You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (7)
Developer's Application (548)
- All Documents
- Additional Information (Reg 6) (3)
- Application Form (5)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (6)
- Drawings (44)
- Environmental Statement (206)
- Other Documents (7)
- Plans (31)
- Post Submission Changes (155)
- Reports (88)
Acceptance (6)
Pre Examination (27)
- All Documents
- Correspondence (11)
- Other (4)
- Preliminary Meeting (11)
- Procedural Decisions (1)
Examination (739)
- All Documents
- + Comments (331)
- + Compulsory Acquisition (11)
- Correspondence (7)
- Deadline I - 24 June 2014. (25)
- Environmental Impact Assessment (8)
- + Examining Authority questions (80)
- + Hearings (83)
- + Information requested (Rule 17) (77)
- LIR and SoCG (41)
- Preliminary Meeting (2)
- Procedural Decisions (21)
- Site Visit (Accompanied) - 30-07-2014 - 1000 - TBA (1)
- Site Visit (Unaccompanied) - 07-07-2014 - 0900 - Swansea (1)
- Site Visit (Unaccompanied) - 09-06-2014 - 0900 - Swansea (1)
- Site Visit (Unaccompanied) - 24-09-2014 - 0900 - Swansea (1)
- Site Visit (Unaccompanied) - 28-10-2014 - 0900 - Swansea (1)
- Written Representations (48)
Decision (35)
- All Documents
- + Comments (12)
- + DECC Consultation (17)
- Development Consent Order (1)
- Other (4)
- Procedural Decisions (1)
Decided (23)
- All Documents
- Development Consent Order (2)
- Other (16)
- Recommendations (5)
Transboundary Documents
- Regulation 24 Response from Cork City Council (Republic of Ireland)
- Regulation 24 Response from Waterford City and County Council (Republic of Ireland)
- Regulation 24 Response from Wicklow County Council (Republic of Ireland)
- Regulation 24 Response from Cork County Council (Republic of Ireland)
- Regulation 24 Response from Wexford County Council (Republic of Ireland)
- Regulation 24 Response from Republic of Ireland
- Email correspondence with Republic of Ireland regarding timetable for response to transboundary EIA consultation
- Tidal Lagoon Swansea Bay request to participate in transboundary EIA consultation from Republic of Ireland 7 November 2014
- 141030 London Gazette Regulation 24 Notice
- Transboundary Screening Matrix 141023
The selected filter includes comments received by the Planning Inspectorate regarding:
- the representations made on the application (including responses to the Examining authority’s first round of questions) and
- the responses to the Examining authority’s subsequent round of questions.
The Planning Inspectorate is required to make these comments available in accordance with Rule 3(5) and Rule 21 of the Infrastructure Planning (Examination Procedure) Rules 2010.
Source | Description |
---|---|
Other | Pontardawe and Swansea Angling Society Ltd Representation accepted by the Examining Authority in to the examination. Attatchment to email was not accepted. |
Other | Geraint Davies MP Representation accepted by the Examining Authority in to the examination. |
Other | The Crown Estate Position Statement - Crown Consent under s.135. Submitted for Deadline VI of 25 November 2014. (Publication delayed to verify contents. Substance also contained in TLSB Appendix C to Note on Crown Consents, published 26/11/2014) |
Other | Dwr Cymru Welsh Water � Withdrawn Withdrawal of Objection. Accepted by the Examining Authority as a late submission for Deadline VI of 25 November 2014. |
Other | Maritime and Coastguard Agency Response to the draft DCO. Accepted by the Examining Authority as a late submission for Deadline VI of 25 November 2014. |
Other | Natural Resources Wales Letter to TLSB - S.150 Consents. Accepted by the Examining Authority as a late submission for Deadline VI of 25 November 2014. |
Other | Swansea University Summary of Case and Further Written Representations. Submitted for Deadline VI of 25 November 2014 |
Other | Baglan Operations Limited, Baglan Pipeline Limited, and Baglan Generating Limited Position Statement. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Section 106 Planning Agreement (25.11.2014) - Clean. Submitted Late for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix C to Note addressing s.150 consents. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing updated plans. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing piling in Area F Slurry Wall (Panel note item 9). Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc RIES (track changes). Submitted for Deadline VI of 25 November 2014. (Replaced 27/11/2014 to ensure visibility of track changes) |
Other | Royal Society for the Protection of Birds Comments on the draft DCO and AEMP version 3. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix A to Note addressing s.150 consents. Submitted for Deadline VI of 25 November 2014. |
