Glyn Rhonwy Pumped Storage

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (3)

Developer's Application (236)

Acceptance (8)

Pre Examination (16)

Examination (407)

Decision (22)

Decided (2)

Date

SourceDescription
Other
Size: 161 KB
Natural Resources Wales
Response to the ExA's request for further information of 26 August 2016. Submitted for Deadline X
Other
Size: 717 KB
Snowdonia Pumped Hydro Limited
Responses to Written Submissions made at Deadline IX. Submitted for Deadline X
Other
Size: 220 KB
Cherry Bartlett
Comments submitted for Deadline X
Other
Size: 319 KB
Snowdonia Society
Responses to comments made by Natural Resources Wales at Deadline IX. Submitted for Deadline X
Other
Size: 615 KB
Jeff Taylor on behalf of Concerned about Glyn Rhonwy
Comments on responses to the ExA's request for further information of 26 August 2016. Submitted for Deadline X
Other
Size: 250 KB
Snowdonia Pumped Hydro Limited
Outline Land Discovery Strategy (Revision 2) - Clean. Submitted for Deadline X
Other
Size: 251 KB
Snowdonia Pumped Hydro Limited
Outline Land Discovery Strategy (Revision 2) - Tracked Changed. Submitted for Deadline X
Other
Size: 4 MB
Dr Mads Huuse
Comments submitted for Deadline X
Other
Size: 667 KB
Snowdonia Pumped Hydro Limited
Outline Construction Noise Management Plan (Revision 3) - Tracked Changed. Submitted for Deadline X
Other
Size: 666 KB
Snowdonia Pumped Hydro Limited 2
Outline Construction Noise Management Plan (Revision 3) - Clean. Submitted for Deadline X
Other
Size: 454 KB
Snowdonia Pumped Hydro Limited
Status of Statements of Common Ground. Submitted for Deadline X
Other
Size: 18 MB
Dave Preskett on behalf of Jeff Taylor
Comments submitted for Deadline X
Other
Size: 8 MB
Snowdonia Pumped Hydro Limited
Response to the ExA's request for further information of 26 August 2016. Submitted for Deadline IX
Other
Size: 4 MB
Snowdonia Pumped Hydro Limited
Outline Excess Water Management Strategy (Revision 3) - Tracked changed. Submitted for Deadline IX
Other
Size: 499 KB
Dave Preskett on behalf of Jeff Taylor
Response to the ExA's request for further information of 26 August 2016. Submission for Deadline IX
Other
Size: 909 KB
Snowdonia Pumped Hydro Limited
Outline Ordnance Management Strategy (Revision 3) - Tracked Changed. Submitted for Deadline IX
Other
Size: 906 KB
Snowdonia Pumped Hydro Limited
Outline Ordnance Management Strategy (Revision 3) - Clean. Submitted for Deadline IX
Other
Size: 841 KB
Snowdonia Pumped Hydro Limited
Land Plans - Plan 1 (Revision J). Submitted for Deadline IX
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Outline Water Management Plan (Revision 4 ) - Track changed. Submitted for Deadline IX
Other
Size: 241 KB
Snowdonia Pumped Hydro Limited
Outline Archaeological Compensation and Enhancement Strategy (Revision 2). Submitted for Deadline IX
Other
Size: 254 KB
Snowdonia Pumped Hydro Limited
Outline Land Discovery Strategy (Revision 2) - Tracked changed. Submitted for Deadline IX
Other
Size: 314 KB
Snowdonia Pumped Hydro Limited
Outline Operational Noise Management Plan (Revision 1). Submitted for Deadline IX
Other
Size: 253 KB
Snowdonia Pumped Hydro Limited
Outline Land Discovery Strategy (Revision 2) - Clean). Submitted for Deadline IX
Other
Size: 1 MB
Snowdonia Pumped Hydro Limited
Outline Biosecurity Plan (Revision 3 ) - Clean. Submitted for Deadline IX
Other
Size: 863 KB
Snowdonia Pumped Hydro Limited
DCO Comparison submission version to (Revision 9). Submitted for Deadline IX
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Outline Water Management Plan (Revision 4 ) - Clean. Submitted for Deadline IX
