You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (15)
Developer's Application (373)
- All Documents
- Application Form (5)
- Compulsory Acquisition Information (7)
- Draft Development Consent Orders (2)
- Environmental Statement (294)
- Other Documents (23)
- Plans (16)
- Reports (26)
Acceptance (6)
Pre Examination (14)
Examination (0)
Decision (0)
Decided (0)
Transboundary Documents
The selection shows documents received from the applicant in relation to the development consent order application.
Source | Description |
---|---|
Other | National Grid Electricity Transmission Plc 5.15.2.14 Environmental Statement - Chapter 15 - Appendix 14 - Assessment of Vibration Effects from Underground Tunnelling Works |
Other | National Grid Electricity Transmission Plc 5.8.2.2 Environmental Statement - Chapter 8 - Appendix 2 - Viewpoint Assessment Part 2 of 6 |
Other | National Grid Electricity Transmission Plc 5.9.2.13 Environmental Statement - Chapter 9 - Appendix 13 - Freshwater Report (Confidential Information Removed) |
Other | National Grid Electricity Transmission Plc 5.9.2.18 Environmental Statement - Chapter 9 - Appendix 18 - Underwater Construction Noise Modelling and Assessment Report - Effects upon Marine Mammals and Fish |
Other | National Grid Electricity Transmission Plc 5.9.2.10 Environmental Statement - Chapter 9 - Appendix 10 - Bat Roost Report (Confidential Information Removed) |
Other | National Grid Electricity Transmission Plc 5.9.2.4 Environmental Statement - Chapter 9 - Appendix 4 - National Vegetation Classification Report |
Other | National Grid Electricity Transmission Plc 5.9.2.12 Environmental Statement - Chapter 9 - Appendix 12 - Terrestrial Mammal Report |
Other | National Grid Electricity Transmission Plc 5.9.2.2 Environmental Statement - Chapter 9 - Appendix 2 - Designated Sites Information |
Other | National Grid Electricity Transmission Plc 5.9.2.3 Environmental Statement - Chapter 9 - Appendix 3 - Phase 1 Habitat Report |
Other | National Grid Electricity Transmission Plc 5.9.2.5 Environmental Statement - Chapter 9 - Appendix 5 - Hedgerow Report |
Other | National Grid Electricity Transmission Plc 5.9.2.11 Environmental Statement - Chapter 9 - Appendix 11 - Bat Activity Report (Confidential Information Removed) |
Other | National Grid Electricity Transmission Plc 5.9 Environmental Statement - Chapter 9 - Ecology and Nature Conservation |
Other | National Grid Electricity Transmission Plc 5.9.2.16 Environmental Statement - Chapter 9 - Appendix 16 - Intertidal Report |
Other | National Grid Electricity Transmission Plc 5.9.2.14 Environmental Statement - Chapter 9 - Appendix 14 - Terrestrial Invertebrate Report (Confidential Information Removed) |
Other | National Grid Electricity Transmission Plc 5.9.2.7 Environmental Statement - Chapter 9 - Appendix 7 - Badger Report - (This report contains confidential information. Therefore this document is only available on request to those who have a legitimate need to view the information) |
Other | National Grid Electricity Transmission Plc 5.9.2.15 Environmental Statement - Chapter 9 - Appendix 15 - Ornithological Assessment Report - (This report contains confidential information. Therefore this document is only available on request to those who have a legitimate need to view the information) |
Other | National Grid Electricity Transmission Plc 5.9.2.9 Environmental Statement - Chapter 9 - Appendix 9 - Reptile Report |
Other | National Grid Electricity Transmission Plc 5.9.2.6 Environmental Statement - Chapter 9 - Appendix 6 - Great Crested Newt Report |
Other | National Grid Electricity Transmission Plc 5.9.2.17 Environmental Statement - Chapter 9 - Appendix 17 - Subtidal Report |
Other | National Grid Electricity Transmission Plc 5.9.2.8 Environmental Statement - Chapter 9 - Appendix 8 - Otter and Water Vole Report (Confidential Removed) |
Other | National Grid Electricity Transmission Plc 5.9.1.2 Environmental Statement - Chapter 9 - Figure 2 - Statutory Designated Sites in the Wider Area |
Other | National Grid Electricity Transmission Plc 5.9.1.6 Environmental Statement - Chapter 9 - Figure 6 - Marine Drop Down Camera and Grab Sample Sites |
Other | National Grid Electricity Transmission Plc 5.9.1.8 Environmental Statement - Chapter 9 - Figure 8 - Grey Seal - Total Estimated Usage for the Irish Sea |
Other | National Grid Electricity Transmission Plc 5.9.1.7 Environmental Statement - Chapter 9 - Figure 7 - New Benthic Habitats |
Other | National Grid Electricity Transmission Plc 5.9.1.4 Environmental Statement - Chapter 9 - Figure 4 - Non-Statutory Designated Sites - Wildlife Sites |
Other | National Grid Electricity Transmission Plc 5.9.2.1 Environmental Statement - Chapter 9 - Appendix 1 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.9.1.1 Environmental Statement - Chapter 9 - Figure 1 - Statutory Designated Sites |
Other | National Grid Electricity Transmission Plc 5.9.1.5 Environmental Statement - Chapter 9 - Figure 5 - Marine Statutory Designated Sites |
Other | National Grid Electricity Transmission Plc 5.9.1.3 Environmental Statement - Chapter 9 - Figure 3 - Non-Statutory Designated Sites |
Other | National Grid Electricity Transmission Plc 5.8.1.6 Environmental Statement - Chapter 8 - Figure 6 - Zones of Theoretical Visibility Pentir Substation |
Other | National Grid Electricity Transmission Plc 5.8.2.2 Environmental Statement - Chapter 8 - Appendix 2 - Viewpoint Assessment Part 4 of 6 |
Other | National Grid Electricity Transmission Plc 5.8.2.5 Environmental Statement - Chapter 8 - Appendix 5 - Views from Road Assessment |
