Knottingley Power Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (2)

Developer's Application (102)

Acceptance (20)

Pre Examination (4)

Examination (133)

Decision (12)

Decided (2)

Date

SourceDescription
Other
Size: 39 KB
Natural England
Natural England's position on Statement of Common Ground with the applicant, email received 7 April 2014.
Other
Size: 197 KB
Canal and River Trust
Comments on written summaries of oral representations made at the Issue Specific Hearing on the draft Development Consent Order and Water Resource Issues on 16 July 2014, submitted for Deadline 8.
Other
Size: 45 KB
Wakefield Council
Email from Wakefield Metropolitan Distruct Council confiriming position on s106 Agreement, received on 11 September 2014.
Other
Size: 7 MB
Knottingley Power Limited
Completed s106 agreement with St Paul's Development Plc. given to Wakefield Metropolitan District Council, received on 12 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 170 KB
Bond Dickinson LLP
Applicant's response to Examining Authority's Rule 17 Letter dated 10 September 2014.
Other
Size: 55 KB
Knottingley Power Project - Rule 17
Other
Size: 4 MB
Knottingley Power Limited
Section 106 Agreement with North Yorkshire County Council and Selby District Council (dated 15 August 2014) received 5 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 71 KB
National Grid
Letter from National Grid confirming position on Protective Provisions Agreement with the Applicant. This email includes request to withdraw all previous respresentations and objetcions, received 5 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 1 MB
Leeds City Council
Letter of consent from Leeds City Council, submitted by Knottingley Power Limited on 5 September 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 85 KB
Knottingley Power Limited
Applicant?s comments on Canal and River Trust submission received for Deadline 8, received on 27 August 2014. The Examining Authority exercised its discretion and has agreed to accept this submission.
Other
Size: 153 KB
Knottingley Power Limited
Covering letter received on 27 August 2014. The Examining Authority exercised its discretion and has agreed to accept this submission.
Other
Size: 54 KB
National Grid
Email received on 15 August 2014 confirming current position on Protection Provisions with the Applicant.
Other
Size: 46 KB
Fulcrum Pipelines Limited
Additional submission received within Deadline 8. The ExA has exercised its discretion and has agreed to accept this submission.
Other
Size: 35 KB
Gas Transportation Company (GTC)
Additional submission received within Deadline 8. The ExA has exercised its discretion and has agreed to accept this submission.
Other
Size: 62 KB
Energetics Design & Build
Additional submission received within Deadline 8. The ExA has exercised its discretion and has agreed to accept this submission.
Other
Size: 47 KB
Yorkshire Water
Email received on 13 August 2014 confirming current position Asset Protection Agreement with the Applicant. This email includes request for withdrawal of all previous representations.
Other
Size: 39 KB
Margaret Ketteridge
Email received within Deadline 8 on behalf of GTC Pipelines Ltd., Utility Grid Installations Ltd., Independent Pipelines Ltd., The Electricity Network Company Ltd., Independent Power Networks Ltd. and Quadrant Pipelines Ltd. The ExA has exercised its discretion and has agreed to accept this submission.
Other
Size: 806 KB
Knottingley Power Limited
Applicant's comments on written summaries of oral representations made at the Issue Specific Hearing on the draft Development Consent Order and Water Resource Issues on 16 July 2014, submitted for Deadline 8.
Other
Size: 132 KB
Environment Agency
Comments on written summaries of oral representations made at the Issue Specific Hearing on the draft Development Consent Order and Water Resource Issues on 16 July 2014, submitted for Deadline 8.
Other
Size: 73 KB
Letter from ExA Changes to the original application Rule 9
Other
Size: 401 KB
Knottingley Power Limited
Supplemental Statement of Common Ground with Canal and River Trust concerning Water Resource issues.
Other
Size: 2 MB
Knottingley Power Limited
Final Unilateral Undertaking to Wakefield Metropolitan District Council Plan
Other
Size: 194 KB
Chapel Haddlesey Parish Council
Email received on 18 July 2014 providing an update on the agreements between the applicant and the Parish Council regarding traffic on Millfield Road. The ExA has exercised its discretion and had agreed to accept this submission.
Other
Size: 96 KB
Knottingley Power Limited
Covering letter to applicants submissions for the 24 July 2014 deadline.