Other
Size: 368 KB
Snowdonia Pumped Hydro Limited
Land Plans - Plan 2 (Revision J). Submitted for Deadline IX
Other
Size: 1 MB
Snowdonia Pumped Hydro Limited
Outline Biosecurity Plan (Revision 3) - Track changed. Submitted for Deadline IX
Other
Size: 316 KB
Natural Resources Wales
Response to the ExA's request for further information of 26 August 2016. Submission for Deadline IX
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Outline Silt Management Plan (Revision 3) - Tracked changed. Submitted for Deadline IX
Other
Size: 951 KB
Snowdonia Pumped Hydro Limited
Outline Construction Traffic Management Plan (Revision 4) - Track changed. Submitted for Deadline IX
Other
Size: 576 KB
Snowdonia Pumped Hydro Limited
Outline Dust Control and Air Quality Management Plan (Revision 2) - Clean. Submitted for Deadline IX
Other
Size: 664 KB
Snowdonia Pumped Hydro Limited 21
Outline Construction Noise Management Plan (Revision 2 ) - Clean. Submitted for Deadline IX
Other
Size: 449 KB
Snowdonia Pumped Hydro Limited
Other consents and Licence Status Document. Submitted for Deadline IX
Other
Size: 580 KB
Snowdonia Pumped Hydro Limited
Outline Dust Control and Air Quality Management Plan (Revision 2) - Tracked changed. Submitted for Deadline IX
Other
Size: 5 MB
Snowdonia Pumped Hydro Limited
Response to representations made by interested parties at Deadlines VII & VIII. Submitted for Deadline IX
Other
Size: 431 KB
Snowdonia Pumped Hydro Limited
Status of Statements of Common Ground. Submitted for Deadline IX
Other
Size: 204 KB
Snowdonia Pumped Hydro Limited
Outline Health and Safety Plan. Submitted for Deadline IX
Other
Size: 274 KB
Snowdonia Pumped Hydro Limited
Table of DCO amendments. Submitted for Deadline IX
Other
Size: 413 KB
Snowdonia Pumped Hydro Limited
Outline Baseline Air Quality Monitoring Plan (Revision 2) - Clean. Submitted for Deadline IX
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Outline Silt Management Plan (Revision 3 ) - Clean. Submitted for Deadline IX
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Land Plans - Key Plan (Revision J). Submitted for Deadline IX
Other
Size: 828 KB
Snowdonia Pumped Hydro Limited
Draft Development Consent Order (Revision 9). Submitted for Deadline IX
Other
Size: 134 KB
Glyn Peris
Response to the ExA's request for further information of 26 August 2016. Submission for Deadline IX
Other
Size: 614 KB
Snowdonia Pumped Hydro Limited
Outline Construction Noise Management Plan (Revision 2) - Tracked changed. Submitted for Deadline IX
Other
Size: 197 KB
Snowdonia Pumped Hydro Limited
Article 36 List. Submitted for Deadline IX
Other
Size: 415 KB
Snowdonia Pumped Hydro Limited
Outline Baseline Air Quality Monitoring Plan (Revision 2) - Tracked changed. Submitted for Deadline IX
Other
Size: 946 KB
Snowdonia Pumped Hydro Limited
Outline Construction Traffic Management Plan (Revision 4 ) - Clean. Submitted for Deadline IX
Other
Size: 350 KB
Snowdonia Pumped Hydro Limited
DCO (Revision 9) Validation Report. Submitted for Deadline IX
Other
Size: 4 MB
Snowdonia Pumped Hydro Limited
Outline Excess Water Management Strategy (Revision 3) - Clean. Submitted for Deadline IX
Other
Size: 729 KB
Snowdonia Pumped Hydro Limited
DCO Comparison Document of Revision 8 and Revision 9. Submitted for Deadline IX
Other
Size: 379 KB
Gwynedd Council
Response to the ExA's request for further information of 26 August 2016. Submission for Deadline IX
Other
Size: 402 KB
Snowdonia Pumped Hydro Limited 8
Outline Code of Construction Practice (Revision 5) - Tracked changed. Submitted for Deadline IX
Other
Size: 399 KB
