Rampion Offshore Wind Farm

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (232)

Acceptance (3)

Pre Examination (19)

Examination (583)

Decision (13)

Decided (2)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 6 MB
5.1.11 Consultation Report Appendix F (FINAL)
Other
Size: 274 KB
5.2 Environmental Protection Statement of Engagement (FINAL)
Other
Size: 588 KB
8.3 Public Rights of Way Strategy (FINAL)
Other
Size: 570 KB
5.1.1a Addendum to Consultation Report (FINAL)
Other
Size: 5 MB
5.1.9 Consultation Report Appendix D2 (FINAL)
Other
Size: 1 MB
5.1.6 Consultation Report Appendix C1 (FINAL)
Other
Size: 13 MB
5.1.2b Consultation Report Appendix A2 (FINAL)
Other
Size: 1 MB
5.1.8 Consultation Report Appendix D1 (FINAL)
Other
Size: 2 MB
5.1.10 Consultation Report Appendix E (FINAL)
Other
Size: 477 KB
5.1.12 Consultation Report Appendix G (FINAL)
Other
Size: 7 MB
5.1.1 Consultation Report (FINAL)
Other
Size: 2 MB
8.2 Onshore Substation Design and Access Statement (FINAL)
Other
Size: 768 KB
5.1.4 Consultation Report Appendix B1 (FINAL)
Other
Size: 1 MB
5.3 No Significant Effects Report (FINAL)
Other
Size: 473 KB
5.1.7 Consultation Report Appendix C2 (FINAL)
Other
Size: 1 MB
5.1.2a Consultation Report Appendix A1 (FINAL)
Other
Size: 13 MB
5.1.3 Consultation Report Appendix A3 (FINAL)
Other
Size: 3 MB
5.1.13 Consultation Report Appendix H (FINAL)
Other
Size: 1 MB
5.1.5 Consultation Report Appendix B2 (FINAL)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.