Other | Natural Resources Wales Further Written Representation. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Covering letter. Submitted Late for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc CEMP (25 November 2014) - clean. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc DCO Validation Report. Submitted Late for Deadline VI of 25 November 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc TLSB and Natural Resources Wales - SoCG. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc TLSB comment on responses to 4 November consultation. Submitted Late for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing Section 106 Agreement. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix A to Note addressing s106 Agreement. Submitted Late for Deadline VI of 25 November 2014. |
Other | Associated British Ports Written Representation and Further Comments. Submitted for Deadline VI of 25 November 2014. |
Other | Welsh Government Written Representation. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal lagoon (Swansea Bay) Plc Book of Reference (25 November 2014). Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc TLSB and The Royal Yachting Association - SoCG. Submitted for Deadline VI of 25 November 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc AEMP (25 November 2014) - track. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Land Plans (2.1.3c, 2.1.4b-2.1.20b). Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCO - 25 November 2014 - Clean. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Table addressing open space (R2). Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix A to Note on Crown consents. Submitted for Deadline VI of 25 November 2014. |
Other | Neath Port Talbot County Borough Council Written Representation and Further Comments. Submitted for Deadline VI of 25 November 2014. |
Other | Western Power Distribution Withdrawal of Objection re. s127 and 138 PA2008 and Further Representation. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Works Plans (ref 2.2.2B - 2.2.10B). Submitted for Deadline VI of 25 November 2014. |
Other | Trinity House Comment on the consultation draft of the DCO dated 11 November 2014. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Commentary on ExA's Version of draft DCO published 11 November 2014. Submitted for Deadline VI of 25 November 2014. |
Other | Tony Colburn Written representation submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Overlay Plans (2.5.2C, 2.5.3B-2.5.10B). Submitted for Deadline VI of 25 November 2014. |
Other | Jill and Brian Burgess Comment on Applicant's Note Addressing Mitigation re. AEMP (Item 14 of 4 November submission). Submitted for Deadline VI of 25 November 2014. |
Other | Dan Morrissey (UK) Limited � Withdrawn Withdrawal of Objection. |
Other | Tidal Lagoon (Swansea Bay) Plc Response to Deadline V Submissions. Submitted Late for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing DCO guidance (Panel note item 4). Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc TLSB and City and County of Swansea Council - SoCG. Submitted for Deadline VI of 25 November 2014. |
Other | Pontardawe and Swansea Angling Society Summary of Representations made to the Examination and Further Representation. Submitted for Deadline VI of 25 November 2014. |
Other | Fish Legal Written Representation. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCO - Clean - 25 November 2014 - Submitted Late as a Word document for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Section 106 Planning Agreement (25.11.2014) - tracked. Submitted Late for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing likely significant effects on Crymlyn Burrows. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc TLSB Commentary on updated DCO. Submitted Late for Deadline VI of 25 November 2014. |
Other | Public Health England Written Representation. Submitted for Deadline VI of 25 November 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix C to Note on Crown consents. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc S106 Appendix E - Draft Development Consent Order. Submitted Late for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCO - 25 November 2014 - showing tracked changes from 4 November 2014 version. Submitted for Deadline VI of 25 November 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix B to Note on Crown consents. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Table addressing statutory undertakers and relevant land plots (Panel note item 1). Submitted Late for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing s.150 consents. Submitted for Deadline VI of 25 November 2014. |