Other
Size: 225 KB
Selby District Council
Additional comments as requested from the ExA during the Issue Specific Hearing on the draft Development Consent Order and Water Resource issues, held on 16 July 2014.
Other
Size: 631 KB
Wakefield Metropolitan District Council
Additional Comments following the Issue Specific hearing on the draft Development Consent Order and Water Resources held on 16 July 2014
Other
Size: 108 KB
Environment Agency
Written summary of the oral representation put at the Issue Specific hearing on the draft Development Consent Order and Water Resources held on 16 July 2014
Other
Size: 1 MB
Knottingley Power Limited
Written summary of the oral representation put at the Issue Specific Hearing on the draft Development Consent Order and Water Resource issues, held on 16 July 2014.
Other
Size: 2 MB
Canal and River Trust
Written summary of the oral representation put at the Issue Specific hearing on the draft Development Consent Order and Water Resources held on 16 July 2014
Other
audio recording
Size: 78 MB
ISH Audio Recording Part 1
Audio recording of the Issue Specific Hearing - Wednesday 16 July 2014 - Part 1
Other
audio recording
Size: 79 MB
ISH Audio Recording Part 2
Audio recording of the Issue Specific Hearing - Wednesday 16 July 2014 - Part 2
Other
Size: 150 KB
Canal and River Trust
Schematic Illustration of Flows for Abstraction Options. This document was submitted at the Issue Specific Hearing on the draft Development Consent Order and Water Resource issues, held on 16 July 2014. The ExA has exercised its discretion and has agreed to accept this submission.
Other
Size: 306 KB
Canal and River Trust
Comparison Note for Thermal Discharges. This document was submitted at the Issue Specific Hearing on the draft Development Consent Order and Water Resource issues, held on 16 July 2014. The ExA has exercised its discretion and has agreed to accept this submission.
Other
Size: 553 KB
Canal and River Trust
Proposed Protective Provisions from the Canal and River Trust. This document was submitted at the Issue Specific Hearing on the draft Development Consent Order and Water Resource issues, held on 16 July 2014. The ExA has exercised its discretion and has agreed to accept this submission.
Other
Size: 50 KB
National Grid Electricity Transmission Plc
Email from National Grid confirming its position on Joint statement submitted by the Applicant on 8 July 2014.
Other
Size: 189 KB
Knottingley Power Limited
Comments on responses to the Examining Authority?s second round of written questions.
Other
Size: 408 KB
Yorkshire Wildlife Trust
Comments on responses to the Examining Authority?s second round of written questions.
Other
Size: 54 KB
Knottingley Power Limited
Joint statement between National Grid Gas Plc, National Grid Electricity Transmission Plc (together ?NG?) and the Applicant. This statement should be read in conjunction with earlier joint statements issued by the parties on 14 May 2014 and 20 June 2014.
Other
Size: 149 KB
Agenda for ISH to be held on 16 July 2014
Agenda for the Issue Specific Hearing on the draft Development Consent Order and Water Resource issues to be held on 16 July 2014.
Other
Size: 63 KB
National Grid
Joint statement between National Grid Gas Plc, National Grid Electricity Transmission Plc (together ?NG?) and the Applicant. This statement should be read in conjunction with an earlier joint statement issued by the parties on 14 May 2014.
Other
Size: 59 KB
National Grid
Email from National Grid confirming its position on Joint Agreement submitted by the Applicant on 20 June 2014.
