
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 10 Submission - 8.105 Context Overlay - Rights of Way and Access Plans - Rev: 01
Other
Sunnica Ltd (PDF, 46 MB)
Deadline 10 Submission - 6.2 Appendix 10I: Outline Landscape and Ecology Management Plan (Tracked) - Rev: 04
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 10 Submission - 8.122 Alternative Without Prejudice Development Consent Order (Tracked)
Other
Sunnica Ltd (PDF, 5 MB)
Deadline 10 Submission - 8.119 Applicant's response to LPA Deadline 8 Submissions
Other
Sunnica Ltd (PDF, 275 KB)
Deadline 10 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Tracked)
Other
Sunnica Ltd (PDF, 245 KB)
Deadline 10 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Tracked)
Other
Sunnica Ltd (PDF, 245 KB)
Deadline 10 Submission - 8.15 Statement of Common Ground with Natural England - Rev: 04
Other
Sunnica Ltd (PDF, 674 KB)
Deadline 10 Submission - 8.118 Applicant's response to Other Parties Deadline 8 Submissions
Other
Sunnica Ltd (PDF, 34 MB)
Deadline 10 Submission - 8.66 Appendix 9C Flood Risk Assessment Addendum - Part 1
Other
Sunnica Ltd (PDF, 35 MB)
Deadline 10 Submission - 6.2 Appendix 10I: Outline Landscape and Ecology Management Plan (Clean) - Rev: 04
Other
Sunnica Ltd (PDF, 14 MB)
Deadline 10 Submission - 6.7 Biodiversity Net Gain Assessment (Clean) - Rev: 05
Other
Sunnica Ltd (PDF, 1 MB)
Deadline 10 Submission - 3.2 Explanatory Memorandum to the DCO (Clean) - Rev: 04
Other
Sunnica Ltd (PDF, 409 KB)
Deadline 10 Submission - 6.2 Appendix 16F: Framework Operation Environmental Management Plan (Clean) - Rev: 05
Other
Sunnica Ltd (PDF, 12 MB)
Deadline 10 Submission - 6.2 Appendix 9C Flood Risk Assessment - Part 1 - Rev: 02
Other
Sunnica Ltd (PDF, 13 MB)
Deadline 10 Submission - 8.120 End of Examination Summary Position Paper
Other
Sunnica Ltd (PDF, 769 KB)
Deadline 10 Submission - 6.2 Appendix 16C: Framework Construction Environmental Management Plan (Clean) - Rev: 07
Other
Sunnica Ltd (PDF, 26 MB)
Deadline 10 Submission - 8.79 Sunnica Detailed Archaeological Mitigation Strategy (Clean)
Other
Sunnica Ltd (PDF, 695 KB)
Deadline 10 Submission - 8.45 Equality Impact Assessment (Clean) - Rev: 01
Other
Sunnica Ltd (PDF, 771 KB)
Deadline 10 Submission - 6.2 Appendix 16C: Framework Construction Environmental Management Plan (Tracked) - Rev: 07
Other
Sunnica Ltd (PDF, 338 KB)
Deadline 10 Submission - 8.49 Objections Schedule (Clean)
Other
Sunnica Ltd (PDF, 245 KB)
Deadline 10 Submission - Cover Letter
Other
Sunnica Ltd (PDF, 717 KB)
Deadline 10 Submission - 1.2 Guide to the Application – Appendix A DCO Examination (Clean) - Rev: 12
Other
Sunnica Ltd (PDF, 246 KB)
Deadline 10 Submission - 8.121 SoCG Update Note for Combined LPA
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 10 Submission - 8.122 Alternative Without Prejudice Development Consent Order (Clean)
Other
Sunnica Ltd (PDF, 10 MB)
Deadline 10 Submission - 7.6 Outline Battery Fire Safety Management Plan (Clean) - Rev: 04
Other
Sunnica Ltd (PDF, 961 KB)
Deadline 10 Submission - 8.123 Without Prejudice Explanatory Memorandum to the Alternative Development Consent Order (Tracked)
Other
Sunnica Ltd (PDF, 30 MB)
Deadline 10 Submission - 8.83 Drainage Technical Note
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 10 Submission - 4.4 Schedule of Negotiations and Powers Sought (Tracked) - Rev: 10
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 10 Submission - 4.4 Schedule of Negotiations and Powers Sought (Clean) - Rev: 10
Other
Sunnica Ltd (PDF, 62 MB)
Deadline 10 Submission - 8.77 Environmental Masterplan Zoomed In - Part 1
Other
Sunnica Ltd (PDF, 26 MB)
Deadline 10 Submission - 8.79 Sunnica Detailed Archaeological Mitigation Strategy (Tracked)
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 10 Submission - 8.48 Tree Preservation Order Trees Location Plan
Other
Sunnica Ltd (PDF, 653 KB)
Deadline 10 Submission - 3.2 Explanatory Memorandum to the DCO (Tracked) - Rev: 04
Other
Sunnica Ltd (PDF, 784 KB)
Deadline 10 Submission - 7.7 Outline Skills, Supply Chain and Employment Plan (Clean) - Rev: 04
Other
Sunnica Ltd (PDF, 10 MB)
Deadline 10 Submission - 7.6 Outline Battery Fire Safety Management Plan (Tracked) - Rev: 04
Other
Sunnica Ltd (PDF, 341 KB)
Deadline 10 Submission - 8.49 Objections Schedule (Tracked)
Other
Sunnica Ltd (PDF, 409 KB)
Deadline 10 Submission - 6.2 Appendix 16F: Framework Operation Environmental Management Plan (Tracked) - Rev: 05
Other
Sunnica Ltd (PDF, 814 KB)
Deadline 10 Submission - 7.7 Outline Skills, Supply Chain and Employment Plan (Tracked) - Rev: 04
Other
Sunnica Ltd (PDF, 341 KB)
Deadline 10 Submission - 8.43 Schedule of Changes to the Draft Development Consent Order - Rev: 03
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 10 Submission - 3.1 Draft Development Consent Order (Clean) - Rev: 05
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 10 Submission - 6.3 Figure 3-1 Sunnica East Parameter Plan
Other
Sunnica Ltd (PDF, 14 MB)
Deadline 10 Submission - 6.7 Biodiversity Net Gain Assessment (Tracked) - Rev: 05
Other
Sunnica Ltd (PDF, 724 KB)
Deadline 10 Submission - 1.2 Guide to the Application – Appendix A DCO Examination (Tracked) - Rev: 12
Other
Sunnica Ltd (PDF, 1,001 KB)
Deadline 10 Submission - 8.88 Campus Plan
Other
Sunnica Ltd (PDF, 212 KB)
Deadline 10 Submission - 8.16 Statement of Common Ground with Historic England - Rev: 05
Other
Sunnica Ltd (PDF, 1 MB)
Deadline 10 Submission - 8.123 Without Prejudice Explanatory Memorandum to the Alternative Development Consent Order (Clean)
Other
Sunnica Ltd (PDF, 6 MB)
Deadline 10 Submission - 8.82 FRA clarification document in light of proposed Scheme changes
Other
Sunnica Ltd (PDF, 59 MB)
Deadline 10 Submission - 8.77 Environmental Masterplan (Zoomed In) - Part 2
Other
Sunnica Ltd (PDF, 781 KB)
Deadline 10 Submission - 8.45 Equality Impact Assessment (Tracked) - Rev: 01
Other
Sunnica Ltd (PDF, 241 KB)
Deadline 10 Submission - 8.12 Statement of Commonality
Other
Sunnica Ltd (PDF, 271 KB)
Deadline 10 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Clean)
Other
Sunnica Ltd (PDF, 12 MB)
Deadline 10 Submission - 8.47 Environmental Masterplan (Zoomed Out)
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 10 Submission - 3.1 Draft Development Consent Order (Tracked) - Rev: 05
Other
Sunnica Ltd (PDF, 181 KB)
Deadline 10 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Clean)
Other
Tattersalls/Newmarket Horsemans Group (PDF, 2 KB)
Deadline 10 Submission
Other
Timothy J Lawson (PDF, 2 KB)
Deadline 10 Submission
Other
Travellers Community at Elms Farm (PDF, 313 KB)
Deadline 10 Submission
Other
Womble Bond Dickinson (UK) LLP on behalf of Drug Development Solutions Limited, LGC Limited and LGC Bioresearch Limited (PDF, 126 KB)
Additional Submission - Withdrawal of objection - Accepted at the discretion of the Examining Authority
Other
Environment Agency (PDF, 107 KB)
Additional Submission – Withdrawal of objection - Accepted at the discretion of the Examining Authority
Other
Eversheds Sutherland on behalf of National Grid Electricity Transmission (NGET) and National Gas Transmission (NGT) (PDF, 109 KB)
Additional Submission – Intention to withdraw objection - Accepted at the discretion of the Examining Authority
Other
Cadent Gas Limited (PDF, 146 KB)
Additional Submission - Withdrawal of objection - Accepted at the discretion of the Examining Authority
Other
HPUT A Limited and HPUT B Limited (PDF, 977 KB)
Deadline 7 Submission - Protective Provisions
Other
Request for Further Information - Rule 17 (PDF, 159 KB)
Other
East Cambridgeshire District Council and Cambridgeshire County Council (PDF, 171 KB)
Deadline 9 Submission - Comments on the Examining Authority’s schedule of changes to the draft Development Consent Order (dDCO)
Other
Health and Safety Executive (PDF, 372 KB)
Deadline 9 Submission - Comments on the Examining Authority’s schedule of changes to the draft Development Consent Order (dDCO)
Other
Say No To Sunnica Action Group Ltd (PDF, 143 KB)
Deadline 9 Submission - Comments on the Examining Authority’s schedule of changes to the draft Development Consent Order (dDCO)
Other
Suffolk County Council (PDF, 299 KB)
Deadline 9 Submission - Comments on the Examining Authority’s schedule of changes to the draft Development Consent Order (dDCO)
Other
Sunnica Ltd (PDF, 694 KB)
Deadline 9 Submission - 1.2 Guide to the Application – Appendix A DCO Examination (Clean) - Revision: 11
Other
Sunnica Ltd (PDF, 700 KB)
Deadline 9 Submission - 1.2 Guide to the Application – Appendix A DCO Examination (Tracked) - Revision: 11
Other
Sunnica Ltd (PDF, 185 KB)
Deadline 9 Submission - Cover Letter
Other
Sunnica Ltd (PDF, 418 KB)
Deadline 9 Submission - 8.115 Response to Rule 17 Request
Other
Sunnica Ltd (PDF, 414 KB)
Deadline 9 Submission - 8.114 Response to SNTS Deadline 7 Submissions in relation to Scheme Sizing and ‘OverBadging’
Other
Sunnica Ltd (PDF, 478 KB)
Deadline 9 Submission - 8.116 Response to Examining Authority’s schedule of changes to the draft Development Consent Order
Other
West Suffolk Council (PDF, 98 KB)
Deadline 9 Submission - Comments on the Examining Authority’s schedule of changes to the draft Development Consent Order (dDCO)
Other
A G Wright & Son Farms Ltd (PDF, 22 MB)
Deadline 8 Submission
Other
Alan B Smith (PDF, 281 KB)
Deadline 8 Submission
Other
Anne Noble (PDF, 50 KB)
Deadline 8 Submission - Comments on any submissions received by Deadline 7
Other
Anne Noble (PDF, 67 KB)
Deadline 8 Submission - Comments on submissions received by Deadline 7
Other
Anne Noble (PDF, 3 MB)
Deadline 8 Submission
Other
Anne Noble (PDF, 4 MB)
Deadline 8 Submission
Other
Anne Noble (PDF, 88 KB)
Deadline 8 Submission
Other
Anne Noble (PDF, 16 MB)
Deadline 8 Submission
Other
Anne Noble (PDF, 980 KB)
Deadline 8 Submission
Other
Chippenham Parish Council (PDF, 166 KB)
Deadline 8 Submission
Other
Dr Catherine Judkins (PDF, 293 KB)
Deadline 8 Submission - Comments on submissions received by Deadline 7
Other
Dr Edmund Fordham (PDF, 4 MB)
Deadline 8 Submission - Annex EF54
Other
Dr Edmund Fordham (PDF, 4 MB)
Deadline 8 Submission - Annex EF57
Other
Dr Edmund Fordham (PDF, 341 KB)
Deadline 8 Submission - Annex EF56
Other
Dr Edmund Fordham (PDF, 14 MB)
Deadline 8 Submission - Annex EF55
Other
Dr Edmund Fordham (PDF, 730 KB)
Deadline 8 Submission - Comments on Deadline 7 Submissions
Other
East Cambridgeshire District Council, Cambridgeshire County Council, Suffolk County Council and West Suffolk Council (PDF, 788 KB)
Deadline 8 Submission - Comments on submissions received by Deadline 7
Other
Peter Goodyear on behalf of Fordham (Cambs) Walking Group (PDF, 1 MB)
Deadline 8 Submission - Comments on submissions received by Deadline 7
Other
Huntingdonshire District Council (PDF, 102 KB)
Deadline 8 Submission
Other
Isleham Parish Council (PDF, 73 KB)
Deadline 8 Submission - Comments on submissions received by Deadline 7
Other
John Leitch (PDF, 73 KB)
Deadline 8 Submission
Other
Natural England (PDF, 246 KB)
Deadline 8 Submission - Comments on RIES and comments on submissions received by Deadline 7
Other
Parish and Town Council Alliance (PDF, 89 KB)
Deadline 8 Submission
Other
Sandie Geddes (PDF, 13 MB)
Deadline 8 Submission
Other
Say No To Sunnica Action Group Ltd (PDF, 3 MB)
Deadline 8 Submission - Comments on D7 Submissions, Comments on RIES, and Summary of Position
Other
Snailwell Parish Council (PDF, 177 KB)
Deadline 8 Submission
Other
Sunnica Ltd (PDF, 416 KB)
Deadline 8 Submission - 6.2 Appendix 16F: Framework Operation Environmental Management Plan (Tracked) - Revision: 04
