Hornsea Offshore Wind Farm (Zone 4) – Project One

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (9)

Developer's Application (223)

Acceptance (3)

Pre Examination (11)

Examination (462)

Decision (32)

Decided (27)

Date

SourceDescription
Other
Size: 2 MB
SMart Wind Ltd
Appendix G. Comments on RSPB's submission at Deadline VII. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix H. Comments on Natural England's submission at Deadline VII. Submitted for Deadline VIII of 6 June 2014
Other
Size: 14 KB
Natural England
Comments on response to Rule 17 letter of 2 June 2014. Submitted for Deadline IX of 9 June 2014 (Late submission).
Other
Size: 321 KB
Natural England
Section B. Response to Rule 17 Request of 2 June. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 320 KB
Natural England
Comments on the Report on the Implications for European Sites (RIES). Submitted for Deadline VIII of 6 June 2014.
Other
Size: 41 KB
SMart Wind Ltd
Comments on responses to Rule 17 letter of 2 June 2014. Submitted for Deadline IX of 9 June 2014.
Other
Size: 506 KB
C.GEN Killingholme Limited
Comments on response to Rule 17 letter of 2 June 2014. Submitted for Deadline IX of 9 June 2014.
Other
Size: 443 KB
Natural England
Section A. Comments on the Applicant?s updated in-combination auk displacement note and updated ornithological summary. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 946 KB
SMart Wind Ltd
Representation submitted for Deadline VIII of 6 June 2014.
Other
Size: 687 KB
SMart Wind Ltd
Appendix M. Updated draft C.GEN Protective Provisions Plan. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix L. Environmental Signposting Document, version 5. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix K. Comments on C.GEN?s submission at Deadline VII. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 8 KB
East Lindsey District Council
Response to the Rule 17 Request of 2 June 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix F. Response to Rule 17 Request of 2 June. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix J. Comments on P66?s submission at deadline VII. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 409 KB
SMart Wind Ltd
Appendix I. Comments on the MMO?s submission at Deadline VII. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 223 KB
Marine Management Organisation
Response to Rule 17 Request of 2 June. Submitted for Deadline VIII of 6 June 2014.
Other
Size: 38 KB
GTC, Independent Power Networks Limited, Independent Pipelines Limited, Quadrant Pipelines Limited
Response to the Rule 17 Request of 2 June 2014
Other
Size: 1 MB
SMart Wind Ltd
Updated Memorandum of Understanding between Natural England and the Applicant. Submitted 3 June 2014.
Other
Size: 777 KB
Associated British Ports
Letter submitted for Deadline VII of 28 May 2014 (late submission)
Other
Size: 2 MB
SMart Wind Ltd
Updated in-combination Auk displacement note. Submitted 3 June 2014
Other
Size: 83 KB
Hornsea Rule 17 letter dated 2 June 2014
Rule 17 issued by the Examining Authority on 2 June 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix O - Environmental Information Signposting Document - Version 4 submitted for the deadline VII of 28 May 2014.
Other
Size: 393 KB
SMart Wind Ltd
Appendix P - E-mail confirming withdrawal of Centrica's representations dated 22 May 2014 submitted for the deadline VII of 28 May 2014.
Other
Size: 379 KB
The Royal Society for the Protection of Birds
Comments on the Report on the Implications for European Sites (RIES). Submitted for Deadline VII of 28 May 2014
Other
Size: 970 KB
SMart Wind Ltd
Appendix G - Comments on RSPBs written representations submitted at Deadlines V and VI submitted for the deadline VII of 28 May 2014.
Other
Size: 959 KB
SMart Wind Ltd
Response to Deadline VII submitted for the deadline VII of 28 May 2014.
Other
Size: 957 KB
SMart Wind Ltd
Appendix I - Status of Agreement on Protective Provisions submitted for the deadline VII of 28 May 2014.
Other
Size: 221 KB
Marine Management Organisation
Comments on Version 5 of draft DCO. Submitted for deadline VII of 28 May 2014
Other
Size: 488 KB
C.GEN.Killingholme Ltd
Response to Rule 17 Request of 12 May 2014. Submitted for Deadline VII of 28 May 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix R - Updated Memorandum of understanding with Natural England submitted for the deadline VII of 28 May 2014.
Other
Size: 208 KB
Phillips 66 Ltd
Submission for deadline VII of 28 May 2014
Other
Size: 950 KB
SMart Wind Ltd
Appendix N - Update on the status of Land Agreements submitted for the deadline VII of 28 May 2014.
Other
Size: 550 KB
SMart Wind Ltd
Appendix M - Vi Aura Limited Generation Licence submitted for the deadline VII of 28 May 2014.
Other
Size: 195 KB
Natural England
Representation submitted for Deadline VII of 28 May 2014.
Other
Size: 2 MB
Environment Agency
Submission withdrawing objections and representations. Submitted for Deadline VII of 28 May 2014
Other
Size: 954 KB
SMart Wind Ltd
Appendix Q - Updated position statement in relation to interface with C.GEN submitted for the deadline VII of 28 May 2014.
Other
Size: 155 KB
Natural England
Comments on the Report on the Implications for European Sites (RIES). Submitted for Deadline VII of 28 May 2014.
Other
Size: 960 KB
SMart Wind Ltd
Appendix L - Updated list of Additional Consents Required submitted for the deadline VII of 28 May 2014.
Other
Size: 997 KB
SMart Wind Ltd
Appendix H - Comments on the RIES issued by the ExA on 14 May 2014 submitted for the deadline VII of 28 May 2014.
Other
Size: 980 KB
SMart Wind Ltd
Appendix K - Final Position Statement in relation to post construction Seabed and Fish Monitoring Conditions submitted for the deadline VII of 28 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix J - Updated Ornithological Summary submitted for the deadline VII of 28 May 2014.
Other
Size: 436 KB
Royal Society for the Protection of Birds
Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix D - Comparison of V5 of the Draft DCO against V1. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 953 KB
SMart Wind Ltd
Appendix S - The Applicant's commentary on proposed C.GEN Protective Provisions. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 219 KB
SMart Wind Ltd
Appendix J13 Relevant Representation by Centrica Plc (Centrica) to C.GEN. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix J - The Applicant's Response to Question 2 of the Rule 17 Letter - Updated clarification note relating to Cumulative and In-combination Collision Assesment. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 993 KB
SMart Wind Ltd
Appendix U - Comparison of the Applicant's proposed C.GEN Protective Provisions v C.GEN's proposed Protective Provisions submitted at Deadline V. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix G- The Applicant's review of EIA conclusions in response to the amendment of the Project Design Envelope. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix C - Word Version of V1 of the Development Consent Order. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix T - The Proposed C.GEN Protective Provisions Plan. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix F - Schedule of changes - version 4. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix B - Pdf Version of V5 of the Development Consent Order. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 43 KB
NATS Safeguarding
Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix M - Errata - corrected version of Appendix U of the Applicant's response to Deadline II - Marine Mammal Clarification Note. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMArt Wind Ltd
Appendix H - Book of Reference Part 2. 2 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix I - Tracked-change Book of Reference Part 4 & 5. 2 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix O - BOWL - Avoidance Rate Paper. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 1 MB
Riby Parish Meeting
Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014
Other
Size: 2 MB
SMart Wind
Appendix E - Comparison of V5 of the Draft DCO against V4. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix Q - BOWL Appropriate Assessment. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 384 KB
Royal Society for the Protection of Birds
Appendix I - RSPB Moray Firth sites Objection. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix H - Book of Reference Part 1. 2 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 41 KB
Grid Installations Ltd, The Electricity Network Company
Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 989 KB
SMart Wind Ltd
Applicant's response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix I - Tracked-change Book of Reference Part 2. 2 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix R - JNCC/SNH Advice Letters in relation to MORL Application. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix I - Track-change Book of Reference Part 1. 2 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix P - MORL Appropriate Assessment.Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 8 MB
SMart Wind Ltd
Appendix V - DCO/DML co-ordinates Plan. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 937 KB
SMart Wind Ltd
Appendix L- Status of Agreement on Protective Provisions. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix K - Letter to Additional Person introduced to the Book of Reference - 20 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMart Wind
Appendix H - Book reference Parts 4 & 5 and schedule. 2 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix I -Tracked-change Book of Reference Part 3. 2 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 266 KB
Royal Society for the Protection of Birds
Appendix II - RSPB letter to Scottish Ministers re Moray Firth Decision. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 133 KB
Natural England
Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix A - Word Version of V5 of the Development Consent Order. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix N - MORL - Avoidance Rate Paper. Response to Rule 17 Request of 12 May. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix H - Book of Reference Part 3. 2 May 2014. Response to Rule 17 Request of 12 May. Submitted for Deadline VI of 21 May 2014.