Other | National Grid Electricity Transmission Plc 5.8.1.5 Environmental Statement - Chapter 8 - Figure 5 - Zones of Theoretical Visibility Wylfa (Gantry) |
Other | National Grid Electricity Transmission Plc 5.8.2.2 Environmental Statement - Chapter 8 - Appendix 2 - Viewpoint Assessment Part 1 of 6 |
Other | National Grid Electricity Transmission Plc 5.8.2.2 Environmental Statement - Chapter 8 - Appendix 2 - Viewpoint Assessment Part 6 of 6 |
Other | National Grid Electricity Transmission Plc 5.8 Environmental Statement - Chapter 8 - Visual Assessment |
Other | National Grid Electricity Transmission Plc 5.8.1.8 Environmental Statement - Chapter 8 - Figure 8 - Effects on Communities During Operation |
Other | National Grid Electricity Transmission Plc 5.8.2.3 Environmental Statement - Chapter 8 - Appendix 3 - Residential Visual Amenity Assessment |
Other | National Grid Electricity Transmission Plc 5.8.2.2 Environmental Statement - Chapter 8 - Appendix 2 - Viewpoint Assessment Part 5 of 6 |
Other | National Grid Electricity Transmission Plc 5.8.2.4 Environmental Statement - Chapter 8 - Appendix 4 - Public Rights of Way Assessment |
Other | National Grid Electricity Transmission Plc 5.8.1.9 Environmental Statement - Chapter 8 - Figure 9 - Effects on Residential Receptors During Construction |
Other | National Grid Electricity Transmission Plc 5.8.2.2 Environmental Statement - Chapter 8 - Appendix 2 - Viewpoint Assessment Part 3 of 6 |
Other | National Grid Electricity Transmission Plc 5.8.1.7 Environmental Statement - Chapter 8 - Figure 7 - Effects on Communities During Construction |
Other | National Grid Electricity Transmission Plc 5.8.1.4 Environmental Statement - Chapter 8 - Figure 4 - Zones of Theoretical Visibilty Ty Fodol Cable Sealing End Compound and Tunnel Head House |
Other | National Grid Electricity Transmission Plc 5.8.2.1 Environmental Statement - Chapter 8 - Appendix 1 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.26.1.1 Environmental Statement - Figure 1 - Travel to Work Areas |
Other | National Grid Electricity Transmission Plc 5.29 Environmental Statement - Photomontages Part 4 of 6 |
Other | National Grid Electricity Transmission Plc 5.7.1.10 Environmental Statement - Chapter 7 - Figure 10 - National and Regional Landscape Character Areas |
Other | National Grid Electricity Transmission Plc 5.29 Environmental Statement - Photomontages Part 5 of 6 |
Other | National Grid Electricity Transmission Plc 5.5.2.3 Environmental Statement - Chapter 5 - Appendix 3 - Schedule of Responses to Stakeholder Review of the Draft ES |
Other | National Grid Electricity Transmission Plc 5.7.2.2 Environmental Statement - Chapter 7 - Appendix 2 - VSAA Character Assessment |
Other | National Grid Electricity Transmission Plc 5.7 Environmental Statement - Chapter 7 - Landscape Assessment |
Other | National Grid Electricity Transmission Plc 5.29 Environmental Statement - Photomontages Part 2 of 6 |
Other | National Grid Electricity Transmission Plc 5.3 Environmental Statement - Chapter 3 - Description of the Proposed Development |
Other | National Grid Electricity Transmission Plc 5.27.2.2 Environmental Statement - Appendix 2 - WHIASU Report |
Other | National Grid Electricity Transmission Plc 5.29 Environmental Statement - Photomontages Part 3 of 6 |
Other | National Grid Electricity Transmission Plc 5.16.1.2 Environmental Statement - Chapter 16 - Figure 2 - Option A and B Wet Noise |
Other | National Grid Electricity Transmission Plc 5.7.1.7 Environmental Statement - Chapter 7 - Figure 7 - Landscape Overview |
Other | National Grid Electricity Transmission Plc 5.29 Environmental Statement - Photomontages Part 1 of 6 |
Other | National Grid Electricity Transmission Plc 5.7.1.12 Environmental Statement - Chapter 7 - Figure 12 - Landscape Mitigation Location Plan |
Other | National Grid Electricity Transmission Plc 5.7.2.4 Environmental Statement - Chapter 7 - Appendix 4 - Registered Parks and Gardens Excluded from the Landscape Assessment |
Other | National Grid Electricity Transmission Plc 5.8.1.3 Environmental Statement - Chapter 8 - Figure 3 - Zones of Theoretical Visibility Braint Cable Sealing End Compound and Tunnel Head House |
Other | National Grid Electricity Transmission Plc 5.16.1.1 Environmental Statement - Chapter 16 - Figure 1 - Option A and B Dry Noise |
Other | National Grid Electricity Transmission Plc 5.28.2.1 Environmental Statement - Appendix 1 - Legislation Compliance Audit |
Other | National Grid Electricity Transmission Plc 5.7.1.17 Environmental Statement - Chapter 7 - Figure 17 - Effects on Landscape Elements |
Other | National Grid Electricity Transmission Plc 5.5.2.2 Environmental Statement - Chapter 5 - Appendix 2 - Schedule of Responses to the PEIR |
Other | National Grid Electricity Transmission Plc 5.8.1.12 Environmental Statement - Chapter 8 - Figure 12 - Effects on Recreational Receptors During Operation |
Other | National Grid Electricity Transmission Plc 5.8.1.14 Environmental Statement - Chapter 8 - Figure 14 - Effects on Roads and Rail During Operation |
Other | National Grid Electricity Transmission Plc 5.7.1.11 Environmental Statement - Chapter 7 - Figure 11 - National Marine Character Areas |
Other | National Grid Electricity Transmission Plc 5.7.1.5 Environmental Statement - Chapter 7 - Figure 5 - Landform and Drainage Overview |
Other | National Grid Electricity Transmission Plc 5.4.1.2 Environmental Statement - Chapter 4 - Figure 2 - Third Party Construction Plans |
