Hornsea Offshore Wind Farm (Zone 4) – Project One

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (9)

Developer's Application (223)

Acceptance (3)

Pre Examination (11)

Examination (462)

Decision (32)

Decided (27)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 2 MB
7.6.3.2 - Phase 1 Intertidal Sand Dune and Salt Marsh Habitat Survey
Other
Size: 1 MB
SMart Wind Ltd
Appendix B. Draft DCO, version 7 (pdf format). Submitted for Deadline VIII of 6 June 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix D. Comparison of the draft DCO Version 7 with Version 6. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 1 MB
Smart Wind Ltd
Appendix A. Draft DCO, version 7 (Word format). Submitted for Deadline VIII of 6 June 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix C. Comparison of draft DCO Version 7 with Version 1. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix E. Schedule of Changes, version 6. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix E - Comparison of Version 6 of draft DCO against Version 5 submitted for the deadline VII of 28 May 2014.
Other
Size: 7 MB
SMart Wind Ltd
Appendix C - Draft Development Consent Order - Version 1 (Microsoft Word Format) submitted for the deadline VII of 28 May 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix F - Schedule of Changes requested to the draft DCO - Version 5 submitted for the deadline VII of 28 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix B - Draft Development Consent Order - Version 6 (PDF) submitted for the deadline VII of 28 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix D - Comparison of Version 6 of draft DCO against Version 1 submitted for the deadline VII of 28 May 2014.
Other
Size: 8 MB
SMart Wind Ltd
Appendix A - Draft Development Consent Order - Version 6 (Microsoft Word Format) submitted for the deadline VII of 28 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix D: Schedule of changes requested to the draft DCO, Version 3. Submitted for Deadline IV of 22 April 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix B: Comparison of Version 4 of draft DCO against Version 3 of draft DCO. Submitted for Deadline IV of 22 April 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix C. Comparison of draft DCO Version 4 against Version 1. Submitted for Deadline IV of 22 April 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix A: Draft Development Consent Order, Version 4. Submitted for Deadline IV of 22 April 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix F Part 1: Tracked Change Book of Reference - 5 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 932 KB
SMart Wind Ltd
Appendix I: Update on status of Land Agreements. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix C: Comparison of Version 3 of the draft DCO against Version 1. Submitted for the Deadline III of 24 February 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix E Part 3: Book of Reference - 5 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix E Part 2: Book of Reference - 5 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix F Parts 4, 5 and Schedule: Tracked Change Book of Reference - 5 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 975 KB
SMart Wind Ltd
Appendix X: Letter of Consent from the the Secretary of State for Transport pursuant to section 135 of the Planning Act 2008 - 10 February 2013. Submitted for the Deadline III of 24 February 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix E Part 1: Book of Reference - 5 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix E Parts 4, 5 and Schedule: Book of Reference - 5 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix Y: Letters to Additional Persons introduced to the Book of Reference (17 and 18 February 2014). Submitted for the Deadline III of 24 February 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix F Part 3: Tracked Change Book of Reference - 5 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix W: Letter of Consent from the Lindsey Marsh Drainage Board to the disapplication of provisions - 4 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix B: Comparison of Version of the draft DCO against Version 2. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix A: Draft Development Consent Order, Version 3. Submitted for the Deadline III of 24 February 2014
Other
Size: 45 KB
SMart Wind Ltd
Appendix F Part 2: Tracked Change Book of Reference - 5 February 2014. Submitted for the Deadline III of 24 February 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix D: Schedule of Changes to the draft DCO - Version 2. Submitted for the Deadline III of 24 February 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix C Schedule of Changes to the draft DCO. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix B Comparison of Version 2 of the draft DCO against Version 1. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix A Draft Development Consent Order - Version 2. Submitted for deadline II 20 January 2014.