Other | Porthcawl Environment Trust Comments relating to the need for an EPS Licence. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix B to Note addressing s106 Agreement. Submitted Late for Deadline VI of 25 November 2014. |
Other | City and County of Swansea SoCG and Further Representation. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Submission addressing RIES. Submitted for Deadline VI of 25 November 2014. |
Other | Dan Morrissey (UK) Limited � Withdrawn Position Statement. Submitted for Deadline VI of 25 November 2014. |
Other | Rhossili Working Group Comment on the RIES and Revised DCO. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix B to Note addressing s.150 consents. Submitted for Deadline VI of 25 November 2014. |
Other | Natural Resources Wales Update on the WFD Article 4(7) derogation process and Email to the Applicant. Submitted for Deadline VI of 25 November 2014. (Replaced 27/11/2014 to include email to the Applicant) |
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCO - tracked - 25 November 2014 - Showing tracked changes from original application version. Submitted Late as a Word document for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCO - 25 November 2014 - showing tracked changes from original application version. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Cover note with response to NRW comments on Crymlyn Burrows note. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCO - 25 November 2014 - Showing tracked changes from 4 November 2014 version. Submitted Late as a Word document for Deadline VI of 25 November 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Commentary on ExA note of information. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing sediment sources and dredging (Panel Note Items 7 & 8). Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc CEMP (25 November 2014) - track. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing crown consents. Submitted for Deadline VI of 25 November 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Index of Submission - Deadline VI. Submitted Late for Deadline VI of 25 November 2014. |
Other | Peter A. Ross Representation accepted by the Examining Authority in to the examination. |
Other | Matthew Cartmill Representation accepted by the Examining Authority in to the examination. |
Other | National Grid Electricity Transmission plc Withdrawal of objection. |
Other | Tidal lagoon Swansea Bay Plc Note addressing mitigation actions and management plans-AEMP (panel item 11) Submitted 4 November 2014 for Deadline V (Replacement due to formatting error). |
Other | Miss. E. Harry Representation accepted by the Examining Authority in to the examination. |
Other | Health and Safety Executive Response to additional information. Submitted for Deadline IV of 7 October 2014. |
Other | Gerald Conyngham Representation accepted by the Examining Authority in to the examination |
Other | Tidal Lagoon Swansea Bay Plc Note addressing mitigation actions and management plans-OEMP (panel item 11) Submitted 4 November 2014 for Deadline V (Replacement due to formatting error). |
Other | Tidal Lagoon Swansea Bay Plc Note addressing mitigation actions and management plans-CEMP (panel item 11) Submitted 4 November 2014 for Deadline V (Replacement due to formatting error). |
Other | Tidal lagoon Swansea Bay Plc Copy of notification of consultation |
Other | Sian James MP Representation accepted by the Examining Authority in to the examination |
Other | Dr Hywel Francis MP Representation accepted by the Examining Authority in to the examination. |
Other | Tidal Lagoon (Swansea Bay) Plc Access and Public rights of way Key plan Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Draft development consent order (Clean) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Updated OEMP (tracked) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing coastal processes (panel item 4) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing mitigation actions and management plans-OEMP (panel item 11) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Updated book of reference Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Schedule of plans Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Draft development consent order (tracked) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing suitability of aspects of the project to adaptive management (panel item 2) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing ship simulation (panel item 15) Submitted 4 November 2014 for Deadline V |
Other | Fish Legal Representation to Examining Authority Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Response to deadline IV Submitted 4 November 2014 for Deadline V |
