Ferrybridge Multifuel 2 (FM2) Power Station

You can filter the results to show only the items that match your interest.

Date

SourceDescription
Other
Size: 360 KB
Ferrybridge MFE 2 Limited
Consultee Response Tracker
Other
Size: 5 MB
Ferrybridge MFE 2 Limited
5.13 Landscape Strategy
Other
Size: 166 KB
West Yorkshire Ecology Service
Late Response to Non-Material Change Consultation
Other
Size: 5 MB
Ferrybridge MFE 2 Limited
FM2 - Section 106 Agreement
Other
Size: 3 MB
Ferrybridge MFE 2 Limited
5.14 Biodiversity Strategy
Other
Size: 56 KB
Natural England
Late Response to Non-Material Change Consultation
Other
Size: 100 KB
Wakefield Council
Response to Non-Material Change Consultation
Other
Size: 15 KB
John Clarkson
Response to Non-Material Change Consultation
Other
Size: 60 KB
Yorkshire Wildlife Trust
Response to Non-Material Change Consultation
Other
Size: 363 KB
The Coal Authority
Response to Non - Material Change Consultation
Other
Size: 1 MB
Ferrybridge MFE 2 Limited
4.12 - FM2 - Revised Indicative Landscaping Plan - Sheet 1
Other
Size: 111 KB
Department of Energy & Climate Change
Letter regarding 'Transfer of the benefit of the Order'
Other
Size: 30 KB
Highways England
Response to Non-Material Change Consultation
Other
Size: 56 KB
R Smith
Response to Non-Material Change Consultation
Other
Size: 12 KB
J.C.Smith
Response to Non-Material Change Consultation
Other
Size: 2 MB
Ferrybridge MFE 2 Limited
5.14 - FM2 - Revised Biodiversity Strategy
Other
Size: 159 KB
Department for Business, Energy & Industrial Strategy
Letter regarding reduced consultation requirements
Other
Size: 218 KB
Ferrybridge MFE 2 Limited
FM2 - Change Application - Reg 6 Notice
Other
Size: 189 KB
West Yorkshire Ecology Service
Late Response to Non-Material Change Consultation
Other
Size: 12 MB
Ferrybridge MFE 2 Limited
Letter regarding Regulation 7A - Consultation and Publicity Statement
Other
Size: 30 KB
Ferrybridge MFE 2 Limited
Ferrbridge Multifuel 2 Power Station (Amendment) Order 2018
Other
Size: 134 KB
The Environment Agency
Response to Non-Material Change Consultation
Other
Size: 787 KB
Ferrybridge MFE 2 Limited
FM2 - Change Application - Application Statement
Other
Size: 657 KB
Ferrybridge MFE 2 Limited
4.12 Indicative Landscaping Plan
Other
Size: 727 KB
Ferrybridge MFE 2 Limited
4.12 - FM2 - Revised Indicative Landscaping Plan - Sheet 2
Other
Size: 60 KB
Network Rail
Response to Non-Material Change Consultation
Other
Size: 2 MB
Ferrybridge MFE 2 Limited
5.13 - FM2 - Revised Landscape Strategy
Other
Size: 250 KB
Ferrybridge MFE 2 Limited
FM2 - Change Application - Cover Letter
Other
Size: 6 MB
Ferrybridge MFE 2 Limited
Section 106 Agreement
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.