Other
Size: 873 KB
Associated British Ports
Submission from ABP in relation to section 127 application.
Other
Size: 2 MB
Royal Society for the Protection of Birds
Summaries of Oral cases for March ISH and April ISH and Comments on Responses to second round of questions. Submitted for Deadline V of 14 May 2014.
Other
Size: 967 KB
SMart Wind Ltd
Appendix K1 - Submission by SMart Wind to the Secretary of State on protective provisions dated 9 May 2014. Submitted for Deadline V of 14 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix D - The Applicant's response to RSPB's representation submitted at Deadline IV. Comments on responses to ExA?s second written questions. Submitted for Deadline V of 14 May 2014.
Other
Size: 93 KB
National Grid
Summary of hearing representation made at the ISH of 29-30 April. Submitted for Deadline V of 14 May 2014.
Other
Size: 246 KB
Environment Agency - Withdrawn
Summary of hearing representation made at the ISH of 29-30 April. Submitted for Deadline V of 14 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix L - Updated Auk Displacement Note - Tiered Assessment Approach. Submitted for Deadline V of 14 May 2014.
Other
Size: 936 KB
SMart Wind Ltd
Appendix K - List of Documents submitted to C GEN's North Killingholme Power Project. Submitted for Deadline V of May 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix M - Updated clarification note relating to cumulative and in-combination collision assessment. Submitted for Deadline V of 14 May 2014.
Other
Size: 2 MB
Natural England
Written Summary of ISH on 29 and 30 April, comments on responses to second written questions, and updates on issues. Submitted for Deadline V of 14 May 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix C - Environmental Information Signposting Document (Version 3). Submitted for Deadline V of 14 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix A - Summary of ISH on 29 April 2014. Submitted for Deadline V of 14 May 2014.
Other
Size: 448 KB
SMart Wind Ltd
Appendix K3 - Enclosure 2 - Proposed Protective Provisions Plan. Submitted for Deadline V of 14 May 2014.
Other
Size: 989 KB
SMart Wind Ltd
Appendix J - Position Paper Supporting the Applicant's Position on Fish Monitoring. Submitted for Deadline V of 14 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix H - The Applicant's Ornithological Summary. Submitted for Deadline V of 14 May 2014.
Other
Size: 964 KB
SMart Wind Ltd
Appendix F - The Applicant's Response to Natural England's representation submitted at Deadline IV. Comments on responses to ExA?s second written questions. Submitted for Deadline V of 14 May 2014.
Other
Size: 940 KB
SMart Wind Ltd
Appendix I - Submitted for Deadline V of 14 May 2014.
Other
Size: 964 KB
SMart Wind Ltd
Appendix Q - The Applicant's submission on the MMO's ability to charge post-consent monitoring fees. Submitted for Deadline V of 14 May 2014.
Other
Size: 968 KB
SMart Wind Ltd
Appendix K2 - Enclosure 1 - Proposed Protective Provisions. Submitted for Deadline V of 14 May 2014.
Other
Size: 415 KB
SMart Wind Ltd
Appendix K4 - Enclosure 3 - Comparison of SMart Wind's proposed PP's against C.GEN's proposed PP's. Submitted for Deadline V of 14 May 2014.
Other
Size: 3 MB
C.GEN Killingholme Limited
Cover Letter, Written Summary from ISH on 30 April with Appendix 1 (Protective Provisions), Appendix 2 (SMart Wind Paper of Amendments), Appendix 3 (C.GEN's Submission to the Secretary of State ? 9 May 2014), and Cable Routing Grid Connection Land Plan. Submitted for Deadline V of 14 May 2014.
Other
Size: 959 KB
SMart Wind Ltd
Appendix G - The Applicant's response to the MMO's representation submitted at Deadline IV. Comments on responses to ExA?s second written questions. Submitted for Deadline V of 14 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix B - Summary of ISH on 30 April 2014. Submitted for Deadline V of 14 May 2014.
Other
Size: 1 MB
Smart Wind Ltd
The Applicant's Written Response to Deadline V
Other
Size: 269 KB
Marine Management Organisation
Summary of hearing representation made at the ISH of 29-30 April. Submitted for Deadline V of 14 May 2014.
Other
Size: 432 KB
SMart Wind Ltd
Appendix K5 - Enclosure 4 - SMart Wind's Commentary on C.GEN's submission to the Secretary of State dated 11 April 2014. Submitted for Deadline V of 14 May 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix N - Updated PVA Note. Submitted for Deadline V of 14 May 2014.
Other
Size: 941 KB
SMart Wind Ltd
Appendix E - The Applicant's response to National Grid's representation submitted at Deadline IV. Comments on responses to ExA?s second written questions. Submitted for Deadline V of 14 May 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix O - Updated Memorandum of Understanding between the Applicant and Natural England. Submitted for Deadline V of 14 May 2014.
Other
Size: 940 KB
SMart Wind Ltd
Appendix P - Coulson e-mail on kittiwake counts. Submitted for Deadline V of 14 May 2014.
Other
Size: 6 MB
Report on the Implications for European Sites (RIES)
The Planning Inspectorate has issued the RIES for consultation on 14 May 2014.
Other
Size: 76 KB
Rule 17 Letter
Rule 17 issued by the Examining Authority on 12 May 2014.
Other
Size: 100 KB
140303 Letter to Royal Society for the Protection of Birds
Letter from the Planning Inspectorate to RSPB in relation to the Issue Specific Hearing on 11 and 12 March 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix O: Table of Enhancement Mitigation and Monitoring Commitments. Submitted for Deadline IV of 22 April 2014
Other
audio recording
Size: 144 MB
Audio recording for Issue Specific Hearing on 30 April 2014. Part 2 of 3
ISH on 30 April 2014. Part 2 of 3.
Other
audio recording
Size: 19 KB
Audio recording for Issue Specific Hearing on 30 April 2014. Part 2 of 3 1
ISH on 30 April 2014. Part 2 of 3.
Other
audio recording
Size: 68 MB
Audio Recording for Issue Specific Hearing on 29 April 2014. Part 1 of 4
ISH on 29 April 2014. Part 1 of 4.
Other
audio recording
Size: 66 MB
Audio Recording for Issue Specific Hearing on 29 April 2014. Part 4 of 4
ISH on 29 April 2014. Part 4 of 4.
Other
audio recording
Size: 180 MB
Audio Recording for Issue Specific Hearing on 30 April 2014. Part 3 of 3
ISH on 30 April 2014. Part 3 of 3.