Snowdonia Pumped Hydro Limited
Outline Code of Construction Practice revision 5 (clean) . Submitted for Deadline IX
Other
Size: 492 KB
Snowdonia Pumped Hydro Limited
Outline Materials Management Plan (Revision 1). Submitted for Deadline IX
Other
Size: 10 MB
Jane and Mads Huuse
Comments submitted for Deadline VIII
Other
Size: 16 KB
Jeff Taylor
Comments submitted for Deadline VIII
Other
Size: 165 KB
Natural Resources Wales
Responses to comments on the ExA’s draft DCO
Other
Size: 109 KB
Snowdonia Pumped Hydro Limited
Responses to Written Submissions made at Deadline VII
Other
Size: 284 KB
Cyngor Cymuned Waunfawr
Sylwadau ar y cais yn dilyn cyfarfod Cymuned yn Waunfawr. Cyflwynwyd ar gyfer Dyddiad Cau VII
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Construction Traffic Management Plan(Revision 3) - Track changed. Submitted for Deadline VII
Other
Size: 273 KB
Snowdonia Pumped Hydro Limited
Applicant's response to representations made by interested parties at Deadline VI. Submitted for Deadline VII
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Biosecurity Plan (Revision 2). Submitted for Deadline VII
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Construction Traffic Management Plan(Revision 3). Submitted for Deadline VII
Other
Size: 784 KB
Snowdonia Pumped Hydro Limited
Draft Development Consent Order comparison of Revision 0 and Revision 8. Submitted for Deadline VII
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Baseline Air Quality Monitoring Plan (Revision 1). Submitted for Deadline VII
Other
Size: 750 KB
Jeff Taylor on behalf of Concerned about Glyn Rhonwy
Comments in relation to water analysis and sampling and a table of data relating to water quality test results. Submitted for Deadline VII
Other
Size: 50 KB
Gwynedd Council
Comments on the ExA's draft Development Consent Order. Submitted for Deadline VII
Other
Size: 169 KB
Dr Jane Huuse
Comments submitted for Deadline VII
Other
Size: 213 KB
Snowdonia Pumped Hydro Limited
Land Discovery Strategy (Revision 1) - Track changed. Submitted for Deadline VII
Other
Size: 2 MB
Mike Vitkovitch
Comments on the ExA's draft Development Consent Order. A response to the Applicant's comments on submissions made at Deadline V and Comments on the proposed Section 278 agreement with the Highway Authority. Submitted for Deadline VII
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Dust Control and Air Quality Management Plan (Revision 1). Submitted for Deadline VII
Other
Size: 210 KB
Snowdonia Pumped Hydro Limited
Land Discovery Strategy (Revision 1). Submitted for Deadline VII
Other
Size: 232 KB
Snowdonia Pumped Hydro Limited
Table of amendments to the draft Development Consent Order. Submitted for Deadline VII
Other
Size: 440 KB
Snowdonia Pumped Hydro Limited
Other Consents and Licences Status. Submitted for Deadline VII
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Silt Management Plan (Revision 2). Submitted for Deadline VII
Other
Size: 1 MB
Snowdonia Pumped Hydro Limited
Ordnance Management Strategy (Revision 2) - Tracked changed. Submitted for Deadline VII
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Water Management Plan (Revision 3). Submitted for Deadline VII
Other
Size: 1 MB
Dave Preskett on behalf of Jeff Talyor
Comments on ordnance and copies of correspondence between Mr Preskett and the Ministry of Defence. Submitted for Deadline VII
Other
Size: 39 KB
Tony Grant
Comments submitted for Deadline VII
Other
Size: 200 KB
Snowdonia Pumped Hydro Limited
Archaeological Compensation and Enhancement Strategy (Revision 1). Submitted for Deadline VII
Other
Size: 420 KB
