You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (6)
Developer's Application (124)
- All Documents
- Application Form (4)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (3)
- Environmental Statement (88)
- Other Documents (1)
- Plans (14)
- Reports (11)
Acceptance (16)
Pre Examination (6)
Examination (173)
- All Documents
- Accompanied Site Inspection (2)
- Additional Submissions (5)
- Compulsory acquisition hearing (if requested) (1)
- Deadline 1 (14)
- Deadline 2 (41)
- Deadline 3 (28)
- Deadline 4 (9)
- Deadline 5 (12)
- Deadline 6 (8)
- Deadline 7 (7)
- Deadline 8 (9)
- Deadline 9 (16)
- Draft Development Consent Orders (1)
- Examination Library (1)
- Hearing Agendas (1)
- Issue Specific Hearing on draft DCO (1)
- Issue Specific Hearing on Environmental Matters (4)
- Notification regarding close of examination (s99) (1)
- Preliminary Meeting Note (1)
- Procedural Decisions (8)
- Recording of Preliminary Meeting (1)
- Report on the Implications for European Sites (RIES) (1)
- Unaccompanied Site Inspection (1)
Decision (13)
- All Documents
- Correction Order (1)
- Development Consent Order as made (1)
- Habitats Regulations Assessment (1)
- Notification of Decision to Accept Application (1)
- Other Documents (1)
- Recommendation Report (1)
- Secretary of State Consultation (6)
- Secretary of State letter and Statement of Reasons (approved) (1)
Decided (0)
The selection shows documents received from the applicant in relation to the development consent order application.
Source | Description |
---|---|
Other |
6.3.18 Figure 8.4 - Abnormal Operational Process Contribution to Short-Term NO2 Concentration - Final - May 2017 (PDF, 3 MB)
Figure 8.4 - Abnormal Operational Process Contribution To Short-Term NO2 Concentration
|
Other |
6.3.19 Figure 9.1 - Baseline Noise Monitoring Locations and Sensitive Noise Receptors - Final - May 2017 (PDF, 1 MB)
Figure 9.1 - Baseline Noise Monitoring Locations and Noise Sensitive Receptors
|
Other |
6.2.5 - ES Chapter 5 - Final - May 2017 (PDF, 424 KB)
Chapter 5 - Construction Programme and Management
|
Other |
6.3.33 Figure 16.37 - 16.54 - Photomontages - Final - May 2017 (PDF, 51 MB)
Figure 16.37-16.54 - Photomontages
|
Other |
6.3.6 Figure 4.2 - Indicative Railway Arrangement - Final - May 2017 (PDF, 344 KB)
Figure 4.2 - Indicative Railway Arrangement
|
Other |
6.3.35 Figure 20.1 - Other Developments Considered for Cumulative Impact Assessment - Final - May 2017 (PDF, 2 MB)
Figure 20.1 - Other Developments Considered for Cumulative Impact Assessment
|
Other |
6.3.8 Figure 4.4 - Above Ground Installation - Final - May 2017 (PDF, 90 KB)
Figure 4.4 - Above Ground Installation
|
Other |
6.3.9 Figure 5.1 - Gas Connection Pipeline construction methods - Final - May 2017 (PDF, 778 KB)
Figure 5.1 - Gas Connection Pipeline Construction Methods
|
Other |
6.4.21 - Appendix 14A - Transport Assessment - Final - May 2017 (PDF, 38 MB)
Appendix 14A - Transport Assessment
|
Other |
6.4.14 - Appendix 10G - Fish Survey Report - Final - May 2017 (PDF, 2 MB)
Appendix 10G - Fish Survey Report
|
Other |
6.4.11 - Appendix 10D - Mammal Survey Report - Final - May 2017 (PDF, 14 MB)
Appendix 10D - Mammal Survey Report
|
Other |
6.4.19 - Appendix 13A - Gazetteer of Cultural Heritage Assets - Final - May 2017 (PDF, 433 KB)