Other
audio recording
Size: 19 KB
Audio Recording for Issue Specific Hearing on 30 April 2014. Part 1 of 3 1
ISH on 30 April 2014. Part 1 of 3.
Other
audio recording
Size: 19 KB
Audio Recording for Issue Specific Hearing on 30 April 2014. Part 3 of 3 1
ISH on 30 April 2014. Part 3 of 3.
Other
audio recording
Size: 115 MB
Audio Recording for Issue Specific Hearing on 30 April 2014. Part 1 of 3
ISH on 30 April 2014. Part 1 of 3.
Other
audio recording
Size: 69 MB
Audio Recording for Issue Specific Hearing on 29 April 2014. Part 3 of 4
ISH on 29 April 2014. Part 3 of 4.
Other
audio recording
Size: 103 MB
Audio Recording for Issue Specific Hearing on 29 April 2014. Part 2 of 4
ISH on 29 April 2014. Part 2 of 4.
Other
Size: 110 KB
Anglian Water
Email confirming withdrawal of part of written representation which relates to sections 127 and 132.
Other
Size: 36 KB
GTC,The Electricity Network Company Ltd,Utility Grid Installations Ltd,Independent Power Networks Ltd, Independent Pipelines Ltd,Quadrant Pipeline Ltd
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 88 KB
National Grid
Hearing submission made at the CAH of 13 March 2014. Submitted for Deadline IV of 22 April 2014.
Other
Size: 15 MB
SMart Wind Ltd
Appendix Y: Compound Numbering Map. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix EE: The Applicant_s Response to EO25. Submitted for Deadline IV of 22 April 2014
Other
Size: 56 MB
SMart Wind Ltd
Appendix DD: Documents submitted to C GEN North Killingholme - Part 2 of 5. Submitted for Deadline IV of 22 April 2014
Other
Size: 793 KB
SMart Wind Ltd
Appendix DD: Documents submitted to C GEN North Killingholme - Part 4 of 5. Submitted for Deadline IV of 22 April 2014
Other
Size: 3 MB
SMart Wind Ltd
Appendix S: Updated collision risk assessment note. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
SMart Wind Ltd
The applicant's response to the ExA's second written questions. Submitted for Deadline IV of 22 April 2014
Other
Size: 90 KB
North East Lincolnshire Council
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix CC: Socio-economic Assessment Methodology Note. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix J: Environment Agency Letter dated 31 March 2014. Submitted for Deadline IV of 22 April 2014
Other
Size: 32 MB
SMart Wind Ltd
Appendix AA: Noise Buffering Map. Submitted for Deadline IV of 22 April 2014
Other
Size: 8 MB
SMart Wind Ltd
Appendix HH: NE - Update on matters not agreed. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix JJ: Letter from DE to support response to CA1. Submitted for Deadline IV of 22 April 2014
Other
Size: 4 MB
C.GEN Killingholme Limited
Appendices 6 ? 11 to written summary of the oral case. Submitted for Deadline IV of 22 April 2014.
Other
Size: 29 MB
SMart Wind Ltd
Appendix DD: Documents submitted to C GEN North Killingholme - Part 3 of 5. Submitted for Deadline IV of 22 April 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix T: Extract pages from The Kittiwake. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix II: Ornithology Roadmap. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix G: Summary of Issue Specific Hearing - 11 and 12 March 2014. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix Z: Compound Tables. Submitted for Deadline IV of 22 April 2014
Other
Size: 9 KB
East Lindsey District Council
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 987 KB
SMart Wind Ltd
Appendix H: Summary of CPO Hearing - 13 March 2014. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix L: Highways Agency Letter dated 24 February 2014. Submitted for Deadline IV of 22 April 2014
Other
Size: 6 MB
C.GEN Killingholme Limited
Appendices 3 ? 5 to written summary of the oral case. Submitted for Deadline IV of 22 April 2014.
Other
Size: 960 KB
SMart Wind Ltd
Appendix N: Applicant submission re C GEN's land drainage objection. Submitted for Deadline IV of 22 April 2014
Other
Size: 243 KB
Scottish Natural Heritage
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 48 MB
SMart Wind Ltd
Appendix DD: Documents submitted to C GEN North Killingholme - Part 1 of 5. Submitted for Deadline IV of 22 April 2014
Other
Size: 151 KB
Marine Management Organisation
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 491 KB
Maritime and Coastguard Agency
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 9 MB
C.GEN Killingholme Limited
Covering letter. Written summary of the oral case. Appendices 1 ? 2. Submitted for Deadline IV of 22 April 2014.
Other
Size: 99 KB
North Lincolnshire Council
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 985 KB
SMart Wind Ltd
Appendix P: The Applicant's Response to EO18. Submitted for Deadline IV of 22 April 2014
Other
Size: 1 MB
Humber Local Enterprise Partnership
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 375 KB
Natural England
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 11 MB
SMart Wind Ltd
Appendix DD: Documents submitted to C GEN North Killingholme - Part 5 of 5. Submitted for Deadline IV of 22 April 2014
Other
Size: 16 MB
SMart Wind Ltd
Appendix GG: MMO - Update of Matters Not Agreed. Submitted for Deadline IV of 22 April 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix K: Anglian Water Letter dated 13 March 2014. Submitted for Deadline IV of 22 April 2014
Other
Size: 7 MB
SMart Wind Ltd
Appendix Q: Flamborough and Filey Coast pSPA Count Sheets. Submitted for Deadline IV of 22 April 2014
Other
Size: 4 MB
SMart Wind Ltd
Appendix FF: Letter from Claire Priestner to support response to CA1. Submitted for Deadline IV of 22 April 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix R: Gull collision risk assessment. Submitted for Deadline IV of 22 April 2014
Other
Size: 31 KB
English Heritage
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 8 MB
SMart Wind Ltd
Appendix V: Clarification Note on in-combination impacts of the onshore cable connection. Submitted for Deadline IV of 22 April 2014
Other
Size: 3 MB
SMart Wind Ltd
Appendix M: GPSS Letter dated 28 November 2013. Submitted for Deadline IV of 22 April 2014
Other
Size: 348 KB
Royal Society for the Protection of Birds
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix E: Environmental Information Signposting Document. Submitted for Deadline IV of 22 April 2014
Other
Size: 3 MB
SMart Wind Ltd
Appendix U: Clarification Note on cumulative and in-combination collision assessments. Submitted for Deadline IV of 22 April 2014
Other
Size: 147 KB
Marine Management Organisation
Summary of the MMO?s oral representation made at the ISH of 11-12 March 2014. Submitted for Deadline IV of 22 April 2014.
