Able Marine Energy Park

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (314)

Acceptance (5)

Pre Examination (13)

Examination (435)

Decision (179)

Decided (50)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
19 - Light (PDF, 7 MB)
Other
14.2 - Navigation Risk Assessment (PDF, 9 MB)
Other
06 - Choice of Site (PDF, 2 MB)
Other
09 - Water and Sediment Quality (PDF, 2 MB)
Other
7.4 - Ground Engineering Interpretative Rpt (PDF, 3 MB)
Other
46 - Glossary (PDF, 48 KB)
Other
ES Front Page V2 - F7 (PDF, 368 KB)
Other
4.4 - Consideration of Alternative Design (PDF, 3 MB)
Other
32.6 - 110ha Compensation site model test report (PDF, 2 MB)
Other
ES Front Page V2 - F13 (PDF, 368 KB)
Other
11.1 - Extended Phase 1 and Scoping Report (PDF, 6 MB)
Other
16.5 - Baseline Assessment Methodology (PDF, 92 KB)
Other
10 - Aquatic Ecology (PDF, 3 MB)
Other
ES Front Page V1 - F11 (PDF, 367 KB)
Other
16.2 - Legislation Policy and Guidance (PDF, 160 KB)
Other
40.2 - Cherry Cobb Sand Geophysics (PDF, 9 MB)
Other
20.1 - Landscape Characteristics Data (ERM) (PDF, 133 KB)
Other
40.1 - Foreshore Compensation Area Desk Study (PDF, 6 MB)
Other
31 - Geology Hydrogeology and Ground Conditions (PDF, 124 KB)
Other
11.2.1 - South Killingholme Southern Extension Area (PDF, 2 MB)
Other
35 - Ecology and Nature Conservation (PDF, 1 MB)
Other
18 - Historic Environment (PDF, 3 MB)
Other
04 - Description of Development (PDF, 4 MB)
Other
7.2 - Water and Sediment Quality (PDF, 4 MB)
Other
11.5 - Breeding Birds Survey (PDF, 2 MB)
Other
13 - Drainage and Flood Risk (PDF, 350 KB)
Other
5.1 - EC Communications on Renewable Energy (PDF, 339 KB)
Other
35.4 - CCS Bird Survey Results August 2010-March 2011 (PDF, 9 MB)
Other
11 - Ecology and Nature Conservation (PDF, 1 MB)
Other
39 - Air Quality (PDF, 81 KB)
Other
8.3 - Assessment of the Effects of Development on Fine Sediments (PDF, 3 MB)
Other
29 - Need for Development (PDF, 40 KB)
Other
4.3 - Schedule of Buildings (PDF, 78 KB)
Other
ES Front Page V1 - F12 (PDF, 367 KB)
Other
25 - Introduction (PDF, 304 KB)
Other
17 - Air Quality (PDF, 595 KB)
Other
35.6 - Humber Black-tailed Godwit Study (PDF, 2 MB)
Other
41.1 - Summary of Adopted Landscape Character Assessments (PDF, 89 KB)
Other
36 - Drainage and Flood Risk (PDF, 1 MB)
Other
08 - Hydrodynamic and Sedimentary Regime (PDF, 2 MB)
Other
44 - In-Combination (PDF, 84 KB)
Other
31.2 - Cherry Cobb SI (Factual) (PDF, 64 MB)
Other
21 - Socio-Economic (PDF, 2 MB)
Other
47 - Acronyms and Abbreviations (PDF, 71 KB)
Other
9.4 - Water Framework Directive Assessment (PDF, 265 KB)
Other
14.1 - AMEP Risk Assessment Workshop Minutes (BMT Isis) Feb 2011 (PDF, 162 KB)
Other
32.1 Compensation site geomorphology (PDF, 1 MB)
Other
ES Front Page V1 - F8 (PDF, 367 KB)
Other
27 - Planning Policy and Context (PDF, 152 KB)
