A list of the upcoming events and deadlines for all applications that are in the examination stage is below. If you are interested in a particular application the exam timetable view on the relevant project page will show a full history.
There is an alternative calendar based view (not fully accessible) of the same information.
July 2024
August 2024
September 2024
October 2024
November 2024
December 2024
Event Date | Project | Description |
---|---|---|
July 2024 | ||
01 July 2024 | Gatwick Airport Northern Runway | The ExA’s Written Questions (ExQ2) Publication by the ExA of:- The ExA’s Further Written Questions (ExQ2) (if required). |
02 July 2024 | Oaklands Farm Solar Park | Issue by the ExA Issue by the ExA of:- the agenda for the Preliminary Meeting - the agenda for Open Floor Hearing 1 |
02 July 2024 | East Yorkshire Solar Farm | Publication by the ExA of ExA’s final itinerary for the Accompanied Site Inspection Publication by the ExA of ExA’s final itinerary for the Accompanied Site Inspection |
02 July 2024 | Immingham Green Energy Terminal | Issue Specific Hearing 8 (ISH8) Issue Specific Hearing 8 (ISH8) on the Draft Development Consent Order and Environmental Matters |
09 July 2024 | Rampion 2 Offshore Wind Farm | Deadline 5 Deadline for receipt by the ExA of: - Responses to ExA’s Further Written Questions(ExQ2) (if required) - Comments on the RIES - Comments on the Applicant’s second update to the draft DCO - Comments on the Applicant’s second update to the Land Rights Tracker - Comments on ExA’s commentary on, or schedule of changes to, the draft DCO (if required) - Completed and Signed Statements of Common Ground - Final Statement of Commonality of Statements of Common Ground - Any further information requested by the ExA under Rule 17 of The Infrastructure Planning(Examination Procedure) Rules 2010 - Comments on any further information/submissions received by Deadline 4 |
09 July 2024 | M5 Junction 10 Improvements Scheme | Deadline 2 For receipt by the ExA of: - Comments on submissions for Deadline 1 - Comments on Local Impact Reports - Comments on the Applicant’s draft itinerary for the ASI - Any further information requested by the ExA under Rule 17 of the Examination Rules - Comments on any further information requested by the ExA and received by Deadline 1 |
09 July 2024 | M5 Junction 10 Improvements Scheme | Publication by the ExA 1 Publication by the ExA of: - ExA’s First Written Questions |
09 July 2024 | Rivenhall IWMF and Energy Centre | Deadline 4 (D4) For receipt by the Examining Authority of: - Responses to the Examining Authority’s ExQ2 (if ExQ2 is issued) - Comments on ExA’s proposed Schedule of Changes to the dDCO (if required) - Final SoCG and Statement of Commonality - Final Navigation Document/Guide to the application - An updated Schedule of Changes to the dDCO - Final signed and dated Section 106 Agreement(s) (if required) - Comments on any other information and submissions received at D3 - Any further information requested by the Examining Authority under Rule 17 of the Examination Procedure Rules |
09 July 2024 | East Yorkshire Solar Farm | Compulsory Acquisition Hearing 1 Compulsory Acquisition Hearing 1 |
09 July 2024 | East Yorkshire Solar Farm | Open Floor Hearing Open Floor Hearing |
10 July 2024 | Oaklands Farm Solar Park | Preliminary Meeting Preliminary Meeting (PM) |
10 July 2024 | Oaklands Farm Solar Park | Open Floor Hearing 1 Open Floor Hearing (OFH1) |
10 July 2024 | East Yorkshire Solar Farm | Issue Specific Hearing 2 on Environmental Matters Issue Specific Hearing 2 on Environmental Matters |
10 July 2024 | Byers Gill Solar | Deadline for receipt by the ExA of: - Written submissions on the Examination Procedure and Timetable - Requests to be heard orally at the Preliminary Meeting - Request to participate in the Issue Specific Hearing 1 (ISH1) - Requests to be heard orally at the Open Floor Hearings (OFH) 1 or 2 - Suggested locations for site inspections (Accompanied and/or Unaccompanied), including justification |
11 July 2024 | East Yorkshire Solar Farm | Accompanied Site Inspection Accompanied Site InspectionAccompanied Site Inspection on Thursday 11 July 2024 starting at the Loftsome Bridge Hotel, Station Road, Wressle, Yorkshire, Y08 6EN from 09:15am (for a safety briefing) and departing at 09:30am. |