Other
Size: 933 KB
SMart Wind Ltd
Appendix I: Network Rail Letter dated 13 March 2014. Submitted for Deadline IV of 22 April 2014
Other
Size: 5 MB
SMart Wind Ltd
Appendix W: Auk Displacement Note. Submitted for Deadline IV of 22 April 2014
Other
Size: 938 KB
SMart Wind Ltd
Appendix F: Update on status of Land Agreements. Submitted for Deadline IV of 22 April 2014
Other
Size: 244 KB
Environment Agency - Withdrawn
Response to the Examining Authority?s second Written Questions submitted for Deadline IV of 22 April 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix X: PVA Note. Submitted for Deadline IV of 22 April 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix BB: Draft Construction and Traffic Management Plan. Submitted for Deadline IV of 22 April 2014
Other
Size: 76 KB
Agenda for Issue-specific Hearing, 29 and 30 April, and 1 May 2014
Agenda for Issue-specific Hearing, 29 and 30 April, and 1 May 2014
Other
Size: 1,011 KB
Phillips 66
Letter dated 26 March 2014 withdrawing paragraph 5 of Written Representation submitted for Deadline II 20 January 2014
Other
Size: 252 KB
Rule 8(3)13 and 17 from the ExA
Letter issued by the Examining Authority on 20 March 2014 including; second round of written questions, notification of further hearings and changes to the examination timetable in relation to the Report on the Implications on European Sites (RIES)
Other
audio recording
Size: 76 MB
Audio recording for Compulsory Acquisition Hearing. Part 2 of 4
CAH on 13 March
Other
audio recording
Size: 78 MB
Audio recording for Compulsory Acquisition Hearing. Part 1 of 4
CAH on 13 March
Other
audio recording
Size: 34 MB
Audio recording for Compulsory Acquisition Hearing. Part 4 of 4
CAH on 13 March
Other
audio recording
Size: 79 MB
Audio recording for Compulsory Acquisition Hearing. Part 3 of 4
CAH on 13 March
Other
audio recording
Size: 66 MB
Audio Recording for Issue Specific Hearing. Part 2 of 3
ISH on 12 March 2014
Other
audio recording
Size: 48 MB
Audio Recording for Issue Specific Hearing. Part 3 of 3
ISH on 12 March 2014
Other
Size: 18 KB
Network Rail Infrastructure Limited
Submission made to inform the Compulsory Acquisition Hearing on 13 March 2014
Other
audio recording
Size: 82 MB
Audio Recording for Issue Specific Hearing. Part 1 of 4
ISH on 11 March 2014
Other
audio recording
Size: 92 MB
Audio Recording for Issue Specific Hearing. Part 3 of 4
ISH on 11 March 2014
Other
audio recording
Size: 63 MB
Audio Recording for Issue Specific Hearing. Part 1 of 3
ISH on 12 March 2014
Other
audio recording
Size: 59 MB
Audio Recording for Issue Specific Hearing. Part 2 of 4
ISH on 11 March 2014
Other
audio recording
Size: 55 MB
Audio Recording for Issue Specific Hearing. Part 4 of 4
ISH on 11 March 2014
Other
Size: 431 KB
Associated British Ports
Submission made to inform the Compulsory Acquisition Hearing on 13 March 2014
Other
Size: 1 MB
Anglian Water
Submission made to inform the Compulsory Acquisition Hearing on 13 March 2014
Other
Size: 130 KB
Royal Society for the Protection of Birds
Comments regarding Issue Specific Hearing on 11 and 12 March 2014
Other
Size: 31 KB
Agenda for Issue-specific Hearing
Agenda for ISH on 11 and 12 March 2014
Other
Size: 302 KB
Marine Management Organisation
Response to Rule 17 Request of 5 February (late submission). Submitted for the Deadline III of 24 February 2014
Other
Size: 30 KB
Darrell & Christine Speight
Representation submitted for the Deadline III of 24 February 2014.
Other
Size: 534 KB
Environment Agency - Withdrawn
Response to Rule 17 Request of 5 February. Submitted for the Deadline III of 24 February 2014.
Other
Size: 331 KB
Humber Local Enterprise Partnership
Hearing representation submitted for the Deadline III of 24 February 2014.
Other
Size: 233 KB
Environment Agency - Withdrawn
Summary of the hearing representation submitted for the Deadline III of 24 February 2014.
Other
Size: 12 KB
East Lindsey District Council
Representation submitted for the Deadline III of 24 February 2014
Other
Size: 38 KB
National Grid
Comments on the ExA's First Written Questions. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix N: SoCG with Marine Management Organisation. Submitted for the Deadline III of 24 February 2014
Other
Size: 973 KB
SMart Wind Ltd
Appendix U: Issue Specific DCO Hearing - The Applicant's Summary of Case. Submitted for the Deadline III of 24 February 2014
Other
Size: 272 KB
Natural England
Comments on the Environment Clarification Notes. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix O: SoCG with Yorkshire and Lincolnshire Wildlife Trusts. Submitted for the Deadline III of 24 February 2014
Other
Size: 235 KB
Marine Management Organisation
Summary of the hearing representation submitted for the Deadline III of 24 February 2014.
Other
Size: 107 KB
C.GEN Killingholme Limited
Appendix 4: Hearing representation submitted for the Deadline III of 24 February 2014
Other
Size: 3 MB
SMart Wind Ltd
Appendix S: Clarification Note in relation to the in-combination assessment on the features of the Humber Estuary SPA and Ramsar site. Submitted for the Deadline III of 24 February 2014
Other
Size: 937 KB
SMart Wind Ltd
Appendix H: The Applicant's Response to Response to Rule 17 Question directed at Natural England. Submitted for the Deadline III of 24 February 2014
Other
Size: 104 KB
C.GEN Killingholme Limited
Summary of the hearing representation. Submitted for the Deadline III of 24 February 2014
Other
Size: 1,023 KB
SMart Wind Ltd
Appendix Z: Overview of Management Plans. Submitted for the Deadline III of 24 February 2014
Other
Size: 37 MB
SMart Wind Ltd
Appendix J11 C.GEN Consultation Report. Submitted for deadline II 20 January 2014, and resubmitted for Deadline III, 24 February 2014 due to a technical error.
Other
Size: 317 KB
VPI Immingham
Representation submitted for the Deadline III of 24 February 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix V: Position Note on Socio-Economic Benefits. Submitted for the Deadline III of 24 February 2014
Other
Size: 66 KB
C.GEN Killingholme Limited
Paper of Amendments in relation to draft DCO. Submitted for the Deadline III of 24 February 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix K: The Applicant's Response to Natural England's written representation. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix L: Memorandum of Understanding between the Applicant and Natural England. Submitted for the Deadline III of 24 February 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix P: SoCG with National Grid. Submitted for the Deadline III of 24 February 2014
Other
Size: 10 MB
C.GEN Killingholme Limited
Appendix 3: Comments on Responses to the ExA?s First Written Questions. Submitted for the Deadline III of 24 February 2014
Other
Size: 978 KB
SMart Wind Ltd
Appendix Q: The Applicant's Response to the P66 Report. Submitted for the Deadline III of 24 February 2014
Other
Size: 301 KB
Natural England
Response to Rule 17 Request of 5 February. Submitted for the Deadline III of 24 February 2014
Other
Size: 999 KB
SMart Wind Ltd
Appendix M: The Applicant's Response to Natural England's comments on the draft DCO/DMLs. Submitted for the Deadline III of 24 February 2014
Other
Size: 938 KB
SMart Wind Ltd
Appendix T: Open Floor Hearing - The Applicant's Summary of Case. Submitted for the Deadline III of 24 February 2014
Other
Size: 939 KB
SMart Wind Ltd
Appendix J: The Applicant's Response to C.GEN's written representation. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
Royal Society for the Protection of Birds
Representation including Summary, Figures and Annexes. Submitted for the Deadline III of 24 February 2014.
Other
Size: 326 KB
Natural England
Comments on the Written Representations. Submitted for the Deadline III of 24 February 2014
Other
Size: 151 KB
Marine Management Organisation
Response to Rule 17 Request of 5 February. Submitted for the Deadline III of 24 February 2014
Other
Size: 1 MB
SMart Wind Ltd
Submitted for Deadline III of 24 February 2014.
Other
Size: 307 KB
Natural England
Summary of the hearing representation submitted for the Deadline III of 24 February 2014
Other
Size: 1 MB
C.GEN Killingholme Limited
Representation, Appendices 1 and 2. Submitted for the Deadline III of 24 February 2014.
