White Rose Carbon Capture and Storage Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (83)

Acceptance (16)

Pre Examination (5)

Examination (184)

Decision (8)

Decided (0)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 7 KB
6.3.15 ES Volume 2 Confidential Badger Method Statement [Not to be published]
Other
Size: 3 MB
6.3.2 ES Volume 2 Chapter B - Noise and Vibration Technical Report
Other
Size: 4 MB
6.3.3 ES Volume 2 Chapter C - Surface Water and Flood Risk Technical Report
Other
Size: 5 MB
6.1 Environmental Statement - Non Technical Summary
Other
Size: 301 KB
6.4.7 ES Volume 3 Section N - Climate Change Risk Assessment
Other
Size: 472 KB
7.1 Master Glossary
Other
Size: 5 MB
6.4.3 ES Volume 3 Section K.2 - Habitats Plan
Other
Size: 788 KB
3.2 - Statement of Reasons - Revision 2 - Changes from Submission - Track Change Version
Post-submission changes to '3.2 Statement of Reasons' (supersedes the application document received on 24 November 2014).
Other
Size: 36 MB
6.3.6 ES Volume 2 Chapter D.1 - Geology Annexes
Other
Size: 48 MB
5.1.1 Consultation Report Appendices 3.1 - 7.7
Other
Size: 4 MB
6.3.5 ES Volume 2 Chapter D - Geology Technical Report
Other
Size: 34 MB
5.1.2 Consultation Report Appendices 7.8 - 7.17
Other
Size: 3 MB
6.4.5 ES Volume 3 Section L - Habitats Regulations Assessment Report
Other
Size: 546 KB
1.4 Application Form
Other
Size: 740 KB
5.7 Carbon Capture Storage (CCS) and Carbon Capture and Readiness (CCR) Statement
Other
Size: 12 MB
6.4.10 ES Volume 3 Section Q - Scoping Opinion
Other
Size: 458 KB
3.3 Funding Statement
Other
Size: 5 MB
6.4.4 ES Volume 3 Section K.3 - Historic Environment Plan
Other
Size: 2 MB
4.2 Land Plan (Key Plan and Sheets 1 - 4)
Other
Size: 7 MB
Site Notice Order Plan
Post-submission changes. Additional submission of Order Plan (the FDO) that was used to accompany the site notices.
Other
Size: 1 MB
6.4.11 ES Volume 3 Section R - Framework Site Waste Management Plan
Other
Size: 1 MB
Drax Power Station Diversion Order 2014 (Confirmed)
Post-submission changes. Additional Submission received of the Long Drax, Diversion Order (the FDO), dated 13 February 2015.
Other
Size: 29 MB
5.1.5 Consultation Report Appendices 8.3 - 12.2
Other
Size: 2 MB
4.3 Works Plan (Key Plan and Sheets 1 - 4)
Other
Size: 582 KB
2.2 - Explanatory Memorandum - Revision 2 - Changes from Submission - Track Change Version
Post-submission changes to ?2.2 Explanatory Memorandum' (supersedes the application document received on 24 November 2014).
Other
Size: 21 MB
6.2 Environmental Statement - Volume 1 (Main Report)
Other
Size: 502 KB
1.3 - Application Index - Revision 2
Post-submission changes to 'Application Index 1.3' (supercedes the application document received on 24 November 2014).
Other
Size: 5 MB
4.1 - Capture Power Limited - Site Location Plan - Revision v4
Post-submission changes to ?4.1 Site Location Plan' (supersedes the application document received on 24 November 2014).
Other
Size: 2 MB
6.4.9 ES Volume 3 Section P - EIA Scoping Report
Other
Size: 4 MB
5.2 Grid Connection Statement
Other
Size: 3 MB
4.4 - Capture Power Limited - Access and Rights of Way Plans (Key Plan and Sheets 1 - 4) - Revision v4
Post-submission changes to '4.4 Access and Rights of Way Plans (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
Other
Size: 4 MB
5.5 Design and Access Statement
Other
Size: 8 MB
6.3.9 ES Volume 2 Chapter G - Archaeology Technical Report
Other
Size: 15 MB
5.1.3 Consultation Report Appendices 7.18 - 8.1
Other
Size: 3 MB
4.8 Indicative Electrical Connection Routes (Work No. 4)
Other
Size: 2 MB
4.4 Access and Rights of Way Plans (Key Plan and Sheets 1 - 4)
Other
Size: 3 MB
4.2 - Capture Power Limited - Land Plan (Key Plan and sheets 1 - 4) - Revision v4
Post-submission changes to '4.2 Land Plan (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
Other
Size: 4 MB
6.4.2 ES Volume 3 Section K.1 - Location Plan
Other
Size: 7 KB
6.3.16 ES Volume 2 Confidential Badger Report [Not to be published]
Other
Size: 490 KB
2.1 - Draft Development Consent Order - Revision 2 - Changes from Submission - Track Change Version