11 July 2024 | Immingham Green Energy Terminal | Deadline 5 (D5) For receipt by the Examining Authority of: - Post-Hearing submissions including written submissions of oral case as requested by Examining Authority (if the Hearings are held) - Comments on responses to the Examining Authority’s Second Written Questions (WQ2) (if issued) - Comments on any other information and submissions received at Deadline 4 - Any further information requested by the Examining Authority under Rule 17 of the Examination Rules Updates from the Applicant: - Guide to the Application - Statements of Common Ground - Statement of Commonality - Draft Development Consent Order including consolidated tracked changed version - Explanatory Memorandum - Schedule of Changes to Draft Development Consent Order - Land Rights Tracker |
15 July 2024 | Gatwick Airport Northern Runway | Deadline 7 For receipt by the ExA of: - Responses to ExQ2 (if issued). - Applicant’s third update to the Land Rights Tracker. - Applicant’s updated Navigation Document in clean and tracked versions. - Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010. - Comments on any further information/ submissions received by Deadline 6. |
17 July 2024 | Viking CCS Pipeline | Issue Specific Hearing 3 (ISH3) Issue Specific Hearing 3 (ISH3) into Environmental Matters including Noise, Cultural Heritage,Landscape, Major Hazards, Transport and Habitats Regulation Assessment |
17 July 2024 | Immingham Green Energy Terminal | Publication by the Examining Authority of Publication by the Examining Authority of:- The Report on Implications for European Sites and any associated questions (if required) - Third Written Questions (if required) - The ExA’s proposed schedule of changes to the draft Development Consent Order (if required) |
18 July 2024 | Rampion 2 Offshore Wind Farm | Reserve Date for ASI2 (NO LONGER REQUIRED) Reserve Date for ASI2 (NO LONGER REQUIRED) |
23 July 2024 | East Yorkshire Solar Farm | Deadline 3 For receipt by the ExA of: - Comments on any submissions received by Deadline 2 - Written summaries of oral contributions at hearings (if required) - Post-hearing submissions requested by the ExA (if required) - Applicant’s updated dDCO, EM, BoR, SoR, SNS and CA Schedule - Updated SoCGs - Updated Statement of Commonality of SoCGs - Any further information requested by the ExA under Rule 17 - Other |
23 July 2024 | Rampion 2 Offshore Wind Farm | Reserve Date(s) Dates reserved (NO LONGER REQUIRED) Monday 22 July 2024 and/or Tuesday 23 July for:- ISH3 and/or CAH2 (NO LONGER REQUIRED) |
23 July 2024 | Rivenhall IWMF and Energy Centre | Deadline 5 (D5) For receipt by the Examining Authority of: - Comments on responses to the Examining Authority’s ExQ2 (if ExQ2 is issued) - Comments on responses to ExA’s proposed Schedule of Changes to the dDCO (if required) - Final draft DCO to be submitted by the Applicant in clean, tracked, word versions and in the statutory Instrument (SI) template with the SI template validation report - Comments on any other information and submissions received at D4 - Any further information requested by the Examining Authority under Rule 17 of the Examination Procedure Rules |
23 July 2024 | Byers Gill Solar | Preliminary Meeting Preliminary Meeting |
23 July 2024 | Byers Gill Solar | Issue Specific Hearing 1 (ISH1) Issue Specific Hearing 1 (ISH1) |
24 July 2024 | Byers Gill Solar | Open Floor Hearing 1 (OFH1) Open Floor Hearing 1 (OFH1) |
24 July 2024 | Byers Gill Solar | Open Floor Hearing 2 (OFH2) Open Floor Hearing 2 (OFH2) |
25 July 2024 | Gatwick Airport Northern Runway | Publication by the RIES Publication by the ExA of:- The Report on the Implications for European Sites (RIES) and any associated questions (if required). |
29 July 2024 | Gatwick Airport Northern Runway | Dates reserved for further Hearings HearingsDates reserved for any: - Issue Specific Hearing(s) (if required). - Open Floor Hearing(s) (if required). - Compulsory Acquisition Hearing(s) (if required). |