Other
Size: 31 KB
Alan Rayner
Comments on Responses to the ExA's First Written Questions. Submitted for the Deadline III of 24 February 2014
Other
Size: 7 MB
SMart Wind Ltd
Appendix R: Baysgarth Moated Site - Photomontages. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix G: Environmental Information Signposting Document. Submitted for the Deadline III of 24 February 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix X MMO Clarification Note Disposal Area 1 and Scour. Submitted for deadline II 20 January 2014.
Other
Size: 12 MB
SMart Wind Ltd
Appendix J20 C.GEN Response to Relevant Representations Appendix 3. Submitted for deadline II 20 January 2014.
Other
Size: 13 MB
SMart Wind Ltd
Appendix J18 C.GEN Response to Relevant Representations Appendix 1. Submitted for deadline II 20 January 2014.
Other
Size: 6 MB
Accompanied Site Visit Pack
Pack containing maps and plans from the application to assist with the accompanied site visit undertaken on 12 February 2014.
Other
Size: 96 KB
Rule 17 with amended timetable
Rule 17 issued by the Examining Authority on 18 February 2014.
Other
audio recording
Size: 88 MB
Audio recording for Issue Specific Hearing Part 3 of 3
13 February 2014
Other
audio recording
Size: 73 MB
Audio recording for Issue Specific Hearing Part 2 of 3
13 February 2014
Other
audio recording
Size: 85 MB
Audio recording for Open Floor Hearing
11 February 2014
Other
audio recording
Size: 70 MB
Audio recording for Issue Specific Hearing Part 1 of 3
13 February 2014
Other
Size: 70 KB
Hornsea Project 1 - Amendment to Rule 17
Amendment to procedural decision issued on 5 February 2014.
Other
Size: 111 KB
Hornsea Project 1 Rule 17
Other
Size: 716 KB
Accompanied Site Visit Map
Confirmed Accompanied Site Visit Route Map for 12 February 2014.
Other
Size: 46 KB
Agendas for Hearings
Agendas for all Open Floor, Issue ? Specific and Compulsory Acquisition Hearings
Other
Size: 221 KB
Accompanied Site Visit Itinerary
Confirmed Accompanied Site Visit Itinerary for 12 February 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix J17 C.GEN's Response to Relevant Representations. Submitted for deadline II 20 January 2014.
Other
Size: 171 KB
Natural England
Summary of Written Representation submitted for deadline II of 20 January 2014
Other
Size: 374 KB
SMart Wind Ltd
Appendix J51 ExA's First Written Questions (FWQ) to C.GEN. Submitted for deadline II 20 January 2014.
Other
Size: 165 KB
SMart Wind Ltd
Appendix J14 Relevant Representation by Able Humber Ports Limited (Able) to C.GEN. Submitted for deadline II 20 January 2014.
Other
Size: 328 KB
SMart Wind Ltd
Appendix J91 ExA's Second Written Questions (SWQ) to C.GEN. Submitted for Deadline II 20 January 2014.
Other
Size: 71 KB
C.GEN Killingholme Limited
Summary of Written Representation. Submitted for deadline II 20 January 2014.
Other
Size: 258 KB
Marine Management Organisation
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 959 KB
SMart Wind Ltd
Appendix I Response to Relevant Representation made by C.GEN North Killingholme Limited. Submitted for deadline II 20 January 2014.
Other
Size: 13 KB
Alan Rayner
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 14 KB
Highways Agency
Response to the ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
Anglian Water
Written Representations submitted for deadline II 20 January 2014
Other
Size: 4 MB
North East Lincolnshire Council
Local Impact Report. Submitted for deadline II 20 January 2014
Other
audio recording
Size: 92 MB
SMart Wind Ltd
Appendix J68 Audio Recording of C.GEN CA Hearing 21 Nov 2013 Part 2. Submitted for deadline II 20 January 2014.
Other
Size: 640 KB
East Lindsey District Council
Local Impact Report. Submitted for deadline II 20 January 2014
Other
Size: 13 KB
Alan Rayner
Written Representation. Submitted for deadline II 20 January 2014.
Other
Size: 14 MB
SMart Wind Ltd
Appendix J48 C.GEN comments on Written Representation by Centrica Appendix. Submitted for deadline II 20 January 2014
Other
audio recording
Size: 5 MB
SMart Wind Ltd
Appendix J72 Audio Recording of C.GEN CA Hearing 22 Nov 2013 Part 2. Submitted for deadline II 20 January 2014.
Other
Size: 410 KB
SMart Wind Ltd
Appendix J39 Written Representation by Centrica Plc to C.GEN. Submitted for deadline II 20 January 2014
Other
audio recording
Size: 91 MB
SMart Wind Ltd
Appendix J71 Audio Recording of C.GEN CA Hearing 22 Nov 2013 Part 1. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
Phillips 66 Limited
Written Representation. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
North Lincolnshire Council
Local Impact Report. Submitted for deadline II 20 January 2014
Other
Size: 9 MB
Centrica Plc
Written Representations. Submitted for deadline II 20 January 2014 - Withdrawn
Other
Size: 202 KB
Natural England
Summary of Relevant Representation. Submitted for deadline II 20 January 2014
Other
audio recording
Size: 85 MB
SMart Wind Ltd
Appendix J69 Audio Recording of C.GEN CA Hearing 21 Nov 2013 Part 3. Submitted for deadline II 20 January 2014.
Other
Size: 5 MB
Natural England
Written Representation. Submitted for deadline II 20 January 2014.
Other
audio recording
Size: 2 MB
SMart Wind Ltd
Appendix J73 Audio Recording of C.GEN CA Hearing 22 Nov 2013 Part 3. Submitted for deadline II 20 January 2014.
Other
audio recording
Size: 88 MB
SMart Wind Ltd
Appendix J76 Audio Recording of C.GEN CA Hearing 22 Nov 2013 Part 6. Submitted for deadline II 20 January 2014.
Other
Size: 12 MB
C.GEN Killingholme Limited
Written Representations. Submitted for deadline II 20 January 2014.
Other
Size: 38 KB
English Heritage
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
audio recording
Size: 10 MB
SMart Wind Ltd
Appendix J74 Audio Recording of C.GEN CA Hearing 22 Nov 2013 Part 4. Submitted for deadline II 20 January 2014.
Other
audio recording
Size: 34 MB
SMart Wind Ltd
Appendix J75 Audio Recording of C.GEN CA Hearing 22 Nov 2013 Part 5. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
Maritime and Coastguard Agency
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 19 KB
North Lincolnshire Council
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 445 KB
Natural England
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014
Other
Size: 300 KB
SMart Wind Ltd
Appendix J47 C.GEN comments on Written Representation by Centrica. Submitted for deadline II 20 January 2014
Other
Size: 9 KB
East Lindsey District Council
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 9 KB
Anglian Water
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 87 KB
Centrica Plc
Summary of Written Representations. Submitted for deadline II 20 January 2014 - Withdrawn
Other
Size: 4 MB
SMart Wind Ltd
Appendix J85 Summary of Case at C.GEN CA Hearing by C.GEN Appendix 3. Submitted for deadline II 20 January 2014
Other
Size: 14 KB
SMart Wind Ltd
Appendix J59 Able Response to C.GEN FWQ. Submitted for deadline II 20 January 2014.
Other
Size: 9 MB
SMart Wind Ltd
Appendix J40 Written Representation by Centrica Plc to C.GEN Appendices. Submitted for deadline II 20 January 2014. Withdrawn.
Other
audio recording
Size: 67 MB
SMart Wind Ltd
Appendix J66 Audio Recording of C.GEN DCO Hearing 20 Nov 2013 Part 3. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix J7 C.GEN Combined Land and Work Plans. Submitted for deadline II 20 January 2014.
