Drax Re-power

You can filter the results to show only the items that match your interest.

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 12 MB
Drax Power Limited
2.7 Site Reconfiguration Works Plans
Other
Size: 39 MB
Drax Power Limited
2.4 Access and Rights of Way Plans
Other
Size: 2 MB
Drax Power Limited
2.8 Pedestrian Bridge Plan
Other
Size: 7 MB
Drax Power Limited
2.3C Indicative Works Associated with Unit Y
Other
Size: 12 MB
Drax Power Limited
2.2 Land Plans
Other
Size: 6 MB
Drax Power Limited
2.6C Indicative Above Ground Gas Installation Elevations
Other
Size: 16 MB
Drax Power Limited
2.3A Works Plans
Other
Size: 3 MB
Drax Power Limited
2.1 Site Location Plan
Other
Size: 6 MB
Drax Power Limited
2.6A Indicative Plant Elevations
Other
Size: 5 MB
Drax Power Limited
2.5A Two Unit Option Indicative Plant Layout
Other
Size: 12 MB
Drax Power Limited
2.3B Indicative Works Associated with Unit X
Other
Size: 5 MB
Drax Power Limited
2.5B One Unit Option Indicative Plant Layout
Other
Size: 6 MB
Drax Power Limited
2.6B Indicative Gas Receiving Facility and Gas Compressor Building Elevations
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.