Knottingley Power Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (2)

Developer's Application (102)

Acceptance (20)

Pre Examination (4)

Examination (133)

Decision (12)

Decided (2)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 499 KB
Knottingley Power Limited
Comparison between Draft Development Consent Order originally submitted (October 2013) vs final version received 5 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 351 KB
Knottingley Power Limited
Draft Development Consent Order Statutory Instrument Template received 5 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 525 KB
Knottingley Power Limited
3.1E Draft Development Consent Order (tracked changes) received 5 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 160 KB
Knottingley Power Limited
Covering Letter, received 5 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 364 KB
Knottingley Power Limited
Final Draft Development Consent Order (Validation Report) received 5 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 134 KB
Knottingley Power Limited
Covering letter received on 28 August 2014. The Examining Authority exercised it's discretion and has agreed to accept this submission.
Other
Size: 1 MB
Knottingley Power Limited
Revised Land Plans (Doc. 2.2B) received on 28 August 2014. The Examining Authority exercised it's discretion and has agreed to accept this submission.
Other
Size: 542 KB
Knottingley Power Limited
Revised Draft Development Consent Order 3.1 D (tracked change), submitted for Deadline 8.
Other
Size: 281 KB
Knottingley Power Limited
Final Revised Explanatory Memorandum 3.2 A (clean) submitted for Deadline 8.
Other
Size: 96 KB
Knottingley Power Limited
Knottingley Power Limited Covering Letter to Deadline 8, 15 August 2014.
Other
Size: 350 KB
Knottingley Power Limited
Final Revised Draft Development Consent Order 3.1 D (clean), submitted for Deadline 8.
Other
Size: 235 KB
Knottingley Power Limited
Revised Explanatory Memorandum. Comparison with original version submitted in October 2013, submitted for Deadline 8.
Other
Size: 514 KB
Knottingley Power Limited
Revised Draft Development Consent Order 3.1.C submitted by the Applicant for the 24 July 2014 deadline
Other
Size: 536 KB
Knottingley Power Limited
Revised Draft Development Consent Order 3.1.C (track changed) submitted by the Applicant for the 24 July 2014 deadline
Other
Size: 494 KB
Knottingley Power Limited
Revised Draft Development Consent Order 3.1.B submitted by the Applicant for the 20 June 2014 deadline
Other
Size: 45 KB
Knottingley Power Limited
Revised Book of Reference submitted by the Applicant for the 20 June 2014 deadline
Other
Size: 1 MB
Knottingley Power Limited
Amended Land Plans submitted by the Applicant for the 20 June 2014 deadline
Other
Size: 516 KB
Knottingley Power Limited
Revised Draft Development Consent Order 3.1.B (track changed) submitted by the Applicant for the 20 June 2014 deadline
Other
Size: 178 KB
Knottingley Power Limited
Updated Schedule of Mitigation submitted by the Applicant for the 20 June 2014 deadline
Other
Size: 2 MB
Knottingley Power Limited
Revised Public Rights of Way, Temporary Closures and Permanent Stopping Up Plan submitted by the Applicant for the 20 June 2014 deadline
Other
Size: 3 MB
Knottingley Power Limited
Revised Works Plans
Other
Size: 2 MB
Knottingley Power Limited
Revised Access to Works Plan submitted by the Applicant for the 20 June 2014 deadline
Other
Size: 554 KB
Knottingley Power Limited
Knottingley Power Limited Covering Letter to Deadline 1 on 11 April 2014.
Other
Size: 3 MB
Knottingley Power Limited
Revised Works Plan. This document supersedes the original document ref 2.3 submitted 31 October 2013.
Other
Size: 30 MB
Knottingley Power Limited
Amended Environmental Statement (6.1) Figures, Volume 3. This document supersedes the original document submitted 31 October 2013.
Other
Size: 2 MB
Knottingley Power Limited
Revised Access to Works Plan. This document supersedes the original document ref 2.8 submitted 31 October 2013.
Other
Size: 539 KB
Knottingley Power Limited
Revised Draft Development Consent Order. This document supersedes the original document ref 3.1 submitted 31 October 2013.
Other
Size: 2 MB
Knottingley Power Limited
Revised Public Rights of Way, Temporary Closure and Permanent Stopping Up Plan. This document supersedes the original document ref 2.9 submitted 31 October 2013.
Other
Size: 39 MB
Knottingley Power Limited
Amended Environmental Statement (6.1) Appendices Volume 5. This document supersedes the original document submitted 31 October 2013.
Other
Size: 45 MB
Knottingley Power Limited
Amended Environmental Statement (6.1) Appendices, Volume 1. This document supersedes the original document submitted 31 October 2013.
Other
Size: 20 KB
Knottingley Power Limited
Amended Environmental Statement - Table of Errata
Other
Size: 25 MB
Knottingley Power Limited
Amended Environmental Statement (6.1) Figures, Volume 1. This document supersedes the original document submitted 31 October 2013.
Other
Size: 45 KB
Knottingley Power Limited
