Pre Application (4)

Developer's Application (232)

Acceptance (3)

Pre Examination (19)

Examination (583)

Decision (13)

Decided (2)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 1,006 KB
E.ON
Comparison between Version 1 and Version 8 of Development Consent Order - Appendix 2 of Response to Rule 17 Request submitted for the Deadline of 18 January 2014. Due to technical issues, we have had to alter the publication date on the website ? this representation was however published on 21 January 2014.
Other
Size: 1,002 KB
E.ON
Draft Development Consent Order Version 8 - Appendix 1 of Response to Rule 17 Request submitted for the Deadline of 18 January 2014. Due to technical issues, we have had to alter the publication date on the website ? this representation was however published on 21 January 2014
Other
Size: 640 KB
E.ON
Comparison between Version 7 and Version 8 of Development Consent Order - Appendix 3 of Response to Rule 17 Request submitted for the Deadline of 18 January 2014. Due to technical issues, we have had to alter the publication date on the website ? this representation was however published on 21 January 2014.
Other
Size: 45 KB
E.ON
Book of Reference Part 2- Version 4 (Tracked version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 45 KB
E.ON
Book of Reference Part 3- Version 4 (Clean version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 45 KB
E.ON
Book of Reference Part 4- Version 4 (Tracked version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 45 KB
E.ON
Book of Reference Part 1- Version 4 (Tracked version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 45 KB
E.ON
Book of Reference Part 1- Version 4 (Clean version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 45 KB
E.ON
Book of Reference Part 4- Version 4 (Clean version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 45 KB
E.ON
Book of Reference Part 5 and Schedule- Version 4 (Clean version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 326 KB
E.ON
Schedule of comments on the Examining Authority's draft DCO - Appendix 4 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 45 KB
E.ON
Book of Reference Part 2- Version 4 (Clean version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 644 KB
E.ON
Draft DCO version 7 - Appendix 1 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 45 KB
E.ON
Book of Reference Part 3- Version 4 (Tracked version) - Appendix 7 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 1,004 KB
E.ON
Comparison of version 7 of Draft DCO with version 1 - Appendix 2 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 770 KB
E.ON
Comparison of version 7 of Draft DCO with the Examining Authority's draft of Dec 2013 - Appendix 3 of Response to Deadline XII submitted for 8 January 2014
Other
Size: 859 KB
E.ON
Appendix 2 - Comparison of Version 6 (December 2013) of the Draft DCO with Version 1 (March 2013) - Written Response to Deadline XI submitted for 10 December 2013
Other
Size: 638 KB
E.ON
Appendix 3 - Comparison of Version 6 (December 2013) of the Draft DCO with Version 5 (November 2013) - Written Response to Deadline XI submitted for 10 December 2013
Other
Size: 890 KB
E.ON
Appendix 1 - Draft DCO (Version 6 - December 2013) - Written Response to Deadline XI submitted for 10 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part I (clean) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part II (with tracks) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part III (clean) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part I (with tracks) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part IV (clean) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part III (with tracks) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part II (clean) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part V and Schedule (with tracks) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Book of Reference Part V and Schedule (clean) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Schedule of Changes to the Book of Reference (Version 2 - Version 3) submitted for the deadline of 5 December 2013
Other
Size: 45 KB
E.ON
Explanatory Note for Book of Reference submitted for the deadline of 5 December 2013
Other
Size: 651 KB
E.ON Climate & Renewables
Appendix 2 of the Applicant's submission for the Deadline IX of 28 November 2013.
Other
Size: 589 KB
E.ON Climate & Renewables
Appendix 1 of the Applicant's submission for the Deadline IX of 28 November 2013.