Snowdonia Pumped Hydro Limited
Construction Noise Management Plan (Revision 1) - Track changed. Submitted for Deadline VII
Other
Size: 514 KB
Natural Resources Wales
Response to the ExA's request for further information and Comments on the ExA’s draft Development Consent Order
Other
Size: 372 KB
Snowdonia Pumped Hydro Limited
Code of Construction Practice (Revision 4). Submitted for Deadline VII
Other
Size: 294 KB
Christine Jordan
Comments on the application and a copy of a letter from Gwynedd County Council. Submitted for Deadline VII
Other
Size: 268 KB
Gwynedd Council
Response to the ExA's request for further information. Submitted for Deadline VII
Other
Size: 192 KB
Snowdonia Pumped Hydro Limited
Article 36 list. Submitted for Deadline VII
Other
Size: 487 KB
Snowdonia Pumped Hydro Limited
Comments on the ExA's draft Development Consent Order. Submitted for Deadline VII
Other
Size: 715 KB
Snowdonia Pumped Hydro Limited
Status of Statements of Common Ground. Submitted for Deadline VII
Other
Size: 755 KB
Snowdonia Pumped Hydro Limited
Draft Development Consent Order (Revision 8). Submitted for Deadline VII
Other
Size: 72 KB
Cherry Bartlett
Comments submitted for Deadline VII
Other
Size: 475 KB
Snowdonia Pumped Hydro Limited
Materials Management Plan (Revision 1) - Track changed. Submitted for Deadline VII
Other
Size: 472 KB
Snowdonia Pumped Hydro Limited
Materials Management Plan (Revision 1). Submitted for Deadline VII
Other
Size: 369 KB
Snowdonia Pumped Hydro Limited
Operational Noise Management Plan (Revision 1) - Track changed. Submitted for Deadline VII
Other
Size: 152 KB
Snowdonia Pumped Hydro Limited
Indicative Elevations and Section of Penstock Configuration. Submitted for Deadline VII
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Silt Management Plan (Revision 2) - Track changed. Submitted for Deadline VII
Other
Size: 5 MB
Snowdonia Pumped Hydro Limited
Hybrid Layout and Works Plans (Version 4) Submitted for Deadline VII
Other
Size: 27 KB
Dr Mads Huuse
Comments submitted for Deadline VII
Other
Size: 319 KB
Snowdonia Pumped Hydro Limited
Construction Noise Management Plan (Revision 1). Submitted for Deadline VII
Other
Size: 1 MB
Glyn Peris Guest House
Comments on the application. Responses to the ExA's request for further information and a Response to the Applicant's Schedule of Mitigation. Submitted for Deadline VII
Other
Size: 4 MB
Snowdonia Pumped Hydro Limited
Responses to the ExA's request for further information of 20 July 2016. Submitted for Deadline VII
Other
Size: 204 KB
Snowdonia Pumped Hydro Limited
Indicative Elevations and Section of Power House Turbine Shaft and Turbine Hall Configuration. Submitted for Deadline VII
Other
Size: 918 KB
Snowdonia Pumped Hydro Limited
Ordnance Management Strategy(Revision 2). Submitted for Deadline VII
Other
Size: 290 KB
Snowdonia Pumped Hydro Limited
Operational Noise Management Plan (Revision 1). Submitted for Deadline VII
Other
Size: 201 KB
Snowdonia Pumped Hydro Limited
Archaeological Compensation and Enhancement Strategy (Revision 1) - Track changed. Submitted for Deadline VII
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Dust Control and Air Quality Management Plan (Revision 1) - Track changed. Submitted for Deadline VII
Other
Size: 4 MB
Snowdonia Pumped Hydro Limited
Figure 2.04b - Works Plans (Sheets 1 to 3) (Version 17). Submitted for Deadline VII
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Baseline Air Quality Monitoring Plan (Revision 1) - Track changed. Submitted for Deadline VII
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Biosecurity Plan (Revision 2) - Track changed. Submitted for Deadline VII