Other
Size: 309 KB
SMart Wind Ltd
Appendix J82 Summary of Case at C.GEN CA Hearing by C.GEN. Submitted for deadline II 20 January 2014
Other
Size: 77 KB
SMart Wind Ltd
Appendix J81 Summary of Case at C.GEN CA Hearing by Able. Submitted for deadline II 20 January 2014
Other
Size: 30 KB
SMart Wind Ltd
Appendix J43 Summary of Written Representation by Able to C.GEN. Submitted for deadline II 20 January 2014
Other
Size: 218 KB
SMart Wind Ltd
Appendix J77 Summary of Case at C.GEN DCO Hearing by C.GEN. Submitted for deadline II 20 January 2014
Other
Size: 11 MB
SMart Wind Ltd
Appendix J54 C.GEN Response to FWQ on CA Appendix 1. Submitted for deadline II 20 January 2014.
Other
Size: 81 KB
SMart Wind Ltd
Appendix J60 Comments on C.GEN response to FWQ by SMart Wind submitted for deadline II 20 January 2014.
Other
Size: 171 KB
SMart Wind Ltd
Appendix J88 Amended C.GEN Land Plan 2.9 following change to C.GEN Order Limits. Submitted for deadline II 20 January 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix J32 Written Representation by SMart Wind to C.GEN Appendix 8. Submitted for deadline II 20 January 2014.
Other
Size: 63 KB
SMart Wind Ltd
Appendix J62 Comments on C.GEN response to FWQ by Able submitted for deadline II 20 January 2014.
Other
Size: 5 MB
SMart Wind Ltd
Appendix J33 Written Representation by SMart Wind to C.GEN Appendix 9. Submitted for deadline II 20 January 2014.
Other
Size: 8 MB
SMart Wind Ltd
Appendix J57 C.GEN Response to FWQ on CA Appendix 4. Submitted for deadline II 20 January 2014.
Other
Size: 159 KB
SMart Wind Ltd
Appendix J46 C.GEN comments on Written Representation by SMart Wind. Submitted for deadline II 20 January 2014
Other
Size: 81 KB
SMart Wind Ltd
Appendix J80 Summary of Case at C.GEN DCO Hearing by Able. Submitted for deadline II 20 January 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix J29 Written Representation by SMart Wind to C.GEN Appendix 5. Submitted for deadline II 20 January 2014
Other
Size: 222 KB
SMart Wind Ltd
Appendix J12 Relevant Representation by SMart Wind Limited (SMart Wind) to C.GEN. Submitted for deadline II 20 January 2014.
Other
Size: 313 KB
SMart Wind Ltd
Appendix J52 C.GEN Response to FWQ on draft DCO. Submitted for deadline II 20 January 2014.
Other
Size: 115 KB
SMart Wind Ltd
Appendix J79 Summary of Case at C.GEN DCO and CA Hearing by Centrica. Submitted for deadline II 20 January 2014
Other
Size: 39 KB
SMart Wind Ltd
Appendix J87 Procedural Decision in relation to the C.GEN Order Limits. Submitted for deadline II 20 January 2014
Other
Size: 28 KB
SMart Wind Ltd
Appendix J86 Application by C.GEN to withdraw land from C.GEN Order Limits. Submitted for deadline II 20 January 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix J27 Written Representation by SMart Wind to C.GEN Appendix 3. Submitted for deadline II 20 January 2014
Other
Size: 3 MB
SMart Wind Ltd
Appendix J61 Comments on C.GEN response to FWQ by SMart Wind Appendices submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix J28 Written Representation by SMart Wind to C.GEN Appendix 4. Submitted for deadline II 20 January 2014
Other
Size: 423 KB
SMart Wind Ltd
Appendix J44 Review of North Killingholme ES by Able. Submitted for deadline II 20 January 2014
Other
Size: 88 KB
SMart Wind Ltd
Appendix J25 Written Representation by SMart Wind to C.GEN Appendix 1. Submitted for deadline II 20 January 2014
Other
audio recording
Size: 62 MB
SMart Wind Ltd
Appendix J70 Audio Recording of C.GEN CA Hearing 21 Nov 2013 Part 4. Submitted for deadline II 20 January 2014.
Other
Size: 808 KB
SMart Wind Ltd
Appendix J53 C.GEN Response to FWQ on Compulsory Acquisition (CA). Submitted for deadline II 20 January 2014.
Other
Size: 15 MB
SMart Wind Ltd
Appendix J21 C.GEN Response to Relevant Representations Appendix 4. Submitted for deadline II 20 January 2014
Other
Size: 5 MB
SMart Wind Ltd
Appendix J55 C.GEN Response to FWQ on CA Appendix 2. Submitted for deadline II 20 January 2014.
Other
Size: 199 KB
SMart Wind Ltd
Appendix J16 Relevant Representation by E.ON UK Plc (E.ON) to C.GEN. Submitted for deadline II 20 January 2014.
Other
Size: 10 MB
SMart Wind Ltd
Appendix J23 C.GEN Response to Relevant Representations Appendix 6. Submitted for deadline II 20 January 2014
Other
Size: 3 MB
SMart Wind Ltd
Appendix J34 Written Representation by SMart Wind to C.GEN Appendix 10. Submitted for deadline II 20 January 2014.
Other
Size: 87 KB
SMart Wind Ltd
Appendix J83 Summary of Case at C.GEN CA Hearing by C.GEN Appendix 1. Submitted for deadline II 20 January 2014
Other
Size: 405 KB
SMart Wind Ltd
Appendix J3 C.GEN Draft DCO (Version 3). Submitted for deadline II 20 January 2014
Other
Size: 6 MB
SMart Wind Ltd
Appendix J5 C.GEN Environmental Statement Volume I. Submitted for deadline II 20 January 2014
Other
Size: 408 KB
SMart Wind Ltd
Appendix J24 Written Representation by SMart Wind to C.GEN. Submitted for deadline II 20 January 2014
Other
Size: 14 KB
SMart Wind Ltd
Appendix J45 Written Representation by E.ON to C.GEN. Submitted for deadline II 20 January 2014
Other
Size: 212 KB
SMart Wind Ltd
Appendix J49 C.GEN comments on Written Representation by Able. Submitted for deadline II 20 January 2014
Other
Size: 148 KB
SMart Wind Ltd
Appendix J64 Partial Note of C.GEN DCO Hearing 20 Nov 2013 (missing audio) submitted for deadline II 20 January 2014.
Other
Size: 66 KB
SMart Wind Ltd
Appendix J50 C.GEN comments on Written Representation by E.ON. Submitted for deadline II 20 January 2014
Other
Size: 17 MB
SMart Wind Ltd
Appendix J8 C.GEN Statement of Reasons. Submitted for deadline II 20 January 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix J36 Written Representation by SMart Wind to C.GEN Appendix 12. Submitted for deadline II 20 January 2014
Other
Size: 5 MB
SMart Wind Ltd
Appendix J30 Written Representation by SMart Wind to C.GEN Appendix 6. Submitted for deadline II 20 January 2014
Other
Size: 4 MB
SMart Wind Ltd
Appendix J58 C.GEN Response to FWQ on CA Appendix 5. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix J35 Written Representation by SMart Wind to C.GEN Appendix 11. Submitted for deadline II 20 January 2014
Other
Size: 126 KB
SMart Wind Ltd
Appendix J38 Summary of Written Representation by SMart Wind to C.GEN. Submitted for deadline II 20 January 2014
Other
Size: 433 KB
SMart Wind Ltd
Appendix J22 C.GEN Response to Relevant Representations Appendix 5. Submitted for deadline II 20 January 2014
Other
audio recording
Size: 74 MB
SMart Wind Ltd
Appendix J67 Audio Recording of C.GEN CA Hearing 21 Nov 2013 Part 1. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix J37 Written Representation by SMart Wind to C.GEN Appendix 13. Submitted for deadline II 20 January 2014
Other
Size: 1 MB
SMart Wind Ltd
Appendix J6 C.GEN Grid Connection Statement. Submitted for deadline II 20 January 2014.