Other
Size: 17 MB
6.5 IPC Scoping Opinion (FINAL)
Other
Size: 678 KB
E.ON - Comparison of draft DCO (version 1 and version 4).pdf
Appendix 1 of Response to the ExA's second written questions submitted for the deadline of 15 October 2013
Other
Size: 467 KB
E.ON - Draft DCO (Version 4 - October 2013) (clean).pdf
Appendix 1 of Response to the ExA's second written questions submitted for the deadline of 15 October 2013
Other
Size: 112 KB
E.ON
List of document submissions and discharging bodies for the DCO and DML. Submitted for deadline of the 12 September 2013
Other
Size: 298 KB
E.ON
Schedule of changes to the draft DCO (Version 2). Submitted for the deadline of the 12 September 2013
Other
Size: 669 KB
E.ON
DCO Comparison Version 2 (August 2013) and Version 3 (September 2013) (Appendix 1b). Submitted for the deadline of 12 September 2013
Other
Size: 529 KB
E.ON
DCO Version 3 (Appendix 1a) Submitted for the deadline of 12 September 2013
Other
Size: 1 MB
6.3.3 Alternatives Appendix 3.1
Other
Size: 45 KB
E.ON - Book of Reference Part 5 and Schedule - Update August 2013 (with tracks)
Submission for the deadline of 15 August 2013 (late submission)
Other
Size: 45 KB
E.ON - Book of Reference Part 2 - Update August 2013 (with tracks)
Submission for the deadline of 15 August 2013 (late submission)
Other
Size: 45 KB
E.ON - Book of Reference Part 1 - Update August 2013 (clean version)
Submitted for the deadline of 15 August 2013 (late submission)
Other
Size: 45 KB
E.ON - Book of Reference Part 5 and Schedule - Update August 2013 (clean version)
Submission for the deadline of 15 August 2013 (late response)
Other
Size: 45 KB
E.ON - Book of Reference Part 1 - Update August 2013 (with tracks)
Submitted for the deadline of 15 August 2013 (late submission)
Other
Size: 45 KB
E.ON - Book of Reference Part 2 - Update August 2013 (clean version)
Submission for the deadline of 15 August 2013 (late submission)
Other
Size: 45 KB
E.ON - Book of Reference Part 3 - Update August 2013 (clean version)
Submission for the deadline of 15 August 2013 (late submission)
Other
Size: 45 KB
E.ON - Book of Reference Part 4 - Update August 2013 (clean version)
Submission for the deadline of 15 August 2013 (late submission)
Other
Size: 45 KB
E.ON - Book of Reference Part 3 - Update August 2013 (with tracks)
Submission for the deadline of 15 August 2013 (late submission)
Other
Size: 45 KB
E.ON - Book of Reference Part 4 - Update August 2013 (with tracks)
Submission for the deadline of 15 August 2013 (late submission)
Other
Size: 749 KB
Draft DCO (Version 2)
Other
Size: 42 MB
6.2.25 Archaeology & Cultural Heritage Figures
Figures for Section 25
Other
Size: 5 MB
6.2.19 Other Marine Users - Figures
Other
Size: 35 MB
6.2.12i SLVIA - Figures 12.1 - 12.12
Other
Size: 6 MB
6.3.24xi Terrestrial Ecology Appendix 24.11
Other
Size: 10 MB
6.3.13i Marine Archaeology Appendix 13.1
Other
Size: 3 MB
6.1.11 Marine Ornithology
Other
Size: 2 MB
6.3.8iv Fish and Shellfish Ecology Appendix 8.4
Other
Size: 6 MB
5.1.11 Consultation Report Appendix F (FINAL)
Other
Size: 14 MB
6.3.27i Noise Appendix 27.1
Other
Size: 418 KB
6.1.21 Air Quality
Other
Size: 274 KB
5.2 Environmental Protection Statement of Engagement (FINAL)
Other
Size: 802 KB
6.1.24 Terrestrial Ecology
Other