Other
Size: 349 KB
Snowdonia Pumped Hydro Limited
Draft Development Consent Order -Validation Report (Revision 8). Submitted for Deadline VII
Other
Size: 671 KB
Snowdonia Pumped Hydro Limited
Draft Development Consent Order comparison of Revision 7 and Revision 8. Submitted for Deadline VII
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Water Management Plan (Revision 3) - Track changed. Submitted for Deadline VII
Other
Size: 379 KB
Snowdonia Pumped Hydro Limited
Code of Construction Practice (Revision 4) - Track changed. Submitted for Deadline VII
Other
Size: 699 KB
Snowdonia Pumped Hydro Limited
Schedule of Mitigation (Revision 2). Submitted for Deadline VI
Other
Size: 225 KB
Snowdonia Pumped Hydro Limited
Table of DCO Amendments (Revision 6). Submitted for Deadline VI
Other
Size: 723 KB
Snowdonia Pumped Hydro Limited
Draft Development Consent Order Comparison Revision 6A to Revision 7. Submitted for Deadline VI
Other
Size: 200 KB
Snowdonia Pumped Hydro Limited
Article 36 list (Revision 6). Submitted for Deadline VI
Other
Size: 446 KB
Snowdonia Pumped Hydro Limited
Statement of Common Ground Status document. Submitted for Deadline VI
Other
Size: 393 KB
Snowdonia Pumped Hydro Limited
Code of Construction Practice (Revision 3). Submitted for Deadline VI
Other
Size: 443 KB
Snowdonia Pumped Hydro Limited
Other Consents and Licences Status. Submitted for Deadline VI
Other
Size: 435 KB
Snowdonia Pumped Hydro Limited
Addendum to Statement of Common Ground with Natural Resources Wales. Submitted for Deadline VI
Other
Size: 2 MB
Ann Lawton
Response to comments made by the Applicant at Deadline IV. Submitted for Deadline VI
Other
Size: 221 KB
Natural Resources Wales
Response to the ExA's Request for Further Information dated 27th June 2016
Other
Size: 232 KB
Glyn Peris Guest House
Response to comments made by the Applicant at Deadline IV. Submitted for Deadline VI
Other
Size: 569 KB
Mike Vitkovich
Response to comments made by the Applicant at Deadline IV. Submitted for Deadline VI
Other
Size: 26 KB
Jeff Taylor
Written submission provided for Deadline VI
Other
Size: 376 KB
Snowdonia Pumped Hydro Limited
Explanatory Memorandum (Revision 2). Submitted for Deadline VI
Other
Size: 109 KB
Tony Grant
Response to comments made by the Applicant at Deadline IV. Submitted for Deadline VI
Other
Size: 560 KB
Snowdonia Pumped Hydro Limited
Statement of Reasons (Revision 3). Submitted for Deadline VI
Other
Size: 791 KB
Snowdonia Pumped Hydro Limited
Draft Development Consent Order (Revision 7). Submitted for Deadline VI
Other
Size: 4 MB
Snowdonia Pumped Hydro Limited
Excess Water Management Strategy (Revision 2). Submitted for Deadline VI
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Response to written submissions made by interested parties at Deadline V. Submitted for Deadline VI
Other
Size: 87 KB
Cherry Bartlett
Response to comments made by the Applicant at Deadline V. Submitted for Deadline VI
Other
Size: 842 KB
Snowdonia Pumped Hydro Limited
Response to the ExA's Request for Further Information dated 27th June 2016. Submitted for Deadline VI
Other
Size: 53 KB
Gwynedd Council
Response to the ExA's second written questions. Submitted for Deadline VI
Other
Size: 345 KB
Snowdonia Pumped Hydro Limited
Draft Development Consent Order (Revision 7) - Validation Report. Submitted for Deadline VI
Other
Size: 7 MB
Snowdonia Pumped Hydro Limited
Signed Statement of Common Ground with Cadw. Submitted for Deadline V
Other
Size: 41 KB
Tony Grant
Comments on the Applicant's response to earlier submission on Noise. Submitted for Deadline V.
