Internal Power Generation Enhancement for Port Talbot Steelworks

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (5)

Developer's Application (213)

Acceptance (6)

Pre Examination (3)

Examination (82)

Decision (15)

Decided (0)

Transboundary Documents
Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 18 KB
DCO Order Limits
Other
Size: 4 MB
2.02 Existing Site Layout Plan
Other
Size: 741 KB
2.06 Indicative elevations-sections-floorplans (SUBMISSION)
Other
Size: 8 MB
2.07.1 Nature Conservation Sites (SUBMISSION)
Other
Size: 3 MB
2.03 Land Plans (SUBMISSION)
Other
Size: 5 MB
2.08 Historic Environment Features (SUBMISSION)
Other
Size: 5 MB
2.07.3 Water Bodies in a River Basin Management Plan (SUBMISSION)
Other
Size: 16 MB
2.05 Indicative Site Layout Plans (SUBMISSION)
Other
Size: 7 MB
2.07.2 Sites of Landscape Importance (SUBMISSION)
Other
Size: 15 MB
2.04 Works Plans (SUBMISSION)
Other
Size: 7 MB
2.01 Location Plan (SUBMISSION)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.