Brechfa Forest Connection

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (5)

Developer's Application (176)

Acceptance (8)

Pre Examination (13)

Examination (456)

Decision (45)

Decided (2)

Date

SourceDescription
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.3.4 Statements of Common Ground - Landscape and Visual - Carmarthenshire County Council. Not published at Deadline 2 in error.
Other
Size: 68 KB
Western Power Distribution (South Wales) PLC
National Grid withdrawal of Relevant Representation. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 31 KB
Dawn Reed
Late Submission for Deadline 8. Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.55 Commentary of Changes to DCO and Application Plan References at Deadline 8. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.7B List of Documents to be certified by the Secretary of State. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 01.7H Guide to the Application. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.54 Commentary of Changes to DCO (Vol 03.1F and Vol 09.31A)
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.34A Works Plans Section A Option B
Other
Size: 286 KB
Natural Resources Wales
Response to Rule 17 Letter
Other
Size: 3 MB
I A R Jones
Submission for Deadline 8
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1F Development Consent Order Option A
Other
Size: 84 KB
National Grid
Withdrawal of Relevant Representation
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.31A Development Consent Order Option B (Tracked change)
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 04.3E Book of Reference (Tracked change)
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 09.59 Book of Reference Change Commentary 4.3D to 4.3E
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.8A Protective Provisions Table
Other
Size: 9 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.1A Works Plans Section A Option A
Other
Size: 114 KB
Kevin and Diana Reader
Submission for Deadline 8
Other
Size: 75 KB
Western Power Distribution (South Wales) PLC
Covering email for Deadline 8
Other
Size: 14 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.4A Environmental Features Plans Section A
Other
Size: 9 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.8A Trees and Hedges with the Potential to be Affected Plans Section A Option A
Other
Size: 2 MB
Leslie and Pearl Birch
Submission for Deadline 8
Other
Size: 198 KB
Pauline Medland
Late Submission for Deadline 8. Accepted at the discretion of the Examining Authority
Other
Size: 419 KB
Mr and Mrs Rentmore
Submission for Deadline 8
Other
Size: 10 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.3A Access and Public Rights of Way Plans Section A
Other
Size: 9 KB
Peter Morris
Submission for Deadline 8
Other
Size: 7 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.39A Trees and Hedges with the Potential to be Affected Plans Section A Option B
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.2B Explanatory Memorandum Option A
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.31A Development Consent Order Option B
Other
Size: 14 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.5A Heritage Designations Plans Section A
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.57 Applicant's responses to Deadline 6 and 7 Submissions
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.2B Explanatory Memorandum Option A (Tracked change)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.56 Comparite of DCO Option A (Vol 03.1F against Vol 03.1)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1F Development Consent Order Option A (Tracked change)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32B Explanatory Memorandum Option B (Tracked change)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32B Explanatory Memorandum Option B
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.7A List of Documents to be certified by the Secretary of State
Other
Size: 33 KB
Mr and Mrs B Davies and Mr and Mrs K Reader
Correspondence with applicant submitted for Deadline 8
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 04.3E Book of Reference
Other
Size: 336 KB
Carmarthenshire County Council
Late Response to Rule 17 Letter. Accepted at the discretion of the Examining Authority
Other
Size: 13 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2D Land Affected and Land Plans Section A
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.58 Applicant's response to ExA's procedural decision 30 March 2016
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.33A Statement of Reasons - Option B (Tracked change)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.3.7A Statements of Common Ground - Carmarthenshire County Council. Late submission for Deadline 7
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 01.7G Guide to the Application
Other
Size: 263 KB
Pauline Medland
Late submission for Deadline 7
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.52 Review of proposals to realign a section of OHL on land at Penwaun and Llwyn Newydd
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 08.3B Draft Section 106 Agreement (unsigned)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.1C Updated Landowner Engagement Table
Other
Size: 174 KB
Leslie and Pearl Birch
Submission for Deadline 7
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 04.1B Statement of Reasons - Option A
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 04.1B Statement of Reasons - Option A (Tracked change)
Other
Size: 6 MB
Dawn, Maurice and Audrey Reed
Submission for Deadline 7
Other
Size: 102 KB
Yoka and Bryan Kilkelly
Submission for Deadline 7
Other
Size: 81 KB
Western Power Distribution (South Wales) PLC
Covering email for Deadline 7
Other
Size: 11 KB
Avril and Bryan Davies
Submission for Deadline 7
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.51 Heads of Terms (Tracked change)
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.53 Bruton Knowles correspondence direct with landowners
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.33A Statement of Reasons - Option B
Other
Size: 477 KB
I A R Jones
Submission for Deadline 7