Other | National Grid Electricity Transmission Plc 5.8.1.13 Environmental Statement - Chapter 8 - Figure 13 - Effects on Roads and Rail During Construction |
Other | National Grid Electricity Transmission Plc 5.7.1.13 Environmental Statement - Chapter 7 - Figure 13 - Landscape Mitigation Proposals for OHL |
Other | National Grid Electricity Transmission Plc 5.7.1.6 Environmental Statement - Chapter 7 - Figure 6 - Landform and Drainage |
Other | National Grid Electricity Transmission Plc 5.29 Environmental Statement - Photomontages Part 6 of 6 |
Other | National Grid Electricity Transmission Plc 5.27.2.3 Environmental Statement - Appendix 3 - List of Participatory Workshop Attendees |
Other | National Grid Electricity Transmission Plc 5.8.1.10 Environmental Statement - Chapter 8 - Figure 10 - Effects on Residential Receptors During Operation |
Other | National Grid Electricity Transmission Plc 5.7.1.3 Environmental Statement - Chapter 7 - Figure 3 - Anglesey AONB and its Setting |
Other | National Grid Electricity Transmission Plc 5.7.1.2 Environmental Statement - Chapter 7 - Figure 2 - Landscape Constraints |
Other | National Grid Electricity Transmission Plc 5.3.2.1 Environmental Statement - Chapter 3 - Appendix 1 - Indicative Pylon Schedule |
Other | National Grid Electricity Transmission Plc 5.15.2.9 Environmental Statement - Chapter 15 - Appendix 9 - Assessment of Noise and Vibration Effects from Construction of Access Tracks, Culverts and Bridges |
Other | National Grid Electricity Transmission Plc 5.5 Environmental Statement - Chapter 5 - EIA Consultation |
Other | National Grid Electricity Transmission Plc 5.8.1.2 Environmental Statement - Chapter 8 - Figure 2 - Overall Zones of Theoretical Visibility |
Other | National Grid Electricity Transmission Plc 5.7.1.15 Environmental Statement - Chapter 7 - Figure 15 - Landscape Mitigation Proposals for Ty Fodol THH and CSEC |
Other | National Grid Electricity Transmission Plc 5.5.2.1 Environmental Statement - Chapter 5 - Appendix 1 - Schedule of Responses to the Scoping Opinion |
Other | National Grid Electricity Transmission Plc 5.30 Environmental Statement - Arboricultural Impact Assessment |
Other | National Grid Electricity Transmission Plc 5.26.2.1 Environmental Statement - Appendix 1 - Welsh Language Impact Assessment Baseline |
Other | National Grid Electricity Transmission Plc 5.8.1.11 Environmental Statement - Chapter 8 - Figure 11 - Effects on Recreational Receptors During Construction |
Other | National Grid Electricity Transmission Plc 5.4 Environmental Statement - Chapter 4 - Construction Operation Maintenance and Decommissioning of the Proposed Development |
Other | National Grid Electricity Transmission Plc 5.3.2.2 Environmental Statement - Chapter 3 - Appendix 2 - Indicative Watercourse Crossing Schedule |
Other | National Grid Electricity Transmission Plc 5.3.1.1 Environmental Statement - Chapter 3 - Figure 1 - Order Limits and Limits of Deviation |
Other | National Grid Electricity Transmission Plc 5.27 Environmental Statement - Well-being Report |
Other | National Grid Electricity Transmission Plc 5.7.1.4 Environmental Statement - Chapter 7 - Figure 4 - Snowdonia National Park and its Setting |
Other | National Grid Electricity Transmission Plc 5.7.1.8 Environmental Statement - Chapter 7 - Figure 8 - LANDMAP Visual and Sensory Aspect Areas Overview |
Other | National Grid Electricity Transmission Plc 5.7.2.3 Environmental Statement - Chapter 7 - Appendix 3 - Landscape Character Area Assessment Relevant to Study Area |
Other | National Grid Electricity Transmission Plc 5.7.1.14 Environmental Statement - Chapter 7 - Figure 14 - Landscape Mitigation Proposals for Braint THH and CSEC |
Other | National Grid Electricity Transmission Plc 5.27.2.1 Environmental Statement - Appendix 1 - Scoping Meeting Notes |
Other | National Grid Electricity Transmission Plc 5.16.1.9 Environmental Statement - Chapter 16 - Figure 9 - Operational Noise - Residual Effects |
Other | National Grid Electricity Transmission Plc 5.7.1.1 Environmental Statement - Chapter 7 - Figure 1 - Landscape Constraints Overview |
Other | National Grid Electricity Transmission Plc 5.4.2.1 Environmental Statement - Chapter 4 - Appendix 1 - Temporary Access Principles |
Other | National Grid Electricity Transmission Plc 5.7.2.1 Environmental Statement - Chapter 7 - Appendix 1 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.7.1.16 Environmental Statement - Chapter 7 - Figure 16 - Landscape Mitigation Proposals Pentir Substation |
Other | National Grid Electricity Transmission Plc 5.3.2.4 Environmental Statement - Chapter 3 - Appendix 4 - Indicative Utility Crossing Schedule |
Other | National Grid Electricity Transmission Plc 5.28 Environmental Statement - Schedule of Mitigation |
Other | National Grid Electricity Transmission Plc 5.26 Environmental Statement - Welsh Language Impact Assessment |
Other | National Grid Electricity Transmission Plc 5.3.2.3 Environmental Statement - Chapter 3 - Appendix 3 - Indicative Public Rights of Way Road and Railway Crossing Schedule |
Other | National Grid Electricity Transmission Plc 5.8.1.1 Environmental Statement - Chapter 8 - Figure 1 - Visual Receptors |
Other | National Grid Electricity Transmission Plc 5.3.1.2 Environmental Statement - Chapter 3 - Figure 2 - Sections of New and Existing Overhead Line |
Other | National Grid Electricity Transmission Plc 5.6 Environmental Statement - Chapter 6 - EIA Methodology and Basis of Assessment |