Appendix 13A - Gazetteer of Cultural Heritage Assets
|
Other |
6.4.2 - Appendix 1B - Environmental Impact Assessment Scoping Opinion - Final - May 2017 (PDF, 6 MB)
Appendix 1B - Environmental Impact Assessment Scoping Opinion
|
Other |
6.2 - Environmental Statement - Volume 1 (Main Report) - Final - May 2017 (PDF, 570 KB)
Environmental Statement - Volume 1 (Main Report) for the Eggborough CCGT project
|
Other |
6.2.11 - ES Chapter 11 - Final - May 2017 (PDF, 818 KB)
Chapter 11 - Water Resources, Flood Risk and Drainage
|
Other |
6.2.14 - ES Chapter 14 - Final - May 2017 (PDF, 613 KB)
Chapter 14 - Traffic and Transportation
|
Other |
6.3.5 Figure 4.1b - Indicative Concept Layout (Multi Shaft Single Shaft) for the Proposed Development - Final - May 2017 (PDF, 466 KB)
Figure 4.1b - Indicative Concept Layout (Multi shaft + Single Shaft) for the Proposed Development with the Existing Coal-Fired Power Station Site.pdf
|
Other |
6.2.19 - ES Chapter 19 - Final - May 2017 (PDF, 544 KB)
Chapter 19 - Human Health
|
Other |
1.3 - Application Form - Final - May 2017 (PDF, 336 KB)
Application Form for the Eggborough CCGT project
|
Other |
6.3.34 Figure 16.55 - Landscape and Biodiversity Plan - Final - May 2017 (PDF, 1 MB)
Figure 16.55 - Landscape and Biodiversity Plan
|
Other |
6.3.31 Figure 16.7 - Viewpoint Locations - Final - May 2017 (PDF, 5 MB)
Figure 16.7 - Viewpoint Locations
|
Other |
6.3.23 Figure 13.2 - Location of Non-Designated Heritage Assets within the 1 km Study Area - Final - May 2017 (PDF, 2 MB)
Figure 13.2 - Location of Non-Designated Heritage Assets within the 1 km Study Area
|
Other |
6.3.20 Figure 11.1 - Watercourses within the Study Area - Final - May 2017 (PDF, 2 MB)
Figure 11.1 - Watercourses within the Study Area
|
Other |
6.3.22 Figure 13.1 - Location of Designated Heritage Assets within the 5 km Study Area - Final - May 2017 (PDF, 2 MB)
Figure 13.1 - Location of Designated Heritage Assets within the 5 km Study Area
|
Other |
2.3 - Draft DCO - Comparisons to Model Provisions version - Final - May 2017 (PDF, 1 MB)
Draft DCO - Comparison to Model Provisions Version document for the Eggborough CCGT project
|
Other |
6.4.22 - Appendix 15A - Agricultural Land Classification Soil Survey - Final - May 2017 (PDF, 4 MB)
Appendix 15A - Agricultural Land Classification Soil Survey Report
|
Other |
6.4.25 - Appendix 16C - Potential Viewpoints - Final - May 2017 (PDF, 413 KB)
Appendix 16C - Potential Viewpoints Locations
|
Other |
6.2.4 - ES Chapter 4 - Final - May 2017 (PDF, 606 KB)
Chapter 4 - The Proposed Development
|
Other |
6.4.24 - Appendix 16B - NYCC Consultation Summary - Final - May 2017 (PDF, 552 KB)
Appendix 16B - North Yorkshire County Council Consultation
|
Other |
6.2.3 - ES Chapter 3 - Final - May 2017 (PDF, 454 KB)
Chapter 3 - Description of the Site
|
Other |
6.3.21 Figure 12.1 Environmental database features - Final - May 2017 (PDF, 2 MB)
Figure 12.1 - Environmental database features
|
Other |
6.4.10 - Appendix 10C - Preliminary Ecological Appraisal - Final - May 2017 (PDF, 19 MB)
Appendix 10C - Preliminary Ecological Appraisal
|
Other |
6.2.21 - ES Chapter 21 - Final - May 2017 (PDF, 471 KB)
Chapter 21 - Summary of Significant Effects
|
Other |
6.4.13 - Appendix 10F - River Corridor and Aquatic Macrophyte Survey Report - Final - May 2017 (PDF, 3 MB)