Other
Sunnica Ltd (PDF, 5 MB)
Deadline 8 Submission - 8.15 Statement of Common Ground with Natural England - Revision: 03
Other
Sunnica Ltd (PDF, 10 MB)
Deadline 8 Submission - 7.6 Outline Battery Fire Safety Management Plan (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 8 Submission - 4.4 Schedule of Negotiations and Powers Sought (Tracked)
Other
Sunnica Ltd (PDF, 9 MB)
Deadline 8 Submission - 7.6 Outline Battery Fire Safety Management Plan (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 190 KB)
Deadline 8 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Clean) - Revision: 04
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 8 Submission - 4.3 Book of Reference (parts 1 to 5) (Clean)
Other
Sunnica Ltd (PDF, 3 MB)
Deadline 8 Submission - 8.35 Statement of Common Ground with Say No to Sunnica and Newmarket Horsemen
Other
Sunnica Ltd (PDF, 764 KB)
Deadline 8 Submission - 6.2 Appendix 16C Framework Construction Environmental Management Plan (Clean) - Revision: 06
Other
Sunnica Ltd (PDF, 339 KB)
Deadline 8 Submission - Late submission accepted at the discretion of the Examining Authority - 8.49 Objections Schedule (Clean) - Revision: 05
Other
Sunnica Ltd (PDF, 697 KB)
Deadline 8 Submission - 1.2 Guide to the Application – Appendix A DCO Examination Document Schedule (Tracked)
Other
Sunnica Ltd (PDF, 765 KB)
Deadline 8 Submission - 6.2 Appendix 16C Framework Construction Environmental Management Plan (Tracked) - Revision:06
Other
Sunnica Ltd (PDF, 602 KB)
Deadline 8 Submission - 6.2 Appendix 16E: Framework Decommissioning Environmental Management Plan (Tracked) - Revision: 04
Other
Sunnica Ltd (PDF, 410 KB)
Deadline 8 Submission - Cover Letter
Other
Sunnica Ltd (PDF, 501 KB)
Deadline 8 Submission - 8.12 Statement of Commonality (Tracked) - Revision: 04
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 8 Submission - 8.36 Statement of Common Ground with Anglian Water - Revision: 03
Other
Sunnica Ltd (PDF, 3 MB)
Deadline 8 Submission - 8.16 Statement of Common Ground with Historic England - Revision: 04
Other
Sunnica Ltd (PDF, 340 KB)
Deadline 8 Submission - Late submission accepted at the discretion of the Examining Authority - 8.49 Objections Schedule (Tracked) - Revision: 05
Other
Sunnica Ltd (PDF, 627 KB)
Deadline 8 Submission - 8.108 Applicant's Response to Other Parties’ Deadline 7 Submissions
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 8 Submission - 8.67 Statement of Common Ground with the Parish and Town Councils’ Alliance
Other
Sunnica Ltd (PDF, 602 KB)
Deadline 8 Submission - 8.112 The Applicant’s position on ‘parcel by parcel’ mitigation and residual effects
Other
Sunnica Ltd (PDF, 308 KB)
Deadline 8 Submission - 4.3 Schedule of Changes to Book of Reference (Clean)
Other
Sunnica Ltd (PDF, 417 KB)
Deadline 8 Submission - 6.2 Appendix 16F: Framework Operation Environmental Management Plan (Clean) - Revision: 04
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 8 Submission - 8.32 Statement of Common Ground with Ministry of Defence - Revision: 01
Other
Sunnica Ltd (PDF, 3 MB)
Deadline 8 Submission - 8.18 Statement of Common Ground with Suffolk Wildlife Trust - Revision: 03
Other
Sunnica Ltd (PDF, 5 MB)
Deadline 8 Submission - 8.13 Statement of Common Ground with Cambridgeshire County Council, Suffolk County Council, East Cambridgeshire District Council and West Suffolk Council - Revision: 03
Other
Sunnica Ltd (PDF, 215 KB)
Deadline 8 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Clean) - Revision: 04
Other
Sunnica Ltd (PDF, 385 KB)
Deadline 8 Submission - 8.20 Draft Statement of Common Ground with National Gas Transmission plc - Revision: 03
Other
Sunnica Ltd (PDF, 216 KB)
Deadline 8 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Tracked) - Revision: 04
Other
Sunnica Ltd (PDF, 479 KB)
Deadline 8 Submission - 8.110 Applicant’s comments on RIES
Other
Sunnica Ltd (PDF, 19 MB)
Deadline 8 Submission - 8.111 Sunnica High-level Route Summary
Other
Sunnica Ltd (PDF, 310 KB)
Deadline 8 Submission - 4.3 Schedule of Changes to Book of Reference (Tracked)
Other
Sunnica Ltd (PDF, 689 KB)
Deadline 8 Submission - 1.2 Guide to the Application – Appendix A DCO Examination Document Schedule (Clean)
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 8 Submission - 8.14 Statement of Common Ground with the Environment Agency - Revision: 03
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 8 Submission - 4.4 Schedule of Negotiations and Powers Sought (Clean)
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 8 Submission - 8.17 Statement of Common Ground with National Highways - Revision: 02
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 8 Submission - 8.34 Statement of Common Ground with East of England Ambulance Service - Revision: 03
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 8 Submission - 8.33 Statement of Common Ground with National Air Traffic Services - Revision: 02
Other
Sunnica Ltd (PDF, 191 KB)
Deadline 8 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Tracked) - Revision: 04
Other
Sunnica Ltd (PDF, 779 KB)
Deadline 8 Submission - 8.109 Applicant's Response to LPA Deadline 7 Submissions
Other
Sunnica Ltd (PDF, 476 KB)
Deadline 8 Submission - 8.19 Draft Statement of Common Ground with National Grid Electricity Transmission plc - Revision: 03
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 8 Submission - 4.3 Book of Reference (parts 1 to 5) (Tracked)
Other
Sunnica Ltd (PDF, 602 KB)
Deadline 8 Submission - 6.2 Appendix 16E: Framework Decommissioning Environmental Management Plan (Clean) - Revision: 04
Other
Sunnica Ltd (PDF, 483 KB)
Deadline 8 Submission - 8.12 Statement of Commonality (Clean) - Revision: 04
Other
Jan Anderson on behalf of the Travellers Community Elms Farm (PDF, 386 KB)
Deadline 8 Submission
Other
West Suffolk Council (PDF, 55 KB)
Deadline 8 Submission - Comments on submissions received by Deadline 7
Other
Worlington Parish Council (PDF, 72 KB)
Deadline 8 Submission
Other
Examining Authority's Schedule of Change to the Applicant's draft DCO (PDF, 371 KB)
Other
Rule 17 and 8(3) Letter (PDF, 167 KB)
Other
Shakespeare Martineau on behalf of South Staffordshire Water PLC (PDF, 366 KB)
Additional Submission - Withdrawal of objection - Accepted at the discretion of the Examining Authority
Other
AG Wright & Sons (Farms) Ltd (PDF, 4 MB)
Deadline 7 Submission - Post Hearing Submission
Other
Alan B Smith (PDF, 8 MB)
Deadline 7 Submission
Other
Alan T Richardson (PDF, 230 KB)
Deadline 7 Submission - Post Hearing Submission
Other
Anne Noble (PDF, 45 KB)
Deadline 7 Submission - Carbon Footprint
Other
Anne Noble (PDF, 77 KB)
Deadline 7 Submission - Land Use
Other
Cambridgeshire County Council (PDF, 2 MB)
Deadline 7 Submission - Comments on the Applicant’s Deadline 6 Submissions and Additional Submissions
Other
Cambridgeshire County Council (PDF, 127 KB)
Deadline 7 Submission - Comments on Other Parties’ Deadline 6 Submissions
Other
Chippenham Parish Council (PDF, 90 KB)
Deadline 7 Submission
Other
CPRE Cambridgeshire and Peterborough (PDF, 58 MB)
Deadline 7 Submission
Other
Dr Edmund Fordham (PDF, 7 MB)
Deadline 7 Submission - Annex EF49 - Experimental determination of metals generated during the thermal failure of lithium ion batteries
Other
Dr Edmund Fordham (PDF, 249 KB)
Deadline 7 Submission - Comments on Applicant's Deadline 6 Submissions
Other
Dr Edmund Fordham (PDF, 13 MB)
Deadline 7 Submission - Annex EF51 - Battery Energy Storage Facility, Doagh Road, Kells – Fire Risk Assessment Addendum
Other
Dr Edmund Fordham (PDF, 470 KB)
Deadline 7 Submission - Annex EF53 - Recommendations for evaluating the quantity of hazardous materials from processes which have run out of control
Other
Dr Edmund Fordham (PDF, 248 KB)
Deadline 7 Submission - Annex EF52 - Battery Energy Storage Facility, Doagh Road, Kells – Fire Risk Assessment Addendum
Other
Dr Edmund Fordham (PDF, 280 KB)
Deadline 7 Submission - Annex EF50 - Consideration of the Planning and Hazardous substances Consent for Kells Battery storage Facility, May 2022
Other
East Cambridgeshire District Council and Cambridgeshire County Council (PDF, 223 KB)
Deadline 7 Submission - Post Hearing Submission
Other
East Cambridgeshire District Council and Cambridgeshire County Council (PDF, 155 KB)
Deadline 7 Submission - Post Hearing Submission - Appendix - Sunnica Arboriculture comments
Other
East Cambridgeshire District Council, Cambridgeshire County Council, Suffolk County Council and West Suffolk Council (PDF, 78 KB)
Deadline 7 Submission - Additional Submission ALC
Other
East Cambridgeshire District Council, Cambridgeshire County Council, Suffolk County Council and West Suffolk Council (PDF, 246 KB)
Deadline 7 Submission - The Joint Councils' position on ‘parcel by parcel’ mitigation and residual effects
Other
East Cambridgeshire District Council, Cambridgeshire County Council, Suffolk County Council and West Suffolk Council (PDF, 312 KB)
Deadline 7 Submission - Comments on the Revised/Updated Statement of Common Ground (SoCG)
Other
East Cambridgeshire District Council, Cambridgeshire County Council, Suffolk County Council and West Suffolk Council (PDF, 2 MB)
Deadline 7 Submission - Joint Responses to Examining Authority's Third Written Questions (ExQ3)
Other
Elizabeth Garget (PDF, 119 KB)
Deadline 7 Submission
Other
Peter Goodyear on behalf of Fordham (Cambs) Walking Group (PDF, 978 KB)
Deadline 7 Submission - Responses to Examining Authority's Third Written Questions (ExQ3)
Other
Peter Goodyear on behalf of Fordham (Cambs) Walking Group (PDF, 930 KB)
Deadline 7 Submission
Other
Freckenham Parish Council (PDF, 75 KB)
Deadline 7 Submission
Other
Graham Reeve (PDF, 1 MB)
Deadline 7 Submission - Post Hearing Submission
Other
Hazel Barber (PDF, 209 KB)
Deadline 7 Submission
Other
Health and Safety Executive (PDF, 134 KB)
Deadline 7 Submission - Late submission accepted at the discretion of the Examining Authority
Other
HPUT A Limited and HPUT B Limited (PDF, 502 KB)
Deadline 7 Submission
Other
Huntingdonshire District Council (PDF, 116 KB)
Deadline 7 Submission
Other
Joanna Reeks (PDF, 201 KB)
Deadline 7 Submission - Post Hearing Submission
Other
John James (PDF, 60 KB)
Deadline 7 Submission
Other
Mike Alder (PDF, 3 KB)
Deadline 7 Submission
Other
Natural England (PDF, 271 KB)
Deadline 7 Submission
Other
Nick Harvey (PDF, 164 KB)
Deadline 7 Submission
Other
R F Turner & Son (PDF, 64 KB)
Deadline 7 Submission - Post Hearing Submission
Other
Red Lodge Parish Council (PDF, 75 KB)
Deadline 7 Submission
Other
Richard Tilbrook (PDF, 4 KB)
Deadline 7 Submission - Post Hearing Submission
Other
Robin Upton (PDF, 2 KB)
Deadline 7 Submission
Other
Sandie Geddes (PDF, 110 KB)
Deadline 7 Submission
Other
Say No To Sunnica Action Group Ltd (PDF, 2 MB)
Deadline 7 Submission - Responses to Examining Authority's Third Written Questions (ExQ3)
Other
Say No To Sunnica Action Group Ltd (PDF, 4 MB)
Deadline 7 Submission - Post Hearing Submission
Other
Say No To Sunnica Action Group Ltd (PDF, 2 MB)
Deadline 7 Submission
Other
Say No To Sunnica Action Group Ltd (PDF, 75 KB)
Deadline 7 Submission - SJ Franklin CV
Other
Say No To Sunnica Action Group Ltd (PDF, 199 KB)
Deadline 7 Submission - Response to National Planning Policy Framework Changes
Other
Say No To Sunnica Action Group Ltd (PDF, 898 KB)
Deadline 7 Submission - Reading Agricultural Consultants Note and Plan
Other
Say No To Sunnica Action Group Ltd (PDF, 73 KB)
Deadline 7 Submission - Observation for Agricultural Land Classification Video Transcript