29 July 2024 | Viking CCS Pipeline | Deadline 4 For receipt by the ExA of: - Written summaries of oral submissions made at any Hearings held during the weeks commencing 24 June and 15 July 2024 - Any post-hearing submissions requested by the ExA - Comments on any other information and submissions received at D3 - Any further information requested by the Examining Authority under Rule 17 of the Examination Procedure Rules |
30 July 2024 | M5 Junction 10 Improvements Scheme | Deadline 3 For receipt by the ExA of: - Responses to ExQ1 - Comments on submissions for Deadline 2 - Updated Land Rights Tracker - Updated BoR, Statement of Reasons and Schedule of Changes to the BoR - Notification of a wish to attend the ASI, ISH, CAHand OFH (if requested) on the w/c 12 August 2024 |
August 2024 | ||
01 August 2024 | Rampion 2 Offshore Wind Farm | Deadline 6 Deadline for receipt by the ExA of: - Final Principal Areas of Disagreement Statements - IPs Closing Statement(s) (if desired) - Post-hearing submissions including written submissions of oral cases (if applicable) - Applicant’s Closing Statement(s) - Applicant’s Close of Examination Progress Tracker - Applicants Final National Policy Statement Tracker - Final draft DCO to be submitted by the Applicant in the SI template with the SI template validation report - Final Book of Reference (BoR) and schedule of changes to BoR - Completed s106 Agreements (if required) - Final Land Rights Tracker - Final Guide to the Application - Any further information requested by the ExA under Rule 17 of The Infrastructure Planning(Examination Procedure) Rules 2010al Guide to the Application - Comments on any further information/submissions received by Deadline 5 |
01 August 2024 | East Yorkshire Solar Farm | Examining Authority's Second Written Questions Examining Authority's Second Written QuestionsPublication of Examining Authority's Second Written Questions (ExQ2) (if required) |
02 August 2024 | Immingham Green Energy Terminal | Deadline 6 (D6) For receipt by the Examining Authority of: - Responses to the Examining Authority’s Third Written Questions (WQ3) (if issued) - Comments on the Examining Authority’s proposed schedule of changes to the draft Development Consent Order (if issued) - Comments on any other information and submissions received at Deadline 5 - Any further information requested by the Examining Authority under Rule 17 of the Examination Procedure Rules |
06 August 2024 | Rampion 2 Offshore Wind Farm | The ExA is under a duty to complete the Examination of the application by the end of the period of six months. |
06 August 2024 | M5 Junction 10 Improvements Scheme | Publication by the ExA 2 Publication by the ExA of:- Final ASI itinerary |
07 August 2024 | Gatwick Airport Northern Runway | Deadline 8 For receipt by the ExA of: - Post-Hearing submissions, including written summaries of oral submissions to the Hearings held during w/c 29 July 2024 (if held). - Comments on responses to ExQ2 (if issued). - Progressed draft legal agreement(s) and/ or an update on progress. - Applicant’s updated draft DCO in clean and tracked versions. - Applicant’s Schedule of Changes to the draft DCO. - Applicant’s updated Navigation Document in clean and tracked versions. - Comments on the Applicant’s third update to the Land Rights Tracker. - Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010. - Comments on any further information/ submissions received by Deadline 7. |
12 August 2024 | Viking CCS Pipeline | Publication by the Examining Authority Publication by the Examining Authority of:- Second Written Questions (ExQ2) (if required) - Report on the Implications for European Sites (if required) - The Examining Authority’s proposed schedule of changes to the draft Development Consent Order (dDCO) (if required) |
14 August 2024 | Gatwick Airport Northern Runway | Publication of the proposed schedule of changes to the draft DCO Publication by the ExA of:- The ExA’s proposed schedule of changes to the draft DCO (if required). |
14 August 2024 | M5 Junction 10 Improvements Scheme | Issue Specific Hearing 3 (ISH3) Issue Specific Hearing 3 (ISH3) covering Traffic and transport, Flooding, Funding,Mitigation through the REAC, Requirements and the EMP and other environmental matters. |