Size: 641 KB
6.2.13 Marine Archaeology - Figure 13.1
Other
Size: 5 MB
6.3.7i Benthos and Sediment Quality Appendix 7.1
Other
Size: 15 MB
6.3.26 LVIA Appendix 26.1 and 26.2
Other
Size: 134 KB
6.3.24iii Terrestrial Ecology Appendix 24.3
Other
Size: 47 MB
6.3.14 Shipping and Navigation Appendix 14.1
Other
Size: 14 MB
6.3.6iii Physical Environment Appendix 6.2
Other
Size: 657 KB
6.1.4 Planning Policy
Other
Size: 8 MB
2.1 Location Plan (FINAL)
Other
Size: 2 MB
6.3.27ii Noise Appendix 27.2 - 27.3
Other
Size: 2 MB
6.3.22i Ground Conditions Appendix 22.1
Other
Size: 684 KB
6.1.28 Onshore Socio-economics
Other
Size: 1,016 KB
6.1.12 SLVIA
Other
Size: 6 MB
2.2.1 Offshore Land Plan (FINAL)
Other
Size: 6 MB
6.3.24vi Terrestrial Ecology Appendix 24.6
Other
Size: 5 MB
6.2.16 Aviation - Figures
Other
Size: 1 MB
6.1.7 Benthos and Sediment Quality
Other
Size: 7 MB
6.2.3 Alternatives Figures
Other
Size: 703 KB
6.1.33 Amended Development Area
Other
Size: 5 MB
6.3.24ix Terrestrial Ecology Appendix 24.9
Other
Size: 248 KB
6.3.13iv Marine Archaeology Appendix 13.4
Other
Size: 13 MB
6.3.6iv Physical Environment Appendix 6.3
Other
Size: 1 MB
6.2.33 Amended Development Area - Figure
Other
Size: 8 MB
6.3.23i Hydrology and Flood Risk App 23.1
Other
Size: 951 KB
8.1 Offshore illustrative layouts and drawings (FINAL)
Other
Size: 333 KB
6.1.15 Telecommunications
Other
Size: 47 MB
6.3.5i EIA Process Appendix 5.1
Other
Size: 9 MB
2.6 Order Limits and Grid Coordinates plan - key plan (FINAL)
Other
Size: 13 MB
2.6.2 Onshore Order limits and grid coordinates plan sheets 1 - 12 (FINAL)
Other
Size: 414 KB
6.1.20 Agriculture and Soils
Other
Size: 2 MB
6.3.11 Marine Ornithology Appendix 11.1 - 11.5
Other
Size: 453 KB
6.1.27 Noise and Vibration
Other
Size: 38 MB
6.2.12ii SLVIA - Figures 12.13 - 12.16B
Other
Size: 7 MB
6.1.18 Commercial Fisheries
Other
Size: 2 MB
6.3.8i Fish and Shellfish Ecology Appendix 8.1
Other
Size: 9 MB
2.5 Works Plan - Key Plan (FINAL)
Other
Size: 588 KB
8.3 Public Rights of Way Strategy (FINAL)
Other
Size: 34 MB
6.3.25ii Arch Cult Heritage Appendix 25.6 pt 1
Other
Size: 426 KB
6.1.13 Marine Archaeology
Other
Size: 6 MB
2.15.1 Offshore Plan showing Crown Land (FINAL)
Other
Size: 23 MB
6.3.25i Arch Cult Heritage Appendices 25.1 - 25.5
Other
Size: 32 MB
6.3.25iii ArchCult Heritage Appendix 25.6 pt 2
Other
Size: 758 KB
6.1.16 Aviation
Other
Size: 692 KB
6.3.8v Fish and Shellfish Ecology Appendix 8.5
Other
Size: 1 MB
6.1.1 Introduction
Other
Size: 389 KB
6.1.29 Transport
Other
Size: 9 MB
6.2.12x SLVIA - Figures 12.48A - 12.50
Other
Size: 6 MB
1.3 Copies of Newspaper Notices (FINAL)
Other
Size: 3 MB
6.3.24viii Terrestrial Ecology Appendix 24.8
Other
Size: 310 KB
6.1.5 EIA Process
Other
Size: 45 KB
4.3.1 Book of Reference Part 1 (FINAL)
Other
Size: 5 MB
6.3.8vi Fish and Shellfish Ecology Appendix 8.6
Other
Size: 570 KB
5.1.1a Addendum to Consultation Report (FINAL)
Other
Size: 19 MB
2.7 Access to work Plans - Key Plan and sheets 1 - 12 (FINAL)
Other
Size: 6 MB
6.1.3 Alternatives
Other
Size: 45 KB
4.3.2 Book of Reference Part 2 (FINAL)
Other
Size: 5 MB
5.1.9 Consultation Report Appendix D2 (FINAL)
Other
Size: 36 MB
2.2.2 Onshore Land Plans Sheets 1 - 12 (FINAL)
Other
Size: 41 MB
6.2.12viii SLVIA - Figures 12.40A - 12.44B
Other
Size: 412 KB