Other
Size: 38 KB
Snowdonia Pumped Hydro Limited
Correspondence with Gwynedd Council. Submitted for Deadline V.
Other
Size: 358 KB
Snowdonia Pumped Hydro Limited
Statement of Common Ground with SPManweb. Submitted for Deadline V
Other
Size: 286 KB
Snowdonia Pumped Hydro Limited
Appendix B - HRA Screening Matrices (Track Changed). SUbmitted for Deadline V.
Other
Size: 276 KB
Snowdonia Pumped Hydro Limited
Appendix B - HRA Screening Matrices (Clean). SUbmitted for Deadline V.
Other
Size: 140 KB
Snowdonia Pumped Hydro Limited
Book of Reference - tracked change draft for request to remove Plot 65 from CA.Submitted for Deadline V
Other
Size: 200 KB
Snowdonia Pumped Hydro Limited
Health & Safety Plan. Submitted for Deadline V
Other
Size: 422 KB
Snowdonia Pumped Hydro Limited
Status of Statements of Common Ground. Submitted for Deadline V
Other
Size: 941 KB
Snowdonia Pumped Hydro Limited
Outline Ordnance Management Strategy (Revision 1). Submitted for Deadline V
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Construction Traffic Management Plan (Revision 2). Submitted for Deadline V
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Responses to written submissions made at Deadline IV. Submitted for Deadline V
Other
Size: 691 KB
Snowdonia Pumped Hydro Limited
Draft DCO (Revision 6B) to accompany request to remove Plot 65 from CA (tracked changed). Submitted for Deadline V
Other
Size: 193 KB
Snowdonia Pumped Hydro Limited
Land Discovery Strategy. Submitted for Deadline V
Other
Size: 374 KB
Snowdonia Pumped Hydro Limited
Construction Noise Management Plan. Submitted for Deadline V
Other
Size: 194 KB
Snowdonia Pumped Hydro Limited
Archaeological Compensation and Enhancement Strategy. Submitted for Deadline V
Other
Size: 488 KB
Snowdonia Pumped Hydro Limited
Operational Noise Management Plan. Submitted for Deadline V
Other
Size: 701 KB
Gwynedd Council
Responses to ExA's Second Written Questions. Submitted for Deadline V.
Other
Size: 214 KB
Snowdonia Pumped Hydro Limited
Dust Management Plan. Submitted for Deadline V
Other
Size: 591 KB
Snowdonia Pumped Hydro Limited
Statement of Reasons - tracked change draft for request to remove Plot 65 from CA. Submitted for Deadline V
Other
Size: 374 KB
Snowdonia Pumped Hydro Limited
Explanatory Memorandum - Tracked change draft for request to remove Plot 65 from CA. Submitted for Deadline
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Water Management Plan (Revision 2). Submitted for Deadline V
Other
Size: 803 KB
Snowdonia Pumped Hydro Limited
3.01 Rev.6A - Draft Development Consent Order (Revision 6A). Submitted for Deadline V
Other
Size: 377 KB
Snowdonia Pumped Hydro Limited
Table of DCO Amendments. Submitted for Deadline V
Other
Size: 782 KB
Snowdonia Pumped Hydro Limited
Schedule of Mitigation. Submitted for Deadline V
Other
Size: 819 KB
Snowdonia Pumped Hydro Limited
Covering Letter for Deadline V submissions
Other
Size: 14 KB
Christine Jordan
Clarification in relation to representations made on behalf of Waunfawr residents. Submitted for Deadline V.