Other
4.2 - Draft Code of Construction Practice (PDF, 546 KB)
Other
34.1 - Saltmarsh Survey Cherry Cobb Sands (PDF, 3 MB)
Other
03 - Planning Policy and Context (PDF, 2 MB)
Other
6.1 - Comparative Assessment (PDF, 3 MB)
Other
9.1 - Bathymetry Hydrography Survey (PDF, 7 MB)
Other
31.3 - SI Interpretive Report (PDF, 2 MB)
Other
16 - Noise and Vibration (PDF, 924 KB)
Other
9.2 - Assessment of proposed reclamation impact on Centrica intake-outfall (PDF, 5 MB)
Other
38 - Noise (PDF, 767 KB)
Other
7.5 - Hydrogeology Risk Assessment (PDF, 7 MB)
Other
11.7 - Winter Farmland Birds (PDF, 343 KB)
Other
18.4 - Setting Effects on Heritage Assets (PDF, 3 MB)
Other
11.11 - Noise Contour Maps (PDF, 5 MB)
Other
41.2 - Landscape Context Photographs (PDF, 1 MB)
Other
23 - Waste (PDF, 151 KB)
Other
9.3 - Assessment of proposed reclamation impact on EON intake-outfall (PDF, 5 MB)
Other
13.1 - Flood Risk Assessment and Drainage Strategy (PDF, 86 MB)
Other
32 - Hydrodynamic and Sedimentary Regime (PDF, 644 KB)
Other
10.3 - MEP Impact of Underwater Piling Noise on Migratory Fish (PDF, 995 KB)
Other
16.4 - Source Data (PDF, 59 KB)
Other
26 - Environmental Assessment Process (PDF, 70 KB)
Other
14.3 - Simulation Study STC for Proposed MUT (BMT) Nov 2010 (PDF, 438 KB)
Other
31.4 - Cherry Cobb Sands Contaminated Land Risk Assessment (PDF, 3 MB)
Other
07 - Geology Hydrogeology and Ground Conditions (PDF, 440 KB)
Other
8.1 - AMEP Estuary Modelling Studies Report (PDF, 5 MB)
Other
11.9 - AMEP Bird Survey Results April 2010-April 2011 (PDF, 10 MB)
Other
20.2 - Preliminary Arboricultural Assessment (PDF, 3 MB)
Other
30 - Choice of Site (PDF, 313 KB)
Other
4.5 - Landscape Masterplan (PDF, 5 MB)
Other
ES Front Page V2 - F14 (PDF, 368 KB)
Other
15 - Traffic and Transport (PDF, 345 KB)
Other
41 - Landscape and Visual Context (PDF, 28 MB)
Other
18.1 - Archaeology and Cultural Heritage Desk Study (PDF, 10 MB)
Other
35.5 - Breeding Bird Survey - Fields (PDF, 2 MB)
Other
02 - Environmental Assessment Process (PDF, 98 KB)
Other
17.1 - Detailed Methodology and Results (PDF, 147 KB)
Other
12.1 - Fisheries Assessment (IECS) (PDF, 102 KB)
Other
ES Front Page V1 - F6 (PDF, 368 KB)
Other
4.1 - Project Specification (PDF, 127 KB)
Other
9.6 - Assessment of relocation EON outfall (PDF, 656 KB)
Other
16.1 - Acoustics Vibration Glossary (PDF, 127 KB)
Other
32.3 Compensation site breach design report (PDF, 2 MB)
Other
ES Front Page V1 - F10 (PDF, 367 KB)
Other
28 - Description of Development (PDF, 4 MB)
Other
11.2 - S Killingholme Phase 1 Ecology (PDF, 4 MB)
Other
16.6 - Road Traffic (PDF, 60 KB)
Other
35.1 - Phase 1 Report Cherry Cobbs Sands (PDF, 3 MB)
Other
2.2 - Consultation Tables (PDF, 939 KB)
Other
15.1 - Transport Assessment (PDF, 62 MB)
Other
32.4 Compensation site model test report (PDF, 2 MB)