Other
Size: 17 MB
SMart Wind
Updated Land Plans sheet 27 of 27 submitted on 18 December 2013
Other
Size: 17 MB
SMart Wind
Updated Land Plans sheet 19 of 27 submitted on 18 December 2013
Other
Size: 22 MB
SMart Wind
Updated Works Plans Sheet 27 of 27 submitted on 18 December 2013
Other
Size: 33 MB
SMart Wind
Replacement page number 778 to correct the Habitats Regulation Assessment (HRA) Report submitted on 18 December 2013
Other
Size: 45 KB
SMart Wind
Updated Book of Reference submitted on 11 December 2013
Other
Size: 34 MB
SMart Wind
Omitted figures 5.1-5.11 to accompany ES Volume 3 Chapter 5 Historic Environment submitted on 18 December 2013
Other
Size: 6 MB
SMart Wind
Replacement version of ES Annex 6.3.9 Wintering and Migratory Birds Survey submitted on 18 December 2013
Other
Size: 45 KB
SMart Wind Ltd
Book of Reference Parts 4 to 5 and Schedule (December 2013)
Other
Size: 45 KB
SMart Wind Ltd
Book of Reference Part 1 of 5 (December 2013) (with tracks)
Other
Size: 45 KB
SMart Wind Ltd
Book of Reference Part 2 of 5 (December 2013) (with tracks)
Other
Size: 45 KB
SMart Wind Ltd
Book of Reference Part 3 of 5 (December 2013)
Other
Size: 45 KB
SMart Wind Ltd
Book of Reference Part 1 of 5 (December 2013)
Other
Size: 45 KB
SMart Wind Ltd
Book of Reference Part 3 of 5 (December 2013) (with tracks)
Other
Size: 45 KB
SMart Wind Ltd
Book of Reference Parts 4 to 5 and Schedule (December 2013) (with tracks)
Other
Size: 45 KB
SMart Wind Ltd
Book of Reference Part 2 of 5 (December 2013)
Other
Size: 45 KB
6.3 Book of Reference Part 1 of 5
Other
Size: 45 KB
6.3 Book of Reference Part 3 of 5
Other
Size: 45 KB
6.3 Book of Reference Parts 4 to 5 and Schedule
Other
Size: 33 KB
SMart Wind Ltd
Updated Book of Reference submitted with s59 Certificates with tracked changes - 24 October 2013
Other
Size: 45 KB
6.3 Book of Reference Part 2 of 5
Other
Size: 21 MB
7.6.7.1 Transport Assessment
Other
Size: 4 MB
7.5.12.1 Radar Early Warning Systems Technical Report
Other
Size: 15 MB
8.1 Scoping Opinion Dec 2010
Other
Size: 17 MB
7.2.12 Infrastructure and Other Users
Other
Size: 20 MB
7.3.8 Noise and Vibration
Other
Size: 28 MB
7.2.4 Marine Mammals
Other
Size: 15 MB
12.3 Planning Statement
Other
Size: 3 MB
7.6.9.2 Airport and Technical Site Safeguarding Consultation Zones
Other
Size: 11 MB
7.4.3.6 Crossing Schedule Offshore
Other
Size: 3 MB
7.2.13 Air Quality and Waste Management
Other
Size: 3 MB
7.3.4 Landscape and Visual Resources Part 4 of 7
Other
Size: 735 KB
12.9 Offshore EPS Draft Application
Other
Size: 3 MB
7.1.5 Environmental Impact Assessment Methodology
Other
Size: 4 MB
2.1 Consultation Report
Other
Size: 787 KB
7.6.4.11 Effects on Landscape Resources at Operational Phase
Other
Size: 5 MB
7.4.3.8 Dredging and Disposal Site Characterisation
Other
Size: 12 MB
7.6.3.4 Great Crested Newt Survey
Other
Size: 10 MB
7.5.8.2 Offshore HVAC Reactive Compensation Substation NRA