Other
Size: 131 KB
Civil Aviation Authority
Responses to the ExA's Second Written Questions from Civil Aviation Authority
Other
Size: 66 KB
St Pauls Developments
Responses to the ExA's Second Written Questions from St Pauls Developments
Other
Size: 136 KB
Environment Agency
Responses to the ExA's Second Written Questions from Environment Agency
Other
Size: 63 KB
St Pauls Developments
Email confirming St Paul?s Developments current position on additional land required for the proposed application
Other
Size: 1 MB
Eggborough Parish Council
Responses to the ExA's Second Written Questions from Eggborough Parish Council
Other
Size: 5 MB
Selby District Council
Responses to the ExA's Second Written Questions from Selby District Council
Other
Size: 133 KB
North Yorkshire County Council
Responses to the ExA's Second Written Questions from North Yorkshire County Council
Other
Size: 234 KB
Chapel Haddlesey Parish Council
Chapel Haddlesey Parish Council, response to Applicants Draft Construction Traffic Management Plan, received 1 June 2014
Other
Size: 1 MB
Wakefield Metropolitan District Council
Responses to the ExA's Second Written Questions from Wakefield Metropolitan District Council
Other
Size: 32 KB
Natural England
Responses to the ExA's Second Written Questions from Natural England
Other
Size: 5 MB
Knottingley Power Limited
Applicant?s Statement of Common Ground between Selby District Council and North Yorkshire County Council
Other
Size: 9 MB
Knottingley Power Limited
The Applicant's Covering Letter and Responses to ExA's Second Written Questions
Other
Size: 50 KB
Knottingley Power Limited
Rule 13 - Applicants Notice of Hearing, received on 16 June 2014.
Other
Size: 54 KB
Notification letter for Issue Specific Hearing on 16 July 2014
Other
Size: 48 KB
National Grid Gas plc and National Grid Electricity Transmission plc
Email received on 14 May 2014. Confirmation from National Grid Gas Plc and National Grid Electricity Transmission Plc regarding position on joint agreement with the Applicant. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 101 KB
Knottingley Power Limited
Response to questions raised at the Issue Specific hearing on Environmental Issues held on 14 May 2014
Other
Size: 127 KB
Knottingley Power Limited
Written summary of the oral representation put at the Compulsory Acquisition hearing held on 15 May 2014
Other
Size: 5 MB
Knottingley Power Limited
Draft Construction Traffic Management Plan for Water and Gas Pipelines. This document was received for the deadline of 23 May 2014.
Other
Size: 118 KB
Knottingley Power Limited
Written summary of the oral representation put at the Issue Specific hearing on Environmental Impacts held on 14 May 2014.
Other
Size: 186 KB
Second Round of Examining Authority's Written Questions
Other
Size: 6 MB
Wakefield Metropolitan District Council
Further information requested by the Examining Authority at the Environmental Impacts Hearing on 14 May 2014
Other
Size: 116 KB
Environment Agency
Written summary of the oral representation put at the Issue Specific hearing on Environmental Impacts held on 14 May 2014.
Other
Size: 76 KB
Other
Size: 55 KB
Knottingley Power Limited
Email received on 14 May 2014. This document constitutes a joint statement on behalf of National Grid Gas Plc and National Grid Electricity Transmission Plc and the Applicant. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 47 KB
Yorkshire Water
Email received on 14 May 2014. Confirmation from Yorkshire Water regarding position on joint agreement with the Applicant. The Examining Authority has exercised its discretion and has agreed to accept this submission
Other
Size: 28 KB
Chapel Haddlesey Parish Council
Email received on 2 May 2014 from Chapel Haddlesey Parish Council. The ExA has exercised its discretion and has agreed to accept this submission.
Other
Size: 69 KB
Knottingley Power Limited
Email received on 14 May 2014. This document constitutes a joint statement on behalf of Yorkshire Water and the Applicant in relation to the protection of Yorkshire Water's existing apparatus. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 62 KB
Northern Gas Networks
Email received on 12 May 2014 from Northern Gas Network requesting withdrawal of their previous representations in relation to the application. The ExA has exercised its discretion and has agreed to accept this submission.