15 August 2024 | M5 Junction 10 Improvements Scheme | Compulsory Acquisition Hearing 1 (CAH1) Compulsory Acquisition Hearing 1 (CAH1) |
15 August 2024 | Immingham Green Energy Terminal | Deadline 7 (D7) For receipt by the Examining Authority of: - Comments on the Report on Implications for European Sites (if issued) - Comments on responses to Examining Authority’s Third Written Questions (WQ3) (if issued) - Comments on responses to the Examining Authority’s proposed schedule of changes to the draft Development Consent Order (if issued) - Comments on any other information and submissions received at Deadline 6 - Any further information requested by the Examining Authority under Rule 17 of the Examination Procedure Rules Final Updates from the Applicant: - Final Statements of Common Ground - Final Statement of Commonality - Final Guide to the Application - Final draft Development Consent Order in the Statutory Instrument (SI) template in both word and PDF versions - SI template validation report and - Consolidated tracked changed version of the final draft Development Consent Order - Final Explanatory Memorandum - Final Schedule of changes to draft Development Consent Order - Final Land Rights Tracker - Final updated Book of Reference |
15 August 2024 | East Yorkshire Solar Farm | Deadline 4 For receipt by the ExA of: - Comments on submissions at Deadline 3 - Responses to the ExAs Second Written Questions - Applicant’s updated dDCO, EM, BoR, SoR, SNS and CA Schedule - Updated SoCGs - Updated Statement of Commonality - Updated Section 106 Agreement/unilateral undertaking (if required) - Any further information requested by the ExA under Rule 17 - Other |
16 August 2024 | M5 Junction 10 Improvements Scheme | Accompanied Site Inspection (ASI) Accompanied Site Inspection (ASI) |
16 August 2024 | M5 Junction 10 Improvements Scheme | Further Open Floor Hearings (if required) Further Open Floor Hearings (if required) - w/c 12 August 2024 |
20 August 2024 | Immingham Green Energy Terminal | Deadline 8 (D8) For receipt by the Examining Authority of: - Any further information requested by Examining Authority |
20 August 2024 | Immingham Green Energy Terminal | Close of Examination by the Examining Authority Close of Examination by the Examining Authority- The Examining Authority is under a duty to complete the examination of the application by the end of the period of six months. |
21 August 2024 | Gatwick Airport Northern Runway | Deadline 9 For receipt by the ExA of: - Responses to the RIES (if issued). Responses to the ExA’s proposed schedule of changes to the draft DCO (if issued). - Finalised PADSSs. - Finalised SoCGs. - Finalised Statement of Commonality for SoCGs. - List of matters not agreed where any SoCG could not be finalised. - Signed and dated legal agreement(s). - Applicant’s final draft DCO (Microsoft Word) in clean and tracked versions. - Applicant’s final draft DCO (PDF) in clean and tracked versions. - Applicant’s final draft DCO to be submitted in the SI template with the SI template validation report. - Applicant’s finalised Schedule of Changes to the draft DCO. - Applicant’s finalised Statement of Reasons in clean and tracked versions. - Applicant’s final BoR and Schedule of Changes to the BoR in clean and tracked versions. - Applicant’s final Land Rights Tracker. - Applicant’s final Navigation Document in clean and tracked versions. - Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010. - Comments on any further information/ submissions received by Deadline 8. |
27 August 2024 | Gatwick Airport Northern Runway | Deadline 10 For receipt by the ExA of: - Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010 |
27 August 2024 | Gatwick Airport Northern Runway | End of Examination The ExA is under a duty to complete the examination of theapplication by the end of the period of six months |
September 2024 | ||