Other | National Grid Electricity Transmission Plc 5.7.1.9 Environmental Statement - Chapter 7 - Figure 9 - LANDMAP Visual and Sensory Aspect Areas |
Other | National Grid Electricity Transmission Plc 5.4.1.1 Environmental Statement - Chapter 4 - Figure 1 - National Grid Construction Plans |
Other | National Grid Electricity Transmission Plc 5.23 Environmental Statement - Chapter 23 - Habitat Regulations Assessment Report |
Other | National Grid Electricity Transmission Plc 5.20.2.1 Environmental Statement - Chapter 20 - Appendix 1 - Wylfa Newydd Power Station |
Other | National Grid Electricity Transmission Plc 5.22 Environmental Statement - Chapter 22 - Summary of Residual Effects |
Other | National Grid Electricity Transmission Plc 5.18 Environmental Statement - Chapter 18 - Agriculture |
Other | National Grid Electricity Transmission Plc 5.18.1.5 Environmental Statement - Chapter 18 - Figure 5 - Soil Associations in the Order Limits |
Other | National Grid Electricity Transmission Plc 5.2 Environmental Statement - Chapter 2 - Alternatives and Proposed Development History |
Other | National Grid Electricity Transmission Plc 5.21 Environmental Statement - Chapter 21 - Statement of Combined Effects with the Wider Works |
Other | National Grid Electricity Transmission Plc 5.23.2.2 Environmental Statement - Chapter 23 - Appendix 2 - Integrity Matrices |
Other | National Grid Electricity Transmission Plc 5.18.2.1 Environmental Statement - Chapter 18 - Appendix 1 - Soil Profiles, ALC Calculations and Land Holding Data |
Other | National Grid Electricity Transmission Plc 5.23.2.1 Environmental Statement - Chapter 23 - Appendix 1 - Screening Matrices |
Other | National Grid Electricity Transmission Plc 5.18.1.2 Environmental Statement - Chapter 18 - Figure 2 - Agricultural Land Classifications at the Pentir Substation Extension |
Other | National Grid Electricity Transmission Plc 5.19.2.1 Environmental Statement - Chapter 19 - Appendix 1 - Pre Screening Assessment |
Other | National Grid Electricity Transmission Plc 5.19.1.1 Environmental Statement - Chapter 19 - Figure 1 - Residual Intra-Project Effects Construction |
Other | National Grid Electricity Transmission Plc 5.20.2.2 Environmental Statement - Chapter 20 - Appendix 2 - Project Descriptions |
Other | National Grid Electricity Transmission Plc 5.18.1.3 Environmental Statement - Chapter 18 - Figure 3 - Agricultural Land Classification at the Braint Tunnel Headhouse & Sealing End Compound |
Other | National Grid Electricity Transmission Plc 5.23.1.2 Environmental Statement - Chapter 23 - Figure 2 - Statutory Designated Sites Detailed |
Other | National Grid Electricity Transmission Plc 5.19 Environmental Statement - Chapter 19 - Intra-Project Effects |
Other | National Grid Electricity Transmission Plc 5.18.1.4 Environmental Statement - Chapter 18 - Figure 4 - Agricultural Land Classification at the Ty Fodol Tunnel Head House and Sealing End Compound |
Other | National Grid Electricity Transmission Plc 5.18.2.3 Environmental Statement - Chapter 18 - Appendix 3 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.20 Environmental Statement - Chapter 20 - Inter-Project Cumulative Effects |
Other | National Grid Electricity Transmission Plc 5.19.2.2 Environmental Statement - Chapter 19 - Appendix 2 - Stage 2 Screening Assessment |
Other | National Grid Electricity Transmission Plc 5.20.1.2 Environmental Statement - Chapter 20 - Figure 2 - Cumulative Developments |
Other | National Grid Electricity Transmission Plc 5.18.2.2 Environmental Statement - Chapter 18 - Appendix 2 - Agriculture Consultation Correspondence |
Other | National Grid Electricity Transmission Plc 5.23.1.3 Environmental Statement - Chapter 23 - Figure 3 - Corsydd Mon, Anglesey Fens SAC and Ramsar |
Other | National Grid Electricity Transmission Plc 5.21.1.1 Environmental Statement - Chapter 21 - Figure 1 - Indicative Locations of Wider Works |
Other | National Grid Electricity Transmission Plc 5.17.1.7 Environmental Statement - Chapter 17 - Figure 7 - Amenity Assessment |
Other | National Grid Electricity Transmission Plc 5.17 Environmental Statement - Chapter 17 - Socio Economics |
Other | National Grid Electricity Transmission Plc 5.17.2.4 Environmental Statement - Chapter 17 - Appendix 4 - Business Survey Results |
Other | National Grid Electricity Transmission Plc 5.24 Environmental Statement - Chapter 24 - Statement of Statutory Nuisance |
Other | National Grid Electricity Transmission Plc 5.23.2.3 Environmental Statement - Chapter 23 - Appendix 3 - Qualifying Features And Conservation Objectives, Threats/Vulnerabilities Of Natura 2000 Sites |
Other | National Grid Electricity Transmission Plc 5.17.2.3 Environmental Statement - Chapter 17 - Appendix 3 - Visitor Survey Results |
Other | National Grid Electricity Transmission Plc 5.17.2.1 Environmental Statement - Chapter 17 - Appendix 1 - Amenity Assessment |
Other | National Grid Electricity Transmission Plc 5.17.2.2 Environmental Statement - Chapter 17 - Appendix 2 - Workforce Analysis Assumptions Log |
Other | National Grid Electricity Transmission Plc 5.20.1.1 Environmental Statement - Chapter 20 - Figure 1 - Indicative Development Locations Wylfa Newydd |
Other | National Grid Electricity Transmission Plc 5.19.1.2 Environmental Statement - Chapter 19 - Figure 2 - Residual Intra-Project Effects Operation |
Other | National Grid Electricity Transmission Plc 5.25 Environmental Statement - Chapter 25 - Electric and Magnetic Fields Report |
Other | National Grid Electricity Transmission Plc 5.23.1.1 Environmental Statement - Chapter 23 - Figure 1 - Statutory Designated Sites Overview |