Appendix 10F - River Corridor and Aquatic Macrophyte Survey Report
|
Other |
6.4.16 - Appendix 11A - Flood Risk Assessment - Final - May 2017 (PDF, 27 MB)
Appendix 11A - Flood Risk Assessment
|
Other |
6.4.18 - Appendix 12B - Groundsure Report - Part 2 - Final - May 2017 (PDF, 45 MB)
Appendix 12B – Groundsure Report
|
Other |
6.4.20 - Appendix 13B Geophysical Survey Report - Final - May 2017 (PDF, 45 MB)
Appendix 13B - Geophysical Survey Report
|
Other |
6.2.15 - ES Chapter 15 - Final - May 2017 (PDF, 649 KB)
Chapter 15 - Land Use, Agriculture and Socio-economics
|
Other |
6.2.2 - ES Chapter 2 - Final - May 2017 (PDF, 459 KB)
Chapter 2 - Assessment Methodology
|
Other |
6.2.20 - ES Chapter 20 - Final - May 2017 (PDF, 693 KB)
Chapter 20 - Cumulative and Combined Effects
|
Other |
6.4.1 - Appendix 1A - Environmental Impact Assessment Scoping Report - Final - May 2017 (PDF, 14 MB)
Appendix 1A - Environmental Impact Assessment Scoping Report
|
Other |
5.11 - Indicative Lighting Strategy - Final - May 2017 (PDF, 2 MB)
Indicative Lighting Strategy for the Eggborough CCGT project
|
Other |
5.8 - Carbon Capture Readiness (CCR) Statement - Final - May 2017 (PDF, 8 MB)
Carbon Capture and Storage (CCS) & Carbon Capture Readiness (CCR) Statement for the Eggborough CCGT project
|
Other |
6.2.18 - ES Chapter 18 - Final - May 2017 (PDF, 464 KB)
Chapter 18 - Sustainability and Climate Change
|
Other |
6.2.12 - ES Chapter 12 - Final - May 2017 (PDF, 673 KB)
Chapter 12 - Geology, Hydrogeology and Land Contamination
|
Other |
6.4.4 - Appendix 8A - Air Quality - Final - May 2017 (PDF, 861 KB)
Appendix 8A - Air Quality Assessment
|
Other |
6.3.17 Figure 8.3 - Operational Process Contribution to Short-Term NO2 Concentration - Final - May 2017 (PDF, 3 MB)
Figure 8.3 - Operational Process Contribution to Short-Term NO2 Concentration
|
Other |
6.3.12 Figure 5.4 - Indicative cofferdam arrangement (cooling water discharge point) - Final - May 2017 (PDF, 79 KB)
Figure 5.4 - Indicative cofferdam arrangement (cooling water discharge point)
|
Other |
4.13 - Indicative Landscaping and Biodiversity Plans (Key Plan and Sheets 1-5) - Final - May 2017 (PDF, 2 MB)
Indicative Landscaping and Biodiversity Plan for the Eggborough CCGT project
|
Other |
4.7 - Indicative Electrical Connection Works Plan - Final - May 2017 (PDF, 553 KB)
Indicative Electrical Connection Works Plan for the Eggborough CCGT project
|
Other |
4.4 - Works Plans (Key Plan and Sheets 1 - 9) - Final - May 2017 (PDF, 9 MB)
Works Plans for the Eggborough CCGT project
|
Other |
4.10 - Indicative Gas Supply Pipelines Connection Works Plans - Final - May 2017 (Key Plan and Sheets 1 - 7) (PDF, 3 MB)
Indicative Gas Supply and Pipelines Connection Works Plans for the Eggborough CCGT project
|
Other |
6.4.15 - Appendix 10H - Habitats Regulations Assessment (HRA) Signposting - Final - May 2017 (PDF, 3 MB)
Appendix 10H - Habitats Regulations Assessment (HRA) Signposting - Final - May 2017
|
Other |
6.3.14 Figure 6.2 - Gas Connection Corridor Options - Final - May 2017 (PDF, 2 MB)
Figure 6.2 - Gas Connection Corridor Options
|
Other |
6.3 - Environmental Statement - Volume 2 (Figures) - Final - May 2017 (PDF, 519 KB)
Environmental Statement - Volume 2 (Figures) for the Eggborough CCGT project
|
Other |