4.1 Statement of Reasons (FINAL)
Other
Size: 9 MB
2.4 Special Category Land plan key plan and sheets 1 -2 (Final)
Other
Size: 6 MB
6.4 Non-Technical Summary (FINAL)
Other
Size: 440 KB
6.1.23 Hydrology and Flood Risk
Other
Size: 41 MB
6.2.12iv SLVIA - Figures 12.20A - 12.24C
Other
Size: 6 MB
6.3.29 Traffic-Appendix 29.1 - 29.8
Other
Size: 2 MB
6.3.22ii Ground Conditions Appendix 22.2
Other
Size: 303 KB
7.2 Safety Zone Statement (FINAL)
Other
Size: 5 MB
6.2.31 Cumulative Figures
Other
Size: 377 KB
6.1.31 Cumulative and Secondary Impacts
Other
Size: 45 KB
4.3.4 Book of Reference Part 4 (FINAL)
Other
Size: 6 MB
2.6.1 Offshore Order limits and grid coordinates plan (FINAL)
Other
Size: 1 MB
6.3.13iii Marine Archaeology Appendix 13.3
Other
Size: 518 KB
6.3.2bi Onshore Project Appendix 2b.1 (FINAL)
Other
Size: 595 KB
6.1.30 Carbon Lifecycle and Balance
Other
Size: 551 KB
6.1.25 Archaeology and Cultural Heritage
Other
Size: 5 MB
6.1.14 Shipping and Navigation
Other
Size: 10 MB
6.3.6i Physical Environment Appendix 6.1 (Part one)
Other
Size: 5 MB
6.1.2a Offshore Project Description (FINAL)
Other
Size: 5 MB
4.2 Funding Statement (FINAL)
Other
Size: 543 KB
6.1.22 Ground Conditions
Other
Size: 36 MB
2.5.2 Onshore Works Plan sheets 1 - 12 (FINAL)
Other
Size: 216 KB
6.3.24i Terrestrial Ecology Appendix 24.1
Other
Size: 189 KB
6.3.2bii Onshore Project Appendix 2b.2 (FINAL)
Other
Size: 1 MB
5.1.6 Consultation Report Appendix C1 (FINAL)
Other
Size: 40 MB
6.2.12vi SLVIA - Figures 12.30 - 12.35
Other
Size: 17 MB
6.3.5ii EIA Process Appendix 5.2
Other
Size: 13 MB
5.1.2b Consultation Report Appendix A2 (FINAL)
Other
Size: 3 MB
2.17 Tree Preservation Order Plan (Final)
Other
Size: 481 KB
1.1 Cover letter to the Planning Inspectorate March 2013 (FINAL)
Other
Size: 3 MB
6.3.24vii Terrestrial Ecology Appendix 24.7
Other
Size: 7 MB
6.2.7 Benthos and Sediment Quality - Figures
Other
Size: 1 MB
5.1.8 Consultation Report Appendix D1 (FINAL)
Other
Size: 45 KB
4.3.3 Book of Reference Part 3 (FINAL)
Other
Size: 43 MB
6.2.26ii LVIA - Figures 26.6 - 26.7
Other
Size: 7 MB
6.2.20 Agriculture and Soils Figures
Other
Size: 2 MB
6.3.10 Marine Mammals Appendix 10.1
Other
Size: 2 MB
6.3.8iii Fish and Shellfish Ecology Appendix 8.3
Other
Size: 2 MB
5.1.10 Consultation Report Appendix E (FINAL)
Other
Size: 45 KB
4.3.5 Book of Reference Part 5 and Schedule (FINAL)
Other
Size: 477 KB
5.1.12 Consultation Report Appendix G (FINAL)
Other
Size: 6 MB
2.11 Plan of Public rights of navigation (FINAL)
Other
Size: 4 MB
6.2.21 Air Quality - Figures
Other
Size: 3 MB
6.3.24x Terrestrial Ecology Appendix 24.10
Other
Size: 661 KB
6.3.12 SLVIA Appendix 12.1 and 12.2
Other
Size: 39 MB
6.2.12iii SLVIA - Figures 12.17A - 12.19B
Other
Size: 7 MB
5.1.1 Consultation Report (FINAL)
Other
Size: 1 MB
6.1.10 Marine Mammals
Other
Size: 15 MB
6.2.28 Onshore Socio Economics - Figures
Other
Size: 26 MB
6.2.22 Ground Conditions Figures
Other
Size: 39 MB
6.2.12ix SLVIA - Figures 12.45A - 12.47B
Other
Size: 21 MB
2.3.2 Onshore Land affected plan key plan and sheets 1 - 12 (FINAL)
Other
Size: 293 KB
1.2 Application Form (FINAL)
Other
Size: 4 MB
6.3.23ii Hydrology and Flood Risk App 23.2
Other
Size: 2 MB
8.2 Onshore Substation Design and Access Statement (FINAL)
Other
Size: 6 MB