Other
Size: 9 MB
8.2 Scoping Opinion May 2012
Other
Size: 570 KB
7.6.7.4 2011 Base Traffic Flows
Other
Size: 15 MB
4.1 Land Plans
Other
Size: 23 MB
7.2.11 Seascape and Visual Resources
Other
Size: 6 MB
7.3.9 Air Quality and Health
Other
Size: 3 MB
7.2.5 Ornithology
Other
Size: 30 MB
7.3.4 Landscape and Visual Resources Part 7 of 7
Other
Size: 796 KB
7.1.2 Policy and Legislative Context
Other
Size: 2 MB
7.5.1.8 Foundation Scour Assessment
Other
Size: 12 MB
10.1 Crown Plan Offshore
Other
Size: 28 MB
7.4.3.2 Subsea Noise Technical Report
Other
Size: 22 MB
7.3.11 Inter-Related Effects Onshore
Other
Size: 26 MB
7.2.7 Commercial Fisheries
Other
Size: 3 MB
7.5.1.4 Quaternary Deposits
Other
Size: 835 KB
7.6.4.1 LVIA Methodology
Other
Size: 15 MB
7.6.1.5 Borehole Logs
Other
Size: 4 MB
7.5.11.2 Wirelines from Sample Viewpoints
Other
Size: 1 MB
7.6.2.2 Planning Policy and Legislation Summary
Other
Size: 410 KB
7.4.3.5 Code of Construction Practice
Other
Size: 5 MB
2.4 Consultation Report Annex 11
Other
Size: 49 MB
1.3 Copies of Newspaper Notices
Other
Size: 32 MB
7.6.5.5 Trial Trenching Report
Other
Size: 563 KB
7.2.14 Inter-Related Effects Offshore
Other
Size: 40 MB
7.5.2.1 Benthic Ecology Technical Report
Other
Size: 1 MB
1.2 Application Form for Project One
Other
Size: 33 MB
10.2 Crown Plan Onshore
Other
Size: 41 MB
2.3 Consultation Report Annexes 4 to 10
Other
Size: 577 KB
7.6.5.7 Site Gazeteer
Other
Size: 767 KB
3.2 Draft DCO Explanatory Memorandum
Other
Size: 399 KB
12.10 Onshore EPS Statement of Compliance
Other
Size: 35 MB
7.6.3.1 Terrestrial Ecology Survey Figures and Associated Tables
Other
Size: 2 MB
7.5.1.3 Metocean Data
Other
Size: 6 MB
7.5.2.2 Water Framework Directive Assessment
Other
Size: 10 MB
7.6.2.4 Tetney to Saltfleet FRA
Other
Size: 506 KB
7.6.4.13 Effects on Landscape Receptors During the Decommissioning Phase
Other
Size: 15 MB
7.5.10.1 Marine Archaeology Technical Report
Other
Size: 231 KB
7.1.b Glossary
Other
Size: 508 KB
7.6.5.9 Screening Assessment HVDC Converter HVAC Substation
Other
Size: 12 MB
12.8 Statutory and Non-statutory Conservation etc. Sites Plan Offshore
Other
Size: 491 KB
7.6.4.5 Seascape Character Areas Key Characteristics
Other
Size: 18 MB
7.2.10 Marine Archaeology and Ordnance
Other
Size: 2 MB
12.2 Carbon Life Cycle Analysis
Other
Size: 1 MB
1.1 Cover Letter to the Planning Inspectorate
Other
Size: 500 KB
7.6.4.2 Nationally Designated Landscapes etc Key Characteristics
Other
Size: 7 MB
7.5.10.2 Draft Written Scheme of Investigation
Other
Size: 245 KB
7.6.7.2 Planning Policy
Other
Size: 238 KB
7.6.7.7 Construction Vehicle Trip Generation Assumptions
Other
Size: 73 MB
7.6.2.1 Correspondence Part 1 of 2
Other
Size: 2 MB
7.6.7.5 Personal Injury Accident Locations
Other
Size: 31 MB
7.6.3.8 Breeding Bird Survey
Other
Size: 20 MB
7.3.3 Ecology and Nature Conservation
Other
Size: 28 MB