Other
Size: 37 KB
Mr and Mrs Rentmore
Late submission for Deadline 7
Other
Size: 38 KB
Diana and Kevin Reader
Submission for Deadline 7
Other
Size: 104 KB
Rule 17 and 8(3) Letter
Other
Size: 111 KB
Llythyr Rheol 17 a 8(3)
Other
Size: 34 KB
Diana and Kevin Reader
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 13 KB
Avril and Bryan Davies
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 12 KB
P and EJ Morris and Sons
Comments submitted for Deadline 6
Other
Size: 363 KB
HV and E Jones
Comments submitted for Deadline 6
Other
Size: 29 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.43.1 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms, Part 1 of 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.46 Agreed notes from landowner meeting on Friday, 4 March 2016
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32A Draft Explanatory Memorandum (Tracked change)
Other
Size: 30 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.43.2 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms, Part 2 of 4
Other
Size: 172 KB
Western Power Distribution (South Wales) PLC
Covering email to Deadline 6 submission
Other
Size: 282 KB
Iwan Jones
Comments submitted for Deadline 6
Other
Size: 139 KB
Iwan Jones
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 30 KB
Diana and Kevin Reader
Comments submitted for Deadline 6
Other
Size: 28 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.43.3 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms, Part 3 of 4
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.2A Explanatory Memorandum (Tracked change)
Other
Size: 470 KB
Carmarthenshire County Council
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 04.3D Book of Reference
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2C Land Affected and Land Plans Section B
Other
Size: 98 KB
Natural Resources Wales
Comments on ExA?s consultation draft DCO and RIES
Other
Size: 105 KB
Natural Resources Wales
Response to Rule 17 Letter of 1 March 2016
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.50 Response to Procedural Decision 27 February, Mr and Mrs Shaw
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32A Draft Explanatory Memorandum
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 04.3D Book of Reference (Tracked change)
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 09.44 Response to ExA's questions regarding changes to the Book of Reference
Other
Size: 3 MB
Diana and Kevin Reader
Further Comments submitted for Deadline 6
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2C Land Affected and Land Plans Section A
Other
Size: 544 KB
Dawn Reed
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.49 Response to RIES
Other
Size: 27 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.48.2 Copies of correspondence with Affected Parties regarding unknown plots, Part 2 of 2
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.45 Response to the ExA's procedural decision letter of 1 March 2016
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 01.7F Guide to the Application
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.2A Explanatory Memorandum
Other
Size: 5 MB
Mr and Mrs Rentmore
Comments submitted for Deadline 6
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.1B Updated Land Owner Engagement Table (Tracked change)
Other
Size: 6 MB
IAR Jones
Comments submitted for Deadline 6
Other
Size: 13 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.43.4 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms, Part 4 of 4
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 09.47 Book of Reference Change Commentary 4.3C to 4.3D
Other
Size: 44 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.48.1 Copies of correspondence with Affected Parties regarding unknown plots, Part 1 of 2
Other
Size: 112 KB
Bryan and Yoka Kilkelly
Comments submitted for Deadline 6
Other
Size: 414 KB
I A R Jones
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 115 KB
Rule 8(3), 17 and s89(3) Letter
Other
Size: 90 KB
Procedural decision of Option B
Other
Size: 83 KB
Llythyr Rheol 8(3), 17 ac a89(3)
Other
Size: 1 MB
Dawn Reed
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 140 KB
Report on the Implications for European Sites
Other
Size: 196 KB
Rule 8(3), Rule 17 and s89(3) and s102A Letter
Other
Size: 118 KB
Llythyr Rheol 8(3), Rheol 17 ac a89(3) ac a102A
Other
Size: 34 KB
Diana and Kevin Reader
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 3 MB
Diana Reader
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 29 KB
Mr and Mrs Rentmore
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 14 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2B Land Affected and Land Plans Section C
Other
Size: 633 KB
Natural Resources Wales
Correspondence with applicant
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.22 Applicant's Written Submissions following the Compulsory Acquisition Hearing held on Wednesday 10 February 2016
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.1A Updated Land Owner Engagement Table
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.22.1 Applicant's Written Submissions following the Compulsory Acquisition Hearing held on Wednesday 10 February 2016 - Appendices
Other
Size: 279 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter ? Enclosure 4
Other
Size: 1 MB
Leslie & Pearl Birch
Post Hearing Comments
Other
Size: 123 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter ? Enclosure 2
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.25 HRA NSER Addendum - Location within DCO where Mitigation is Secured
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2B Land Affected and Land Plans Section B
Other
Size: 496 KB
Pauline Medland
Comments submitted for Deadline 5
Other
Size: 10 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2B Land Affected and Land Plans Section A
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.5 Outline Tree Inventory Showing Trees Potentially Affected Maps 37-45 (Late Submission for Deadline 5)
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.1 Outline Tree Inventory Showing Trees Potentially Affected Maps 1-9 (Late Submission for Deadline 5)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.24 Commentary of Changes to Draft Development Consent Order 3.1D