Other
Size: 139 KB
SMart Wind Ltd
Appendix J42 Written Representation by Able to C.GEN. Submitted for deadline II 20 January 2014
Other
Size: 92 KB
SMart Wind Ltd
Appendix J78 Summary of Case at C.GEN DCO and CA Hearing by SMart Wind. Submitted for deadline II 20 January 2014
Other
Size: 1 MB
C.GEN Killingholme Ltd
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
audio recording
Size: 84 MB
SMart Wind Ltd
Appendix J65 Audio Recording of C.GEN DCO Hearing 20 Nov 2013 Part 2. Submitted for deadline II 20 January 2014.
Other
Size: 111 KB
SMart Wind Ltd
Appendix J4 C.GEN Explanatory Memorandum. Submitted for deadline II 20 January 2014
Other
Size: 7 MB
SMart Wind Ltd
Appendix J31 Written Representation by SMart Wind to C.GEN Appendix 7. Submitted for deadline II 20 January 2014
Other
Size: 124 KB
SMart Wind Ltd
Appendix J41 Summary of Written Representation by Centrica Plc to C.GEN. Submitted for deadline II 20 January 2014. Withdrawn.
Other
Size: 3 MB
SMart Wind Ltd
Appendix J26 Written Representation by SMart Wind to C.GEN Appendix 2. Submitted for deadline II 20 January 2014
Other
Size: 10 MB
SMart Wind Ltd
Appendix J56 C.GEN Response to FWQ on CA Appendix 3. Submitted for deadline II 20 January 2014.
Other
Size: 52 KB
SMart Wind Ltd
Appendix J84 Summary of Case at C.GEN CA Hearing by C.GEN Appendix 2. Submitted for deadline II 20 January 2014
Other
Size: 84 KB
SMart Wind Ltd
Appendix J63 Comments on Able response to C.GEN FWQ by C.GEN submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix F Letter of Consent from North Lincolnshire Council, Lead Local Flood Authority. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix E Letter of Consent from North East Lindsey Drainage Board. Submitted for deadline II 20 January 2014.
Other
Size: 976 KB
SMart Wind Ltd
Appendix V Project Specific Information for the Cumulative and In-Combination Assessments Benthic. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix PP referred to in response to NS14 - Wind Rose Diagram. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix WW - Mainstream Renewable Power Annual Report 2012. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix MMM. Statement of Common Ground with Eastern Inshore Fisheries and Conservation Authority. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Part 2 of the First Written Response - Responses to the ExA's Frist Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix L Humber Estuary SAC Clarification Note with Addendum and Appendices. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix GG in response to GE1 Table of Enhancement, Mitigation and Monitoring Commitments. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix K Marine Processes Clarification Note. Submitted for deadline II 20 January 2014.
Other
Size: 5 MB
SMart Wind Ltd
Appendix Y Dredging and Disposal Site Characterisation Sandwave Clearance Disposal Areas. Submitted for deadline II 20 January 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix J10 C.GEN Update to Book of Reference as submitted at the preliminary meeting. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix G Letter of Consent from Lincolnshire County Council, Lead Local Flood Authority. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix YY referred to in response to DC16 - Plan. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix FFF. Statement of Common Ground with Natural England (All Other Matters). Submitted for deadline II 20 January 2014.
Other
Size: 956 KB
SMart Wind Ltd
Appendix BB in response to G1 - Table providing update on Additional Consents. Submitted for deadline II 20 January 2014.
Other
Size: 1,023 KB
SMart Wind Ltd
Part 3 of the Applicant's First Written Response - Responses to Relevant Representations. Submitted for deadline II 20 January 2014.
Other
Size: 12 MB
SMart Wind Ltd
Appendix SS in response to OP2 - Selected Planning History. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix W Eastern Inshore Fisheries and Conservation Authority Clarification Note. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix P Clarification Note relating to Cumulative and In-Combination Collision Assessments. Submitted for deadline II 20 January 2014.
Other
Size: 941 KB
SMart Wind Ltd
Appendix J Documents submitted in relation to the North Killingholme Power Project (list). Submitted for deadline II 20 January 2014.
Other
Size: 521 KB
SMart Wind Ltd
Appendix J19 C.GEN Response to Relevant Representations Appendix 2. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix SSS. Statement of Common Ground with Natural England (Offshore Ornithology). Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix PPP. Statement of Common Ground with NFFO (National Federation of Fishermen's Organisations) and VisNed (Dutch Demersal Fisheries Organisation). Submitted for deadline II 20 January 2014.
Other
Size: 196 KB
SMart Wind Ltd
Appendix J89 Amended C.GEN Land Plan 2.10 following change to C.GEN Order Limits. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix NNN. Statement of Common Ground with Trinity House. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix J2 C.GEN Application form. Submitted for deadline II 20 January 2014.
Other
Size: 123 KB
SMart Wind Ltd
Appendix J92 SMart Wind Response to C.GEN SWQ. Submitted for deadline II 20 January 2014
Other
Size: 2 MB
SMart Wind Ltd
Appendix UUU. Statement of Common Ground with Lincolnshire County Council. Submitted for deadline II 20 January 2014.
Other
Size: 9 MB
SMart Wind Ltd
Appendix T Clarification Note relating to the Impacts of the Export Cable Installation on Intertidal. Submitted for deadline II 20 January 2014.
Other
Size: 940 KB
SMart Wind Ltd
Appendix XX referred to in response to DC15 - Extended Response. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix RRR. Draft Statement of Common Ground with Marine Management Organisation. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix QQ referred to in response to F7 - Demersal Otter trawling within a wind farm. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix N Flight Height Distribution Clarification Note. Submitted for deadline II 20 January 2014.
Other
Size: 141 KB
Environment Agency - Withdrawn
Response to ExA's First Written Questions. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix QQQ. Statement of Common Ground with Environment Agency. Submitted for deadline II 20 January 2014.
Other
Size: 968 KB
SMart Wind Ltd
Appendix II in response to GE8 - Summary of assessment associated with named Frameworks, Acts and Co. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix M Clarification Note relating to the Displacement of Offshore Ornithological Receptors. Submitted for deadline II 20 January 2014.
Other
Size: 11 MB
SMart Wind Ltd
Appendix GGG. Statement of Common Ground with Forewind Limited. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix LLL. Statement of Common Ground with English Heritage (offshore). Submitted for deadline II 20 January 2014.
Other
Size: 114 KB
National Grid
Written Representation. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix AA Report on the Implications for European Sites Integrity matrices. Submitted for deadline II 20 January 2014.
Other
Size: 132 KB
SMart Wind Ltd
Appendix J90 Amended C.GEN Land Plan 2.11 following change to C.GEN Order Limits. Submitted for deadline II 20 January 2014.
Other
Size: 933 KB
SMart Wind Ltd
Appendix JJ referred to in response to EO4 - References. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix KKK. Statement of Common Ground with The UK Chamber of Shipping. Submitted for deadline II 20 January 2014.
Other
Size: 952 KB
SMart Wind Ltd
Appendix DD referred to in response to G3 - SoCG Status Tables. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix J1 C.GEN Covering Letter accompanying application with Consultation Report addendum. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix DDD. Statement of Common Ground with East Lindsey District Council. Submitted for deadline II 20 January 2014.