02 September 2024 | Viking CCS Pipeline | Deadline 5 For receipt by the ExA of: - Responses to Examining Authority’s ExQ2 (if required) - Responses to the RIES (if required) - Responses to the Examining Authority’s proposed schedule of changes to the draft Development Consent Order - Comments on any other information and submissions received at D4 - Updated SoCG - An updated Statement of Commonality of SoCG (if required) - Updated CA Schedule - Any further information requested by the Examining Authority under Rule 17 of the Examination Procedure Rules Updates from the Applicant: - Guide to the Application - Updated BoR and Schedule of Changes to the BoR in clean and tracked versions (if required) |
03 September 2024 | M5 Junction 10 Improvements Scheme | Deadline 4 For receipt by the ExA of: - Written post hearing submissions including written submissions of oral cases made at Hearings the w/c 12 August 2024 |
03 September 2024 | East Yorkshire Solar Farm | Deadline 5 For receipt by the ExA of: - Comments on submissions at Deadline 4 - Any further information requested by the ExA under Rule 17 - Other |
10 September 2024 | M5 Junction 10 Improvements Scheme | Publication by the ExA 3 Publication of:- The ExA’s Second Written Questions (ExQ2) (if required) |
18 September 2024 | East Yorkshire Solar Farm | Time reserved for hearings during week commencing 16 September 2024 Time reserved for hearings during week commencing 16 September 2024Time reserved for hearings: Issue Specific Hearing(s) (if required) Compulsory Acquisition Hearing (if required) |
19 September 2024 | Viking CCS Pipeline | Deadline 6 For receipt by the Examining Authority of: - Comments on responses to Examining Authority’s ExQ2 (if required) - Comments on the responses to the RIES (if required) - Comments on responses to the Examining Authority’s proposed schedule of changes to the draft Development Consent Order - Comments on any other information and submissions received at D5 - Closing Statements from IPs and APs - Any further information requested by the Examining Authority under Rule 17 of the Examination Procedure Rules Final Updates from the Applicant: - Final Statements of Common Ground - Final Statement of Commonality of SoCG - Final Guide to the Application - Final draft Development Consent Order in the Statutory Instrument template with the SI template validation report in word and PDF (both in clean and tracked versions) - Final Explanatory Memorandum - Final Schedule of changes to dDCO - Final Compulsory Acquisition Schedule - Final updated Book of Reference |
26 September 2024 | Viking CCS Pipeline | Deadline 7 For receipt by the Examining Authority of: -Any further information requested by the Examining Authority under Rule 17 of the Examination Procedure Rules |
26 September 2024 | Viking CCS Pipeline | Close of Examination by the Examining Authority Close of Examination by the Examining AuthorityThe Examining Authority is under a duty to complete the examination of the application by the end of the period of six months. Please note that the ExA may close the Examination before the end of the six-month period if it is satisfied that all relevant matters have been addressed and discussed. |
October 2024 | ||
01 October 2024 | M5 Junction 10 Improvements Scheme | Deadline 5 For receipt by the ExA of: - Responses to ExQ2 - Updated Land Rights Tracker |
01 October 2024 | East Yorkshire Solar Farm | Deadline 6 For receipt by the ExA of: - Comments on any submissions at Deadline 5 - Applicant’s updated dDCO and EM - Applicant’s updated BoR, SoR, SNS and CA Schedule - Updated SoCGs - Updated SoCG and Statement of Commonality of SoCG - Final signed and dated Section 106 Agreement/Unilateral Undertaking (if required) - Updated Navigation Document/Guide to the application - Written summaries of oral contributions at hearings (if required) - Post-hearing submissions requested by the ExA (if required) - Any further information requested by the ExA under Rule 17 - Other |
09 October 2024 | Rivenhall IWMF and Energy Centre | Close of Examination The ExA is under a duty to complete the Examination of the application by the end of the period of six months. Please note that the ExA may close the Examination before the end of the six month period if satisfied that all relevant matters have been addressed and discussed. |