7.5.2.1 Benthic Ecology Technical Report Appendix F
Other
Size: 37 MB
7.6.4.7 Local Receptors for Landfall and Cable Route
Other
Size: 724 KB
7.6.4.6 Planning Policy
Other
Size: 913 KB
7.5.11.3 Cumulative Effects Wirelines from Sample Viewpoints
Other
Size: 34 MB
5.1 Works Plans Offshore Part 2 of 2
Other
Size: 21 MB
7.3.4 Landscape and Visual Resources Part 6 of 7
Other
Size: 21 MB
5.2 Works Plans Onshore Part 2 of 2
Other
Size: 7 MB
3.1 Draft Development Consent Order
Other
Size: 27 MB
7.6.1.2 Fugro Landfall SI
Other
Size: 15 MB
5.3 Works Plans Intertidal
Other
Size: 501 KB
7.6.8.3 Operational Noise Assessment
Other
Size: 6 MB
7.6.1.1 Baseline Data from EA and Local Authorities
Other
Size: 691 KB
7.6.4.15 Meteorological Data
Other
Size: 1 MB
7.3.5 Historic Environment
Other
Size: 7 MB
7.1.3 Project Description
Other
Size: 16 MB
7.6.5.2 Aerial Photographic Survey Report
Other
Size: 568 KB
7.6.5.8 Designated Assets Baseline
Other
Size: 37 MB
7.3.6 Land Use Agriculture and Recreation
Other
Size: 12 MB
7.1.4 Site Selection and Consideration of Alternatives
Other
Size: 10 MB
7.4.3.7 Illustrative Layouts and Drawings
Other
Size: 592 KB
7.6.7.8 Traffic Flows with Construction Traffic
Other
Size: 5 MB
7.3.4 Landscape and Visual Resources Part 5 of 7
Other
Size: 2 MB
11.1 Safety Zone Statement
Other
Size: 10 MB
7.6.3.6 Otter and Water Vole Survey
Other
Size: 13 MB
7.3.4 Landscape and Visual Resources Part 3 of 7
Other
Size: 28 MB
7.2.8 Shipping and Navigation
Other
Size: 14 MB
7.2.9 Aviation Military and Communications
Other
Size: 13 MB
7.1a Non Technical Summary
Other
Size: 41 MB
2.2 Consultation Report Annexes 1 to 3
Other
Size: 636 KB
7.6.4.10 Effects on Visual Receptors at Construction Phase
Other
Size: 8 MB
7.5.1.2 Wave Modelling
Other
Size: 6 MB
7.5.1.6 Cable Burial Plume Assessment
Other
Size: 3 MB
7.1.1 Introduction
Other
Size: 517 KB
7.6.4.4 Historic Landscapes etc Table of Key Characteristics
Other
Size: 29 MB
7.5.5.1 Ornithology Technical Report
Other
Size: 563 KB
7.6.4.9 Effects on Landscape Resources at Construction Phase
Other
Size: 31 MB
7.2.1 Marine Processes
Other
Size: 11 MB
7.5.1.1 Tidal Calibration Report
Other
Size: 43 MB
7.3.1 Geology and Ground Conditions
Other
Size: 7 MB
7.5.13.1 Air Quality Technical Report
Other
Size: 9 MB
7.4.4.1 Offshore Export Cable Route Selection
Other
Size: 684 KB
7.4.5.2 Transboundary Effects Screening Note
Other
Size: 19 MB
7.4.4.2 Landfall Onshore Cable Route Converter Substation Location Selection
Other
Size: 33 MB
12.6 Habitats Regulation Assessment
Other
Size: 37 MB
5.1 Works Plans Offshore Part 1 of 2
Other
Size: 4 MB
7.6.2.3 Converter Station FRA
Other
Size: 35 MB
7.5.3.1 Fish and Shellfish Technical Report
Other
Size: 28 MB
2.5 Consultation Report Annexes 12 to 17
Other
Size: 577 KB
7.6.4.3 Locally Designated Landscapes etc Key Characteristics
Other
Size: 985 KB