Other
31.1 - Summary Desk Study and SI Design Rpt (PDF, 3 MB)
Other
2.3 - Cumulative Impact list (PDF, 5 MB)
Other
10.2 - Impact Assessment of AMEP on Humber Lamprey (PDF, 932 KB)
Other
16.3 - Assessment of Noise Baseline (PDF, 322 KB)
Other
11.7 - (Front Cover) (PDF, 32 KB)
Other
18.3 - Geophysical Survey Report (PDF, 6 MB)
Other
41.3 - Photomontages (PDF, 2 MB)
Other
01 - Introduction (PDF, 3 MB)
Other
33 - Water and Sediment Quality (PDF, 266 KB)
Other
11.3 - South Killingholme Protected Species (PDF, 6 MB)
Other
16.8 - Noise Contours (PDF, 2 MB)
Other
40 - Historic Environment (PDF, 2 MB)
Other
8.4 - Dredging Plume Dispersion (PDF, 2 MB)
Other
11.12 - Hedgerow and Ditch Losses (PDF, 1,014 KB)
Other
8.2 - Geomorphological Review of the Humber (PDF, 2 MB)
Other
11.10 - Breeding Birds Report 2011 (PDF, 4 MB)
Other
30.1 - Assessment of Alternative Sites for Compensatory Habitat (PDF, 3 MB)
Other
22 - Aviation (PDF, 906 KB)
Other
9.5 - Anglian Water Letter (PDF, 73 KB)
Other
15.2 - Framework Travel Plan (PDF, 4 MB)
Other
32.2 Hydraulic model set up report (PDF, 2 MB)
Other
ES Front Page V1 - F9 (PDF, 367 KB)
Other
7.3 - GI South Humber Channel (PDF, 13 MB)
Other
11.6 - Coastal Bird Survey (PDF, 7 MB)
Other
7.6 - Dredging Strategy (PDF, 12 MB)
Other
11.8 - AMEP Protected Species (PDF, 10 MB)
Other
10.1 - Benthic and Fish Surveys Report (PDF, 4 MB)
Other
45 - References (PDF, 311 KB)
Other
42 - Socio-Economics (PDF, 273 KB)
Other
35.8 - Badger Bait-Marking Survey April 2011 (PDF, 1 MB)
Other
35.3 - Protected Species Survey Report (PDF, 8 MB)
Other
ES Front Page V1 - F5 (PDF, 368 KB)
Other
34 - Aquatic Ecology (PDF, 304 KB)
Other
11.4 - Spring Passage and Breeding Birds Survey (PDF, 1 MB)
Other
30.2 - Prelim Alternative Sites Report (BandV) Sept 2010 (PDF, 5 MB)
Other
24 - Health (PDF, 718 KB)
Other
20 - Landscape and Visual Impact (PDF, 7 MB)
Other
32.5 - Compensation site sedimentation and erosion (PDF, 927 KB)
Other
40.3 - Cherry Cobb Sands Geoarchaeological Appraisal (PDF, 2 MB)
Other
35.2 - Cherry Cobb Sands Water Vole Survey (PDF, 393 KB)
Other
2.1 - Sup Scoping Opinion Responses (PDF, 1 MB)
Other
36.1 - Flood Risk Assessment (PDF, 4 MB)
Other
43 - Waste (PDF, 89 KB)
Other
05 - Need for Development (PDF, 2 MB)
Other
37 - Transport (PDF, 2 MB)
Other
7.1 - Geoenvironmental Assessment (PDF, 13 MB)
Other
35.7 - Old Little Humber Farm Phase 1 Habitat Survey (PDF, 3 MB)
Other
6.2 - Streamlined Carbon Footprint of OWF Transport (PDF, 2 MB)
Other
14 - Navigation (PDF, 574 KB)
Other
12 - Commercial Fisheries (PDF, 154 KB)
Other
48 - Non-Technical Summary (14b) (PDF, 34 MB)
Other
18.2 - Historic Environment Desk-based Assessment (PDF, 17 MB)
Other
16.7 - Piling Mitigation Data (PDF, 496 KB)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.