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.2.15B DCO03 Appendix 1 Mitigation Table
Other
Size: 26 KB
Diana Reader on behalf of the Land Owners Group
Post hearing comments
Other
Size: 83 KB
HV and KI Miles
Comments submitted for Deadline 5
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 4.3C Book of Reference
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 1.7E Guide to the Application
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 4.3C Book of Reference (Tracked Change)
Other
Size: 178 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter of 3 February 2016
Other
Size: 143 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter ? Enclosure 3
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.2.18.2A DCO34 Appendix 2 Existing Assets Table
Other
Size: 122 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter ? Enclosure 1
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.10A Plan Showing Location of Temporary Bridge
Other
Size: 35 KB
Yoka and Bryan Kilkelly
Post Hearing Comments
Other
Size: 2 MB
Avril and Bryan Davies
Comments submitted for Deadline 5
Other
Size: 108 KB
Diana Reader
Post Hearing Comments
Other
Size: 986 KB
Pauline Medland
Further comments submitted for Deadline 5
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.23.1 Applicant's Written Submissions following the Issue Specific Hearing on the DCO held on Thursday 11 February 2016 - Appendices
Other
Size: 93 MB
Diana and Kevin Reader
Post Hearing Comments
Other
Size: 251 KB
Pembrokeshire County Council
Response to Section 89 Letter
Other
Size: 810 KB
I A R Jones
Comments submitted for Deadline 5
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.23 Applicant's Written Submissions following the Issue Specific Hearing on the DCO held on Thursday 11 February 2016
Other
Size: 307 KB
Brecon Beacons National Park Authority
Response to Section 89 Letter
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.3 Outline Tree Inventory Showing Trees Potentially Affected Maps 19-27 (Late Submission for Deadline 5)
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.4 Outline Tree Inventory Showing Trees Potentially Affected Maps 28-36 (Late Submission for Deadline 5)
Other
Size: 72 KB
Maurice Reed, Audrey Reed and Dawn Reed
Comments submitted for Deadline 5
Other
Size: 438 KB
Avril and Bryan Davies
Post Hearing Comments
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.2 Outline Tree Inventory Showing Trees Potentially Affected Maps 10-18 (Late Submission for Deadline 5)
Other
Size: 329 KB
Western Power Distribution (South Wales) PLC
Post Hearing Comments regarding Affected Persons
Other
Size: 17 KB
Diana Reader
Comments regarding corrections to the Updated Land Owner Engagement Table
Other
Size: 2 MB
Yoka and Bryan Kilkelly
Comments submitted for Deadline 5
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1E Draft Development Consent Order
Other
Size: 190 KB
Powys County Council
Response to Section 89 Letter
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 9.27 Book of Reference Change Commentary 4.3B to 4.3C (Late Submission for Deadline 5)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1E Draft Development Consent Order (Tracked Change)
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.6 Outline Tree Inventory Showing Trees Potentially Affected Maps 46-55 (Late Submission for Deadline 5)
Other
audio recording
Size: 60 MB
Audio Recording of the Compulsory Acquisition Hearing Session 1
Compulsory Acquisition Hearing on 10 February 2015
Other
audio recording
Size: 27 MB
Audio Recording of the Compulsory Acquisition Hearing Session 3
Compulsory Acquisition Hearing on 10 February 2015
Other
audio recording
Size: 55 MB
Audio Recording of the Issue Specific Hearing Session 1
Issue Specific Hearing relating to the draft Development Consent Order on 11 February 2015
Other
audio recording
Size: 47 MB
Audio Recording of the Issue Specific Hearing Session 2
Issue Specific Hearing relating to the draft Development Consent Order on 11 February 2015
Other
audio recording
Size: 35 MB
Audio Recording of the Compulsory Acquisition Hearing Session 2
Compulsory Acquisition Hearing on 10 February 2015
Other
Size: 89 KB
Llythyr Rheol 13(6)
Llythyr o'r Awdurdod Archwilio ynghlyn a hysbysiad gwrandawiadau mis Chwefror.
Other
Size: 902 KB
Avril and Bryan Davies
Further Correspondence submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 9 MB
Pauline Medland
Late response to ExA?s Second Written Questions. Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Avril and Bryan Davies
Further Comments submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 214 KB
Avril and Bryan Davies
Further Comments submitted for Deadline 4
Other
Size: 333 KB
Jillie Gardiner
Correspondence submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 641 KB
Natural Resources Wales
Correspondence with applicant submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 712 KB
Jillie Gardiner
Further correspondence submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 116 KB
Rule 8(3) and Rule 17 Letter to Applicant regarding s102
Other
Size: 108 KB
Rule 13(6) letter
Letter from the Examining Authority regarding notifcation of February hearings
Other
Size: 109 KB
Rule 8(3) and Rule 17 Letter to Mr and Mrs Shaw regarding Other Person status
Other
Size: 35 KB
Hearing Agenda 10 February 2016
Agenda for Compulsory Acquisition Hearing on 10 February 2016
Other
Size: 109 KB
Hearing Agenda 11 February 2016
Agenda for Issue Specific Hearing relating to the Draft Development Consent Order (DCO) on 11 February 2016
Other
Size: 709 KB
HV and E Jones
Comments submitted for Deadline 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.6 Copy of Section 37 Recommendation and Secretary of State Decision for Legacy Substation to Oswestry Substation 132kV Connection
Other
Size: 726 KB
Natural Resources Wales
Response to ExA?s Second Written Questions
Other
Size: 4 MB
Yoka Kilkelly on behalf of the Landowners group
Comments submitted for Deadline 4
Other
Size: 4 MB
Pauline Medland