Other | Pontardawe and Swansea Angling Society Ltd Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Index of submission Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Cover letter Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Access and Public rights of way key plan (sheet 2 of 11) submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Draft section 106 agreement (panel item 1) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing mitigation actions and management plans-AEMP (panel item 11) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing seaward extent of plots 16005 and 0510 (panel item 38) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Representations made outside of deadline Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Updated commentary on panels note of information Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing relevance of worst case scenarios (panel item 3) Submitted 4 November 2014 for Deadline V |
Other | Natural Resources Wales
Appendix 1- Revised report- Mud sources and depositional processes in Swansea Bay. Submitted 4 November 2014 for Deadline V
|
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing heavy metals (panel item 36) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Updated CEMP (clean) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Updated land plans Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Updated OEMP (Clean) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Commentary on Draft development consent order (panel item 31) Submitted 4 November 2014 for Deadline V |
Other | Natural Resources Wales Deadline V response to panel note Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing mitigation actions and management plans-CEMP (panel item 11) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing likely significant effects on Crymlyn Burrows (panel item 5) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Updated CEMP (tracked) Submitted 4 November 2014 for Deadline V |
Other | Tidal Lagoon (Swansea Bay) Plc Access and Public rights of way Key plan (sheet 3 of 11) Submitted 4 November 2014 for Deadline V |
Other | Baglan Operations Limited, Baglan Pipeline Limited, and Baglan Generating Limited Written Representation Submitted for Deadline V of 28 October 2014 |
Other | Baglan Bay Company Limited Withdrawal of objection. Submitted for Deadline V of 28 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Paper of alternative DCO drafting (Panel Note Item 20). Submitted for Deadline V of 28 October 2014. |
Other | Neath Port Talbot County Borough Council Comments on Deadline IV Submissions, Response to Panel?s Note Published 27 October and Response to 7 October Draft DCO. Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Report on article 4.7 WFD derogation and summary (panel note item 6). Submitted for Deadline V of 28 October 2014. |
Other | St Modwen Properties plc Summary of Oral Case made at 22 and 23 October Hearings. Submitted for Deadline V of 28 October 2014
|
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCO (doc ref 3.1) - (Tracked). Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCO (doc ref 3.1) - (Clean). Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc AEMP (doc ref 6.2, app 4.1) - (Tracked Only). Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Written Summary of Oral Case made at Compulsory Acquisition Hearing 23 October. Submitted for Deadline V of 28 October 2014. |
Other | Associated British Ports Written Representation and Summary of Oral Case made at hearings commencing 21 October. Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc TLSB-NRW SoCG - SLVIA and natural and built Environment. Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Cover Letter Submitted for Deadline V of 28 October 2014 |
Other | City and County of Swansea Summary of Oral Case made at Hearings Commencing 21 October, Responses to Agenda Items and Other Comments. Submitted for Deadline V of 28 October 2014 |
Other | Porthcawl Environment Trust Written Representation Submitted for Deadline V of 28 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc List of other consents required (doc ref 5.6) - (Clean). Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc TLSB-NRW SoCG - onshore traffic, noise, dust & vibration. Submitted for Deadline V of 28 October 2014. |
Other | Dan Morrissey (UK) Limited � Withdrawn Written Representation Submitted for Deadline V of 28 October 2014
|
Other | Tidal Lagoon (Swansea Bay) Plc Flood defences plan referred to in requirement 27 of draft DCO. Submitted for Deadline V of 28 October 2014. |
Other | Pontardawe and Swansea Angling Society Ltd Written Representation Submitted for Deadline V of 28 October 2014.