Other
Size: 21 KB
SMart Wind Ltd
Index to Bundle of Documents submitted in relation to the CGEN Project. Submitted for deadline II 20 January 2014
Other
Size: 939 KB
SMart Wind Ltd
Appendix CC referred to in response to G2 - Update on Land Agreements. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix U Marine Mammal Clarification Note. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix H Letter of Consent from North East Lincolnshire Council, Lead Local Flood Authority. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix D Letter of Consent from the Environment Agency. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix MM referred to in response to CS16 - Figure of P66 pipeline in relation to the Project. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix AAA. Statement of Common Ground with Danish Fishermen's Association. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
Environment Agency - Withdrawn
Written Representation. Submitted for deadline II 20 January 2014 - Withdrawn.
Other
Size: 3 MB
SMart Wind Ltd
Appendix S Sites of Special Scientific Interest Clarification Note. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix HHH. Letter of Common Ground from East Anglia Offshore Wind Limited. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix BBB. Statement of Common Ground with Rederscentrale. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix OO referred to in response to NS1 - Oil and Gas Licence Blocks. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix Z Report on the Implications for European Sites Screening matrices. Submitted for deadline II 20 January 2014.
Other
Size: 1 MB
SMart Wind Ltd
Appendix LL referred to in response to CS15 - Figure showing Disposal Site Locations. Submitted for deadline II 20 January 2014.
Other
Size: 948 KB
SMart Wind Ltd
Appendix NN referred to in response to LH4 - Extended Response. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix EEE SoCG with Natural England (Terrestrial Ornithology). Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix JJJ. Statement of Common Ground with Maritime and Coastguard Agency. Submitted for deadline II 20 January 2014.
Other
Size: 14 MB
SMart Wind Ltd
Appendix VV referred to in response to DC3 - Siemens Group Annual Report 2013. Submitted for deadline II 20 January 2014.
Other
Size: 5 MB
SMart Wind Ltd
Appendix UU DONG Energy AS Interim Financial Report First Nine Months 2013. Submitted for deadline II 20 January 2014.
Other
Size: 924 KB
SMart Wind Ltd
Appendix FF referred to in response to PN1 - Project Corporate Structure. Submitted for deadline II 20 January 2014.
Other
Size: 295 KB
Royal Society for the Protection of Birds
Written Representations. Submitted for deadline II 20 January 2014.
Other
Size: 30 KB
SMart Wind Ltd
Appendix J15 Summary of Relevant Representation by Able to C.GEN. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix WWW. Statement of Common Ground with Highways Agency. Submitted for deadline II 20 January 2014.
Other
Size: 986 KB
SMart Wind Ltd
Appendix R Population Scale Information for Ornithological EIA Species. Submitted for deadline II 20 January 2014.
Other
Size: 5 MB
SMart Wind Ltd
Appendix TT DONG Energy AS Interim Financial Report First Half Year 2013. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix O Review of Avoidance Rates in Seabirds at Offshore Wind Farms. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix III. Statement of Common Ground with Royal Yachting Association. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix VVV. Statement of Common Ground with English Heritage (Onshore). Submitted for deadline II 20 January 2014.
Other
Size: 943 KB
SMart Wind Ltd
Appendix EE referred to in response to G3 - SoCG Table of Commonality in support of Response. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix OOO. Statement of Common Ground with BP Exploration Operating Company Limited. Submitted for deadline II 20 January 2014.
Other
Size: 925 KB
SMart Wind Ltd
Appendix KK referred to in response to CS15 Table showing Disposal Sites Included within the Application. Submitted for deadline II 20 January 2014.
Other
Size: 4 MB
SMart Wind Ltd
Appendix CCC. Statement of Common Ground with North East Lincolnshire Council. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix TTT. Statement of Common Ground with North Lincolnshire Council. Submitted for deadline II 20 January 2014.
Other
Size: 969 KB
SMart Wind Ltd
Appendix HH in response to GE5 Table of Assessment of Maintenance Works and Conclusions of Likely Impacts. Submitted for deadline II 20 January 2014.
Other
Size: 45 KB
SMart Wind Ltd
Appendix J9 C.GEN Book of Reference. Submitted for deadline II 20 January 2014.
Other
Size: 2 MB
SMart Wind Ltd
Appendix Q Data Collection and Presentation Clarification Note. Submitted for deadline II 20 January 2014.
Other
Size: 952 KB
SMart Wind Ltd
Part 1 of the Applicant's First Written Response - Written Representations. Submitted for deadline II 20 January 2014.
Other
Size: 3 MB
SMart Wind Ltd
Appendix RR referred to in response to OP2 - Extract from North Lincolnshire LDF Housing and Employment Allocations. Submitted for deadline II 20 January 2014.
Other
Size: 994 KB
SMart Wind Ltd
Appendix ZZ referred to in response to DC17. Submitted for deadline II 20 January 2014.
Other
Size: 24 KB
SMart Wind Ltd
Notification of Hearings under Rule 13(6), The Infrastructure Planning (Examination Procedure) Rules 2010. (Please note the word ?Regulation 13(6)? should read ?Rule 13(6)?)
Other
Size: 63 KB
Notification of Hearings
Notification by the Examining Authority of the date time and place of hearings as set out in the examination timetable
Other
Size: 944 KB
SMart Wind Ltd
Errata List submitted on 18 December 2013
Other
Size: 34 KB
Cover Letter to Member State - Netherlands
Covering Letter to the Member State regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 34 KB
Cover Letter to Member State - Norway
Covering Letter to the Member State regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 34 KB
Cover Letter to Member State - Denmark
Covering Letter to the Member State regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 34 KB
Cover Letter to Scottish Natural Heritage
Other
Size: 34 KB
Cover Letter to Member State - France
Covering Letter to the Member State regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 34 KB
Cover Letter to Member State - Belgium
Covering Letter to the Member State regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 34 KB
Cover Letter to Member State - Iceland
Covering Letter to the Member State regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 34 KB
Cover Letter to Member State - Germany
Covering Letter to the Member State regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 42 KB
Cover Letter to the Federal Authority, Brussels
Covering Letter to the Federal Authority regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 98 KB
SMart Wind Ltd
Letter of consent from the Crown Estate Commissioners pursuant to s135 submitted on 18 December 2013
Other
Size: 172 KB
SMart Wind Ltd
Letter from Ofwat submitted on 18 December 2013
Other
Size: 42 KB
Cover Letter to the Region of Brussels
Covering Letter to the Region of Brussels regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 43 KB
Cover Letter to the Walloon Region
Covering Letter to the Walloon Region regarding Rule 6 Letter - Invitation to the Preliminary Meeting.
Other
Size: 132 KB
Rule 8 Letter
Rule 8 Letter issued by the Examining Authority on 18 December 2013
Other
Size: 57 KB
Preliminary Meeting Note
Note of Preliminary Meeting held on 10 December 2013
Other
Size: 80 KB
Draft Site Visit Itinerary
Issued with Rule 8 Letter on 18 December 2013
Other
Size: 716 KB
Draft Accompanied Site Visit Map of Route
Issued with Rule 8 Letter on 18 December 2013
Other
Size: 148 KB
ExA's First Written Questions
The Examining Authority's First Written Questions accompanying Rule 8 Letter issued on 18 December 2013.
Other
Size: 1 MB
Public Health England
Letter from Public Health England dated 2 October 2013 confirming their position in regards to the project
Other
audio recording
Size: 52 MB
Preliminary Meeting Audio
Audio recording of the Preliminary Meeting held on 10 December 2013
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.