Other
audio recording
Size: 69 MB
Issue Specific Hearing - Wednesday 14 May 2014 - Part 1
Audio recording of the Issue Specific Hearing - Wednesday 14 May 2014 - Part 1
Other
audio recording
Size: 61 MB
Issue Specific Hearing - Wednesday 14 May 2014 - Part 2
Audio recording of the Issue Specific Hearing - Wednesday 14 May 2014 - Part 2
Other
audio recording
Size: 2 MB
Open Floor Hearing - Wednesday 14 May 2014
Audio recording of the Open Floor Hearing - Wednesday 14 May 2014
Other
audio recording
Size: 34 MB
Issue Specific Hearing - Wednesday 14 May 2014 - Part 3
Audio recording of the Issue Specific Hearing - Wednesday 14 May 2014 - Part 3
Other
Size: 33 KB
Compulsory Acquisition Hearing - Thursday 15 May 2014
Audio recording of the Compulsory Acquisition Hearing - Thursday 15 May 2014
Other
Size: 55 KB
Northern Gas Networks
Email from Northern Gas Networks confirming position on Asset Protection Deed with Knottingley Power Limited, received 8 May 2014
Other
Size: 45 KB
Lancashire County Council
Lancashire County Council response to Rule 17 issued on 1 May 2014
Other
Size: 51 KB
North Yorkshire County Council
North Yorkshire County Council response to Rule 17 issued on 1 May 2014
Other
Size: 29 KB
Mid Yorkshire NHS Trust
Mid Yorkshire NHS Trust response to Rule 17 issued on 1 May 2014
Other
Size: 274 KB
Wakefield Metropolitan District Council
Wakefield Metropolitan District Council response to Rule 17 issued on 1 May 2014
Other
Size: 108 KB
Knottingley Power Limited
Knottingley Power Limited response to Rule 17 issued on 1 May 2014
Other
Size: 56 KB
West Yorkshire Fire and Rescue Service
West Yorkshire Fire and Rescue Service response to Rule 17 issued on 1 May 2014
Other
Size: 108 KB
Natural England
Natural England response to Rule 17 issued on 1 May 2014
Other
Size: 83 KB
North Yorkshire County Council (Regional and Strategic Policy Team)
North Yorkshire County Council (Regional and Strategic Policy Team) response to Rule 17 issued on 1 May 2014
Other
Size: 41 KB
GTC Pipelines
GTC response to Rule 17 issued on 1 May 2014
Other
Size: 5 MB
Notification and timetable for ASV on 13 May 2014
Notification and timetable for ASV on 13 May 2014.
Other
Size: 140 KB
Knottingley Power Limited
Knottingley Power Ltd comments on Written Representations and Interested Parties responses to the Examining Authority?s first written questions
Other
Size: 131 KB
Knottingley Power Limited
Knottingley Power Ltd comments on Local Impact Reports from Selby District Council and North Yorkshire County Council
Other
Size: 127 KB
Knottingley Power Limited
Knottingley Power Ltd comments on Local Impact Report from Wakefield Metropolitan District Council
Other
Size: 140 KB
Knottingley Power Limited
Knottingley Power Ltd comments on Written Representations and Interested Parties responses to the Examining Authority?s first written questions
Other
Size: 227 KB
Canal and River Trust
Canal and River Trust comments on Written Representations and Interested Parties responses to Examining Authority?s first written questions
Other
Size: 58 KB
St Pauls Developments
Email from St Pauls Developments confirming position on lands right provisions agreement with Knottingley Power Limited, received 2 May 2014.
Other
Size: 148 KB
Agendas for Hearings to be held on 14 and 15 May 2014
Agendas for Hearings to be held on 14 and 15 May 2014
Other
Size: 54 KB
140501 EN010050 Knottingley Power Project - Rule 17 and Rule 8(3)
Other
Size: 46 KB
Yorkshire Water
Email received from Yorkshire Water in relation to a draft Asset Protection Agreement between the applicant and Yorkshire Water, received 24 April 2014.
Other
Size: 50 KB
National Grid Gas plc and National Grid Electricity Transmission plc
Email from National Grid confirming the current position on Statement of Common Ground and Protective Provisions with the applicant.
Other
Size: 41 KB
Network Rail
Network Rail?s position in relation to draft Asset Protection Agreement with the applicant, email received 24 April 2014.
Other
Size: 9 MB
Knottingley Power Limited
Further version of signed Statement of Common Ground submitted by Wakefield Metropolitan District Council for Deadline 1, received on 29 April 2014. The Examining Authority has exercised its discretion and accepted this submission.
Other
Size: 7 MB
Knottingley Power Limited
Responses to the ExA?s First Written Questions
Other
Size: 59 KB
Knottingley Power hearing and ASV notification letter final
Other
Size: 881 KB
Knottingley Power Limited
Statement of Common Ground between the applicant and Natural England.
Other
Size: 205 KB
Selby District Council & North Yorkshire County Council
Responses to the ExA's First Written Questions
Other
Size: 5 MB
Environment Agency
This file contains Written Representation, Appendix A and summary of written representation
Other
Size: 764 KB
Knottingley Power Limited
Statement of Common Ground between the applicant and Network Rail Infrastructure Limited and National Grid Electricity Transmission plc.