Comments submitted for Deadline 4
Other
Size: 7 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.5 Copy of Secretary of State's Decision and Examining Authority's Recommendation in Hinkley Point C Connection
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.11 WPD Adaptation to Climate Change Reports (from June 2011 and May 2015)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1D Draft Development Consent Order (Tracked Change)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.17 Responses to Examining Authority's Second Round of Written Questions
Other
Size: 987 KB
Diana and Kevin Reader
Response to ExA?s Second Written Questions
Other
Size: 55 KB
Dr M Woods and N Woods
Comments submitted for Deadline 4
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.14 Consultation Responses from the Civil Aviation Authority
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.16 Special Report -The State of Environmental Impact Assessment Practice in the UK - IEMA (2011)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.9 Letter from Mainline Pipelines agreeing to Protective Provisions
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.3 Copy of Metropolitan Board of Works v McCarthy (1874)
Other
Size: 5 MB
Susanna Rentmore
Comments submitted for Deadline 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.20 Applicants Comments on Submission Made By Interested Parties At Deadline 3
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.21 Commentary of Changes to Draft Development Consent Order 3.1C
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.13 Consultation Responses from the Ministry of Defence
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.15 WPD Company Directive on Pollution Prevention
Other
Size: 135 KB
Avril and Bryan Davies
Comments submitted for Deadline 4
Other
Size: 14 KB
RWE Innogy
Response to ExA?s Second Written Questions
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.17 The Energy Networks Association Engineering Technical Report 136 (June 2007)
Other
Size: 479 KB
Carmarthenshire County Council
Response to ExA?s Second Written Questions
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.1 Updated Land Owner Engagement Table
Other
Size: 109 KB
Blaengwen Group
Comments submitted for Deadline 4
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.7 List of Documents to be Certified by the Secretary of State
Other
Size: 121 KB
Wales & West Utilities
Comments submitted for Deadline 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.2 Table of Plots with Unknown Ownership
Other
Size: 54 KB
Christopher Ogwyn Evans
Comments submitted for Deadline 4
Other
Size: 9 MB
Western Power Distribution (South Wales) PLC
BFC Vol 08.6A Construction Environmental Management Plan
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.2.18.3A DCO34 Appendix 3 Proposed Works to Existing Assets Plans
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.8 Protective Provisions Table
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.2.15A DCO03 Appendix 1 Mitigation Table
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.12 Due Diligence Letter
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1D Draft Development Consent Order
Other
Size: 3 MB
Leslie & Pearl Birch
Comments submitted for Deadline 4
Other
Size: 6 KB
Gareth Thomas
Comments submitted for Deadline 4
Other
Size: 162 KB
Bryan and Yoka Kilkelly
Comments submitted for Deadline 4
Other
Size: 129 KB
Dawn Reed
Comments submitted for Deadline 4
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 01.7D Guide to the Application
Other
Size: 93 KB
Jillina Gardiner
Response to ExA?s Second Written Questions. Late submission for Deadline 4, accepted at the discretion of the Examining Authority
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 09.19 Table of Proposed Amendments to Book of Reference
Other
Size: 174 KB
Howard and Karen Miles
Comments submitted for Deadline 4
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.10 Plan Showing Location of Temporary Bridge
Other
Size: 2 MB
IAR Jones
Comments submitted for Deadline 4
Other
Size: 18 KB
Diana & Kevin Reader
Comments submitted for Deadline 4
Other
Size: 12 KB
Peter Morris and family
Comments submitted for Deadline 4
Other
Size: 99 KB
R and PB Eagle
Comments submitted for Deadline 4
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.4 Copy of Wildtree Hotels Limited v Harrow London Borough Council (2000)
Other
Size: 106 KB
Rule 8(3) and Rule 17 Letter
Letter to the applicant regarding Mr and Mrs Shaw dated 27 January 2016
Other
Size: 169 KB
Section 89 Letter to Neath Port Talbot
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Police and Crime Commissioner
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Brecons Beacons NPA
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Pembrokeshire County Council
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Powys County Council
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Ceredigion County Council
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Pembrokeshire Coast NPA
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to City and County of Swansea
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 130 KB
Llythyr Rheol 13 a 16 - Hysbysiad o Wrandawiad a Hysbysiad o Ail Cwestiynau
Other
Size: 104 KB
Rule 13 and 16 Letter - Notification of hearings and issue of second questions
Other
Size: 274 KB
ExA's Second round of questions
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1C Draft Development Consent Order (Tracked Change), validated in SI Template. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 08.1A Planning Statement Appendix 1 RevA
Other
Size: 153 KB
Mr and Mrs Eagle
Written Representation. Late submission for Deadline 3, accepted at the discretion of the Examining Authority
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1C Draft Development Consent Order, validated in SI Template. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority
Other
Size: 62 KB
RH and BL Howells
Summary of oral case put at the Compulsory Acquisition Hearing of 2 and 2 December 2015. Representation not previously published due to administration error.