15 October 2024 | East Yorkshire Solar Farm | Publication by the ExA of The ExA’s schedule of changes to the draft DCO, Report on Implications for European Sites (RIES) and ExQ3 Publication by the ExA of The ExA’s schedule of changes to the draft DCO, Report on Implications for European Sites (RIES) and ExQ3Publication by the ExA of: - The ExA’s schedule of changes to the draft DCO (if required) - Report on Implications for European Sites (RIES) (if required) - ExA’s Written Questions (ExQ3) (if required) |
18 October 2024 | M5 Junction 10 Improvements Scheme | ASI and Hearings ASI and HearingsDates reserved for ASIs and hearings: - Further ISHs (if required). - Further CAH (if required). - Further OFHs (if required). - Further ASIs (if required). |
22 October 2024 | M5 Junction 10 Improvements Scheme | Publication by the ExA 4 Publication by the ExA of: - Report on the Implications for European Sites (RIES) and any associated questions (if required) - ExA’s commentary on, or schedule of changes to, the dDCO |
30 October 2024 | M5 Junction 10 Improvements Scheme | Deadline 6 For receipt by the ExA of: - Written summaries of oral submissions made at Hearings held during the w/c 14 October 2024 |
November 2024 | ||
05 November 2024 | East Yorkshire Solar Farm | Deadline 7 For receipt by the ExA of: - Comments on submissions at Deadline 6 - Comments on the ExA’s schedule of changes to the dDCO (if required) - Comments on RIES (if required) - Responses to ExQ3 (if required) - Any further information requested by the ExA under Rule 17 - Other |
12 November 2024 | M5 Junction 10 Improvements Scheme | Deadline 7 For receipt by the ExA of: - Comments on the RIES and responses to any associated questions (if issued) - Comments on any additional information/submissions received by Deadline 6 - Comments on the ExA’s dDCO/Schedule of changes |
14 November 2024 | East Yorkshire Solar Farm | Deadline 8 For receipt by the ExA of: - Comments on submissions at Deadline 7 - Applicant’s final dDCO - Final and/or updated DCO in editable and PDF formats to be submitted by the Applicant in the SI template with the SI template validation report - Applicant’s final EM - Applicant’s final BoR, SoR, SNS and CA Schedule - Summary Statements from Interested Parties - Final SoCG - Final Statement of Commonality of SoCG - List of matters not agreed where SoCG could not be finalised - Final Navigation Document/Guide to the application - Final Status of Negotiations with Statutory Undertakers - Final NPS tracker - Final signed and dated section 106 - Responses to comments on RIES (if required) - Any further information requested by the ExA under Rule 17 - Other |
19 November 2024 | M5 Junction 10 Improvements Scheme | Deadline 8 For receipt by the ExA of: - Applicant’s Comments on the RIES and responses to any associated questions (if issued) - Applicant’s Comments on the ExA’s dDCO/Schedule of changes and responses to submissions at Deadline 7 - Final DCO to be submitted by the Applicant in the SI template with the SI template validation report - Final BoR and schedule of changes to BoR - Final SoCGs - Final Principal Areas of Disagreement Summary Statement - Final Statement of Commonality of SoCG - List of matters not agreed where SoCG could not be finalised - Final Navigation Document/Guide to the application - Final Land Rights Tracker - Final NPS Tracker - Final signed and dated section 106 (if required) - Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010 |
21 November 2024 | East Yorkshire Solar Farm | Deadline for completion of Examination Deadline for completion of ExaminationThe ExA is under a duty to complete the Examination of the application by the end of the period of six months |
26 November 2024 | M5 Junction 10 Improvements Scheme | Deadline 9 For receipt by the ExA of: - Closing Submissions (all except Applicant) - Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010 |
December 2024 | ||
02 December 2024 | M5 Junction 10 Improvements Scheme | Deadline 10 For the receipt by the ExA of: - Applicant’s Closing Submissions |
04 December 2024 | M5 Junction 10 Improvements Scheme | Close of Examination The ExA is under a duty to complete the Examination of the application by the end of the period of six months |