Able Marine Energy Park

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (314)

Acceptance (5)

Pre Examination (13)

Examination (435)

Decision (179)

Decided (33)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 222 KB
Cherry Cobb Sands Compensation Site Detail and Section
Other
Size: 1,014 KB
Development Consent Boundary
Other
Size: 571 KB
Key Development Statistics 2 of 2
Other
Size: 360 KB
Quay Sections 1 of 2
Other
Size: 207 KB
Maximum Building Dimensions
Other
Size: 1 MB
Core Development Areas
Other
Size: 5 MB
Indicative Masterplan
Other
Size: 1 MB
Proposed Site Facilites and Access 1 of 2
Other
Size: 2 MB
Footpath No. 50 Diversion Section Locations
Other
Size: 364 KB
Planning Application drawings Front Page
Other
Size: 568 KB
Indicative Sequence Plan View 1 of 3
Other
Size: 4 MB
Cherry Cobb Sands Compensation Site Existing Ground Levels
Other
Size: 484 KB
Southern Return Wall Elevation
Other
Size: 715 KB
Concrete Deck General Arrangement
Other
Size: 363 KB
Design drawings Front Page
Other
Size: 369 KB
Footpath No. 50 Diversion Indicative Sections
Other
Size: 689 KB
Proposed Site Facilites and Access 2 of 2
Other
Size: 800 KB
Indicative Sequence Cross Section 2 of 2
Other
Size: 230 KB
Quay General Arrangement
Other
Size: 757 KB
Front Wall Elevation
Other
Size: 170 KB
Lighting Column Details 30m and 50m
Other
Size: 647 KB
Indicative Piling Layout
Other
Size: 2 MB
Building Key Plan
Other
Size: 697 KB
Indicative Sequence Plan View 2 of 3
Other
Size: 5 MB
Existing Ground Levels - AMEP South Bank
Other
Size: 1 MB
Key Development Statistics 1 of 2
Other
Size: 803 KB
Indicative Sequence Plan View 3 of 3
Other
Size: 556 KB
Surface Water Pumping Station Indicative Layout
Other
Size: 539 KB
Old Little Humber Farm Compensation Site Indicative Layout
Other
Size: 630 KB
Indicative Sequence Cross Section 1 of 2
Other
Size: 5 MB
Indicative Landscape Masterplan
Other
Size: 2 MB
Northern Return Wall Elevation
Other
Size: 1 MB
Quay Sections 2 of 2
Other
Size: 3 MB
Site Location Plan
Other
Size: 296 KB
Surface Water Pumping Station Indicative Elevation
Other
Size: 720 KB
Cherry Cobb Sands Compensation Site General Arrangement
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.