Other
Size: 169 KB
Western Power Distribution (South Wales) PLC
Email from Mr David Kenyon to provide clarification on the Applicant?s response to Mrs Reader?s representation at the Open Floor Hearing on Monday 30th November 2015. Late submission for Deadline 3
Other
Size: 486 KB
Mr and Mrs Hewer
Written Representations
Other
Size: 822 KB
Carol Evans
Written Representation
Other
Size: 5 MB
Natural Resources Wales
Response in relation to the Updated Habitats Regulations Assessment No Significant Effects Report (HRA NSER)
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_08.6.1_CEMP - Habitat Management Plan
Other
Size: 4 MB
Les Birch
Written Representation, Carmarthenshire County Council Website report, and Copy of the Report into Cable Costs by Western Power Distribution South Wales plc dated June 2013
Other
Size: 2 MB
Rhodri Glyn Thomas AC/AM
Written Representation on behalf of Mr and Mrs Reader
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.12_Applicants Response to Compulsory Acquisition Hearings
Other
Size: 63 KB
Colin Jones
Written Representation
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_01.7C_Guide to the Application
Other
Size: 3 MB
BJP Land Agents
Correspondence from D.A and W G Jones and Summary Table of Negotiations
Other
Size: 187 KB
BJP Land Agents
Correspondence from Messrs James
Other
Size: 14 MB
BJP Land Agents
Covering Letter and Correspondence from clients and solicitors with the Applicant, and Appendix 1 ? Change Requests
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.14_Applicants Response to Issue Specific Hearing on the Draft DCO
Other
Size: 517 KB
Grwp Blaengwen
Written Representation including Summary of oral case put at the Issue Specific Hearing of 8 December 2015
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_3.1B_Draft Development Consent Order
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.3.7_Statements of Common Ground - Development Consent Order - Carmarthenshire County Council
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.11_Applicants Response to Open Floor Hearings
Other
Size: 416 KB
Karen Miles
Summary of oral case put at Compulsory Acquisition Hearing of 2 December 2015 with supporting information
Other
Size: 2 MB
Bryan and Avril Davies
Written Representation. Accepted at the 30 November - 3 December 2015 Hearings.
Other
Size: 5 MB
Grwp Blaengwen
Press cuttings. Accepted at the 30 November - 3 December 2015 Hearings.
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_3.1B_Draft Development Consent Order (Tracked Change)
Other
Size: 226 KB
Avril and Bryan Davies
Comments following hearings and site inspection in week commencing 30 November 2015
Other
Size: 27 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.16_Existing and Wire Line View Transparencies
Other
Size: 173 KB
S87 &102A Letter sent to Yvonne Shaw dated 18 December 2015
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.10_Commentary of Changes to Draft DCO 3.1A
Other
Size: 533 KB
Mr and Mrs Evans
Written Representation
Other
Size: 466 KB
Leslie and Pearl Birch
Summaries of oral cases put at the Open Floor Hearings of 30 November and 1 December and the Compulsory Acquisition Hearing of 3 December 2015. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority.
Other
Size: 152 KB
Dr Michael Woods and Nicola Woods
Written Representation
Other
Size: 39 KB
Susanna Rentmore
Post Hearing Written Representation
Other
Size: 109 KB
Bryan and Yoka Kilkelly
Written Representation
Other
Size: 23 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.15_Responses to Examining Authority Questions asked at Hearings
Other
Size: 3 MB
Avril and Bryan Davies
Comments following Accompanied Site Inspection on 1 December 2015
Other
Size: 4 MB
Diana Reader
Summaries of oral cases put at the Open Floor Hearing of 30 November 2015 and the Compulsory Acquisition Hearing of 2 December 2015. Plus Appendices 4-28
Other
Size: 48 KB
Howard and Karen Miles
Submission in lieu of representation at the Compulsory Acquisition Hearing of 2 December 2015
Other
Size: 61 KB
Mr and Mrs Reed and Dawn Reed
Written Representation
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.13_Applicants Response to Issue Specific Hearing on Environmental Matters
Other
Size: 5 MB
Brechfa Forest and Llanllwni Mountain Tourism Cluster Group
Written Representation
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_02.9_Deviation Plans
Other
Size: 143 KB
Alan Dufty
Written Representation. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority.
Other
Size: 40 MB
Carmarthenshire County Council
Summary of oral case put at the Issue Specific Hearing of 8 December 2015 and Appendices. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority.
Other
Size: 4 MB
Karen Miles
Written Representation from 30 landowners represented by BJP Land Agents
Other
Size: 44 KB
Pauline Medland
Written Representation
Other
Size: 46 KB
Carmarthenshire Local Access Forum
Written Statement in lieu of oral case at the Environmental Matters Hearing of 8 December 2015
Other
Size: 16 KB
P & E J Morris and Sons
Written Representation
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_08.3A_Draft Section 106 Agreement
Other
Size: 51 KB
Jennifer Harrison
Summary of oral case put at the Open Floor Hearing of 1 December 2015.
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_05.4A_Habitat Regulations Assessment - NSER
Other
Size: 307 KB
Natural Resources Wales
Response in relation to the Statement of Common Ground between Western Power Distribution and Carmarthenshire County Council
Other
Size: 66 KB
Carmarthenshire County Council
Response to the Examining Authority?s request for further information at the Issue Specific Hearing of 8 and 9 December 2015
Other
Size: 636 KB
Leslie and Pearl Birch
Written Representation
Other
audio recording
Size: 89 MB
Issue Specific Hearing - 8-12-2015 Session 2
Issue Specific Hearing on Environmental Matters Session 2 of 4
Other
audio recording
Size: 79 MB
Issue Specific Hearing - 8-12-2015 Session 4
Issue Specific Hearing on Environmental Matters Session 4 of 4
Other
audio recording
Size: 74 MB
Issue Specific Hearing - 8-12-2015 Session 3
Issue Specific Hearing on Environmental Matters Session 3 of 4
Other
audio recording
Size: 58 MB
Issue Specific Hearing - 8-12-2015 Session 1
Issue Specific Hearing on Environmental Matters Session 1 of 4
Other
audio recording
Size: 42 MB
Issue Specific Hearing - 10-12-2015 Session 1
Issue Specific Hearing on the draft Development Consent Order Session 1 of 2
Other
audio recording
Size: 31 MB
Issue Specific Hearing - 10-12-2015 Session 2
Issue Specific Hearing on the draft Development Consent Order Session 2 of 2
Other
Size: 108 KB
Procedural Decision Welsh Language Version
Procedural Decision issued by the Examining Authority, dated 7 December 2015, to accept a Note Regarding Proposal for Alternative Southern Extension to Underground Section as Scheme Variation into the examination and request additional information from the Applicant
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
Note regarding proposal for alternative southern extension to underground section as scheme variation. Letter dated 19 November 2015 referred to in procedural decision issued on 7 December 2015.