6.3.3 Figure 3.2 - Parts of the Site - Final - May 2017 (PDF, 2 MB)
Figure 3.2 - Parts of the Site (Plan) for the Eggborough CCGT project
|
Other |
6.3.25 Figure 16.1 - Potential Viewpoint Locations - Final - May 2017 (PDF, 5 MB)
Figure 16.1 - Potential Viewpoint Locations
|
Other |
4.8 - Indicative Cooling Water Connection Works Plans (Key Plan and Sheets 1 - 3) - Final - May 2017 (PDF, 3 MB)
Indicative Cooling Water Connection for the Eggborough CCGT project
|
Other |
6.4 ES - Volume 3 (Appendices) - Final - May 2017 (PDF, 528 KB)
ES - Volume 3 (Appendices)
|
Other |
6.3.7 Figure 4.3 - Gas Connection - Final - May 2017 (PDF, 767 KB)
Figure 4.3 - Gas Connection
|
Other |
6.3.4 Figure 4.1a - Indicative Concept Layout (Single Shaft) for the Proposed Development - Final - May 2017 (PDF, 465 KB)
Figure 4.1a - Indicative Concept Layout (Single Shaft) for the Proposed Development with the Existing Coal-Fired Power Station Site
|
Other |
6.4.26 - Appendix 18A - Carbon assessment - Final - May 2017 (PDF, 524 KB)
Appendix 18A - Carbon assessment
|
Other |
6.4.23 - Appendix 16A - Landscape and Visual Impact Assessment Methodology - Final - May 2017 (PDF, 634 KB)
Appendix 16A - Landscape and Visual Impact Assessment Methodology
|
Other |
2.1 - Draft Development Consent Order - Final - May 2017 (PDF, 1 MB)
Draft Development Consent Order for the Eggborough CCGT project
|
Other |
2.2 - Explanatory Memorandum - Final - May 2017 (PDF, 547 KB)
Explanatory Memorandum for the Eggborough CCGT project
|
Other |
6.2.6 - ES Chapter 6 - Final - May 2017 (PDF, 417 KB)
Chapter 6 - Need, Alternatives and Design Evolution
|
Other |
6.3.2 Figure 3.1 - The Site Boundary Plan - Final - May 2017 (PDF, 1 MB)
Figure 3.1 - The Site Bounary Plan for the Eggborough CCGT project
|
Other |
1.4 - Notices for Statutory Publicity - Final - May 2017 (PDF, 13 MB)
Notices for Statutory Publicity for the Eggborough CCGT project
|
Other |
6.2.16 - ES Chapter 16 - Final - May 2017 (PDF, 956 KB)
Chapter 16 - Landscape and Visual Amenity
|
Other |
6.2.13 - ES Chapter 13 - Final - May 2017 (PDF, 843 KB)
Chapter 13 - Cultural Heritage
|
Other |
6.2.9 - ES Chapter 9 - Final - May 2017 (PDF, 1 MB)
Chapter 9 - Noise and Vibration
|
Other |
6.2.8 - ES Chapter 8 - Final - May 2017 (PDF, 785 KB)
Chapter 8 - Air Quality
|
Other |
6.2.10 - ES Chapter 10 - Final - May 2017 (PDF, 705 KB)
Chapter 10 - Ecology
|
Other |
6.3.29 Figure 16.5 - Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present - Final - May 2017 (PDF, 3 MB)
Figure 16.5 - Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present
|
Other |
1.2 - Application Guide - Final - May 2017 (PDF, 509 KB)
Application Guide for the Eggborough CCGT project
|
Other |
6.2.7 - ES Chapter 7 - Final - May 2017 (PDF, 468 KB)
Chapter 7 - Legislative Context and Planning Policy Framework
|
Other |
4.12 - Indicative Drainage Plan - Final - May 2017 (PDF, 564 KB)
Indicative Drainge Plan for the Eggborough CCGT project
|
Other |
4.1 - Location Plan - Final - May 2017 (PDF, 2 MB)
Location Plan for the Eggborough CCGT project
|
Other |
4.11 - Indicative Above Ground Installation Plans (Sheets 1 and 2) - Final - May 2017 (PDF, 282 KB)
Indicative Above Ground Installation Plans for the Eggborough CCGT project
|
Other |
5.3 - Gas Connection Statement - Final - May 2017 (PDF, 1 MB)