Other
Say No To Sunnica Action Group Ltd (VIDEO, 32 MB)
Deadline 7 Submission - Observation for Agricultural Land Classification Video
Other
Shores Charity (PDF, 91 KB)
Deadline 7 Submission - Post Hearing Submission
Other
Snailwell Parish Council (PDF, 148 KB)
Deadline 7 Submission
Other
Suffolk County Council (PDF, 363 KB)
Deadline 7 Submission - Response to Action Point No. 7 Consequent upon Issue Specific Hearing 4 on Environmental Matters and the draft Development Consent Order (dDCO)
Other
Suffolk County Council (PDF, 733 KB)
Deadline 7 Submission - Post Hearing Submission
Other
Sunnica Ltd (PDF, 403 KB)
Deadline 7 Submission - 6.2 Appendix 16F: Framework Operation Environmental Management Plan (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 27 MB)
Deadline 7 Submission - 8.95 Applicant's response to the ExA's Third Written Questions
Other
Sunnica Ltd (PDF, 13 MB)
Deadline 7 Submission - 8.96 Applicant's response to Other Parties Deadline 6 Submissions
Other
Sunnica Ltd (PDF, 10 MB)
Deadline 7 Submission - 8.105 Context overlay - Rights of Way and Access Plans
Other
Sunnica Ltd (PDF, 666 KB)
Deadline 7 Submission - 1.2 Guide to the Application – Appendix A DCO Examination (Clean) - Revision: 09
Other
Sunnica Ltd (PDF, 21 MB)
Deadline 7 Submission - 6.2 Appendix 10I Landscape and Ecology Management Plan (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 24 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix F
Other
Sunnica Ltd (PDF, 396 KB)
Deadline 7 Submission - 4.3 Schedule of Changes to Book of Reference (Tracked) - Revision: 05
Other
Sunnica Ltd (PDF, 15 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix B
Other
Sunnica Ltd (PDF, 7 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 7 of 7
Other
Sunnica Ltd (PDF, 22 MB)
Deadline 7 Submission - 6.2 Appendix 13C: Framework Construction Traffic Management Plan and Travel Plan - Appendix C - Part 3 of 7
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 7 Submission - 8.22 Statement of Common Ground with Burwell Parish Council - Revision: 01
Other
Sunnica Ltd (PDF, 199 KB)
Deadline 7 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 40 MB)
Deadline 7 Submission - 8.102 B050 Crash Site Report
Other
Sunnica Ltd (PDF, 13 MB)
Deadline 7 Submission - 8.99 Land Plan and Parameter Plan Overlay
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan (Tracked) - Revision: 05
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 7 Submission - 4.4 Schedule of Negotiations and Powers Sought (Clean) - Revision: 08
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 7 Submission - 8.106 Written Summary of Applicant’s Oral Submissions at the Resumed Compulsory Acquisition Hearing (CAH) 1 on 14 February 2023
Other
Sunnica Ltd (PDF, 301 KB)
Deadline 7 Submission - 8.49 Objections Schedule (Clean) - Revision 04
Other
Sunnica Ltd (PDF, 62 MB)
Deadline 7 Submission - 8.46 Arboricultural Impact Assessment Report (Tracked) - Revision 02
Other
Sunnica Ltd (PDF, 178 KB)
Deadline 7 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 6 MB)
Deadline 7 Submission - 4.2 Funding Statement (Clean) - Revision: 02
Other
Sunnica Ltd (PDF, 23 MB)
Deadline 7 Submission - 6.2 Appendix 13C: Framework Construction Traffic Management Plan and Travel Plan - Appendix C - Part 2 of 7
Other
Sunnica Ltd (PDF, 179 KB)
Deadline 7 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) -(Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 17 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 6 of 7
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 7 Submission - 4.3 Book of Reference (parts 1 to 5) (Clean) - Revision: 07
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 7 Submission - 6.7 Biodiversity Net Gain (Clean)
Other
Sunnica Ltd (PDF, 221 KB)
Deadline 7 Submission - 8.12 Statement of Commonality - Revision 03
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 7 Submission - 6.3 Figure 3-1 Sunnica East Parameter Plan
Other
Sunnica Ltd (PDF, 198 KB)
Deadline 7 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Clean) - Revision 03
Other
Sunnica Ltd (PDF, 1 MB)
Deadline 7 Submission - 4.1 Statement of Reasons (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 8 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan (Clean) - Revision: 05
Other
Sunnica Ltd (PDF, 596 KB)
Deadline 7 Submission - 6.2 Appendix 16E Framework Decommissioning Environmental Management Plan DEMP (Clean)
Other
Sunnica Ltd (PDF, 1 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix E
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 7 Submission - 4.4 Schedule of Negotiations and Powers Sought (Tracked) - Revision: 08
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 7 Submission - 4.3 Book of Reference (parts 1 to 5) (Tracked) - Revision: 07
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 7 Submission - 8.38 Draft Statement of Common Ground with Barton Mills Parish Council - Revision: 02
Other
Sunnica Ltd (PDF, 606 KB)
Deadline 7 Submission - 6.2 Appendix 16E Framework Decommissioning Environmental Management Plan DEMP (Tracked)
Other
Sunnica Ltd (PDF, 17 MB)
Deadline 7 Submission - 6.2 Appendix 13C: Framework Construction Traffic Management Plan and Travel Plan - Appendix C - Part 5 of 7
Other
Sunnica Ltd (PDF, 392 KB)
Deadline 7 Submission - 4.3 Schedule of Changes to Book of Reference (Clean) - Revision: 05
Other
Sunnica Ltd (PDF, 1 MB)
Deadline 7 Submission - 8.100 Written Summary of Applicant’s Oral Submissions at Issue Specific Hearing 4 (ISH4)
Other
Sunnica Ltd (PDF, 62 MB)
Deadline 7 Submission - 8.46 Arboricultural Impact Assessment Report (Clean) - Revision 02
Other
Sunnica Ltd (PDF, 14 MB)
Deadline 7 Submission - 6.2 Appendix 13C: Framework Construction Traffic Management Plan and Travel Plan - Appendix C - Part 4 of 7
Other
Sunnica Ltd (PDF, 29 MB)
Deadline 7 Submission - 6.2 Appendix 13C: Framework Construction Traffic Management Plan and Travel Plan - Appendix C - Part 1 of 7
Other
Sunnica Ltd (PDF, 683 KB)
Deadline 7 Submission - 1.2 Guide to the Application – Appendix A DCO Examination (Tracked) - Revision: 09
Other
Sunnica Ltd (PDF, 376 KB)
Deadline 7 Submission - 4.2 Funding Statement (Tracked) - Revision: 02
Other
Sunnica Ltd (PDF, 211 KB)
Deadline 7 Submission - 8.16 Draft Statement of Common Ground with Historic England - Revision: 03
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 7 Submission - 6.3 Figure 3-17a to d Cable Corridor
Other
Sunnica Ltd (PDF, 760 KB)
Deadline 7 Submission - 6.2 Appendix 16C: Framework Construction Environmental Management Plan (Tracked) - Revision: 05
Other
Sunnica Ltd (PDF, 409 KB)
Deadline 7 Submission - 6.2 Appendix 16F: Framework Operation Environmental Management Plan (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 7 Submission - 8.101 Written Summary of Applicant’s Oral Submissions at the Compulsory Acquisition Hearing 2 (CAH2)
Other
Sunnica Ltd (PDF, 554 KB)
Deadline 7 Submission - 8.104 Applicant's response to Suffolk County Council's proposed amendments to Schedule 1
Other
Sunnica Ltd (PDF, 786 KB)
Deadline 7 Submission - 7.7 Outline Skills Supply Chain and Employment Plan - (Tracked)
Other
Sunnica Ltd (PDF, 429 KB)
Deadline 7 Submission - 8.103 Landscape Mitigation Parcel Schedule
Other
Sunnica Ltd (PDF, 28 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix G
Other
Sunnica Ltd (PDF, 566 KB)
Deadline 7 Submission - 8.94 Cover Letter
Other
Sunnica Ltd (PDF, 927 KB)
Deadline 7 Submission - 8. 97 Applicant's Response to LPA Deadline 6 Submissions
Other
Sunnica Ltd (PDF, 29 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix D
Other
Sunnica Ltd (PDF, 302 KB)
Deadline 7 Submission - 8.49 Objections Schedule (Tracked) - Revision 04
Other
Sunnica Ltd (PDF, 22 MB)
Deadline 7 Submission - 6.2 Appendix 10I Landscape and Ecology Management Plan (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 7 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix A
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 7 Submission - 6.3 Figure 3-2 Sunnica West Parameter Plan
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 7 Submission - 6.7 Biodiversity Net Gain (Tracked)
Other
Sunnica Ltd (PDF, 897 KB)
Deadline 7 Submission - 8.98 Cable and Vehicle Access Across Chippenham Park Avenue
Other
Sunnica Ltd (PDF, 757 KB)
Deadline 7 Submission - 6.2 Appendix 16C: Framework Construction Environmental Management Plan (Clean) - Revision: 05
Other
Sunnica Ltd (PDF, 60 MB)
Deadline 7 Submission - 8.77 Environmental Masterplan (Zoomed In)
Other
Sunnica Ltd (PDF, 774 KB)
Deadline 7 Submission - 7.7 Outline Skills Supply Chain and Employment Plan (Clean)
Other
Sunnica Ltd (PDF, 3 MB)
Deadline 7 Submission - 4.1 Statement of Reasons (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 12 MB)
Deadline 7 Submission - 2.2 Work Plans - Revision: 05
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 7 Submission - 8.25 Statement of Common Ground with Moulton Parish Council - Revision: 01
Other
Bidwells on behalf of the Mitcham family (PDF, 242 KB)
Deadline 7 Submission - Post Hearing Submission
Other
West Suffolk Council (PDF, 101 KB)
Deadline 7 Submission - Comments on the Applicant’s Deadline 6 Submissions and Additional Submissions
Other
West Suffolk Council (PDF, 215 KB)
Deadline 7 Submission - Post Hearing Submission
Other
Part 1 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (Document 4 KB)
Other
Part 1 of the Recording of the Issue Specific Hearing 4 (ISH4) on 17 February 2023 (Document 4 KB)
Other
Transcript for the Part 4 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (PDF, 144 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Action points arising from Compulsory Acquisition Hearing 2 (CAH2) - 14 February 2023 (PDF, 89 KB)
Other
Other
Action points arising from the resumed Compulsory Acquisition Hearing 1 (CAH1) - 14 February 2023 (PDF, 91 KB)
Other
Part 2 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (Document 4 KB)
Other
Part 2 of the Recording of the Issue Specific Hearing 4 (ISH4) on 17 February 2023 (Document 4 KB)
Other
Part 3 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (Document 4 KB)
Other
Part 4 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (Document 4 KB)
Other
Rule 8(3) Letter (PDF, 168 KB)
Other
Transcript for the Part 1 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (PDF, 227 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 1 of the Recording of the Issue Specific Hearing 4 (ISH4) on 17 February 2023 (PDF, 179 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 2 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (PDF, 168 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 2 of the Recording of the Issue Specific Hearing 4 (ISH4) on 17 February 2023 (PDF, 226 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 3 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (PDF, 207 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 4 of the Recording of the Issue Specific Hearing 4 (ISH4) on 16 February 2023 (PDF, 144 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Compulsory Acquisition Hearing 2 (CAH2) - Transcript - Part 1 - 14 February 2023 (PDF, 198 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Compulsory Acquisition Hearing 2 (CAH2) - Transcript - Part 2 - 14 February 2023 (PDF, 54 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Recording of Compulsory Acquisition Hearing 2 (CAH2) - Part 1 - 14 February 2023 (Document 4 KB)
Other
Recording of Compulsory Acquisition Hearing 2 (CAH2) - Part 2 - 14 February 2023 (Document 4 KB)