Other
Size: 98 KB
Procedural Decision
Procedural Decision issued by the Examining Authority, dated 7 December 2015, to accept a Note Regarding Proposal for Alternative Southern Extension to Underground Section as Scheme Variation into the examination and request additional information from the Applicant
Other
audio recording
Size: 5 MB
Open Floor Hearing 2015 12 01 Translation from Welsh
Other
audio recording
Size: 19 KB
Compulsory Acquisition Hearing - 02-12-2015 - Session 1 1
Other
audio recording
Size: 108 MB
Compulsory Acquisition Hearing - 02-12-2015 - Session 1
Other
audio recording
Size: 34 MB
Compulsory Acquisition Hearing - 03-12-2015 - Session 2
Other
audio recording
Size: 19 KB
Open Floor Hearing - 30-11-2015 - Session 1 1
Other
audio recording
Size: 22 MB
Open Floor Hearing - 30-11-2015 - Session 2
Other
audio recording
Size: 96 MB
Open Floor Hearing - 30-11-2015 - Session 1
Other
audio recording
Size: 36 MB
Compulsory Acquisition Hearing - 02-12-2015 - Session 2
Other
audio recording
Size: 63 MB
Open Floor Hearing - 01-12-2015
Other
audio recording
Size: 52 MB
Compulsory Acquisition Hearing - 03-12-2015 - Session 1
Other
Size: 2 MB
Western Power Distribution (South Wales) Plc
BFC_Vol_09.3.5_Statement of Common Ground_Historic Environment_Carmarthenshire County Council
Other
Size: 1 MB
Western Power Distribution (South Wales) Plc
BFC_Vol_09.7A_Comments on Local Impact Reports - Accepted at the discretion of the ExA as a late submission to Deadline 2.
Other
Size: 23 KB
BJP Land Agents
Written Submission - Status of Land Negotiation/ Compulsory Acquisition - Accepted at the discretion of the ExA as a late submission to Deadline 2.
Other
Size: 3 MB
Western Power Distribution (South Wales) Plc
BFC_Vol_09.3.6_Statement of Common Ground_Landscape and Visual_Natural Resources Wales
Other
Size: 20 KB
Diana Reader
Written Submission - Status of Land Negotiation/ Compulsory Acquisition - Accepted at the discretion of the ExA as a late submission to Deadline 2.
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.6.2 Applicant's Comments on Written Representations from Other Parties
Other
Size: 60 KB
Dr M Woods and N Woods
Comments on Responses to Relevant Representations
Other
Size: 140 KB
Western Power Distribution (South Wales) plc
BFC Vol 04.3B Book of Reference
Other
Size: 221 KB
Bryan and Yoka Kilkelly
Written representation
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.9 Commentary of Changes to Draft Development Consent Order 3.1
Other
Size: 36 KB
D.A and W.B. Davies
Written representation and suggested location for an Accompanied Site Inspection
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC - Guide to the Application
Other
Size: 140 KB
Western Power Distribution (South Wales) plc
BFC Vol 04.3B Book of Reference (Tracked Change)
Other
Size: 213 KB
E.L and M. James
Report of meeting with BJP Land Agents on 23 November 2015
Other
Size: 146 KB
R.H and B.L Howells
Written representation
Other
Size: 32 KB
Susanna Rentmore
Written representation
Other
Size: 63 KB
Linda Evans
Written representation
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.8 Applicant's Comments on Responses to Examining Authoritys First Written Questions
Other
Size: 1 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.7 Applicant's Response to Carmarthenshire County Councils Local Impact Report
Other
Size: 18 KB
G James & Sons
Written representation
Other
Size: 781 KB
Avril and Bryan Davies
Report of meeting between D.A. Davies and W. B Davies, BJP Land Agents, and WPD and Freedom on 17 November 2015.
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 03.1A Draft Development Consent Order
Other
Size: 1 MB
BJP Land Agents
Updates on discussions with the Applicant and Extract of summary table of negotiations. Accepted as a late submission for deadline 2 at the discretion of the Examining Authority.