Gas Connection and Pipeline Statement for the Eggborough CCGT project
|
Other |
6.3.26 Figure 16.2 - Landscape Characterisation - Final - May 2017 (PDF, 2 MB)
Figure 16.2 - Landscape Characterisation
|
Other |
6.4.8 - Appendix 10A - Legislation and Planning Policy - Final - May 2017 (PDF, 435 KB)
Appendix 10A - Legislation and Planning Policy
|
Other |
6.3.28 Figure 16.4 - Proposed 90 m Stack Zone of Theoretical Visibility with Existing Power Station Present - Final - May 2017 (PDF, 3 MB)
Figure 16.4 - Proposed 90 m Stack Zone of Theoretical Visibility with Existing Power Station Present
|
Other |
6.2.1 - ES Chapter 1 - Final - May 2017 (PDF, 360 KB)
Chapter 1 - Introduction
|
Other |
6.3.10 Figure 5.2 - Gas Connection Open Cut Construction Typical Cross Section - Final - May 2017 (PDF, 156 KB)
Figure 5.2 - Gas Connection Open Cut Construction Typical Cross Section
|
Other |
6.3.13 Figure 6.1 - Initial CCGT Site Options - Final - May 2017 (PDF, 1 MB)
Figure 6.1 - Initial CCGT Site Options
|
Other |
6.3.16 Figure 8.2 - Operational Process Contribution to Long-Term NO2 Concentration - Final - May 2017 (PDF, 3 MB)
Figure 8.2 - Operational Process Contribution to Long-Term NO2 Concentration
|
Other |
6.4.9 - Appendix 10B - Ecological Impact Assessment Methodology - Final - May 2017 (PDF, 439 KB)
Appendix 10B - Ecological Impact Assessment Methodology
|
Other |
4.14 - Indicative Deemed Marine Licence Coordinates - Final - May 2017 (PDF, 98 KB)
Indicative Deemed Marine License Coordinates for the Eggborough CCGT project
|
Other |
4.2 - Land Plans (Key Plan and Sheets 1 - 4) - Final - May 2017 (PDF, 13 MB)
Land Plans for the Eggborough CCGT project
|
Other |
4.5 - Access and Rights of Way Plans (Key Plan and Sheets 1 - 4) - Final - May 2017 (PDF, 9 MB)
Access and Rights of Way Plans for the Eggborough CCGT project
|
Other |
4.9 - Indicative Groundwater and Towns Water Supply Connections Works Plan - Final - May 2017 (PDF, 945 KB)
Indicative Raw and Towns Water Supply Connections Works Plans for the Eggborough CCGT project
|
Other |
4.3 - Crown Land and Special Category Land Plan - Final - May 2017 (PDF, 2 MB)
Crown Land for the Eggborough CCGT project
|
Other |
6.4.5 - Appendix 8B - Plume Visibility - Final - May 2017 (PDF, 353 KB)
Appendix 8B - Plume Visibility
|
Other |
6.4.6 - Appendix 9A - Construction Noise Assessment Methodology - Final - May 2017 (PDF, 409 KB)
Appendix 9A - Construction Noise Assessment Methodology
|
Other |
6.4.3 - Appendix 5A - Construction Environmental Management Plan (CEMP) - Final - May 2017 (PDF, 628 KB)
Appendix 5A - Construction Environment Management Plan (CEMP)
|
Other |
6.4.27 - Appendix 21A - Commitments Register - Final - May 2017 (PDF, 551 KB)
Appendix 21A - Commitments Register
|
Other |
6.3.15 Figure 8.1 - Air Quality Study Area and Receptor Locations - Final - May 2017 (PDF, 6 MB)
Figure 8.1 - Air Quality Study Area and Receptor Locations
|
Other |
1.1 - Application Cover Letter - Final - May 2017 (PDF, 379 KB)
|
Other |
6.3.1 Figure 1.1 - Site Location Plan - Final - May 2017 (PDF, 2 MB)
Figure 1.1 - Site Location Plan for the Eggborough CCGT project
|
Other |
5.5 - Planning Statement - Final - May 2017 (PDF, 1 MB)
Planning Statement for the Eggborough CCGT project
|
Other |