Revised Book of Reference. This document supersedes the original document ref 4.3 submitted 31 October 2013.
Other
Size: 22 MB
Knottingley Power Limited
Addendum to amended Environmental Statement (6.1) Appendices, Volume 5.
Other
Size: 24 MB
Knottingley Power Limited
Amended Environmental Statement (6.1) Figures, Volume 4. This document supersedes the original document submitted 31 October 2013.
Other
Size: 4 MB
Knottingley Power Limited
Amended Environmental Statement (6.1) Volume 2 ( Power Plant, Sections 7-16). This document supersedes the original document submitted 31 October 2013.
Other
Size: 2 MB
Knottingley Power Limited
Amended Environmental Statement (6.1) Volume 3 (Gas Pipeline Sections 17-24). This document supersedes the original document submitted 31 October 2013.
Other
Size: 160 KB
Application Document 8.1 Design and Access Statement
Other
Size: 193 KB
Other
Size: 15 MB
Application Document 5.1 Consultation Report Appendix AB-AN
Other
Other
Size: 3 MB
App Doc 6.1 Env State Vol 1 Introductory Sections 1-6
Other
Size: 23 MB
Application Document 5.1 Consultation Report Appendix B
Other
Size: 4 MB
Application Document 6.4 Flood Risk Assessment
Other
Size: 806 KB
Application Document 1.1 Cover Letter To PINS
Other
Size: 29 MB
Application Document 5.1 Consultation Report Appendix N-Z
Other
Size: 1 MB
Application Document 2.2 Land Plan
Other
Size: 17 MB
App Doc 6.1 Env State Appendices Volume 8
Other
Size: 45 KB
Application Document 4.3 Book of Reference
Other
Size: 5 MB
Application Document 2.4 Indicative Generating Station Layout Drawings
Other
Size: 22 MB
Application Document 5.1 Consultation Report Appendix A
Other
Size: 119 KB
Application Document 7.2 Pipelines Statement
Other
Size: 9 MB
Application Document 5.1 Consultation Report Appendix C-M
Other
Size: 581 KB
Application Document 2.6 indicative pump house layout drawings
Other
Size: 45 MB
App Doc 6.1 Env State Appendices Volume 11
Other
Size: 33 MB
App Doc 6.1 Env State Appendices Volume 2
Other
Size: 3 MB
Application Document 1.2 Application Form
Other
Size: 38 MB
App Doc 6.1 Env State Appendices Volume 13
Other
Size: 19 MB
Application document 5.2 planning statement
Other
Size: 7 MB
Application Document 4.2 Funding Statement
Other
Size: 42 MB
App Doc 6.1 Env State Appendices Volume 14
Other
Size: 31 MB
App Doc 6.1 Env State Appendices Volume 3
Other
Size: 6 MB
Application Document 5.1 Consultation Report Appendix AT-AZ
Other
Size: 48 MB
Application Document 5.1 Consultation Report Appendix AS Part 1
Other
Size: 1 MB
Application Document 2.7 Indicative AGI Layout drawing
Other
Size: 31 MB
App Doc 6.1 Env State Figures Volume 3
Other
Size: 4 MB
App Doc 6.1 Env State Vol 2 Power Plant Sections 7-16
Other
Size: 204 KB
Application Document 3.2 Explanatory Memorandum
Other
Size: 23 MB
Application Document 1.3 Copies of Newspaper Notices
Other
Size: 47 MB
App Doc 6.1 Env State Appendices Volume 4
Other
Size: 24 MB
App Doc 6.1 Env State Figures Volume 4
Other
Size: 486 KB
Application Document 3.1 Draft Proposed Development Consent Order
Other
Size: 641 KB
Application Document 8.3 Combined Heat and Power Report
Other
Size: 3 MB
Application Document 2.1 Location Plan
Other
Size: 35 MB
App Doc 6.1 Env State Figures Volume 2
Other
Size: 930 KB
Application Document 2.5 Indicative Overhead Lines and Pylons Layout Drawings
Other
Size: 42 MB
App Doc 6.1 Env State Appendices Volume 10
Other
Size: 2 MB
Application Document 2.9 PROW Temporary Closure and Permanent Stopping Up Plan
Other
Size: 30 MB
Application Document 5.1 Consultation Report Appendix AA
Other
Size: 7 MB
Other
Size: 25 MB
App Doc 6.1 Env State Figures Volume 1
Other
Size: 357 KB
Application Document 3.3 Comparison to Model Provisions
Other
Size: 44 MB
App Doc 6.1 Env State Appendices Volume 12
Other
Size: 42 MB
App Doc 6.1 Env State Appendices Volume 6
Other
Size: 250 KB
Application Document 4.1 Statement of Reasons
Other
Size: 9 MB
Application Document 8.2 Carbon Capture and Storage Report
Other
Size: 6 MB
Application Document 2.10 Landscaping Plan
Other
Size: 3 MB
Application Document 6.3 Scoping Opinion
Other
Size: 814 KB
Application Document 6.2 Non-Technical Summary
Other
Size: 105 KB
Application Document 7.1 Grid Connection Statement
Other
Size: 1 MB
Application Document 5.1 Consultation Report Main Report
Other
Size: 22 MB
Application Document 5.1 Consultation Report Appendix AO AR
Other
Size: 19 MB
Application Document 5.1 Consultation Report Appendix AS Part 2
Other
Size: 2 MB
Application Document 2.8 Access To Works Plan
Other
Size: 3 MB
Application Document 2.3 Works Plan
Other
Size: 44 MB
App Doc 6.1 Env State Appendices Volume 9
Other
Size: 4 MB
App Doc 6.1 Env State Vol 3 Gas Pipeline Sections 17-24
Other
Size: 103 KB
Application Docume 5.3 Environment Protection Statement of Engagement
Other
Size: 34 MB
App Doc 6.1 Env State Appendices Volume 5
Other
Size: 46 MB
App Doc 6.1 Env State Appendices Volume 1
Other
Size: 673 KB
App Doc 6.1 Env State Vol 4 Sociecon CEMP Cumulative Sections 25-27
Other
Size: 44 MB
App Doc 6.1 Env State Appendices Volume 7
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.