Other | National Grid Electricity Transmission Plc 5.18.1.1 Environmental Statement - Chapter 18 - Figure 1 - Provisional Agricultural Land Classification |
Other | National Grid Electricity Transmission Plc 5.17.1.6 Environmental Statement - Chapter 17 - Figure 6 - Community Study Areas |
Other | National Grid Electricity Transmission Plc 5.17.1.5 Environmental Statement - Chapter 17 - Figure 5 - Commercial Receptors |
Other | National Grid Electricity Transmission Plc 5.15.2.17 Environmental Statement - Chapter 15 - Appendix 17 - Summary of Residual Noise and Vibration Effects from All Construction Activities |
Other | National Grid Electricity Transmission Plc 5.15.2.16 Environmental Statement - Chapter 15 - Appendix 16 - Assessment of Noise Effects from Construction Traffic Routes used by Construction Vehicles |
Other | National Grid Electricity Transmission Plc 5.15.2.15 Environmental Statement - Chapter 15 - Appendix 15 - Assessment of Noise Effects from Access Tracks used by Construction Vehicles |
Other | National Grid Electricity Transmission Plc 5.15.2.18 Environmental Statement - Chapter 15 - Appendix 18 - Assessment of Cumulative Noise Effects from Traffic Routes used by Construction Traffic |
Other | National Grid Electricity Transmission Plc 5.15.2.2 Environmental Statement - Chapter 15 - Appendix 2 - Baseline Sound Monitoring Report |
Other | National Grid Electricity Transmission Plc 5.16.2.3 Environmental Statement - Chapter 16 - Appendix 3 - OHL Conductor Assessment Methodology Summary |
Other | National Grid Electricity Transmission Plc 5.16.1.7 Environmental Statement - Chapter 16 - Figure 7 - Tunnel Head House - Ty Fodol (50 percent Normal Operating Conditions) |
Other | National Grid Electricity Transmission Plc 5.16.1.8 Environmental Statement - Chapter 16 - Figure 8 - Pentir Substation |
Other | National Grid Electricity Transmission Plc 5.17.1.4 Environmental Statement - Chapter 17 - Figure 4 - Tourist Attractions and Recreational Resources |
Other | National Grid Electricity Transmission Plc 5.15.1.1 Environmental Statement - Chapter 15 - Figure 1 - Baseline Noise Monitoring Locations and Receptor Locations |
Other | National Grid Electricity Transmission Plc 5.16.1.4 Environmental Statement - Chapter 16 - Figure 4 - Option B Wet Noise |
Other | National Grid Electricity Transmission Plc 5.16.1.3 Environmental Statement - Chapter 16 - Figure 3 - Option B Dry Noise |
Other | National Grid Electricity Transmission Plc 5.15.2.11 Environmental Statement - Chapter 15 - Appendix 11 - Assessment of Vibration Effects from Pylon Construction |
Other | National Grid Electricity Transmission Plc 5.15.2.7 Environmental Statement - Chapter 15 - Appendix 7 - Assessment of Noise Effects at Pentir Substation Construction Compound |
Other | National Grid Electricity Transmission Plc 5.15.2.5 Environmental Statement - Chapter 15 - Appendix 5 - Assessment of Noise Effects from Works at Penmynydd Road Construction Compound |
Other | National Grid Electricity Transmission Plc 5.15.1.2 Environmental Statement - Chapter 15 - Figure 2 - Study Areas for Construction Compounds, and Substation Construction Works |
Other | National Grid Electricity Transmission Plc 5.15.1.7 Environmental Statement - Chapter 15 - Figure 7 - Study Area for Construction Traffic Routes |
Other | National Grid Electricity Transmission Plc 5.15.1.3 Environmental Statement - Chapter 15 - Figure 3 - Study Areas for Pylon Construction and Dismantling Works |
Other | National Grid Electricity Transmission Plc 5.16.2.6 Environmental Statement - Chapter 16 - Appendix 6 - A Method for Assessing the Community Response to Overhead Line Noise |
Other | National Grid Electricity Transmission Plc 5.16.2.5 Environmental Statement - Chapter 16 - Appendix 5 - Noise Model Output Assessment Tables |
Other | National Grid Electricity Transmission Plc 5.15.2.8 Environmental Statement - Chapter 15 - Appendix 8 - Assessment of Noise Effects from Works at Pentir Substation |
Other | National Grid Electricity Transmission Plc 5.15.2.6 Environmental Statement - Chapter 15 - Appendix 6 - Assessment of Noise Effects from Works at Pentir Construction Compound |
Other | National Grid Electricity Transmission Plc 5.15.2.3 Environmental Statement - Chapter 15 - Appendix 3 - Baseline Sound Levels Used for Numerical Assessment of Effects |
Other | National Grid Electricity Transmission Plc 5.15.2.12 Environmental Statement - Chapter 15 - Appendix 12 - Assessment of Noise Effects from Works within the Braint Construction Compound |
Other | National Grid Electricity Transmission Plc 5.15.2.4 Environmental Statement - Chapter 15 - Appendix 4 - Construction Noise and Vibration Model Inputs |
Other | National Grid Electricity Transmission Plc 5.15.1.6 Environmental Statement - Chapter 15 - Figure 6 - Study Area for Access Tracks |
Other | National Grid Electricity Transmission Plc 5.15.2.13 Environmental Statement - Chapter 15 - Appendix 13 - Assessment of Noise Effects from Works within the Ty Fodol Construction Compound |
Other | National Grid Electricity Transmission Plc 5.16.2.2 Environmental Statement - Chapter 16 - Appendix 2 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.16.1.5 Environmental Statement - Chapter 16 - Figure 5 - Tunnel Head House - Braint |
Other | National Grid Electricity Transmission Plc 5.16.2.1 Environmental Statement - Chapter 16 - Appendix 1 - Representative Noise Baseline Areas Map |
