Hinkley Point C New Nuclear Power Station

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (1)

Developer's Application (308)

Acceptance (0)

Pre Examination (38)

Examination (599)

Decision (50)

Decided (186)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 104 MB
8.7 Cannington Park and Ride Design and Access Statement 1
Other
Size: 112 MB
8.3 Hinkley Point C Accomodation Campus Design and Access Statement 1
Other
Size: 138 MB
8.17 Hinkley Point C Landscape Strategy 1
Other
Size: 13 MB
8.16 Economic Strategy 1
Other
Size: 25 MB
8.1 Hinkley Point C Project Wide Design and Access Statement 1
Other
Size: 46 MB
8.12 Planning Statement 1
Other
Size: 44 MB
8.4 Bridgwater A Design and Access Statement 1
Other
Size: 56 MB
8.9 Junction 23 Design and Access Statement 1
Other
Size: 91 MB
8.8 Combwich Design and Access Statement 1
Other
Size: 6 MB
8.13 Accomodation Strategy 1
Other
Size: 76 MB
8.11 Williton Design and Access Statement 1
Other
Size: 14 MB
8.15 Health Impact Assessment 1
Other
Size: 43 MB
8.2 Hinkley Point C Development Site Design and Access Statement 1
Other
Size: 11 MB
8.14 Sustainability Statement 1
Other
Size: 82 MB
8.5 Bridgwater C Design and Access Statement 1
Other
Size: 74 MB
8.10 Junction 24 Design and Access Statement 1
Other
Size: 44 MB
8.6 Cannington Bypass Design and Access Statement 1
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.