Other
Recording of Resumed Compulsory Acquisition Hearing 1 (CAH1) - Part 1 - 14 February 2023 (Document 4 KB)
Other
Recording of Resumed Compulsory Acquisition Hearing 1 (CAH1) - Part 2 - 14 February 2023 (Document 4 KB)
Other
Resumed Compulsory Acquisition Hearing 1 (CAH1) - Transcript - Part 1 - 14 February 2023 (PDF, 173 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Resumed Compulsory Acquisition Hearing 1 (CAH1) - Transcript - Part 2 - 14 February 2023 (PDF, 141 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Report on the Implications for European Sites (RIES) (PDF, 445 KB)
Issued by the Examining Authority – 13 February 2023
Other
Sunnica Ltd (PDF, 244 KB)
Additional Submission - Letter in response to Examining Authority's request for further information of 07 February 2023 - Accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 27 KB)
Additional Submission – Schedule of Changes to OLEMP and Environmental Masterplans - Accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 24 KB)
Additional Submission – Schedule of Changes to Framework CTMP and Travel Plan - Accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 6 MB)
Additional Submission – Hedgerow Creation/Retained/Loss Status - Accepted at the discretion of the Examining Authority
Other
Detailed Agenda for Compulsory Acquisition Hearing 2 (CAH2) on 14 February 2023 (PDF, 124 KB)
Other
Detailed Agenda for Issue Specific Hearing 4 (ISH4) on 16 February and 17 February 2023 (PDF, 167 KB)
Other
Rule 17 Letter - Request for further information from the Applicant (PDF, 141 KB)
Other
Dr Edmund Fordham (PDF, 704 KB)
Deadline 6 Submission - Late Submission accepted at the discretion of the Examining Authority
Other
Dr Edmund Fordham (PDF, 125 KB)
Deadline 6 Submission - Annex EF48 - Late Submission accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 455 KB)
Additional Submission – 8.90 Potential expanded crash site exclusion area plan - Rev 00 - Accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 281 KB)
Additional Submission – 8.93 Landscape and Visual Impact Assessment (LVIA) Position Statement - Rev 00 - Accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 236 KB)
Additional Submission – 8.91 Local Highway Authorities Protective Provisions - Rev 00 - Accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 207 KB)
Additional Submission – 8.94 Deadline 6 Additional Submissions Cover Letter - Rev 00 - Accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 433 KB)
Additional Submission – 8.89 Crash site exclusion area plan - Rev 00 - Accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 299 KB)
Additional Submission – 8.92 Ecology Position Statement - Rev 00 - Accepted at the discretion of the Examining Authority
Other
Examining Authority’s Final Itinerary for Accompanied Site Inspection 4 (ASI4) - Wednesday 15 February 2023 (PDF, 133 KB)
Other
Examining Authority’s written questions and requests for information (ExQ3) (PDF, 398 KB)
Other
A G Wright & Sons (PDF, 3 MB)
Deadline 6 Submission
Other
Alan B Smith (PDF, 254 KB)
Deadline 6 Submission - Comments on Funding Statement by Sunnica dated 13th January 2023
Other
Andrew Munro (PDF, 3 KB)
Deadline 6 Submission - Comments on any further information requested by Deadline 5
Other
Anglian Water (PDF, 2 KB)
Deadline 6 Submission - Statement of Common Ground (SoCG) request
Other
Anne Noble (PDF, 729 KB)
Deadline 6 Submission - Comments on any further information requested by Deadline 5
Other
Annette Flindall (PDF, 16 KB)
Deadline 6 Submission
Other
Cambridgeshire County Council (PDF, 2 MB)
Deadline 6 Submission - Development and Public Rights of Way - Guidance for Planners and Developers
Other
Cambridgeshire County Council (PDF, 569 KB)
Deadline 6 Submission - Comments on the Applicant’s Deadline 5 Submissions
Other
Catherine Judkins (PDF, 618 KB)
Deadline 6 Submission - Comments on any further information requested by Deadline 5
Other
Claire Mills (PDF, 602 KB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
Dr Edmund Fordham (PDF, 8 MB)
Deadline 6 Submission - Annex EF46
Other
Dr Edmund Fordham (PDF, 329 KB)
Deadline 6 Submission - Comments on the Applicant’s Deadline 5 submissions
Other
Dr Edmund Fordham (PDF, 96 KB)
Deadline 6 Submission - Annex EF47 - Late Submission accepted at the discretion of the Examining Authority
Other
East Cambridgeshire District Council (PDF, 103 KB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
Peter Goodyear on behalf of Fordham (Cambs) Walking Group (PDF, 873 KB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
Peter Goodyear on behalf of Fordham (Cambs) Walking Group (PDF, 102 MB)
Deadline 6 Submission - Feasibility Study
Other
Peter Goodyear on behalf of Fordham (Cambs) Walking Group (PDF, 10 MB)
Deadline 6 Submission - East Cambridgeshire Cycling and Walking Routes Strategy
Other
Helen Faulkner (PDF, 81 KB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
Isleham Parish Council (PDF, 483 KB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
Isleham Society (PDF, 96 KB)
Deadline 6 Submission
Other
John Leitch (PDF, 94 KB)
Deadline 6 Submission - Comments on any further information requested by Deadline 5
Other
Natural England (PDF, 172 KB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
Note of an Unaccompanied Site Inspection on 25 and 26 January 2023 (PDF, 81 KB)
Other
Parish and Town Council Alliance (PDF, 83 KB)
Deadline 6 Submission
Other
Robin Upton (PDF, 1 KB)
Deadline 6 Submission
Other
Rule 17 Letter - Request for further information from the applicant (PDF, 142 KB)
Other
Sandie Geddes (PDF, 3 MB)
Deadline 6 Submission - Comment on 8.73 Applicant's Response to other parties’ Deadline 4 Submissions
Other
Say No To Sunnica Action Group Ltd (PDF, 25 MB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
Suffolk County Council (PDF, 298 KB)
Deadline 6 Submission - Comments on the Applicant’s Deadline 5 Submissions
Other
Suffolk County Council (PDF, 270 KB)
Deadline 6 Submission - Comments on the Applicant’s Response to ExA Second Written Questions [REP5-056]
Other
Suffolk County Council (PDF, 127 KB)
Deadline 6 Submission - Comments on the De-commissioning section of the Applicant’s response to the LPA Deadline 4 submissions
Other
Sunnica Ltd (PDF, 842 KB)
Deadline 6 Submission - 3.2 Draft DCO Explanatory Memorandum (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 6 Submission - 8.18 Draft Statement of Common Ground with Suffolk Wildlife Trust - Revision: 02
Other
Sunnica Ltd (PDF, 9 MB)
Deadline 6 Submission - 8.82 Flood Risk Assessment clarification document in light of proposed Scheme changes (Clean) - Revision: 01
Other
Sunnica Ltd (PDF, 243 KB)
Deadline 6 Submission - 8.15 Draft Statement of Common Ground with Natural England - Revision: 02
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 6 Submission - 8.33 Draft Statement of Common Ground with National Air Traffic Services - Revision: 01
Other
Sunnica Ltd (PDF, 32 MB)
Deadline 6 Submission - 2.1 Land and Crown Land Plans (Clean) - Revision: 06
Other
Sunnica Ltd (PDF, 23 MB)
Deadline 6 Submission - 2.4 Traffic Regulation Measures Plan - Temporary Road Closure - Part 2 - Revision: 03
Other
Sunnica Ltd (PDF, 29 MB)
Deadline 6 Submission - 2.4 Traffic Regulation Measures Plan - Temporary Measures - Part 1 - Revision: 03
Other
Sunnica Ltd (PDF, 32 MB)
Deadline 6 Submission - 2.1 Land and Crown Land Plans (Tracked) - Revision: 06
Other
Sunnica Ltd (PDF, 196 KB)
Deadline 6 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Clean) - Revision: 02
Other
Sunnica Ltd (PDF, 816 KB)
Deadline 6 Submission - 8.88 Campus Plan
Other
Sunnica Ltd (PDF, 252 KB)
Deadline 6 Submission - Cover Letter
Other
Sunnica Ltd (PDF, 312 KB)
Deadline 6 Submission - 4.3 Schedule of Changes to Book of Reference (parts 1 to 5) (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 838 KB)
Deadline 6 Submission - 3.2 Draft DCO Explanatory Memorandum (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 248 KB)
Deadline 6 Submission - 8.49 Objections Schedule (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 26 MB)
Deadline 6 Submission - 2.4 Traffic Regulation Measures Plan - Temporary Road Closure - Part 1 - Revision: 03
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 6 Submission - 4.3 Book of Reference (parts 1 to 5) (Clean) - Revision: 05
Other
Sunnica Ltd (PDF, 16 MB)
Deadline 6 Submission - 8.86 Applicant's Response to other parties Deadline 5 Submissions
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 6 Submission - 8.17 Draft Statement of Common Ground with National Highways - Revision: 01
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 6 Submission - 3.1 Draft Development Consent Order (Tracked) - Revision: 04
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 6 Submission - 4.4 Schedule of Negotiations and Powers Sought (Clean) - Revision: 07
Other
Sunnica Ltd (PDF, 376 KB)
Deadline 6 Submission - 8.87 Design Principles
Other
Sunnica Ltd (PDF, 825 KB)
Deadline 6 Submission - 1.2 Guide to the Application – Appendix A DCO Examination (Clean) - Revision: 08
Other
Sunnica Ltd (PDF, 9 MB)
Deadline 6 Submission - 8.82 Flood Risk Assessment clarification document in light of proposed Scheme changes (Tracked) - Revision: 01
Other
Sunnica Ltd (PDF, 850 KB)
Deadline 6 Submission - 1.2 Guide to the Application – Appendix A DCO Examination (Tracked) - Revision: 08
Other
Sunnica Ltd (PDF, 297 KB)
Deadline 6 Submission - 8.20 Draft Statement of Common Ground with National Grid Gas plc - Revision: 02
Other
Sunnica Ltd (PDF, 1 MB)
Deadline 6 Submission - 8.85 Issues Paper: Public Rights of Way Experience Note
Other
Sunnica Ltd (PDF, 255 KB)
Deadline 6 Submission - 8.43 Schedule of Changes to the Draft Development Consent Order - Revision: 02
Other
Sunnica Ltd (PDF, 308 KB)
Deadline 6 Submission - 4.3 Schedule of Changes to Book of Reference (parts 1 to 5) (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 6 Submission - 4.4 Schedule of Negotiations and Powers Sought (Tracked) - Revision: 07
Other
Sunnica Ltd (PDF, 378 KB)
Deadline 6 Submission - 8.19 Draft Statement of Common Ground with National Grid Electricity Transmission plc - Revision: 02
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 6 Submission - 6.7 Biodiversity Net Gain Assessment (Clean) - Revision: 03
Other
Sunnica Ltd (PDF, 210 KB)
Deadline 6 Submission - 8.16 Draft Statement of Common Ground with Historic England - Revision: 02
Other
Sunnica Ltd (PDF, 258 KB)
Deadline 6 Submission - 8.38 Draft Statement of Common Ground with Barton Mills Parish Council - Revision: 01
Other
Sunnica Ltd (PDF, 451 KB)
Deadline 6 Submission - 8.13 Draft Statement of Common Ground with Cambridgeshire County Council, Suffolk County Council, East Cambridgeshire District Council and West Suffolk Council - Revision: 02
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 6 Submission - 6.7 Biodiversity Net Gain Assessment (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 6 Submission - 8.14 Statement of Common Ground with the Environment Agency - Revision: 02
Other
Sunnica Ltd (PDF, 26 MB)
Deadline 6 Submission - 2.4 Traffic Regulation Measures Plan - Temporary Measures - Part 2 - Revision: 03
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 6 Submission - 8.34 Draft Statement of Common Ground with East of England Ambulance Service - Revision: 02
Other
Sunnica Ltd (PDF, 3 MB)
Deadline 6 Submission - 4.3 Book of Reference (parts 1 to 5) (Tracked) - Revision: 05
Other