Other | National Grid Electricity Transmission Plc 5.17.1.1 Environmental Statement - Chapter 17 - Figure 1 - Lower Super Output Areas |
Other | National Grid Electricity Transmission Plc 5.16.1.6 Environmental Statement - Chapter 16 - Figure 6 - Tunnel Head House - Ty Fodol (100 percent Realistic Worst Case) |
Other | National Grid Electricity Transmission Plc 5.15.2.10 Environmental Statement - Chapter 15 - Appendix 10 - Assessment of Noise and Vibration Effects from Pylon Construction, Dismantling and Conductor Stringing |
Other | National Grid Electricity Transmission Plc 5.15.1.5 Environmental Statement - Chapter 15 - Figure 5 - Noise and Vibration Study Area for Underground Tunnelling Works |
Other | National Grid Electricity Transmission Plc 5.14.2.3 Environmental Statement - Chapter 14 - Appendix 3 - Detailed Air Quality Monitoring Assessment |
Other | National Grid Electricity Transmission Plc 5.15 Environmental Statement - Chapter 15 - Construction Noise and Vibration |
Other | National Grid Electricity Transmission Plc 5.15.2.1 Environmental Statement - Chapter 15 - Appendix 1 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.17.1.3 Environmental Statement - Chapter 17 - Figure 3 - Travel to Work Area |
Other | National Grid Electricity Transmission Plc 5.14 Environmental Statement - Chapter 14 - Air Quality |
Other | National Grid Electricity Transmission Plc 5.17.1.2 Environmental Statement - Chapter 17 - Figure 2 - Welsh Indices of Multiple Deprivation |
Other | National Grid Electricity Transmission Plc 5.16.2.4 Environmental Statement - Chapter 16 - Appendix 4 - Taking into Account the Existing 400 kV OHL |
Other | National Grid Electricity Transmission Plc 5.15.1.4 Environmental Statement - Chapter 15 - Figure 4 - Study Area for Tunnelling Construction Compounds |
Other | National Grid Electricity Transmission Plc 5.16 Environmental Statement - Chapter 16 - Operational Noise and Vibration |
Other | National Grid Electricity Transmission Plc 5.11.2.7 Environmental Statement - Chapter 11 - Appendix 7 - Ground Investigation Information Part 4 of 4 |
Other | National Grid Electricity Transmission Plc 5.13.1.6 Environmental Statement - Chapter 13 - Figure 6 - Public Rights of Way (PRoW) |
Other | National Grid Electricity Transmission Plc 5.12.2.3 Environmental Statement - Chapter 12 - Appendix 3 - Tunnel Head Houses and Cable Sealing End Compounds Flood Consequences Assessment |
Other | National Grid Electricity Transmission Plc 5.13.1.1 Environmental Statement - Chapter 13 - Figure 1 - Existing Main Traffic Routes |
Other | National Grid Electricity Transmission Plc 5.12.2.5 Environmental Statement - Chapter 12 - Appendix 5 - Water Framework Directive Assessment |
Other | National Grid Electricity Transmission Plc 5.12.1.12 Environmental Statement - Chapter 12 - Figure 12 - Susceptibility to Groundwater Flooding |
Other | National Grid Electricity Transmission Plc 5.12.2.2 Environmental Statement - Chapter 12 - Appendix 2 - Pentir Substation Extension Flood Consequences Assessment |
Other | National Grid Electricity Transmission Plc 5.12 Environmental Statement - Chapter 12 - Water Quality, Resources and Flood Risk |
Other | National Grid Electricity Transmission Plc 5.12.2.4 Environmental Statement - Chapter 12 - Appendix 4 - Overhead Line Flood Consequences Assessment |
Other | National Grid Electricity Transmission Plc 5.12.1.7 Environmental Statement - Chapter 12 - Figure 7 - Local and Wider Hydrological Area of Influence |
Other | National Grid Electricity Transmission Plc 5.14.2.1 Environmental Statement - Chapter 14 - Appendix 1 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.13 Environmental Statement - Chapter 13 - Traffic and Transport |
Other | National Grid Electricity Transmission Plc 5.12.1.14 Environmental Statement - Chapter 12 - Figure 14 - Groundwater Water Framework Directive Status |
Other | National Grid Electricity Transmission Plc 5.13.1.13 Environmental Statement - Chapter 13 - Figure 13 - Fear and Intimidation |
Other | National Grid Electricity Transmission Plc 5.13.1.3 Environmental Statement - Chapter 13 - Figure 13 - Proposed Temporary Access Point Locations |
Other | National Grid Electricity Transmission Plc 5.12.1.4 Environmental Statement - Chapter 12 - Figure 4 - Braint Topography |
Other | National Grid Electricity Transmission Plc 5.12.1.2 Environmental Statement - Chapter 12 - Figure 2 - Local and Wider Hydrological Area of Influence for Sub-Sections |
Other | National Grid Electricity Transmission Plc 5.12.2.6 Environmental Statement - Chapter 12 - Appendix 6 - Designated Sites |
Other | National Grid Electricity Transmission Plc 5.13.2.1 Environmental Statement - Chapter 13 - Appendix 1 - Transport Assessment Part 1 of 2 |
Other | National Grid Electricity Transmission Plc 5.12.1.1 Environmental Statement - Chapter 12 - Figure 1 - Local and Wider Hydrological Area of Influence |
Other | National Grid Electricity Transmission Plc 5.11 Environmental Statement - Chapter 11 - Geology Hydrogeology and Ground Conditions |
Other | National Grid Electricity Transmission Plc 5.12.1.8 Environmental Statement - Chapter 12 - Figure 8 - Afon Braint 0.1% and CC Flood Map |
Other | National Grid Electricity Transmission Plc 5.14.1.5 Environmental Statement - Chapter 14 - Figure 5 - Reported Air Quality Effects |
Other | National Grid Electricity Transmission Plc 5.14.2.2 Environmental Statement - Chapter 14 - Appendix 2 - Construction Dust Assessment Method |
Other | National Grid Electricity Transmission Plc 5.13.1.11 Environmental Statement - Chapter 13 - Figure 11 - Summary of Residual Effects - Pedestrian Delay |