Other
Size: 237 KB
Grwp Blaengwen
Notification of attendance and intention to speak at Hearings
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 03.1A Draft Development Consent Order - Comparison between 3.1 and 3.1A (Tracked Change)
Other
Size: 1 MB
Bruce and Yvonne Shaw
Written representation
Other
Size: 32 KB
BJP Land Agents
Correspondence between BJP Land Agents and applicant?s representative relating to Heads of Terms
Other
Size: 313 KB
G and H Thomas
Written representation and suggested location for an Accompanied Site Inspection
Other
Size: 187 KB
H.V and K.I. Miles
Written representation, notifications of attendance at hearings and suggested location for an Accompanied Site Inspection
Other
Size: 26 KB
BJP Land Agents
Comments on delayed Heads of Terms
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
FC Vol 09.3.3 Statements of Common Ground - Natural Resources Wales
Other
Size: 1 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.6.1 Applicant's Comments on Written Representations from Carmarthenshire County Council
Other
Size: 141 KB
Dawn Reed
Written representation, notifications of attendance at hearings and suggested location for an Accompanied Site Inspection
Other
Size: 315 KB
Natural Resources Wales
Suggestions for an Accompanied Site Inspection Itinerary
Other
Size: 153 KB
Attendance list and Itinerary for Accompanied Site Inspection
Attendance list of all those confirmed attendees for the two day site visit on 1 and 11 December 2015, plus a final Itinerary
Other
Size: 94 KB
Carmarthenshire County Council
Written representation
Other
Size: 130 KB
A.J and M.P. Reed
Written representation, notifications of attendance at hearings and suggested location for an Accompanied Site Inspection
Other
Size: 438 KB
Leslie and Pearl Birch
Written representation and notifications of attendance at Open Floor Hearings
Other
Size: 35 KB
Alan Dufty
Written representation
Other
Size: 973 KB
Diana Reader
Submission prior to Compulsory Acquisition Hearing of 2 and 3 December 2015
Other
Size: 33 KB
Hearing Agendas
Agenda for Issue Specific Hearing on the Draft Development Consent Order (DCO) on 10 December 2015
Other
Size: 42 KB
Hearing Agendas
Agenda for Agenda for Issue Specific Hearing on Environmental Matters on 8 and 9 December 2015
Other
Size: 18 KB
Hearing Agendas
Agendas for Open Floor Hearings on 30 November and 1 December 2015
Other
Size: 39 KB
Hearing Agendas
Agenda for Compulsory Acquisition Hearing on 2 and 3 December 2015
Other
Size: 117 KB
BJP Land Agents
Letters on behalf of clients to the Examining Authority and the applicant. Accepted at the discretion of the Examining Authority.
Other
Size: 97 KB
BJP Land Agents
Email from the Nia Wyn Davies enclosing Heads of Terms and BJP response on behalf of clients. Accepted at the discretion of the Examining Authority
Other
Size: 12 MB
Accompanied Site Inspection Itinerary
This itinerary is provided in outline and is subject to change and refinement
Other
Size: 78 KB
Brechfa Forest and Llanllwni Mountain Tourism Cluster Group.
Written Representation
Other
Size: 14 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.23.2_EIA22 Appendix 2 Relevant Watercourses Part2
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.12_DLV20 Appendix 1 Report into Underground Cables
Other
Size: 667 KB
Ms L Morris, Secretary on behalf of Grwp Blaengwen
Written Representation and Notification of attendance at open floor hearings and Issue specific hearings
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.19.3_EIA09 Appendix 3 CCC Scoping Opinion to PINS
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.8.2_DLV06 Appendix 2 Ellie Davies - CV
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
Response to the Examining Authority?s first questions
Other
Size: 65 KB
Dr M Woods
Written Representation
Other
Size: 150 KB
Rhodri Glyn Thomas AM
Written Representation
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.2.19.1 EIA09 Appendix 1 Notes of NRW ecology meetings
Other
Size: 4 MB
Carmarthenshire County Council
Local Impact Report and Appendices 1-4
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.19.4_EIA09 Appendix 4 CCC Response on Draft ES
Other
Size: 70 KB
Gilfach Wen Barn
Written Representation
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.1_DLV24 Appendix 1 NG Our Approach to Design and Routeing 2012
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.2_DLV24 Appendix 2 NG Approach to Options Appraisal 2012
Other
Size: 50 KB
Civil Aviation Authority
Position Statement
Other
Size: 7 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.4.2_DLV24 Appendix 4 CIGRE Guidelines Part 2
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.3.2_Statements of Common Ground - Historic Environment - Dyfed Archaeological Trust and Cadw
Other
Size: 8 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.6.4_DLV02 Appendix 4 Figure 1 Appendix 9.8 Other Receptors
Other
Size: 6 MB
Yoka Kilkelly and other Land and Property Owners
Written Representation
Other
Size: 7 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.6.3_DLV02 Appendix 3 Figure 1 Appendix 9.7 Classified Roads
Other
Size: 7 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.18.3_DCO34 Appendix 3 Proposed Works to Existing Assets Plans
Other
Size: 5 MB
Natural Resources Wales
Responses to the Examining Authority?s first questions
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.16_DCO24 Appendix 1 Brechfa Forest West Wind Farm Approved layout
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.20.2_EIA13 Appendix 2 BFWWF Completed Unilateral Undertaking
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.2_CA12 Appendix 1 Justification for Land
Other
Size: 221 KB
Natural Resources Wales
Comment concerning their remit in respect of this application
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.26_EIA30 Appendix 1 Tables 20.1 & 20.2
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC_Vol_01.7A_Guide to the Application
Other
Size: 8 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.20.1_EIA13 Appendix 1 BFWWF Habitat Management Plan
Other
Size: 384 KB
Carmarthenshire County Council
Responses to the Examining Authority?s first questions
Other
Size: 67 KB
Jillina Gardiner
Written Representation
Other
Size: 16 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.23.1_EIA22 Appendix 1 Relevant Watercourses Part1
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.27_HA11 Appendix 1 HRA Figure 2 Otter Figures
Other
Size: 93 KB
Yoka Kilkelly
Notification of attendance at hearings and accompanied site inspection, making oral representations at hearings and suggested locations for site inspection
Other
Size: 6 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.18.2_DCO34 Appendix 2 Existing Assets Table
Other
Size: 2 MB
Robert F Jones on behalf of Grwp Blaengwen
Written Representation and notification of a wish to be heard at an open floor hearing.