Sunnica Ltd (PDF, 177 KB)
Deadline 6 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Clean) - Revision: 02
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 6 Submission - 3.1 Draft Development Consent Order (Clean) - Revision: 04
Other
Sunnica Ltd (PDF, 177 KB)
Deadline 6 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Tracked) - Revision: 02
Other
Sunnica Ltd (PDF, 23 MB)
Deadline 6 Submission - 2.4 Traffic Regulation Measures Plan - Temporary Road Closure - Part 3 - Revision: 03
Other
Sunnica Ltd (PDF, 213 KB)
Deadline 6 Submission - 8.12 Statement of Commonality - Revision: 02
Other
Sunnica Ltd (PDF, 198 KB)
Deadline 6 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Tracked) - Revision: 02
Other
Sunnica Ltd (PDF, 9 MB)
Deadline 6 Submission - 2.3 Access and Rights of Way Plans - Revision: 05
Other
Sunnica Ltd (PDF, 249 KB)
Deadline 6 Submission - 8.49 Objections Schedule (Tracked) - Revision: 03
Other
Sunnica Ltd (PDF, 10 MB)
Deadline 6 Submission - 2.2 Works Plans - Revision: 04
Other
Tattersalls/Newmarket Horsemans Group (PDF, 1 KB)
Deadline 6 Submission
Other
The Jockey Club (PDF, 2 KB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
West Suffolk Council (PDF, 182 KB)
Deadline 6 Submission - Comments on any Additional Submissions accepted at Deadline 5
Other
Worlington Parish Council (PDF, 15 KB)
Deadline 6 Submission - Worlington Parish Council Response to Alan Smith submission
Other
Worlington Parish Council (PDF, 35 KB)
Deadline 6 Submission - Worlington Parish Councils Response to Sunnica’s Applicant's Response to Other Parties’ Deadline 4 Submissions
Other
Other
Sunnica Ltd (PDF, 22 MB)
Deadline 5 Submission - 6.2 Appendix 8M Habitats Regulations Assessment: Report to Inform an Appropriate Assessment (Tracked) - Rev: 02 - Late Submission accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 405 KB)
Deadline 5 Submission - 6.2 Appendix 16F Framework Operation Environmental Management Plan (Clean) - Rev: 02 - Late Submission accepted at the discretion of the Examining Authority
Other
Preliminary meeting note (PDF, 530 KB)
Other
HPUT A Limited and HPUT B Limited (PDF, 134 KB)
Deadline 5 Submission - Proposed Draft Protective Provisions
Other
Bryan Cave Leighton Paisner LLP on behalf of HPUT A Limited and HPUT B Limited (PDF, 4 MB)
Deadline 5 Submission - Written Representation of HPUT A Limited and HPUT B Limited dated 11 November 2022
Other
HPUT A Limited and HPUT B Limited (PDF, 31 KB)
Deadline 5 Submission - Written Summary of oral submission at CAH1
Other
HPUT A Limited and HPUT B Limited (PDF, 2 MB)
Deadline 5 Submission - Comments on Sunnica’s Response to Written Representation [REP3A-035] relating to the Campus to the east of Newmarket Road
Other
A G Wright & Son (Farms) Ltd (PDF, 4 MB)
Deadline 5 Submission
Other
Alan B Smith (PDF, 129 KB)
Deadline 5 Submission
Other
Andrew Munro (PDF, 5 MB)
Deadline 5 Submission - Responses to the Examining Authority’s Second Written Questions (ExQ2)
Other
Anne Noble (PDF, 511 KB)
Deadline 5 Submission
Other
Cambridgeshire County Council (PDF, 270 KB)
Deadline 5 Submission - Responses to the Examining Authority’s Second Written Questions (ExQ2)
Other
Cambridgeshire County Council (PDF, 131 KB)
Deadline 5 Submission - Comments on the draft Statement of Common Ground (S0CG)
Other
Cambridgeshire County Council (PDF, 281 KB)
Deadline 5 Submission - Comments on Land and Crown Land Plans, draft Statement of Common Ground (SoCG), Applicant's written summary of oral submissions and FRA Addendum
Other
Cambridgeshire County Council (PDF, 175 KB)
Deadline 5 Submission - Comments on Applicant’s revised draft Development Consent Order (dDCO)
Other
Dr Alastair Burn (PDF, 2 KB)
Deadline 5 Submission - Comments on Applicant's written summary of oral submissions and response to ExAQ2
Other
Dr Edmund Fordham (PDF, 1,023 KB)
Deadline 5 Submission - Annex EF45
Other
Dr Edmund Fordham (PDF, 380 KB)
Deadline 5 Submission
Other
East Cambridgeshire District Council (PDF, 96 KB)
Deadline 5 Submission - Comments on Applicant’s revised draft Development Consent Order (dDCO)
Other
East Cambridgeshire District Council (PDF, 237 KB)
Deadline 5 Submission - Responses to the Examining Authority’s Second Written Questions (ExQ2)
Other
East Cambridgeshire District Council (PDF, 185 KB)
Deadline 5 Submission - Responses to the Examining Authority’s Second Written Questions (ExQ2)
Other
East Cambridgeshire District Council (PDF, 126 KB)
Deadline 5 Submission - Comments on Applicant’s revised draft Development Consent Order (dDCO) - Fees
Other
Environment Agency (PDF, 239 KB)
Deadline 5 Submission
Other
Historic England (PDF, 165 KB)
Deadline 5 Submission - Responses to the Examining Authority’s Second Written Questions (ExQ2)
Other
Liam and Clare MacGillivray (PDF, 185 KB)
Deadline 5 Submission - Responses to the Examining Authority’s Second Written Questions (ExQ2)
Other
Natural England (PDF, 187 KB)
Deadline 5 Submission
Other
Nick Harvey (PDF, 111 KB)
Deadline 5 Submission - Any further information requested by the Examining Authority
Other
Rule 8(3) and Rules 13, 16 and 17 Letter (PDF, 189 KB)
Other
Say No To Sunnica Action Group Ltd (PDF, 2 KB)
Deadline 5 Submission - Comments on Applicant’s draft itinerary for Accompanied Site Inspection 4
Other
Say No To Sunnica Action Group Ltd (PDF, 7 MB)
Deadline 5 Submission - Response to ExAQ2.7.4, Comments on Applicants ISH3 Submissions and Comments on Hatchfield Farm
Other
Say No To Sunnica Action Group Ltd (PDF, 122 KB)
Deadline 5 Submission
Other
Suffolk County Council (PDF, 937 KB)
Deadline 5 Submission - Responses to the Examining Authority’s Second Written Questions (ExQ2)
Other
Suffolk County Council (PDF, 120 KB)
Deadline 5 Submission - Comments on Applicant’s revised draft Development Consent Order (dDCO)
Other
Suffolk County Council (PDF, 161 KB)
Deadline 5 Submission - Responses to Deadline 4 Submissions in relation to Flood Risk
Other
Sunnica Ltd (PDF, 77 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 1 of 7 (Tracked)
Other
Sunnica Ltd (PDF, 45 MB)
Deadline 5 Submission - 8.77 Environmental Masterplan (Zoomed In) - 3 of 4
Other
Sunnica Ltd (PDF, 91 MB)
Deadline 5 Submission - 8.46 Arboricultural Impact Assessment Report (Tracked) - Rev: 01
Other
Sunnica Ltd (PDF, 687 KB)
Deadline 5 Submission - 8.73 Applicant's response to other parties Deadline 4 Submissions
Other
Sunnica Ltd (PDF, 38 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 5 of 7 (Tracked)
Other
Sunnica Ltd (PDF, 56 MB)
Deadline 5 Submission - 6.2 Appendix 10I Outline Landscape and Ecology Management Plan (Clean) - Rev: 02
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix A (Clean)
Other
Sunnica Ltd (PDF, 24 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix F (Tracked)
Other
Sunnica Ltd (PDF, 46 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 2 of 7 (Tracked)
Other
Sunnica Ltd (PDF, 43 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 4 of 7 (Clean)
Other
Sunnica Ltd (PDF, 3 MB)
Deadline 5 Submission - 8.76 Report on Current Status of Heritage Aspects of the RPG
Other
Sunnica Ltd (PDF, 24 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix E (Tracked)
Other
Sunnica Ltd (PDF, 634 KB)
Deadline 5 Submission - 1.2 Guide to the Application - Appendix A DCO Examination (Tracked) - Rev: 07
Other
Sunnica Ltd (PDF, 24 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix E (Clean)
Other
Sunnica Ltd (PDF, 192 KB)
Deadline 5 Submission - Deadline 5 Cover Letter
Other
Sunnica Ltd (PDF, 35 MB)
Deadline 5 Submission - 8.74 Second Change Application
Other
Sunnica Ltd (PDF, 567 KB)
Deadline 5 Submission - 6.2 Appendix 16E Framework Decommissioning Environmental Management Plan (Tracked) - Rev: 02
Other
Sunnica Ltd (PDF, 6 MB)
Deadline 5 Submission - 6.2 Appendix 8M Habitats Regulations Assessment: Report to Inform an Appropriate Assessment (Clean) - Rev: 02
Other
Sunnica Ltd (PDF, 28 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 7 of 7 (Clean)
Other
Sunnica Ltd (PDF, 24 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix F (Clean)
Other
Sunnica Ltd (PDF, 5 MB)
Deadline 5 Submission - 6.6 Offsetting Habitat Provision for Stone-Curlew Specification (Clean) - Rev: 01
Other
Sunnica Ltd (PDF, 410 KB)
Deadline 5 Submission - 6.2 Appendix 16F Framework Operation Environmental Management Plan (Tracked) - Rev: 02
Other
Sunnica Ltd (PDF, 5 MB)
Deadline 5 Submission - 6.6 Offsetting Habitat Provision for Stone-Curlew Specification (Tracked) - Rev: 01
Other
Sunnica Ltd (PDF, 562 KB)
Deadline 5 Submission - 6.2 Appendix 16E Framework Decommissioning Environmental Management Plan (Clean) - Rev: 02
Other
Sunnica Ltd (PDF, 46 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 2 of 7 (Clean)
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 3 of 7 (Tracked)
Other
Sunnica Ltd (PDF, 28 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix G (Clean)
Other
Sunnica Ltd (PDF, 91 MB)
Deadline 5 Submission - 8.46 Arboricultural Impact Assessment Report (Clean) - Rev: 01
Other
Sunnica Ltd (PDF, 28 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 7 of 7 (Tracked)
Other
Sunnica Ltd (PDF, 10 MB)
Deadline 5 Submission - 8.71 Applicant's Response to ExA Second Written Questions
Other
Sunnica Ltd (PDF, 1 MB)
Deadline 5 Submission - 8.72 Applicant's response to LPA Deadline 4 Submissions
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan (Tracked) - Rev: 04
Other
Sunnica Ltd (PDF, 775 KB)
Deadline 5 Submission - 6.2 Appendix 16C Framework Construction Environmental Management Plan (Tracked) - Rev: 04
Other
Sunnica Ltd (PDF, 259 KB)
Deadline 5 Submission - 8.78 Peer Review of SNTS ALC Report
Other
Sunnica Ltd (PDF, 33 MB)
Deadline 5 Submission - 8.83 Drainage Technical Note (Tracked)
Other
Sunnica Ltd (PDF, 24 MB)
Deadline 5 Submission - 8.79 Sunnica Detailed Archaeological Mitigation Strategy
Other
Sunnica Ltd (PDF, 753 KB)
Deadline 5 Submission - 6.2 Appendix 16C Framework Construction Environmental Management Plan (Clean) - Rev: 04
Other
Sunnica Ltd (PDF, 13 MB)
Deadline 5 Submission - 8.80 Agricultural Land Classification (ALC) Guidance
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 5 Submission - 4.4 Schedule of Negotiations and Powers Sought (Clean) - Rev: 06
Other
Sunnica Ltd (PDF, 9 MB)
Deadline 5 Submission - 7.6 Outline Battery Fire Safety Management Plan (Tracked) - Rev: 02
Other
Sunnica Ltd (PDF, 23 MB)
Deadline 5 Submission - 8.47 Environmental Masterplan (Zoomed Out)
Other
Sunnica Ltd (PDF, 425 KB)
Deadline 5 Submission - 4.2 Funding Statement (Tracked) - Rev: 01
Other
Sunnica Ltd (PDF, 55 MB)
Deadline 5 Submission - 6.2 Appendix 10I Outline Landscape and Ecology Management Plan (Tracked) - Rev: 02
Other
Sunnica Ltd (PDF, 38 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 6 of 7 (Tracked)
Other
Sunnica Ltd (PDF, 29 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix D (Tracked)
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 5 Submission - 8.82 FRA clarification document in light of proposed Scheme changes
Other
Sunnica Ltd (PDF, 276 KB)
Deadline 5 Submission - 8.81 Public Rights of Way Closure Note
Other
Sunnica Ltd (PDF, 623 KB)
Deadline 5 Submission - 1.2 Guide to the Application - Appendix A DCO Examination (Clean) - Rev: 07
Other
Sunnica Ltd (PDF, 8 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan (Clean) - Rev: 04
Other
Sunnica Ltd (PDF, 33 MB)
Deadline 5 Submission - 8.83 Drainage Technical Note (Clean)
Other
Sunnica Ltd (PDF, 55 MB)