Other | National Grid Electricity Transmission Plc 5.13.1.10 Environmental Statement - Chapter 13 - Figure 10 - Summary of Residual Effects - Severance |
Other | National Grid Electricity Transmission Plc 5.12.1.6 Environmental Statement - Chapter 12 - Figure 6 - Braint Fluvial Flood Mapping |
Other | National Grid Electricity Transmission Plc 5.13.1.5 Environmental Statement - Chapter 13 - Figure 5 - Abnormal Indivisible Loads (AIL) Routes |
Other | National Grid Electricity Transmission Plc 5.12.1.9 Environmental Statement - Chapter 12 - Figure 9 - Order Limits Topography |
Other | National Grid Electricity Transmission Plc 5.12.1.13 Environmental Statement - Chapter 12 - Figure 13 - Pentir Topography |
Other | National Grid Electricity Transmission Plc 5.13.1.7 Environmental Statement - Chapter 13 - Figure 7 - Unnamed Roads |
Other | National Grid Electricity Transmission Plc 5.14.1.3 Environmental Statement - Chapter 14 - Figure 3 - Construction Dust Emissions Sensitive Receptors |
Other | National Grid Electricity Transmission Plc 5.13.2.2 Environmental Statement - Chapter 13 - Appendix 2 - Planning Policy |
Other | National Grid Electricity Transmission Plc 5.12.2.1 Environmental Statement - Chapter 12 - Appendix 1 - Overarching Flood Consequences Assessment |
Other | National Grid Electricity Transmission Plc 5.13.2.1 Environmental Statement - Chapter 13 - Appendix 1 - Transport Assessment Part 2 of 2 |
Other | National Grid Electricity Transmission Plc 5.14.1.2 Environmental Statement - Chapter 14 - Figure 2 - Air Quality Monitoring Locations |
Other | National Grid Electricity Transmission Plc 5.13.1.12 Environmental Statement - Chapter 13 - Figure 12 - Summary of Residual Effects - Pedestrian Amenity |
Other | National Grid Electricity Transmission Plc 5.13.1.2 Environmental Statement - Chapter 13 - Figure 2 - Proposed Construction Routes |
Other | National Grid Electricity Transmission Plc 5.12.1.5 Environmental Statement - Chapter 12 - Figure 5 - Ty Fodol Topography |
Other | National Grid Electricity Transmission Plc 5.12.1.3 Environmental Statement - Chapter 12 - Figure 3 - Detailed Hydrological Features |
Other | National Grid Electricity Transmission Plc 5.12.1.10 Environmental Statement - Chapter 12 - Figure 10 - Overhead Line Fluvial Flood Risk |
Other | National Grid Electricity Transmission Plc 5.11.2.7 Environmental Statement - Chapter 11 - Appendix 7 - Ground Investigation Information Part 3 of 4 |
Other | National Grid Electricity Transmission Plc 5.13.1.14 Environmental Statement - Chapter 13 - Figure 14 - Summary of Residual Effects - Driver Delay |
Other | National Grid Electricity Transmission Plc 5.12.1.11 Environmental Statement - Chapter 12 - Figure 11 - Overhead Line Surface Water Hazard Mapping |
Other | National Grid Electricity Transmission Plc 5.11.2.8 Environmental Statement - Chapter 11 - Appendix 8 - Shaft and Tunnel Groundwater Inflow |
Other | National Grid Electricity Transmission Plc 5.14.1.1 Environmental Statement - Chapter 14 - Figure 1 - Air Quality Construction Routes |
Other | National Grid Electricity Transmission Plc 5.13.1.8 Environmental Statement - Chapter 13 - Figure 8 - Highway Link References |
Other | National Grid Electricity Transmission Plc 5.12.2.7 Environmental Statement - Chapter 12 - Appendix 7 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.14.1.4 Environmental Statement - Chapter 14 - Figure 4 - Road Traffic and Emergency Generators Emissions Sensitive Receptors |
Other | National Grid Electricity Transmission Plc 5.13.1.9 Environmental Statement - Chapter 13 - Figure 9 - Highway Link and Receptor Sensitivity Classification |
Other | National Grid Electricity Transmission Plc 5.13.1.4 Environmental Statement - Chapter 13 - Figure 4 - Traffic Count Locations |
Other | National Grid Electricity Transmission Plc 5.11.2.7 Environmental Statement - Chapter 11 - Appendix 7 - Ground Investigation Information Part 2 of 4 |
Other | National Grid Electricity Transmission Plc 5.10.2.8 Environmental Statement - Chapter 10 - Appendix 8 - Heritage Viewpoints |
Other | National Grid Electricity Transmission Plc 5.11.1.2 Environmental Statement - Chapter 11 - Figure 2 - Superficial Geology |
Other | National Grid Electricity Transmission Plc 5.11.1.3 Environmental Statement - Chapter 11 - Figure 3 - Superficial Hydrogeology |
Other | National Grid Electricity Transmission Plc 5.11.1.6 Environmental Statement - Chapter 11 - Figure 6 - Private Groundwater Abstractions |
Other | National Grid Electricity Transmission Plc 5.10.2.3 Environmental Statement - Chapter 10 - Appendix 3 - ASIDOHL (Assessment of the Significance of the Impact of Development on Historic Landscape) |
Other | National Grid Electricity Transmission Plc 5.10 Environmental Statement - Chapter 10 - Historic Environment |
Other | National Grid Electricity Transmission Plc 5.10.2.4 Environmental Statement - Chapter 10 - Appendix 4 - Cadw Designations |
Other | National Grid Electricity Transmission Plc 5.11.2.1 Environmental Statement - Chapter 11 - Appendix 1 - Local Planning Policy |
Other | National Grid Electricity Transmission Plc 5.11.1.7 Environmental Statement - Chapter 11 - Figure 7 - Potentially Contaminated Land |
Other | National Grid Electricity Transmission Plc 5.11.1.10 Environmental Statement - Chapter 11 - Figure 10 - Coal Authority Information |
Other | National Grid Electricity Transmission Plc 5.11.1.12 Environmental Statement - Chapter 11 - Figure 12 - Landmap Geological Landscapes |