6.2.24 Terrestrial Ecology Figures
Other
Size: 11 MB
6.3.18 Commercial Fisheries Appendix
Other
Size: 7 MB
6.2.10 Marine Mammals Figures
Other
Size: 2 MB
6.3.8ii Fish and Shellfish Ecology Appendix 8.2
Other
Size: 2 MB
2.8 Footpath Stopping up and diversion plan (FINAL)
Other
Size: 11 MB
6.3.24ii Terrestrial Ecology Appendix 24.2
Other
Size: 768 KB
5.1.4 Consultation Report Appendix B1 (FINAL)
Other
Other
Size: 1 MB
5.3 No Significant Effects Report (FINAL)
Other
Size: 10 MB
2.16 Open Access Land Plan Key Plan and sheets 1 - 3 (FINAL)
Other
Size: 11 MB
6.2.27 Noise - Figures
Other
Size: 645 KB
6.1.19 Other Marine Users
Other
Size: 2 MB
6.2.9 Nature Conservation figures
Other
Size: 13 MB
6.2.8 Fish and Shellfish Ecology - Figures
Other
Size: 6 MB
2.5.1 Offshore Works Plan (FINAL)
Other
Size: 3 MB
6.2.23 Hydrology and Flood Risk Figures
Other
Size: 15 MB
6.3.7ii Benthos and Sediment Quality Appendix 7.2
Other
Size: 826 KB
4.4 Section 132 Application March 2013 (FINAL)
Other
Size: 8 MB
6.3.13ii Marine Archaeology Appendix 13.2
Other
Size: 27 MB
6.3.6v Physical Environment Appendix 6.4
Other
Size: 473 KB
5.1.7 Consultation Report Appendix C2 (FINAL)
Other
Size: 34 MB
6.2.26i LVIA - Figures 26.1 - 26.5
Other
Size: 11 MB
6.3.24iv Terrestrial Ecology Appendix 24.4
Other
Size: 1 MB
6.1.17 Offshore Socio-economics
Other
Size: 564 KB
6.1.9 Nature Conservation
Other
Size: 841 KB
6.1.8 Fish and Shellfish Ecology
Other
Size: 3 MB
6.2.4 Planning Policy - Figures
Other
Size: 9 MB
2.2 Land Plan Key Plan (FINAL)
Other
Size: 3 MB
6.3.24v Terrestrial Ecology Appendix 24.5
Other
Size: 482 KB
6.2.17 Offshore Socio-economics Figures
Other
Size: 28 MB
6.2.6 Physical Environment Figures
Other
Size: 1 MB
5.1.2a Consultation Report Appendix A1 (FINAL)
Other
Size: 401 KB
3.2 Explanatory Memorandum March 2013 (FINAL)
Other
Size: 37 MB
6.2.12vii SLVIA - Figures 12.36 - 12.39B
Other
Size: 3 MB
6.1.6 Physical Environment
Other
Size: 4 MB
6.2.2a Offshore Project Desc Figures (FINAL)
Other
Size: 10 MB
2.15.2 Onshore Plan showing Crown Land Key plan and sheets 1 - 2 (FINAL)
Other
Size: 349 KB
6.1.32 Environmental Management
Other
Size: 1 MB
6.1.2b Onshore Project Description
Other
Size: 13 MB
5.1.3 Consultation Report Appendix A3 (FINAL)
Other
Size: 676 KB
3.1 Development Consent Order March 2013 (FINAL)
Other
Size: 3 MB
5.1.13 Consultation Report Appendix H (FINAL)
Other
Size: 43 MB
Other
Size: 21 MB
2.12 Important Hedgerows Plan - key plan and sheets 1 - 12 (FINAL)
Other
Size: 15 MB
6.2.2b Onshore Project Desc Figures (FINAL)
Other
Size: 6 MB
2.3.1 Offshore Land Affected Plan (FINAL)
Other
Size: 292 KB
7.1 Cable Statement (FINAL)
Other
Size: 44 MB
6.2.12v SLVIA - Figures 12.25A - 12.29B
Other
Size: 91 MB
6.3.6ii Physical Environment Appendix 6.1 (Part two)
Other
Size: 256 KB
5.4 Consents and licences required under other legislation (FINAL)
Other
Size: 666 KB
6.1.26 Landscape and Visual Impact Assessment
Other
Size: 1 MB
5.1.5 Consultation Report Appendix B2 (FINAL)
Other
Size: 21 MB
Other
Size: 6 MB
2.14.1 Offshore Plan of historic and schedule monument sites (FINAL)
Other
Size: 6 MB
2.13.1 Offshore Nature Conservation Sites Plan (FINAL)
Other
Size: 25 MB
2.10 Public Rights of Way plan (FINAL)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.