Deadline 5 Submission - 6.2 Appendix 10I Landscape and Ecology Management Plan (Tracked) - Rev: 02 - Late Submission accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 5 Submission - 8.48 Tree Preservation Order Trees Location Plan - Rev: 01
Other
Sunnica Ltd (PDF, 9 MB)
Deadline 5 Submission - 7.6 Outline Battery Fire Safety Management Plan (Clean) - Rev: 02
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 5 Submission - 8.77 Environmental Masterplan (Zoomed In) - 2 of 4
Other
Sunnica Ltd (PDF, 13 MB)
Deadline 5 Submission - 4.2 Funding Statement (Clean) - Rev: 01
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 3 of 7 (Clean)
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix A (Tracked)
Other
Sunnica Ltd (PDF, 15 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix B (Clean)
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 5 Submission - 4.4 Schedule of Negotiations and Powers Sought (Tracked) - Rev: 06
Other
Sunnica Ltd (PDF, 56 MB)
Deadline 5 Submission - 6.2 Appendix 10I Landscape and Ecology Management Plan (Clean) - Rev: 02 - Late Submission accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 43 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 4 of 7 (Tracked)
Other
Sunnica Ltd (PDF, 38 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 5 of 7 (Clean)
Other
Sunnica Ltd (PDF, 28 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix G (Tracked)
Other
Sunnica Ltd (PDF, 15 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix B (Tracked)
Other
Sunnica Ltd (PDF, 62 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 1 of 7 (Clean)
Other
Sunnica Ltd (PDF, 48 MB)
Deadline 5 Submission - 8.77 Environmental Masterplan (Zoomed In) - 1 of 4
Other
Sunnica Ltd (PDF, 40 MB)
Deadline 5 Submission - 8.77 Environmental Masterplan (Zoomed In) - 4 of 4
Other
Sunnica Ltd (PDF, 38 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix C - 6 of 7 (Clean)
Other
Sunnica Ltd (PDF, 29 MB)
Deadline 5 Submission - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan - Appendix D (Clean)
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 5 Submission - 6.7 Biodiversity Net Gain (Clean) - Rev: 02 - Late Submission accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 5 Submission - 6.7 Biodiversity Net Gain (Tracked) - Rev: 02 - Late Submission accepted at the discretion of the Examining Authority
Other
Sunnica Ltd (PDF, 142 KB)
Notice of February 2023 resumed Compulsory Acquisition Hearing (CAH1), Compulsory Acquisition Hearing (CAH2) and Issue Specific Hearing (ISH4)
Other
West Suffolk Council (PDF, 220 KB)
Deadline 5 Submission - Responses to the Examining Authority’s Second Written Questions (ExQ2)
Other
West Suffolk Council (PDF, 12 MB)
Deadline 5 Submission - Preserving Archaeological Remains
Other
West Suffolk Council (PDF, 146 KB)
Deadline 5 Submission - Comments on draft DCO, draft Statement of Common Ground (SoCG) and Applicant's written summary of oral submissions
Other
West Suffolk Council (PDF, 23 KB)
Deadline 5 Submission - Sourcing and Managing Mitigation Land
Other
Examining Authority’s written questions and requests for information (ExQ2) (PDF, 457 KB)
Other
Nick Harvey (PDF, 151 KB)
Deadline 4 Submission - Late Submission accepted at the discretion of the Examining Authority
Other
A G Wright & Son (Farms) Ltd (PDF, 195 KB)
Deadline 4 Submission - Post hearing submission - Appendix 12
Other
A G Wright & Son (Farms) Ltd (PDF, 2 MB)
Deadline 4 Submission - Post hearing submission - Appendix 11
Other
A G Wright & Son (Farms) Ltd (PDF, 3 MB)
Deadline 4 Submission - Post hearing submission - Appendix 4
Other
A G Wright & Son (Farms) Ltd (PDF, 170 KB)
Deadline 4 Submission - Post hearing submission - Appendix 13
Other
A G Wright & Son (Farms) Ltd (PDF, 27 MB)
Deadline 4 Submission - Post hearing submission
Other
A G Wright & Son (Farms) Ltd (PDF, 2 MB)
Deadline 4 Submission - Post hearing submission - Appendix 10
Other
A G Wright & Son (Farms) Ltd (PDF, 3 MB)
Deadline 4 Submission - Post hearing submission - Appendix 8
Other
A G Wright & Son (Farms) Ltd (PDF, 1 MB)
Deadline 4 Submission - Post hearing submission - Appendix 6
Other
A G Wright & Son (Farms) Ltd (PDF, 105 KB)
Deadline 4 Submission - Post hearing submission - Appendix 3a
Other
A G Wright & Son (Farms) Ltd (PDF, 2 MB)
Deadline 4 Submission - Post hearing submission - Appendix 5
Other
A G Wright & Son (Farms) Ltd (PDF, 1 MB)
Deadline 4 Submission - Post hearing submission - Appendix 1
Other
A G Wright & Son (Farms) Ltd (PDF, 109 KB)
Deadline 4 Submission - Post hearing submission - Appendix 7
Other
A G Wright & Son (Farms) Ltd (PDF, 75 KB)
Deadline 4 Submission - Post hearing submission - Appendix 14
Other
A G Wright & Son (Farms) Ltd (PDF, 160 KB)
Deadline 4 Submission - Post hearing submission - Appendix 15
Other
A G Wright & Son (Farms) Ltd (PDF, 2 MB)
Deadline 4 Submission - Post hearing submission - Appendix 2
Other
A G Wright & Son (Farms) Ltd (PDF, 322 KB)
Deadline 4 Submission - Post hearing submission - Appendix 9
Other
A G Wright & Son (Farms) Ltd (PDF, 3 MB)
Deadline 4 Submission - Post hearing submission - Appendix 3c
Other
A G Wright & Son (Farms) Ltd (PDF, 2 MB)
Deadline 4 Submission - Post hearing submission - Appendix 3
Other
A G Wright & Son (Farms) Ltd (PDF, 3 MB)
Deadline 4 Submission - Post hearing submission - Appendix 3b
Other
A G Wright & Sons Farms Ltd, R F Turner & Son and Freckenham Estate (PDF, 1 MB)
Deadline 4 Submission - Post hearing submission - Appendix 3
Other
A G Wright & Sons Farms Ltd, R F Turner & Son and Freckenham Estate (PDF, 632 KB)
Deadline 4 Submission - Post hearing submission - Appendix 2
Other
A G Wright & Sons Farms Ltd, R F Turner & Son and Freckenham Estate (PDF, 1 MB)
Deadline 4 Submission - Post hearing submission - Appendix 1
Other
A G Wright & Sons Farms Ltd, R F Turner & Son and Freckenham Estate (Document 20 KB)
Deadline 4 Submission - Post hearing submission - Appendix 5
Other
A G Wright & Sons Farms Ltd, R F Turner & Son and Freckenham Estate (PDF, 72 KB)
Deadline 4 Submission - Post hearing submission - Appendix 4
Other
A G Wright & Sons Farms Ltd, R F Turner & Son and Freckenham Estate (PDF, 6 MB)
Deadline 4 Submission - Post hearing submission - Cover Letter
Other
Alan B Smith (PDF, 54 KB)
Deadline 4 Submission - Post hearing submission
Other
Alan T Richardson (PDF, 5 KB)
Deadline 4 Submission - Post hearing submission (Part 2)
Other
Alan T Richardson (PDF, 5 KB)
Deadline 4 Submission - Post hearing submission (Part 1)
Other
Alan T Richardson (PDF, 997 KB)
Deadline 4 Submission - Stationary Energy Storage Failure Events
Other
Alan T Richardson (PDF, 3 KB)
Deadline 4 Submission - Post hearing submission (Part 3)
Other
Alan T Richardson (PDF, 3 KB)
Deadline 4 Submission - Post hearing submission (Part 4)
Other
Andrew Munro (PDF, 44 MB)
Deadline 4 Submission - Post hearing submission
Other
Anne Noble (PDF, 121 KB)
Deadline 4 Submission - Post hearing submission
Other
Brenda Knowles (PDF, 2 KB)
Deadline 4 Submission - Post hearing submission
Other
Cambridgeshire County Council (PDF, 86 KB)
Deadline 4 Submission - Written Summary of Oral Case for Open Floor Hearing 1 (OFH1)
Other
Cambridgeshire County Council (PDF, 12 MB)
Deadline 4 Submission - Physical activity and the environment
Other
Cambridgeshire County Council (PDF, 220 KB)
Deadline 4 Submission - Joint Cambridgeshire & Peterborough Overarching Health and Wellbeing Strategy
Other
Cambridgeshire County Council (PDF, 4 MB)
Deadline 4 Submission - An Interim Nature Recovery Network for East Cambridgeshire
Other
Cambridgeshire County Council (PDF, 2 MB)
Deadline 4 Submission - Comments on the Applicant’s D3 and D3a submissions
Other
Cambridgeshire County Council (PDF, 44 MB)
Deadline 4 Submission - A Green Future: Our 25 Year Plan to Improve the Environment
Other
Cambridgeshire County Council and East Cambridgeshire County Council (PDF, 170 KB)
Deadline 4 Submission - Written Summary of Oral Case for Issue Specific Hearing 2 (ISH2)
Other
Cambridgeshire County Council and East Cambridgeshire County Council (PDF, 146 KB)
Deadline 4 Submission - Written Summary of or Oral Case for Issue Specific Hearing 3 (ISH3)
Other
Dr Catherine Judkins (PDF, 1 MB)
Deadline 4 Submission - Post hearing submission
Other
Dr Edmund Fordham (PDF, 1 MB)
Deadline 4 Submission - Post hearing submission - ISH3 - Annex EF41 - 5 of 6
Other
Dr Edmund Fordham (PDF, 89 KB)
Deadline 4 Submission - Post hearing submission - ISH2 - Ecology and Biodiversity - 1 of 3
Other
Dr Edmund Fordham (PDF, 44 KB)
Deadline 4 Submission - Post hearing submission - OFH2 - Annex EF43 - 2 of 3
Other
Dr Edmund Fordham (PDF, 239 KB)
Deadline 4 Submission - Post hearing submission - ISH3 - Annex EF38 - 2 of 6
Other
Dr Edmund Fordham (PDF, 184 KB)
Deadline 4 Submission - Post hearing submission - ISH3 - BESS Safety and Consenting Requirements - 1 of 6
Other
Dr Edmund Fordham (PDF, 4 MB)
Deadline 4 Submission - Post hearing submission - ISH2 - Annex EF36 - 2 of 3
Other
Dr Edmund Fordham (PDF, 410 KB)
Deadline 4 Submission - Post hearing submission - ISH3 - Annex EF39 - 3 of 6
Other
Dr Edmund Fordham (PDF, 341 KB)
Deadline 4 Submission - Post hearing submission - ISH3 - Annex EF42 - 6 of 6
Other
Dr Edmund Fordham (PDF, 147 KB)
Deadline 4 Submission - Post hearing submission - OFH2 - Annex EF44 - 3 of 3
Other
Dr Edmund Fordham (PDF, 114 KB)
Deadline 4 Submission - Post hearing submission - OFH2 - Need for involvement of the Regulator and Scheme Benefits - 1 of 3
Other
Dr Edmund Fordham (PDF, 7 MB)
Deadline 4 Submission - Post hearing submission - ISH3 - Annex EF40 - 4 of 6
Other
Dr Edmund Fordham (PDF, 2 MB)
Deadline 4 Submission - Post hearing submission - ISH2 - Annex EF37 - 3 of 3
Other
Womble Bond Dickinson UK LLP on behalf of Drug Development Solutions Limited, LGC Limited and LGC Bioresearch Limited (PDF, 124 KB)
Deadline 4 Submission - Post hearing submission
Other
Environment Agency (PDF, 213 KB)
Deadline 4 Submission - Post hearing submission
Other
Peter Goodyear on behalf of Fordham (Cambs) Walking Group (PDF, 109 KB)
Deadline 4 Submission - Post hearing submission
Other
Fordham Parish Council (PDF, 101 KB)
Deadline 4 Submission - Post hearing submission Open Floor Hearing 1 (OFH1)
Other
Hermes Property Unit Trust A and B Limited (“HPUT”) (PDF, 35 KB)
Deadline 4 Submission - Late Submission accepted at the discretion of the Examining Authority
Other
Isabel Cross (PDF, 133 KB)
Deadline 4 Submission - Post hearing submission
Other
Isleham Parish Council (PDF, 56 KB)
Deadline 4 Submission - Post hearing submission
Other
Isleham Society (PDF, 102 KB)
Deadline 4 Submission - Post hearing submission
Other
Jane Leitch (PDF, 87 KB)
Deadline 4 Submission - Post hearing submission Open Floor Hearing 2 (OFH2)
Other
John Bridges (PDF, 97 KB)
Deadline 4 Submission - Post hearing submission
Other
John Gosden (PDF, 2 KB)
Deadline 4 Submission - Post hearing submission Issue Specific Hearing 3 (ISH3)
Other
John Leitch (PDF, 123 KB)
Deadline 4 Submission - Post hearing submission Open Floor Hearing 2 (OFH2)
Other
Josie Jennings (PDF, 161 KB)
Deadline 4 Submission - Post hearing submission
Other
Julia Huffer (PDF, 4 MB)
Deadline 4 Submission - Any further information requested by the Examining Authority - An Interim Nature Recovery Network for East Cambridgeshire
Other
Julia Huffer (PDF, 20 MB)
Deadline 4 Submission - Any further information requested by the Examining Authority - Biodiversity Net Gain: East Cambridgeshire
Other
Justin Fuga (PDF, 536 KB)
Deadline 4 Submission - Post hearing submission
Other
Liam and Clare MacGillivray (PDF, 46 KB)