Post-submission changes to ?2.1 Draft Development Consent Order' (supersedes the application document received on 24 November 2014).
Other
Size: 841 KB
6.3.7i - ES - Traffic Sensitivity Test
Post-submission changes. New document (13 April 2015 - Revision 1).
Other
Size: 1 MB
6.3.13 ES Volume 2 Chapter I - Ecology Technical Report
Other
Size: 2 MB
4.9 Indicative Drainage Plan
Other
Size: 2 MB
5.6 Combined Heat and Power Assessment
Other
Size: 964 KB
2.3 Draft DCO - Comparison with Model Provisions
Other
Size: 15 MB
6.3.4 ES Volume 2 Chapter C.1 - Flood Risk Assessment
Other
Size: 1 MB
5.2 - Grid Connection Statement - Revision 2 - Changes from Submission - Track Change Version
Post-submission changes to ?5.2 Grid Connection Statement? (supersedes the application document received on 24 November 2014).
Other
Size: 45 KB
3.1 - Book of Reference - Revision 4
Post-submission changes to ?3.1 Book of Reference? (supersedes the application document received on 24 November 2014).
Other
Size: 74 KB
1.1 Application Cover Letter
Other
Size: 955 KB
4.8 - Capture Power Limited - Indicative Route of Electrical Connection for 400 kV Plan
Post-submission changes to '4.8 Indicative Electrical Connection Routes (Work No. 4)? (one sheet replacing Sheets 1 ? 3 originally submitted) (supersedes the application document received on 24 November 2014).
Other
Size: 540 KB
6.4.1 ES Volume 3 Section J - Construction Environmental Management Plan
Other
Size: 133 KB
4.0 Overall Cover Sheet
Other
Size: 4 MB
5.4 Planning Statement
Other
Size: 7 MB
4.5 Indicative Generating Station Drawings (Work No. 1A)
Other
Size: 22 MB
6.3.7 ES Volume 2 Chapter E - Transport Assessment
Other
Size: 45 KB
3.1 Book of Reference
Other
Size: 16 MB
6.3.14 ES Volume 2 Chapter I - Ecology Technical Report Annexes 1-11
Other
Size: 27 MB
1.5 Notices for Statutory Publicity
Other
Size: 43 MB
6.3.10b ES Volume 2 Chapter G.1 - Geophysical Survey Results
Other
Size: 1 MB
6.3.1 ES Volume 2 Chapter A - Emissions to Atmosphere Technical Report
Other
Other
Size: 264 KB
Capture Power Ltd
Post-submission changes. Letter to the Planning Inspectorate regarding amendments to the DCO application and updates to the application documents.
Other
Size: 2 MB
6.3.11 ES Volume 2 Chapter G.2 - Written Scheme of Investigation
Other
Size: 3 MB
4.1 Site Location Plan
Other
Size: 1 MB
4.6 Indicative Site Raising Drawing (Work Nos. 1A and 1B)
Other
Size: 1 MB
5.1 Consultation Report
Other
Size: 30 MB
6.3.12 ES Volume 2 Chapter H - LVIA Technical Report
Other
Size: 281 KB
6.3.0 ES Volume 2 (Technical Reports) Cover Sheet and Contents
Other
Size: 14 MB
6.3.10a ES Volume 2 Chapter G.1 - Geophysical Survey Results
Other
Size: 3 MB
4.10 Indicative Landscaping and Biodiveristy Framework Plan
Other
Size: 564 KB
2.2 Explanatory Memorandum
Other
Size: 456 KB
5.3 Other Consents and Licences
Other
Size: 771 KB
3.2 Statement of Reasons
Other
Size: 11 MB
6.3.8 ES Volume 2 Chapter F - Socio-economic Characteristics
Other
Size: 265 KB
6.4.8 ES Volume 3 Section O - Statement under S79 (1) of the EPA 1990
Other
Size: 754 KB
2.1 Draft Development Consent Order
Other
Size: 429 KB
6.4.6 ES Volume 3 Section M - Green House Gas Assessment
Other
Size: 37 MB
5.1.4 Consultation Report Appendices 8.2
Other
Size: 167 MB
ES Volume 2 Chapter H - LVIA Revision 05.2
Post-submission changes to 6.3.12 ES Volume 2 Chapter H - LVIA Technical Report (addition of Figure H 4.5) (supersedes the application document received on 24 November 2014).
Other
Size: 4 MB
4.3 - Capture Power Limited - Works Plan (Key Plan and sheets 1 - 4) - Revision v4
Post-submission changes to '4.3 Works Plan (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
Other
Size: 268 KB
6.4.0 ES Volume 3 (Other Reports and Plans) Cover Sheet and Contents
Other
Size: 469 KB
1.3 Application Index
Other
Size: 1 MB
5.2 - Grid Connection Statement - Revision 2 - Changes from Submission - Clean Version
Post-submission changes to ?5.2 Grid Connection Statement? (supersedes the application document received on 24 November 2014).
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.