Other
Size: 3 MB
Caddick Construction Limited
Written Representation received after the deadline of 11 April 2014. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 15 KB
Eggborough Parish Council
Written Representation
Other
Size: 581 KB
Knottingley Power Limited
Statement of Common Ground between the applicant and National Grid Electricity and National Grid Gas.
Other
Size: 37 KB
Yorkshire Water - Withdrawn
Written Representation
Other
Size: 331 KB
Yorkshire Wildlife Trust
This file contains both the written representation and the responses to the ExA's first written questions
Other
Size: 331 KB
Yorkshire Wildlife Trust
This file contains both the Written Representation and the responses to the ExA's First Written Questions
Other
Size: 452 KB
Knottingley Power Limited
Statement of Common Ground between the applicant and Canal and River Trust.
Other
Size: 18 KB
John McCartney (Cllr North Yorkshire County Council)
Written Representation
Other
Size: 7 MB
Knottingley Power Limited
Statement of Common Ground between the applicant and the Environment Agency.
Other
Size: 2 MB
Selby District Council & North Yorkshire County Council
Joint Local Impact Report
Other
Size: 501 KB
Knottingley Power Limited
Statement of Common Ground between the applicant and Yorkshire Wildlife Trust
Other
Size: 2 MB
Canal and River Trust
Written Representation
Other
Size: 5 MB
Environment Agency
Responses to the ExA?s First Written Questions
Other
Size: 272 KB
National Grid Electricity Transmission Plc and National Grid Gas Plc
Written Representation
Other
Size: 827 KB
Wakefield Metropolitan District Council
Responses to the ExA's First Written Questions
Other
Size: 115 KB
Knottingley Power Limited
Comments on Relevant Representations already received
Other
Size: 45 KB
Civil Aviation Authority
Written Representation
Other
Size: 630 KB
Knottingley Power Limited
Statement of Common Ground between the applicant and WMDC
Other
Size: 636 KB
Wakefield Metropolitan District Council
Local Impact Report
Other
Size: 1 MB
Dr Glynn Powell
Written Representation received from non-interested party. The Examining Authority has exercised its discretion and has agreed to accept this submission.
Other
Size: 102 KB
Note of the Preliminary Meeting
Note of the Preliminary Meeting held on 13 March 2014
Other
Size: 199 KB
First round of Examining Authority's Written Questions
First Written Questions issued on 20 March 2014
Other
Size: 157 KB
Rule 8 Letter
Other
Size: 3 MB
Knottingley Power
Draft Operational Travel Plan. This document was omitted in error from the Appendices within Section 15 of the original Environmental Statement (6.1) and was submitted by the applicant on 13 December 2013. The Examining Authority exercised its discretion and has agreed to accept this submission on 20 March 2014.
Other
Size: 3 MB
Knottingley Power Limited
Draft Construction Travel Plan. This document was omitted in error from the Appendices within Section 15 of the original Environmental Statement (6.1) and was submitted by the applicant on 13 December 2013. The Examining Authority exercised its discretion and has agreed to accept this submission on 20 March 2014.
Other
Size: 22 MB
Knottingley Power Limited
Historic Mining Review. This document was omitted in error from the Appendices within Section 12 of the original Environmental Statement (6.1) and was submitted by the applicant on 13 December 2013. The Examining Authority exercised its discretion and has agreed to accept this submission on 20 March 2014.
Other
Size: 45 KB
Chapel Haddlesey Parish Council
Late representation received on 6 March 2014. The Examining Authority exercised its discretion and has agreed to accept this submission on 20 March 2014.
Other
Size: 514 KB
Knottingley Power Limited
Letter received from the applicant on 4 March 2014 including comments on the application. The Examining Authority exercised its discretion and has agreed to accept this submission on 20 March 2014.
Other
Size: 52 KB
East Riding of Yorkshire Council
Late representation received on 20 January 2014. The Examining Authority exercised its discretion and has agreed to accept this submission on 20 March 2014.
Other
audio recording
Size: 60 MB
Preliminary Meeting Audio
Audio recording of the Preliminary Meeting held on 13 March 2014
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.