Other | National Grid Electricity Transmission Plc 5.10.2.5 Environmental Statement - Chapter 10 - Appendix 5 - Historic Environment Photographs |
Other | National Grid Electricity Transmission Plc 5.11.2.3 Environmental Statement - Chapter 11 - Appendix 3 - Regulator Correspondence |
Other | National Grid Electricity Transmission Plc 5.10.2.6 Environmental Statement - Chapter 10 - Appendix 6 - Development Plan Policies |
Other | National Grid Electricity Transmission Plc 5.11.2.5 Environmental Statement - Chapter 11 - Appendix 5 - Walkover Survey |
Other | National Grid Electricity Transmission Plc 5.11.2.7 Environmental Statement - Chapter 11 - Appendix 7 - Ground Investigation Information Part 1 of 4 |
Other | National Grid Electricity Transmission Plc 5.11.2.6 Environmental Statement - Chapter 11 - Appendix 6 - Private Water Supply Risk Assessment |
Other | National Grid Electricity Transmission Plc 5.11.1.8 Environmental Statement - Chapter 11 - Figure 8 - Historical Land Uses |
Other | National Grid Electricity Transmission Plc 5.11.1.9 Environmental Statement - Chapter 11 - Figure 9 - Surface Ground Workings |
Other | National Grid Electricity Transmission Plc 5.10.2.7 Environmental Statement - Chapter 10 - Appendix 7 - Trial Trench Report |
Other | National Grid Electricity Transmission Plc 5.11.1.4 Environmental Statement - Chapter 11 - Figure 4 - Bedrock Hydrogeology |
Other | National Grid Electricity Transmission Plc 5.11.1.5 Environmental Statement - Chapter 11 - Figure 5 - Contaminated Land Regulatory Information - Consents, Licences and Incidents |
Other | National Grid Electricity Transmission Plc 5.11.1.1 Environmental Statement - Chapter 11 - Figure 1 - Bedrock Geology |
Other | National Grid Electricity Transmission Plc 5.11.1.11 Environmental Statement - Chapter 11 - Figure 11 - Tunnel Geological Longitudinal Section |
Other | National Grid Electricity Transmission Plc 5.11.2.4 Environmental Statement - Chapter 11 - Appendix 4 - Coal Authority Report |
Other | National Grid Electricity Transmission Plc 5.11.2.2 Environmental Statement - Chapter 11 - Appendix 2 - Reference Tables for Figures 11.5, 11.6, 11.7, 11.8 and 11.9 |
Other | National Grid Electricity Transmission Plc 5.10.2.2 Environmental Statement - Chapter 10 - Appendix 2 - Geophysical Survey Report Part 5 of 8 |
Other | National Grid Electricity Transmission Plc 5.10.2.2 Environmental Statement - Chapter 10 - Appendix 2 - Geophysical Survey Report Part 7 of 8 |
Other | National Grid Electricity Transmission Plc 5.10.2.2 Environmental Statement - Chapter 10 - Appendix 2 - Geophysical Survey Report Part 6 of 8 |
Other | National Grid Electricity Transmission Plc 5.10.2.2 Environmental Statement - Chapter 10 - Appendix 2 - Geophysical Survey Report Part 8 of 8 |
Other | National Grid Electricity Transmission Plc 5.10.2.2 Environmental Statement - Chapter 10 - Appendix 2 - Geophysical Survey Report Part 3 of 8 |
Other | National Grid Electricity Transmission Plc 5.10.2.2 Environmental Statement - Chapter 10 - Appendix 2 - Geophysical Survey Report Part 4 of 8 |
Other | National Grid Electricity Transmission Plc 5.10.2.2 Environmental Statement - Chapter 10 - Appendix 2 - Geophysical Survey Report Part 2 of 8 |
Other | National Grid Electricity Transmission Plc 5.10.1.9 Environmental Statement - Chapter 10 - Figure 9 - Settings Assessment: Location of Assets in Relation to the Proposed Development |
Other | National Grid Electricity Transmission Plc 5.10.1.5 Environmental Statement - Chapter 10 - Figure 5 - Location of Trial Trenches |
Other | National Grid Electricity Transmission Plc 5.0 Environmental Statement - Non-Technical Summary |
Other | National Grid Electricity Transmission Plc 5.10.1.7 Environmental Statement - Chapter 10 - Figure 7 - Dinorwig Landscape of Outstanding Historical Interest |
Other | National Grid Electricity Transmission Plc 5.10.1.3 Environmental Statement - Chapter 10 - Figure 3 - Extent of Geophysical Surveys |
Other | National Grid Electricity Transmission Plc 5.10.1.8 Environmental Statement - Chapter 10 - Figure 8 - Location of Recorded Archaeological Remains in Relation to the Proposed Development |
Other | National Grid Electricity Transmission Plc 5.10.2.1 Environmental Statement - Chapter 10 - Appendix 1 - Historic Environment Desk Study Report |
Other | National Grid Electricity Transmission Plc 5.10.1.4 Environmental Statement - Chapter 10 - Figure 4 - Geophysical Survey Results |
Other | National Grid Electricity Transmission Plc 5.10.1.1 Environmental Statement - Chapter 10 - Figure 1 - Designated Assets |
Other | National Grid Electricity Transmission Plc 5.10.1.6 Environmental Statement - Chapter 10 - Figure 6 - Assets Included in the Settings Assessment |
Other | National Grid Electricity Transmission Plc 5.10.1.2 Environmental Statement - Chapter 10 - Figure 2 - Non-Designated Assets |
Other | National Grid Electricity Transmission Plc 5.1.1.1 Environmental Statement - Chapter 1 - Figure 1 - Location of the Proposed Development
|
Other | National Grid Electricity Transmission Plc 5.1.2.1 Environmental Statement - Chapter 1 - Appendix 1 - Notification to Provide an Environmental Statement |
Other | National Grid Electricity Transmission Plc 5.10.2.2 Environmental Statement - Chapter 10 - Appendix 2 - Geophysical Survey Report Part 1 of 8 |
Other | National Grid Electricity Transmission Plc 5.1 Environmental Statement - Chapter 1 - Introduction |
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.