|
Other | Rhossili Working Group Response to Issue Specific Hearing of 21st October 2014. Submitted for Deadline V of 28 October 2014 |
Other | Fish Legal Comments on Deadline IV Submissions and Comments in Relation to the EIA Regulations 2009. Submitted for Deadline V of 28 October 2014. |
Other | Natural Resources Wales Summary of Oral Case made at 21 and 22 October Hearings. Submitted for Deadline V of 28 October 2014. |
Other | Swansea University Summary of Oral Case made at 22 and 23 October Hearings and Further Written Representation. Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Response to requests for information in relation to coastal processes by NRW. Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Index of Submissions - Submitted for Deadline V of 28 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing (i) access & (ii) boating (Panel Note Item 21). Submitted for Deadline V of 28 October 2014. |
Other | St Modwen Developments Limited Summary of Oral Case made at 22 and 23 October Hearings. Submitted for Deadline V of 28 October 2014
|
Other | Tidal Lagoon (Swansea Bay) Plc TLSB-NRW SoCG - flooding. Submitted for Deadline 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Written Summary of Oral Case made at Issue Specific Hearings 21 and 22 October + Design and News Release Annexes. Submitted for Deadline V of 28 October 2014 |
Other | St Modwen Properties VIII Sarl Summary of Oral Case made at 22 and 23 October Hearings. Submitted for Deadline V of 28 October 2014
|
Other | Tidal Lagoon (Swansea Bay) Plc Updated list of other consents required (doc ref 5.6) - (Tracked). Submitted for Deadline V of 28 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing NRW Comments on AEMP (Panel Note Item 11). Submitted for Deadline V of 28 October 2014. |
Other | Pontardawe and Swansea Angling Society Ltd Comments on the Draft Development Consent Order submitted for Deadline IV of 7 October 2014. |
Other | St Modwen Developments Ltd, St Modwen Properties Plc and St Modwen Properties VIII Sarl Submission to clarify written representation. Submitted for Deadline IV of 7 October 2014. |
Other | Michael Kirby Non Interested Party - Written submission for Deadline IV of 7 October 2014. Submission accepted by the ExA. |
Other | Public Health Wales Response to additional information. Submitted for Deadline IV of 7 October 2014. |
Other | Public Health Wales Response to Rule 17 and Rule 8 submitted for Deadline IV of 7 October 2014 |
Other | Kaye Chambers Non Interested Party - Written submission for Deadline IV of 7 October 2014. Submission accepted by the ExA. |
Other | Swansea City and Council Comments of Draft Development Consent Order submitted for Deadline IV of 7 October 2014. |
Other | Pontardawe and Swansea Angling Society Ltd Submission in relation to Issue Specific Hearings commencing 16 September 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Land and Works Plan Overlay: Sheets 1-9. Submitted for Deadline IV of October 2014. |
Other | Dr Pamela Muirhead Further response to Issue Specific Hearing of 17 September 2014. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Agreed list of the key elements of the Project (CCSC and NPTCBC) submitted for Deadline IV of 7 October 2014. |
Other | Royal Society for the Protection of Birds Comments on additional information submitted by the applicant submitted for Deadline IV of 7 October 2014 |
Other | Rhossili Working Group Response to Appendix 5.8.1 of Marine Mammals Chapter in Report R2286 and Issue Specific Hearing of 17 September 2014. Submitted for Deadline IV of 7 October 2014. |
Other | Swansea City and County Written representations submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Overlay of Land Plans and Works Plans submitted with the Application (doc ref 2.1 and 2.2) submitted for Deadline IV of 7 October 2014. |
Other | Welsh Government Comments on Draft Development Consent Order submitted for Deadline IV of 7 October 2014
|
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan: Sheet 8 of 9. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Book of Reference (BoR) submitted for Deadline IV of 7 OCtober 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Planning Drawing - offshore building public realm sections. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated list of other consents required (track changed version) submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing engineering solutions in respect of Sabellaria and monitoring/adaptive management submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Written summary of TLSB's oral submissions made at compulsory acquisition hearings. Submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan - Marine Works, Seawall Section: Sheet 5. Submitted for Deadline IV of 7 October 2014.
