North Wales Wind Farms Connection

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (3)

Developer's Application (193)

Acceptance (6)

Pre Examination (19)

Examination (446)

Decision (43)

Decided (2)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 142 KB
SP Manweb
Option B Submission Covering letter
Other
Size: 140 KB
SP Manweb
Book Of Reference Parts 1-5 Option B (Clean Version)
Other
Size: 11 MB
SP Manweb
Access and rights of Way Plan- Sheet 6 to Sheet 13 (Option B)
Other
Size: 31 MB
SP Manweb
Works Plan - Key Plan to Sheet 5 (Option B)
Other
Size: 7 MB
SP Manweb
Section Drawing Sheet 15 to Sheet 29 (Option B)
Other
Size: 34 MB
SP Manweb
Access and rights of Way Plan to Key Plan- Sheet 5 (Option B)
Other
Size: 6 MB
SP Manweb
Section Drawing Sheet 1 to Sheet 14 (Option B)
Other
Size: 5 MB
SP Manweb
Statement of reasons (4.1 v2) ?Option B
Other
Size: 554 KB
SP Manweb
Compulsory Acquisition document- Option B
Other
Size: 140 KB
SP Manweb
Book Of Reference Option B Schedule of Changes
Other
Size: 8 MB
SP Manweb
Works Plan - Sheet 6 to Sheet 13 (Option B)
Other
Size: 32 MB
SP Manweb
Land Plan- Key Plan to Sheet 5 (Option B)
Other
Size: 7 MB
SP Manweb
Crown Land Plan - Key Plan to Sheet 3 (Option B)
Other
Size: 18 MB
SP Manweb
Comparison Plan between Option A and Option B - Sheet 1 - Sheet 5
Other
Size: 140 KB
SP Manweb
Book Of Reference Parts 1-5 Option B Tracked Changes
Other
Size: 8 MB
SP Manweb
Land Plan- Sheet 6 to Sheet 13 (Option B)
Other
Size: 9 MB
SP Manweb
Landscaping Plans ? Option B
Other
Size: 760 KB
SP Manweb
Environmental Report- Option B
Other
Size: 32 MB
SP Manweb
Comparison Plan between Option A and Option B - Sheet 6 - Sheet 13
Other
Size: 12 MB
SP Manweb
Document 6.19.11 Envrionmental Statement Chapter 6 - Ecology and Biodiversity Technical Appendix 6.11. Submitted on 11 August 2015 by the Applicant to replace an application document not previously published with the location of badger setts omitted.
Other
Size: 1 MB
SP Manweb
Document 2.5.1 Crown Land Plan Sheet 1- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 5 MB
SP Manweb
Appendix 4 Document 6.19.9 Aboricultural Survey Figures (Updated)-Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 406 KB
SP Manweb
Appendix 1 Planning Inspectorate Section 55 Application Acceptance Checklist- Submitted by the Applicant on 3 July 2015 in response to s55 checklist.
Other
Size: 35 MB
SP Manweb
Photomontages A1 - VP47 (Wireframe)- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 120 KB
SP Manweb
Covering letter- Submitted on 3 July 2015 by the Applicant in response to the s55 checklist.
Other
Size: 32 MB
SP Manweb
Photomontages A1 - VP34- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 37 MB
SP Manweb
Photomontages A1 - VP47- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 6 MB
SP Manweb
Document 2.5.0 Overall Location Plan and Master Key Plan for Crown Land Plan-Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 244 KB
SP Manweb
S55 Checklist SP Manweb Responses Document- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 19 MB
SP Manweb
Photomontages A1 - VP34 (Wireframe)- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 3 MB
SP Manweb
Appendix 3 Document 2.2.11 Land Plans Sheet 11 (Updated)- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 1 MB
SP Manweb
Document 2.5.3 Crown Land Plan Sheet 3- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 8 MB
SP Manweb
Appendix 2 Document 1.4a Newspaper Notices (Updated)- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 1 MB
SP Manweb
Document 2.5.2 Crown Land Plan Sheet 2- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.