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.9_DLV13 Appendix 1 Modified Table 9.1
Other
Size: 31 KB
Mrs J Harrison
Written Representation
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.17_DCO33 Appendix 1 Email from Openreach
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.11_DLV19 Appendix 1 Strategic Options Comparison
Other
Size: 319 KB
Western Power Distribution (South Wales) plc
Notification from the applicant that WPD intend to provide an alternative option for poles 84 to 86 south of the River Towy, which has been accepted by the ExA as a Deadline 1 submission
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.5_CA18 Appendix 1 Land Owner Engagements
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.5_Position with regard to Statements of Common Ground
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.3.1_Statements of Common Ground - Carmarthenshire County Council
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.3_DLV24 Appendix 3 NG UG Policy New Connections
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.7_DLV03 Appendix 1 Viewpoints
Other
Size: 104 KB
Jonathan Edwards MP
Written Representation
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.1_DLV22 Appendix 1 Route Alignment Selection Report
Other
Size: 2 MB
Clients of BJP Residential Ltd
Written Representation and Appendices
Other
Size: 294 KB
Clients of BJP Residential Ltd
Written Representation Summary
Other
Size: 142 KB
Western Power Distribution (South Wales) plc
Covering letter and document list
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.22_EIA20 Appendix 1 Conceptual Site Model
Other
Size: 10 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.4.1_DLV24 Appendix 4 CIGRE Guidelines Part 1
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.4_Applicant's Responses to Relevant Representations
Other
Size: 8 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.6.1_DLV02 Appendix 1 Figure 1 Appendix 9.5 Residential Receptors
Other
Size: 60 KB
Carmarthenshire County Council
Notifications of attendance and suggested locations at accompanied site inspection, attendance open floor hearings, and oral representations at hearings
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.18.1_DCO34 Appendix 1 S37 Consent Burry Port
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.5_DLV22 Appendix 5 Route Alignment Selection Report Appendix 2.1
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.10_DLV15 Appendix 1 Table of Receptors
Other
Size: 10 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.4.4_DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 4
Other
Size: 12 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.4.3_DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 3
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.3_DLV22 Appendix 3 Route Alignment Selection Report Appendix 1.1
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.15_DCO03 Appendix 1 Mitigation Table
Other
Size: 10 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.2_DLV22 Appendix 2 Route Alignment Selection Report Figures
Other
Size: 5 MB
J P Hewer
Written Representation and Appendices
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.8.3_DLV06 Appendix 3 John Meehan - CV
Other
Size: 232 KB
Carmarthenshire County Council
Written Representation
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.28_OM02 Guide to the Application
Other
Size: 58 KB
RWE Innogy UK
Response to Examining Authority?s written question EIA13
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.1_CA01 Appendix 1 Change Requests
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.25_EIA29 Appendix 1 SIA Guidelines
Other
Size: 8 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.6.2_DLV02 Appendix 2 Figure 1 Appendix 9.6 Footpaths
Other
Size: 6 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.3_CA13 Appendix 1 Organogram
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.21_EIA17 Appendix 1 Stage 3 Consultation - NRW
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.24_EIA26 Appendix 1 Outline Frac-out Contingency Plan
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.4_CA14 Appendix 1 Annual Report and Financial Statements
Other
Size: 37 KB
Cadw
Confirmation of Statement of Common Ground for the historic environment
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.4.1_DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 1
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.8.1_DLV06 Appendix 1 Phillip Black - CV
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.19.2_EIA09 Appendix 2 Follow up Email with NRW
Other
Size: 13 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.4.2_DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 2
Other
Size: 144 KB
Bryan and Yoka Kilkelly
Written Representation
Other
Size: 62 KB
Mrs N Woods
Written Representation.
Other
Size: 101 KB
Notification of Hearings and Accompanied Site Visit
Other
Size: 114 KB
Hysbysiad o Wrandawiadau ac Arolygiad y Safle
Other
Size: 152 KB
Examining Authority's note of an Unaccompanied Site Inspection undertaken on 05 October 2015
Other
Size: 336 KB
ExA First round of questions
First Round of Written Questions Issued by the Examining Authority (ExA)
Other
Size: 158 KB
Brechfa Connection Preliminary Meeting Note
Note of the Preliminary Meeting held on 6 October 2015
Other
Size: 117 KB
Rule 8 Letter
Other
Size: 122 KB
Llythyr Rheol 8
Other
audio recording
Size: 66 MB
Brechfa Connection Preliminary Meeting Audio recording
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.