|
Other | Monkstone Cruising and Sailing Club Written submission for Deadline IV of 7 October 2014. |
Other | Baglan Operations Ltd, Baglan Pipelines Ltd and Baglan Generating Ltd Joint Submission - Schedule of Exhibits for compulsory acquisition hearing 30 September 2014. Submitted for Deadline IV of 7 October 2014. |
Other | Swansea City and Council Definitions of Significance submitted for Deadline IV of 7 October 2014 |
Other | University of Wales Trinity Saint David Written submission in lieu of an oral representation and comment on issues raised at the Issue Specific Hearing of 16 September 2014. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Planning Drawing - Marine Works, Turbine and Sluice Gate Housing: Elevation. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Additional note to the ES regarding anecdotal information on seals in and around Swansea Bay submitted for Deadline IV of 7 October 2014. |
Other | Public Health England Comments on additional information. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated land plans reflecting a reduction in the red line boundary of the project and showing realignment of part of project access road. Submitted for Deadline IV of 7 October 2014. |
Other | Natural Resources Wales response to panel note submitted for Deadline IV of 7 October 2014. |
Other | Natural Resources Wales Comments on updated Water Framework Directive Assessment. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated CEMP (clean version) submitted for Deadline IV of 7 October 2014
|
Other | Pontardawe and Swansea Angling Society Ltd Submission regarding protective provision for fishery owners submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan: Sheet 2 of 9. Submitted for Deadline IV of 7 October 2014. |
Other | Rhossili Working Group Written submission of oral case, 16 September 2014 Issue Specific Hearing - Agenda item 6.4: Porpoises and HRA - submitted for Deadline IV of 7 October 2014. |
Other | Pontardawe and Swansea Angling Society Ltd Comments on the updated WFD assessment submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Cover letter and index of submissions submitted for Deadline IV of 7 October 2014 |
Other | Wildfowl and Wetlands Trust Comments on additional information provided by the Applicant submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc TLSB commentary on Panel's note of information proposed by interested parties. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan - Marine Works, Seawall Section: Sheet 2. Submitted for Deadline IV of 7 October 2014. |
Other | Swansea Environmental Forum Written representation submitted for Deadline IV of 7 October 2014 |
Other | Pontardawe and Swansea Angling Society Ltd Response to TLSB Deadline 3 comments on PASAS Deadline 2 submissions submitted for Deadline IV of 7 October 2014.
|
Other | Pontardawe and Swansea Angling Society Ltd Comments on the updated AEMP submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Water Framework Directive Assessment submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Planning Drawing - Marine Works, Sluice House: Typical Section. Submitted for Deadline IV of 7 October 2014. |
Other | Swansea City and County Response to Panel's note submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Note on EIA effect(s) of realignment of Project access road submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note clarifying any necessary discounting in job totals in respect of the turbine assembly plant and concrete batching plant submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan: Sheet 1 of 9. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Tabular note in respect of consent status of measures contained in the AEMP, and examples of comparable plans submitted for Deadline IV of 7 October 2014. |
Other | Fulcrum Pipelines Ltd Comments on scoping report. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan - Marine Works Typical Sections. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan - Marine Works, Seawall Section Sheet 3. Submitted for Deadline IV of 7 October 2014. |
Other | Dan Morrissey (UK) Limited � Withdrawn Written representation submitted for Deadline IV of 7 October 2014. |
Other | Carmarthenshire County Council Comments on additional information. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal lagoon (Swansea Bay) Plc Written summary of TLSB's oral submissions made a issue specific hearing held 16th, 17th, 18th and 23rd september 2014 and relevant answers. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note clarifying jobs figures in paragraph 22.5.3.16 of the ES submitted for Deadline IV of 7 October 2014. |
Other | Natural Resources Wales Written summary of oral submissions made at issue specific hearings. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Paper of protective provisions to be included in the draft DCO submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Examples of precedents in relation to derogations from the WFD submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan - Marine Works, Seawall Section: Sheet 1. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan: Sheet 3 of 9. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated piling plan submitted for Deadline IV of 7 October 2014. |
Other | Fieldfisher on behalf of National Grid Electricity Transmission Plc Updated on Protective Provisions negotiations and notification of non attendance at 30 September hearing. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated OEMP (clean version) submitted for Deadline IV of 7 October 2014 |
Other | Doug Probert Non Interested Party - Written submission for Deadline IV of 7 October 2014. Submission accepted by the ExA. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated masterplan key plan submitted for Deadline IV of 7 October 2014 |