Other
Size: 2 MB
Snowdonia Pumped Hydro Limited
Biosecurity Plan (Revision 1). Submitted for Deadline V
Other
Size: 439 KB
Snowdonia Pumped Hydro Limited
Status of Other Consents and Licences.Submitted for Deadline V.
Other
Size: 218 KB
Snowdonia Pumped Hydro Limited
Schedule of Other Required Plans and Strategies (Revision 2). Submitted for Deadline V.
Other
Size: 3 MB
Snowdonia Pumped Hydro Limited
Silt Management Plan (Revision 1). Submitted for Deadline V
Other
Size: 362 KB
Snowdonia Pumped Hydro Limited
Code of Construction Practice (Revision 2). Submitted for Deadline V
Other
Size: 732 KB
Snowdonia Pumped Hydro Limited
DCO Comparison Document - Revision 5 to Revision 6A. Submitted for Deadline V
Other
Size: 102 KB
Snowdonia Pumped Hydro Limited
Baseline Air Quality Monitoring Report. Submitted for Deadline V
Other
Size: 5 MB
Snowdonia Pumped Hydro Limited
Response to ExA's Second Written Questions. Submitted for Deadline V
Other
Size: 224 KB
Snowdonia Pumped Hydro Limited
Formal request by the Applicant to amend the draft DCO to remove Plot 65 from Compulsory Acquisition. Submitted for Deadline V
Other
Size: 1 MB
Snowdonia Pumped Hydro Limited
No Significant Effects Report (unchanged from the version sent at Deadline I [REP1-001]). Submitted for Deadline V
Other
Size: 206 KB
Snowdonia Pumped Hydro Limited
Article 38 list (Revision 4 for Deadline 5). Submitted for Deadline V
Other
Size: 112 KB
Snowdonia National Park Authority
Response to the ExA's Second Written Questions. Submitted for Deadline V.
Other
Size: 21 KB
Dr Jane Huuse
Representation relating to Cefn Du Road. Submitted for Deadline V.
Other
Size: 198 KB
Snowdonia Pumped Hydro Limited
Materials Managament Plan. Submitted for Deadline V
Other
Size: 2 MB
Chris Jordan
Copy of a letter sent by the Applicant relating to a public event. Submitted for Deadline V.
Other
Size: 348 KB
Glyn Peris Guest House
Mitigation Response. Submitted for Deadline V
Other
Size: 19 MB
Mike Vitkovitch
Submission regarding noise. Submitted for Deadline V.
Other
Size: 141 KB
Glyn Peris Guest House
Other issues.Submitted for Deadline V
Other
Size: 9 MB
Tony Grant
Further Comments Submitted for Deadline V.
Other
Size: 6 MB
Mike Vitkovitch
Submission regarding Access Roads - Part 1. Submitted for Deadline V
Other
Size: 1,004 KB
Natural Resources Wales
Response to Examining Authority's 2nd written questions and other comments. Submitted for Deadline V.
Other
Size: 2 MB
Mike Vitkovitch
Submission regarding Access Roads - Part 2. Submitted for Deadline V
Other
Size: 1 MB
Glyn Peris Guest House
Copies of correspondence between the Applicant and the interested party. Submitted for Deadline V.
Other
Size: 2 MB
Glyn Peris Guest House
Response to the ExA's Second Written Questions. Submitted for Deadline V
Other
Size: 117 KB
Natural Resources Wales
Clarification on response provided to the Examination for Deadline IV. Submitted for Deadline V.
Other
Size: 262 KB
Tony Grant
Written summary of oral submissions put at the hearings on 17 & 18 May 2016. Submitted for Deadline V.
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.