7.6.2.5 Classification of Surface Water Bodies
Other
Size: 16 MB
7.6.4.16 Landscape Scheme and Management Plan
Other
Size: 9 MB
7.3.7 Traffic and Transport
Other
Size: 3 MB
7.5.1.5 Bedform Analysis
Other
Size: 8 MB
7.3.4 Landscape and Visual Resources Part 1 of 7
Other
Size: 5 MB
7.5.11.1 Seascape and Visual Technical Report
Other
Size: 10 MB
7.2.3 Fish and Shellfish Ecology
Other
Size: 19 MB
7.5.8.1 Subzone 1 and Offshore Cable Route NRA
Other
Size: 4 MB
7.3.10 Socio Economics
Other
Size: 60 MB
7.5.7.1 Commercial Fisheries Technical Report
Other
Size: 4 MB
10.3 Crown Plan Intertidal
Other
Size: 5 MB
12.4 List of Other Consents Required
Other
Size: 296 KB
7.6.8.1 Construction Noise Model
Other
Size: 34 MB
5.2 Works Plans Onshore Part 1 of 2
Other
Size: 50 MB
7.6.5.3 Geophysical Survey Report
Other
Size: 14 MB
7.3.4 Landscape and Visual Resources Part 2 of 7
Other
Size: 637 KB
7.6.3.3 Hedgerow Report
Other
Size: 14 MB
7.6.5.4 Field Walking Report
Other
Size: 6 MB
7.6.5.6 Intertidal Walkover Survey Report
Other
Size: 1 MB
6.1 Statement of Reasons
Other
Size: 17 MB
7.6.3.12 Ecological Management Plan
Other
Size: 12 MB
7.6.1.4 Landmark Envirocheck Report Converter Substation Site
Other
Size: 11 MB
7.6.3.5 Reptile Survey
Other
Size: 6 MB
7.6.7.6 Public Transport Networks
Other
Size: 577 KB
7.6.4.12 Effects on Visual Receptors at Operational Phase
Other
Size: 545 KB
7.6.4.8 Representative Visual Receptors HVDC Converter HVAC Substation
Other
Size: 18 MB
7.4.3.4 Crossing Schedule Onshore
Other
Size: 650 KB
7.6.4.14 Effects on Visual Receptors During the Decommissioning Phase
Other
Size: 20 MB
7.2.2 Benthic Subtidal and Intertidal Ecology
Other
Size: 26 MB
7.6.2.1 Correspondence Part 2 of 2
Other
Size: 13 MB
12.7 Statutory and Non-statutory Conservation etc. Sites Plan Onshore
Other
Size: 956 KB
9.1 Statement of Engagement
Other
Size: 9 MB
7.2.6 Nature Conservation
Other
Size: 5 MB
7.3.2 Hydrology and Flood Risk
Other
Size: 2 MB
7.6.6.1 Soil Types and Descriptions
Other
Size: 305 KB
7.6.7.3 Description of Network
Other
Size: 3 MB
7.4.3.1 Airborne Noise Technical Report
Other
Size: 10 MB
6.2 Funding Statement
Other
Size: 2 MB
7.4.3.3 Site Waste Management Plan
Other
Size: 528 KB
7.6.8.2 Operational Noise Model Input
Other
Size: 16 MB
7.6.3.7 Bat Survey
Other
Size: 6 MB
7.5.9.1 Aviation Military and Communication Technical Report
Other
Size: 642 KB
7.6.8.4 Cumulative Noise Assessment
Other
Size: 24 MB
7.5.4.1 Marine Mammal Technical Report
Other
Size: 31 MB
7.6.5.1 Desk Based Assessment
Other
Size: 2 MB
7.6.3.9 Wintering and Migratory Bird Survey
Other
Size: 951 KB
7.6.9.1 Electromagnetic Fields Study
Other
Size: 7 MB
7.6.1.3 Groundsure EnviroInsight and GeoInsight Reports
Other
Size: 6 MB
7.4.5.1 Cumulative Transboundary and Inter-related Effects Document
Other
Size: 6 MB
7.5.1.7 Landfall Assessment
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.