Other | Welsh Government Response to additional information submitted for Deadline IV of 7 October 2014. |
Other | Neath Port Talbot County Borough Council Written representation submitted for Deadline IV of 7 October 2014. |
Other | Porthcawl Environment Trust Written representation submitted for Deadline IV of 7 October 2014. |
Other | Swansea Fishermen Group Members Withdrawal of objection by individual members. Submitted for Deadline IV of 7 October 2014. |
Other | Associated British Ports Summary of oral submission made at Issue Specific Hearings. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated statement in respect of coastal processes submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated list of other consents required (clean version) submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Note to support amendment to DCO to address flood risk submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Planning Drawings - Marine Works, 7m Turbine House: Typical Section. Submitted for Deadline IV of 7 OCtober 2014. |
Other | Royal Mail Written Representation submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Updated schedule of plans submitted for Deadline IV of 7 October 2014 |
Other | Associated British Ports Letter to Tidal Lagoon (Swansea Bay) plc - Comment on draft Protective Provisions and revised articles. |
Other | Tidal Lagoon (Swansea Bay) Plc Note on EIA effect(s) of alternative proposed route into Baglan substation submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Draft Development Consent Order (track changed version) submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Updated OEMP (track changed version) submitted for Deadline IV of 7 October 2014 |
Other | Natural Resources Wales Written representation submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated AEMP submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Note addressing Swansea Bay SINC submitted for Deadline IV of 7 October 2014. |
Other | Welsh Government Submission in relation to Issue Specific Hearings commencing 16 September 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan: Sheet 7 of 9. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated CEMP (track changed version) submitted for Deadline IV of 7 October 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan: Sheet 9 of 9. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Note in respect of secured DCO works in other/comparable DCOs submitted for Deadline IV of 7 October 2014. |
Other | Trinity House Written representation submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Works Plan - Marine Works, Seawall Section: Sheet 4. Submitted for Deadline IV of 7 Octber 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Planning Drawings - Marine Works, Dredging: General Arrangement. Submitted for Deadline IV of 7 OCtober 2014. |
Other | Baglan Operations Limited, Baglan Pipeline Limited and Baglan Generating Limited Summary of oral case made at 30 September 2014 hearing. Submitted for Deadline IV of October 2014. |
Other | Rhossili Working Group Comments on additional documentation submitted in July and August 2014 submitted for Deadline IV of 7 October 2014
|
Other | Geldards LLP on behalf of Baglan Bay Company Limited First Master Definitions Agreement referred to in Written representation published 10 July 2014. Submitted for Deadline IV of 7 October 2014. |
Other | Swansea Fishermen's Group Withdrawal of objection. Submitted for Deadline IV of 7 October 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Draft Development Consent Order (clean version) submitted for Deadline IV of 7 October 2014 |
Other | Fish Legal Post hearing comments submitted for Deadline IV of 7 October 2014 |
Other | St Modwen Properties VIII Sarl Ltd Submission in relation to Issue Specific Hearings commencing 16 September 2014. |
Other | St Modwen Properties Plc Submission in relation to Issue Specific Hearings commencing 16 September 2014. |
Other | St Modwen Developments Ltd Submission in relation to Issue Specific Hearings commencing 16 September 2014. |
Other | Swansea University Submission in relation to Issue Specific Hearings commencing 16 September 2014. |
Other | Welsh Government Further written response submitted for Deadline III of 5 August 2014 (Late submission) |
Other | Tidal Lagoon (Swansea Bay) Plc Draft DCOb - Tidal Lagoon Swansea Bay, City and County of Swansea Council, Neath Port Talbot County Borough Council - Submitted on 1 September 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Response to Natural Resources Wales advice on updated FCA - Submitted on 1 September 2014 |
Other | Natural Resources Wales Further written response submitted for Deadline III of 5 August 2014 (Late submission) |
Other | Pontardawe and Swansea Angling Society Ltd Further written response submitted for Deadline III of 5 August 2014 (Late submission) |
Other | Ian Wisby on behalf of Swansea Fishermen WITHDRAWN Written response submitted for Deadline III of 5 August 2014, the publication of the representation was delayed to enable documents to be submitted by post (Late Submission). |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix 4.2 Outline Operation Environmental Management Plan (clean version). Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix 4.1 Construction Environmental Management Plan (clean version). Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix 4.2 Outline Operation Environmental Management Plan (changes shown). Submitted for Deadline III of 5 August 2014. |
Other | Tidal lagoon (Swansea Bay) Plc Shadow HRA relating to Cetaceans and Pinnipeds. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Appendix 4.1 Construction Environmental Management Plan (changes shown). Submitted for Deadline III of 5 August 2014. |