Deadline 4 Submission - Any further information requested by the Examining Authority
Other
Linda Homan (PDF, 12 KB)
Deadline 4 Submission - Post hearing submission
Other
Lucy Frazer MP (PDF, 2 KB)
Deadline 4 Submission - Post hearing submission
Other
Mark Goldsack (PDF, 200 KB)
Deadline 4 Submission - Post hearing submission
Other
Matt Hancock MP (PDF, 3 KB)
Deadline 4 Submission - Post hearing submission
Other
Natural England (PDF, 198 KB)
Deadline 4 Submission
Other
Newmarket Town Council (PDF, 3 KB)
Deadline 4 Submission - Post hearing submission
Other
Nick Harvey (PDF, 144 KB)
Deadline 4 Submission - Post hearing submission
Other
Nick Harvey (PDF, 308 KB)
Deadline 4 Submission - Late Submission accepted at the discretion of the Examining Authority
Other
Nicole Langstaff (PDF, 100 KB)
Deadline 4 Submission - Post hearing submission
Other
Peter Knowles (PDF, 3 KB)
Deadline 4 Submission - Post hearing submission
Other
Red Lodge Parish Council (PDF, 353 KB)
Deadline 4 Submission - Post hearing submission
Other
Red Lodge Parish Council (PDF, 116 KB)
Deadline 4 Submission - Post hearing submission
Other
Sam Lee-McCloud (PDF, 223 KB)
Deadline 4 Submission - Post hearing submission
Other
Sandie Geddes (PDF, 170 KB)
Deadline 4 Submission - Post hearing submission
Other
Say No To Sunnica Action Group Ltd (PDF, 18 MB)
Deadline 4 Submission - Post hearing submission
Other
Say No To Sunnica Action Group Ltd (PDF, 72 KB)
Deadline 4 Submission - Agricultural Land Classification
Other
Snailwell Parish Council (PDF, 146 KB)
Deadline 4 Submission - Post hearing submission
Other
Suffolk County Council (PDF, 212 KB)
Deadline 4 Submission - Post hearing submission Issue Specific Hearing 3 (ISH3)
Other
Suffolk County Council (PDF, 247 KB)
Deadline 4 Submission - Post hearing submission Issue Specific Hearing 2 (ISH2)
Other
Suffolk County Council (PDF, 180 KB)
Deadline 4 Submission - Post hearing submission Cllr Richard Rout Open Floor Hearing 1 (OFH1)
Other
Suffolk County Council (PDF, 312 KB)
Deadline 4 Submission - Suffolk County Council Response to the Updated Framework Construction Traffic Management Plan and Travel Plan (FCTMP&TP) (APP3-014)
Other
Suffolk County Council (PDF, 165 KB)
Deadline 4 Submission - Response by Suffolk County Council to Appendix A of [REP3-019] Applicant’s Response to the Joint Local Impact Report
Other
Suffolk County Council (PDF, 203 KB)
Deadline 4 Submission - Response by Suffolk County Council to Action Point No. 8 Consequent Upon ISH2 on Environmental Matters
Other
Sunnica Ltd (PDF, 81 MB)
Deadline 4 Submission - 8.69 Applicant's Response to BESS Safety Issues Raised During ISH3
Other
Sunnica Ltd (PDF, 178 KB)
Deadline 4 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Tracked) - Revision: 01
Other
Sunnica Ltd (PDF, 185 KB)
Deadline 4 Submission - 8.34 Draft Statement of Common Ground with East of England Ambulance Service - Rev: 01
Other
Sunnica Ltd (PDF, 529 KB)
Deadline 4 Submission - 8.56 Written Summary of Applicant’s Oral Submissions at the Compulsory Acquisition Hearing 1 (CAH1) on 6 December 2022
Other
Sunnica Ltd (PDF, 27 MB)
Deadline 4 Submission - 2.1 Land and Crown Land Plans (Clean) - Rev: 04
Other
Sunnica Ltd (PDF, 27 MB)
Deadline 4 Submission - 2.1 Land and Crown Land Plans (Tracked) - Rev: 04
Other
Sunnica Ltd (PDF, 417 KB)
Deadline 4 Submission - 8.59 Written Summary of Applicant’s Oral Submissions at the Open Floor Hearing 1 (OFH1) on 6 December 2022 and Open Floor Hearing 2 (OFH2) on 9 December 2022
Other
Sunnica Ltd (PDF, 899 KB)
Deadline 4 Submission - 3.1 Draft Development Consent Order (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 16 MB)
Deadline 4 Submission - 8.61 Applicant's response to East Cambridgeshire District Council, Cambridgeshire County Council, Suffolk County Council and West Suffolk Council Deadline 2, 3 and 3A Submissions
Other
Sunnica Ltd (PDF, 251 KB)
Deadline 4 Submission - 8.49 Objections Schedule (Tracked) - Rev: 02
Other
Sunnica Ltd (PDF, 651 KB)
Deadline 4 Submission - 8.67 Draft Statement of Common Ground with the Parish and Town Council's Alliance
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 4 Submission - 4.4 Schedule of Negotiations and Powers Sought (Tracked) - Rev: 05
Other
Sunnica Ltd (PDF, 241 KB)
Deadline 4 Submission - 8.60 Applicant's Response to Dr Edmund Fordham Deadline 3A Submissions
Other
Sunnica Ltd (PDF, 232 KB)
Deadline 4 Submission - 8.14 Statement of Common Ground with the Environment Agency - Rev: 01
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 4 Submission - 8.65 Applicant's response to comments on 8.10 Horse Racing Industry Impact Assessment
Other
Sunnica Ltd (PDF, 600 KB)
Deadline 4 Submission - 1.2 Guide to the Application – Appendix A DCO Examination - Rev: 06
Other
Sunnica Ltd (PDF, 444 KB)
Deadline 4 Submission - 8.13 Draft Statement of Common Ground with Cambridgeshire County Council, Suffolk County Council, East Cambridgeshire District Council and West Suffolk Council
Other
Sunnica Ltd (PDF, 5 MB)
Deadline 4 Submission - 8.57 Written Summary of Applicant’s Oral Submissions at the Issue Specific Hearing – Environmental Matters on 7 December 2022
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 4 Submission - 8.18 Draft Statement of Common Ground with Suffolk Wildlife Trust - Rev: 01
Other
Sunnica Ltd (PDF, 181 KB)
Deadline 4 Submission - 8.20 Draft Statement of Common Ground with National Grid Gas plc - Rev: 01
Other
Sunnica Ltd (PDF, 186 KB)
Deadline 4 Submission - 8.49 Objections Schedule (Clean) - Rev: 02
Other
Sunnica Ltd (PDF, 53 MB)
Deadline 4 Submission - 8.66 Appendix 9C: Flood Risk Assessment Addendum - Part 2 (Drainage Strategy)
Other
Sunnica Ltd (PDF, 211 KB)
Deadline 4 Submission - 8.16 Draft Statement of Common Ground with Historic England - Rev: 01
Other
Sunnica Ltd (PDF, 24 MB)
Deadline 4 Submission - 8.62 Applicant's Response to Say No To Sunnica Action Group Ltd Deadline 2, 3 and 3A Submissions
Other
Sunnica Ltd (PDF, 243 KB)
Deadline 4 Submission - 8.64 Applicant's response to Say No To Sunnica Key Data Letter (28 November 2022)
Other
Sunnica Ltd (PDF, 770 KB)
Deadline 4 Submission - Cover Letter
Other
Sunnica Ltd (PDF, 244 KB)
Deadline 4 Submission - 8.15 Draft Statement of Common Ground with Natural England - Rev: 01
Other
Sunnica Ltd (PDF, 193 KB)
Deadline 4 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Tracked) - Rev: 01
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 4 Submission - 4.3 Book of Reference (parts 1 to 5) (Clean) - Rev: 04
Other
Sunnica Ltd (PDF, 297 KB)
Deadline 4 Submission - 4.3 Schedule of Changes to Book of Reference (parts 1 to 5) (Clean) - Rev: 02
Other
Sunnica Ltd (PDF, 2 MB)
Deadline 4 Submission - 4.4 Schedule of Negotiations and Powers Sought (Clean) - Rev: 05
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 4 Submission - 8.58 Written Summary of Applicant’s Oral Submissions at the Issue Specific Hearing 3 (ISH3) on 8 December 2022
Other
Sunnica Ltd (PDF, 481 KB)
Deadline 4 Submission - 8.63 Applicant's Response to Other Parties’ Deadline 2, 3 and 3A Submissions
Other
Sunnica Ltd (PDF, 45 MB)
Deadline 4 Submission - 8.66 Appendix 9C: Flood Risk Assessment Addendum - Part 1
Other
Sunnica Ltd (PDF, 273 KB)
Deadline 4 Submission - 4.3 Schedule of Changes to Book of Reference (parts 1 to 5) (Tracked) - Rev: 02
Other
Sunnica Ltd (PDF, 192 KB)
Deadline 4 Submission - 8.55 Statutory Undertaker Representations Schedule (PA2008 S138) (Clean) - Rev: 01
Other
Sunnica Ltd (PDF, 891 KB)
Deadline 4 Submission - 3.1 Draft Development Consent Order (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 169 KB)
Deadline 4 Submission - 8.43 Schedule of Changes to the Draft Development Consent Order - Rev: 01
Other
Sunnica Ltd (PDF, 77 KB)
Deadline 4 Submission - 8.57 Appendix A Chippenham Park Historic maps - CONFIDENTIAL
Other
Sunnica Ltd (PDF, 177 KB)
Deadline 4 Submission - 8.68 Statutory Undertaker Representations Schedule (PA2008 S127) (Clean) - Revision: 01
Other
Sunnica Ltd (PDF, 78 KB)
Additional Submission accepted at the discretion of the Examining Authority - Applicants Notice of further proposed changes to the application
Other
Sunnica Ltd (PDF, 4 MB)
Deadline 4 Submission - 4.3 Book of Reference (parts 1 to 5) (Tracked) - Rev: 04
Other
Sunnica Ltd (PDF, 207 KB)
Deadline 4 Submission - 8.12 Statement of Commonality - Rev: 01
Other
Sunnica Ltd (PDF, 208 KB)
Deadline 4 Submission - 8.19 Draft Statement of Common Ground with National Grid Electricity Transmission plc
Other
Sunnica Ltd (PDF, 626 KB)
Deadline 4 Submission - 8.21 Draft Statement of Common Ground with Anglian Water
Other
Tattersalls (PDF, 3 MB)
Deadline 4 Submission - Post hearing submission
Other
The Jockey Club (PDF, 1 KB)
Deadline 4 Submission - Post hearing submission
Other
Christian Wall on behalf of The Newmarket Horsemens Group (PDF, 132 KB)
Deadline 4 Submission - Post hearing submission
Other
John Morrey on behalf of The Newmarket Horsemens Group (PDF, 77 KB)
Deadline 4 Submission - Post hearing submission
Other
Jan Anderson on behalf of the Travellers Community Elms Farm (PDF, 2 MB)
Deadline 4 Submission - Post hearing submission
Other
Tim Lawson (PDF, 153 KB)
Deadline 4 Submission - Post hearing submission
Other
West Suffolk Council (PDF, 94 KB)
Deadline 4 Submission - Summary of Stone-curlew conservation in the Brecks and at the proposed Sunnica site
Other
West Suffolk Council (PDF, 171 KB)
Deadline 4 Submission -Post hearing submission Issue Specific Hearing 2 (ISH2) on Ecology & Biodiversity, Historic Environment and Landscape and Visual Impact
Other
West Suffolk Council (PDF, 130 KB)
Deadline 4 Submission - Review of Arboricultural Impact Assessment [REP3-021]
Other
West Suffolk Council (PDF, 78 KB)
Deadline 4 Submission - Review of Environmental Masterplan [REP3-022]
Other
West Suffolk Council (PDF, 299 KB)
Deadline 4 Submission - European Site Conservation Objectives: Supplementary advice on conserving and restoring site features
Other
West Suffolk Council (PDF, 8 MB)
Deadline 4 Submission - Shifting sands. Techniques to encourage European rabbit recovery
Other
West Suffolk Council (PDF, 331 KB)
Deadline 4 Submission - Review of Outline Landscape and Ecology Management Plan [REP3-011 and [REP3-012]
Other
West Suffolk Council (PDF, 7 MB)
Deadline 4 Submission - Post hearing submission of Cllr Brian Harvey
Other
West Suffolk Council (PDF, 115 KB)
Deadline 4 Submission - Post hearing submission Issue Specific Hearing 3 (ISH3) on Principle and nature of development Air quality and human health Socio-economics and land use Water resources, flood risk and drainage Public rights of way
Other
Worlington Parish Council (PDF, 64 KB)
Deadline 4 Submission
Other
Recording of the Open Floor Hearing 2 (OFH2) on Friday 9 December 2022 (Document 4 KB)
Other
Transcript for the Recording of the Open Floor Hearing 2 (OFH2) on Friday 9 December 2022 (PDF, 855 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Action points arising from Issue Specific Hearing 3 (ISH3) on Other Environmental Matters (PDF, 119 KB)
Other
Part 1 of the Recording of the Issue Specific Hearing 3 (ISH3) on Other Environmental Matters on Thursday 8 December 2022 (Document 4 KB)
Other
Part 2 of the Recording of the Issue Specific Hearing 3 (ISH3) on Other Environmental Matters on Thursday 8 December 2022 (Document 4 KB)
Other
Part 3 of the Recording of the Issue Specific Hearing 3 (ISH3) on Other Environmental Matters on Thursday 8 December 2022 (Document 4 KB)
Other
