You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (4)
Developer's Application (83)
- All Documents
- Additional Information (Reg 6) (1)
- Application Form (4)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (3)
- Drawings (6)
- Environmental Statement (32)
- Other Documents (1)
- Plans (5)
- Post Submission Changes (17)
- Reports (11)
Acceptance (16)
Pre Examination (5)
- All Documents
- Additional Submissions (1)
- Other (1)
- Preliminary Meeting (2)
- Procedural Decisions (1)
Examination (184)
- All Documents
- Additional Submissions (14)
- Deadline I - 20-05-2015 (61)
- Deadline II - 10-06-2015 (14)
- Deadline III - 19-06-2015 (7)
- Deadline IV - 08-07-2015 (15)
- Deadline IX - 13-10-2015 (5)
- Deadline V - 05-08-2015 (11)
- Deadline VI - 21-08-2015 (10)
- DEADLINE VII - 23-09-2015 (16)
- DEADLINE VIII - 07-10-2015 (7)
- Document Library.pdf (1)
- Environmental Impact Assessment (1)
- + Hearings (10)
- Preliminary Meeting (2)
- Procedural Decisions (9)
- Site Visit (Accompanied) - 03-07-2015 - 1000 - Drax Power Station (1)
Decision (8)
- All Documents
- + DECC Consultation (3)
- Decision (4)
- Procedural Decisions (1)
Decided (0)
The selection shows documents received from the applicant in relation to the development consent order application.
Source | Description |
---|---|
Other |
3.2 - Statement of Reasons - Revision 2 - Changes from Submission - Track Change Version (PDF, 788 KB)
Post-submission changes to '3.2 Statement of Reasons' (supersedes the application document received on 24 November 2014).
|
Other |
Site Notice Order Plan (PDF, 7 MB)
Post-submission changes. Additional submission of Order Plan (the FDO) that was used to accompany the site notices.
|
Other |
Drax Power Station Diversion Order 2014 (Confirmed) (PDF, 1 MB)
Post-submission changes. Additional Submission received of the Long Drax, Diversion Order (the FDO), dated 13 February 2015.
|
Other |
2.2 - Explanatory Memorandum - Revision 2 - Changes from Submission - Track Change Version (PDF, 582 KB)
Post-submission changes to ?2.2 Explanatory Memorandum' (supersedes the application document received on 24 November 2014).
|
Other |
1.3 - Application Index - Revision 2 (PDF, 502 KB)
Post-submission changes to 'Application Index 1.3' (supercedes the application document received on 24 November 2014).
|
Other |
4.1 - Capture Power Limited - Site Location Plan - Revision v4 (PDF, 5 MB)
Post-submission changes to ?4.1 Site Location Plan' (supersedes the application document received on 24 November 2014).
|
Other |
4.4 - Capture Power Limited - Access and Rights of Way Plans (Key Plan and Sheets 1 - 4) - Revision v4 (PDF, 3 MB)
Post-submission changes to '4.4 Access and Rights of Way Plans (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
|
Other |
4.2 - Capture Power Limited - Land Plan (Key Plan and sheets 1 - 4) - Revision v4 (PDF, 3 MB)
Post-submission changes to '4.2 Land Plan (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
|
Other |
2.1 - Draft Development Consent Order - Revision 2 - Changes from Submission - Track Change Version (PDF, 490 KB)
Post-submission changes to ?2.1 Draft Development Consent Order' (supersedes the application document received on 24 November 2014).
|
Other |
6.3.7i - ES - Traffic Sensitivity Test (PDF, 841 KB)
Post-submission changes. New document (13 April 2015 - Revision 1).
|
Other |
5.2 - Grid Connection Statement - Revision 2 - Changes from Submission - Track Change Version (PDF, 1 MB)
Post-submission changes to ?5.2 Grid Connection Statement? (supersedes the application document received on 24 November 2014).
|
Other |
3.1 - Book of Reference - Revision 4 (PDF, 45 KB)
Post-submission changes to ?3.1 Book of Reference? (supersedes the application document received on 24 November 2014).
|
Other |
4.8 - Capture Power Limited - Indicative Route of Electrical Connection for 400 kV Plan (PDF, 955 KB)
Post-submission changes to '4.8 Indicative Electrical Connection Routes (Work No. 4)? (one sheet
replacing Sheets 1 ? 3
originally submitted) (supersedes the application document received on 24 November 2014).
|
Other |
Capture Power Ltd (PDF, 264 KB)
Post-submission changes. Letter to the Planning Inspectorate regarding amendments to the DCO application and updates to the application documents.
|
Other |
ES Volume 2 Chapter H - LVIA Revision 05.2 (PDF, 167 MB)
Post-submission changes to 6.3.12 ES Volume 2 Chapter H - LVIA Technical Report (addition of Figure H 4.5) (supersedes the application document received on 24 November 2014).
|
Other |
4.3 - Capture Power Limited - Works Plan (Key Plan and sheets 1 - 4) - Revision v4 (PDF, 4 MB)
Post-submission changes to '4.3 Works Plan (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
|
Other |
5.2 - Grid Connection Statement - Revision 2 - Changes from Submission - Clean Version (PDF, 1 MB)
Post-submission changes to ?5.2 Grid Connection Statement? (supersedes the application document received on 24 November 2014).
|