5.10 - Indicative Landscaping and Biodiversity Strategy (including Arboricultural Assessment and Landscape and Biodiversity Plan) - Final - May 2017 (PDF, 11 MB)
5.10 - Indicative Landscaping and Biodiversity Strategy (including Arboricultural Assessment and Landscape and Biodiversity Plan)
|
Other |
6.4.12 - Appendix 10E - Great Crested Newt Survey Report - Final - May 2017 (PDF, 3 MB)
Appendix 10E - Great Crested Newt Survey Report
|
Other |
5.6 - Design and Access Statement - Final - May 2017 (PDF, 4 MB)
Design and Access Statement for the Eggborough CCGT project
|
Other |
6.2.17 - ES Chapter 17 - Final - May 2017 (PDF, 536 KB)
Chapter 17 - Waste Management
|
Other |
6.4.7 - Appendix 9B - Operational Noise Information - Final - May 2017 (PDF, 400 KB)
Appendix 9B - Operational Noise Information
|
Other |
6.3.24 Figure 15.1 - Agricultural Land Classification Soil Survey Map - Final - May 2017 (PDF, 606 KB)
Figure 15.1 – Agricultural Land Classification Soil Survey Map
|
Other |
6.3.27 Figure 16.3 - Public Rights of Way - Final - May 2017 (PDF, 1 MB)
Figure 16.3 - Public Rights of Way
|
Other |
6.3.30 Figure 16.6 - Above Ground Installation Zone of Theoretical Visibility - Final - May 2017 (PDF, 2 MB)
Figure 16.6 - Above Ground Installation Zone of Theoretical Visibility
|
Other |
6.1 - Environmental Statement Non-Technical Summary - Final - May 2017 (PDF, 14 MB)
Environmental Statement Non-Technical Summary for the Eggborough CCGT project
|
Other |
5.1 - Consultation Report - Final - May 2017 (PDF, 89 MB)
5.1 - Consultation Report
|
Other |
5.4 - Other Consents and Licences - Final - May 2017 (PDF, 385 KB)
Other Consents and Licenses for the Eggborough CCGT project
|
Other |
6.4.17 - Appendix 12A - Phase I Geotechnical & Geo-Environmental Site Assessment - Final - May 2017 (PDF, 14 MB)
Appendix 12A - Phase 1 Geotechnical & Geo-Environmental Site Assessment
|
Other |
7.12 Statement of Common Ground - Sport England - Final - May 17 (PDF, 504 KB)
7.12 Statement of Common Ground - Sport England - Final - May 17
|
Other |
5.2 - Grid Connection Statement - Final - May 2017 (PDF, 361 KB)
5.2 - Grid Connection Statement
|
Other |
6.3.11 Figure 5.3 - Indicative cofferdam arrangement (cooling water abstraction point) - Final - May 2017 (PDF, 121 KB)
Figure 5.3 - Indicative Cofferdam Arrangement (cooling water abstraction point)
|
Other |
3.1 - Book of Reference - Final - May 2017 (PDF, 33 KB)
Book of Reference for the Eggborough CCGT project
|
Other |
3.3 - Funding Statement - Final - May 2017 (PDF, 11 MB)
Funding Statement
|
Other |
3.2 - Statement of Reasons - Final - May 2017 (PDF, 879 KB)
Statement of Reasons for the Eggborough CCGT project
|
Other |
6.4.18 - Appendix 12B - Groundsure Report - Part 1 (PDF, 39 MB)
Appendix 12B - Groundsure Report - Part 1
|
Other |
6.3.32 Figure 16.8 - 16.36 - Photo Viewpoints - Final - May 2017 (PDF, 29 MB)
Figure 16.8-16.36 - Photo Viewpoints
|
Other |
4.6 - Indicative Generating Station Plan (Key Plan and Sheets 1 - 6) - Final - May 2017 (PDF, 4 MB)
Indicative Generating Station Plans for the Eggborough CCGT project
|
Other |
5.9 - Statutory Nuisance Statement - Final - May 2017 (PDF, 545 KB)
5.9 - Statutory Nuisance Statement
|
Other |
5.7 - Combined Heat and Power Assessment - Final - May 2017 (PDF, 1 MB)
5.7 - Combined Heat and Power Assessment for the Eggborough CCGT project
|