Part 4 of the Recording of the Issue Specific Hearing 3 (ISH3) on Other Environmental Matters on Thursday 8 December 2022 (Document 4 KB)
Other
Transcript for the Part 1 of the Recording of the Issue Specific Hearing 3 (ISH3) on Other Environmental Matters on Thursday 8 December 2022 (PDF, 488 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 2 of the Recording of the Issue Specific Hearing 3 (ISH3) on Other Environmental Matters on Thursday 8 December 2022 (PDF, 408 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 3 of the Recording of the Issue Specific Hearing 3 (ISH3) on Other Environmental Matters on Thursday 8 December 2022 (PDF, 153 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 4 of the Recording of the Issue Specific Hearing 3 (ISH3) on Other Environmental Matters on Thursday 8 December 2022 (PDF, 680 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Action points arising from Issue Specific Hearing (ISH2) on Environmental Matters (PDF, 137 KB)
Other
Part 1 of the Recording of the Issue Specific Hearing 2 (ISH2) on Environmental Matters on Wednesday 7 December 2022 (Document 4 KB)
Other
Part 2 of the Recording of the Issue Specific Hearing 2 (ISH2) on Environmental Matters on Wednesday 7 December 2022 (Document 4 KB)
Other
Part 3 of the Recording of the Issue Specific Hearing 2 (ISH2) on Environmental Matters on Wednesday 7 December 2022 (Document 4 KB)
Other
Part 4 of the Recording of the Issue Specific Hearing 2 (ISH2) on Environmental Matters on Wednesday 7 December 2022 (Document 4 KB)
Other
Rule 9 - Procedural Decision regarding Applicant's Second Change Request (PDF, 143 KB)
Other
Transcript for the Part 1 of the Recording of the Issue Specific Hearing 2 (ISH2) on Environmental Matters on Wednesday 7 December 2022 (PDF, 500 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 2 of the Recording of the Issue Specific Hearing 2 (ISH2) on Environmental Matters on Wednesday 7 December 2022 (PDF, 341 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 3 of the Recording of the Issue Specific Hearing 2 (ISH2) on Environmental Matters on Wednesday 7 December 2022 (PDF, 331 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 4 of the Recording of the Issue Specific Hearing 2 (ISH2) on Environmental Matters on Wednesday 7 December 2022 (PDF, 422 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Part 1 of the Recording of the Compulsory Acquisition Hearing (CAH1) on Tuesday 6 December 2022 (Document 4 KB)
Other
Part 2 of the Recording of the Compulsory Acquisition Hearing (CAH1) on Tuesday 6 December 2022 (Document 4 KB)
Other
Recording of the Open Floor Hearing 1 (OFH1) on Tuesday 6 December 2022 (Document 4 KB)
Other
Transcript for the Part 1 of the Recording of the Compulsory Acquisition Hearing (CAH1) on Tuesday 6 December 2022 (PDF, 419 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Part 2 of the Recording of the Compulsory Acquisition Hearing (CAH1) on Tuesday 6 December 2022 (PDF, 143 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Transcript for the Recording of the Open Floor Hearing 1 (OFH1) on Tuesday 6 December 2022 (PDF, 285 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Say No To Sunnica Action Group Ltd (PDF, 1 MB)
Deadline 2 Submission – Late Submission accepted at the discretion of the Examining Authority – Natural England Technical Information Note TIN049
Other
Say No To Sunnica Action Group Ltd (PDF, 2 MB)
Deadline 2 Submission – Late Submission accepted at the discretion of the Examining Authority - Agricultural Land Classification of England and Wales
Other
Say No To Sunnica Action Group Ltd (PDF, 91 KB)
Deadline 2 Submission – Late Submission accepted at the discretion of the Examining Authority – Annex B: Development Involving Agricultural Land
Other
Peter Goodyear on behalf of Fordham (Cambs) Walking Group (PDF, 260 KB)
Additional Submission - Position Statement in lieu of participation at Issue Specific Hearing (ISH3) -Accepted at the discretion of the Examining Authority
Other
Say No To Sunnica Action Group Ltd (PDF, 1 MB)
Additional Submission - Position Statement in lieu of attendance at Issue Specific Hearing (ISH3) - Accepted at the discretion of the Examining Authority
Other
Natural England (PDF, 119 KB)
Additional Submission - Position Statement in lieu of attendance at Issue Specific Hearing (ISH3) - Accepted at the discretion of the Examining Authority
Other
Natural England (PDF, 94 KB)
Additional Submission - Position Statement in lieu of attendance at Issue Specific Hearing (ISH2) - Accepted at the discretion of the Examining Authority
Other
Say No To Sunnica Action Group Ltd (PDF, 251 KB)
Deadline 3A Submission – Response to Sunnica Energy Farm application document 8.10 Horse Race Industry Impact Assessment (REP2-039)
Other
Say No To Sunnica Action Group Ltd (PDF, 139 KB)
Deadline 3A Submission
Other
Say No To Sunnica Action Group Ltd (PDF, 24 MB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Alan B Smith (PDF, 3 MB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Cambridgeshire County Council (PDF, 162 KB)
Deadline 3A Submission - Comments on Applicant’s revised draft Development Consent Order (dDCO)
Other
Chippenham Parish Council (PDF, 323 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Claire Mills (PDF, 104 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Dr Catherine Judkins (PDF, 122 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Dr Edmund Fordham (PDF, 9 MB)
Deadline 3A Submission - Comments on applicant's responses to Examining Authority’s First Written Questions (ExQ1) - Annex EF35
Other
Dr Edmund Fordham (PDF, 258 KB)
Deadline 3A Submission - Comments on applicant's responses to Examining Authority’s First Written Questions (ExQ1)
Other
Dr Edmund Fordham (PDF, 18 MB)
Deadline 3A Submission - Comments on applicant's responses to Examining Authority’s First Written Questions (ExQ1) - Annex EF34
Other
East Cambridgeshire District Council (PDF, 179 KB)
Deadline 3A Submission - Comments on Applicant’s revised draft Development Consent Order (dDCO)
Other
East Cambridgeshire District Council, Cambridgeshire County Council, Suffolk County Council and West Suffolk Council (PDF, 2 MB)
Deadline 3A Submission - Joint Comments on the Applicant’s Responses to Examining Authority’s Questions 1 (ExQ1)
Other
East Cambridgeshire District Council, Cambridgeshire County Council, Suffolk County Council and West Suffolk Council (PDF, 69 KB)
Deadline 3A Submission - Joint Comments on Initial Statements of Common Ground
Other
Fordham Parish Council (PDF, 215 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Forestry Commission (PDF, 112 KB)
Deadline 3A Submission
Other
Freckenham Parish Council (PDF, 154 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Freckenham Parish Council (PDF, 159 KB)
Deadline 3A Submission - Comments on applicant's responses to Examining Authority’s First Written Questions (ExQ1)
Other
Garry Chapman (PDF, 150 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Godolphin Management Company Limited (PDF, 188 KB)
Deadline 3A Submission - Response to Horse Racing Industry Impact Assessment [REP2-039]
Other
Helen Faulkner (PDF, 80 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Historic England (PDF, 153 KB)
Deadline 3A Submission
Other
Isleham Parish Council (PDF, 5 MB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
National Grid Electricity Transmission Plc (NGET) (PDF, 58 KB)
Deadline 3A Submission - Comments on Applicant’s revised draft Development Consent Order (dDCO)
Other
Newmarket Town Council (PDF, 159 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Nick Acklam (PDF, 106 KB)
Deadline 3A Submission - Comments on Written Representations (WRs)
Other
Nicole Langstaff (PDF, 158 KB)
Deadline 3A Submission - Comments on Written Representations (WRs) and Applicants revised draft Development Consent Order (dDCO)
Other
Say No To Sunnica Action Group Ltd (PDF, 1 MB)
Deadline 3A Submission - Comments on Initial Statements of Common Ground
Other
Say No To Sunnica Action Group Ltd (PDF, 174 KB)
Deadline 3A Submission - Comments on Applicant’s revised draft Development Consent Order (dDCO)
Other
Say No To Sunnica Action Group Ltd (PDF, 30 MB)
Deadline 3A Submission - Comments on applicant's responses to Examining Authority’s First Written Questions (ExQ1)
Other
Suffolk County Council (PDF, 180 KB)
Deadline 3A Submission - Comments on the Applicant’s Schedule of Change to the draft Development Consent Order (dDCO) from Change Request application to Deadline 2
Other
Sunnica Ltd (PDF, 46 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 2 of 7 (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 3A Submission - 7.3 Design and Access Statement (Clean) - Rev: 02
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 1 of 7 (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 15 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix B (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 1 of 7 (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 284 KB)
Deadline 3A Submission - Cover Letter
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 3A Submission - 8.51 Applicant’s response to other party Deadline 2 First Written Question Submissions
Other
Sunnica Ltd (PDF, 28 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 7 of 7 (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 29 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix D (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 24 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix F (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 23 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix E (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 43 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 4 of 7 (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 47 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 3 of 7 (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 23 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix E (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 581 KB)
Deadline 3A Submission - 1.2 Guide to the Application – Appendix A DCO Examination Document Schedule - Rev: 05
Other
Sunnica Ltd (PDF, 10 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 23 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan (Clean) - Rev:03
Other
Sunnica Ltd (PDF, 11 MB)
Deadline 3A Submission - 7.3 Design and Access Statement (Tracked) - Rev: 02
Other
Sunnica Ltd (PDF, 43 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 4 of 7 (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 9 MB)
Deadline 3A Submission - 8.52 Update by the Applicant on Heritage Matters and Substation Connection
Other
Sunnica Ltd (PDF, 38 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 5 of 7 (Tracked) - Rev: 03
Other
Sunnica Ltd (PDF, 15 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix B (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 38 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 6 of 7 (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 16 MB)
Deadline 3A Submission - 2.3 Access and rights of way plans - Rev: 04
Other
Sunnica Ltd (PDF, 38 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 5 of 7 (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 46 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix C - 2 of 7 (Clean) - Rev: 03
Other
Sunnica Ltd (PDF, 16 MB)
Deadline 3A Submission - Environmental Statement - 6.2 Appendix 13C Framework Construction Traffic Management Plan and Travel Plan Appendix A (Tracked) - Rev: 03