Other | St Modwen Developments Limited, St Modwen Properties Plc and St Modwen Properties VIII Sarl Written response submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Dwr Cymru Cyfyngedig. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Rhossili Working Group. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant's cover letter relating to documents submitted for Deadline III of 5 August 2014. |
Other | Swansea University Written response submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Associated British Ports. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Swansea Environmental Forum. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Intertissue Limited. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Pontardawe and Swansea Angling Society. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Wildfowl and Wetlands Trust. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by City and County of Swansea. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Wildfowl and Wetlands Trust. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on Local Impact Reports made by City and Council of Swansea. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Alan Rayner. Submitted for Deadline III of 5 August 2014. |
Other | Swansea Environmental Forum Written response submitted for Deadline III of 5 August 2014. |
Other | Associated British Ports Written response submitted for Deadline III of 5 August 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Natural Resources Wales. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Swansea Environmental Forum. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Design Commission for Wales. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on Local Impact Reports made by Neath Port Talbot County Borough Council. Submitted for Deadline III of 5 August 2014. |
Other | Neath Port Talbot County Borough Council Written response submitted for Deadline III of 5 August 2014 |
Other | Pontardawe and Swansea Angling Society Ltd Written response submitted for Deadline III of 5 August 2014 |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Dan Morrisey UK Limited. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Carmarthenshire County Council. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Rhossili Working Group. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Neath Port Talbot County Borough Council. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Neath Port Authority. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Mark Hughes. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Royal Yachting Association. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant's index of documents submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Peter Keith-Lucas. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Swansea University. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Royal Society for the Protection of Birds. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Wildlife Trust of South and West Wales. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Baglan Bay Company Limited. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Neath Port Talbot County Borough Council. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea bay) Plc Applicant?s comments on written representations made by Monkstone Cruising and Sailing Club. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Fish Legal. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea bay) Plc Applicant?s comments on written representations made by WildlifeTrust of South and West Wales. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Porthcawl Environment Trust. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Water Framework Directive Assessment (doc ref 8.3). Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Natural Resources Wales. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Mapeley Steps Limited. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Welsh Government. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Trinity House. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant's comments on relevant representations made by interested parties. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Updated Adaptive Environmental Management Plan (AEMP) (doc ref 6.2 App 23.1). Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by St Modwen Developments. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Welsh Government. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Pontardawe and Swansea Angling Society. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea bay) Plc Applicant?s comments on responses to ExA?s written questions made by National Grid Electricity Transmission Plc. Submitted for Deadline III of 5 August 2014. |
Other | Royal Society for the Protection of Birds Written response submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by GTC Engineering. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Natural England. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Royal Society for the Protection of Birds. Submitted for Deadline III of 5 August 2014. |
Other | City and County of Swansea Council Written response submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Associated British Ports. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on written representations made by Afan Valley Angling Club. Submitted for Deadline III of 5 August 2014. |
Other | Fish Legal Written response submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by Dwr Cymru Cyfyngedig. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by The Crown Estate. Submitted for Deadline III of 5 August 2014. |
Other | Tidal Lagoon (Swansea Bay) Plc Applicant?s comments on responses to ExA?s written questions made by City and County of Swansea. Submitted for Deadline III of 5 August 2014. |
Other | Natural Resources Wales Written response submitted for Deadline III of 5 August 2014 |
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.