Preesall Saltfield Underground Gas Storage

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (265)

Acceptance (0)

Pre Examination (33)

Examination (182)

Decision (36)

Decided (329)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
14.9d-WX40004-UE31D-01-Photomontage 4a Yr4 Sheet 2 of 3 (PDF, 3 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 5.3 IPC Scoping Opinion new (PDF, 53 MB)
Other
4.1 Application for Deemed Hazardous Substances Consent (PDF, 11 MB)
Other
6.1 Draft Development Consent Order (PDF, 399 KB)
Other
5.5 Non-Technical Summary of the Environmental Statement (PDF, 8 MB)
Other
5.1. Volume 1A Environmental Statement (PDF, 8 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.7 Rock Sea-Lavender Surveys (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.6 Seascape Landscape Townscape and Visual Amenity Summary (PDF, 36 KB)
Other
Figure 1.3-DCO Sections (Sheet 6 of 10) (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.10 Terrestrial Invertebrate Surveys (PDF, 1 MB)
Other
Figure 1.36-Entrance Facilities site and Location Plan (PDF, 23 MB)
Other
10.1-WX40004-UE31D-01-Drift-Geology (PDF, 2 MB)
Other
14.9l-WX40004-UE31D-01-Photomontage 10 Sheet 1 of 3 (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.4 Marine Ecology Baseline Report (PDF, 11 MB)
Other
5.2 ES Vol 1B Binder 1 Contents Page (PDF, 328 KB)
Other
Figure 1.16-Seawater Pump Station Site Location Plan (PDF, 3 MB)
Other
Figure 1.42-Gas Compressor Compound Sections-Sheet 1 of 2 (PDF, 1 MB)
Other
14.1-WX40004-UE31D-01-Character-Types and Areas-Sheet 1 of 3 (PDF, 2 MB)
Other
Figure 1.47-Indicative Line of Proposed Access Road Junction with A588 (PDF, 4 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.1 Ecology and Nature Conservation Regulatory and Planning Policy Framework (PDF, 90 KB)
Other
14.9f-WX40004-UE31D-01-Photomontage 5a Yr4 Sheet 2 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.1 SeascapeLandscapeTownscapeVisualAmenity-RegulatoryandPlanningPolicyFramework (PDF, 34 KB)
Other
Figure 1.3-DCO Sections (Sheet 9 of 10) (PDF, 2 MB)
Other
9.1-WX40004-UE31D-01-Statutory-Designated-Sites-for-Nature-Conservation (PDF, 3 MB)
Other
14.6-WX40004-UE31D-01-Visual-Receptors Construction-Sheet 3 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.6 Arable Weed Surveys (PDF, 3 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.5 Seascape Landscape Townscape and Visual Amenity Residual Effects (PDF, 55 KB)
Other
Figure 1.3-DCO Sections (Sheet 5 of 10) (PDF, 12 MB)
Other
Figure 1.7-Fleetwood Masterplan (PDF, 13 MB)
Other
Figure 1.50-Dual Gas Metering Station (PDF, 12 MB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 8 of 10 (PDF, 1 MB)
Other
14.9g-WX40004-UE31D-01-Photomontage 5b Sheet 1 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 1.1 EIA Scoping Report Fig - Study Area Boundaries Sheet 3 of 3 (PDF, 4 MB)
Other
14.9d-WX40004-UE31D-01-Photomontage 4a Yr19 Sheet 3 of 3 (PDF, 3 MB)
Other
14.9l-WX40004-UE31D-01-Photomontage 10 Yr4 Sheet 2 of 3 (PDF, 555 KB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.9 Lancashire Pond Biodiversity Surveys (PDF, 6 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.8 NW Strategy 2009 Regional Character Areas and Types (PDF, 3 MB)
Other
Figure 1.11-Outfall Profile (PDF, 203 KB)
Other
Figure 1.35-Temporary Closure or Diversion of Public Footpaths (PDF, 41 MB)
Other
10.3-WX40004-UE31D-01-Statutory-Designated-Sites-for-Geology (PDF, 3 MB)
Other
14.8-WX40004-UE31D-01-Background and Predicted Noise (PDF, 1 MB)
Other
14.10-WX40004-WXD-01-Landscape and Ecological (PDF, 8 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.3 Ecology and Nature Conservation Baseline Information Requests (PDF, 29 KB)
Other
Figure 1.3-DCO Sections (Sheet 4 of 10) (PDF, 2 MB)
Other
14.7-WX40004-UE31D-01-Visual-Receptors Operational-Sheet 3 of 3 (PDF, 1 MB)
Other
14.9j-WX40004-UE31D-01-Photomontage 8 Yr19 Sheet 3 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 5.5 Scoping Consultation Response Summary Table (PDF, 465 KB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 9.19 Natural England Consultation-Mitigation Licences (PDF, 108 KB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 10 of 10 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 2.2 Marine Dispersion Modelling Report (PDF, 18 MB)
Other
5.2. ES Vol 1B Binder 3 Contents Page (PDF, 369 KB)
Other
Figure 1.44-Compressor Compound Proposed Plantings (PDF, 45 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 17.1 Flood Risk Assessment (PDF, 12 MB)
Other
Figure 1.14-Proposed Seawall Crossing to Brine Outfall Pipe (PDF, 2 MB)
Other
14.9i-WX40004-UE31D-01-Photomontage 7 Yr4 Sheet 2 of 3 (PDF, 1 MB)
Other
Figure 1.22-Booster Pump Station Site and Location Plan (PDF, 17 MB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 3 of 10 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 5.2 Regulation 6(1)(b) Notification (PDF, 134 KB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 5.4 Late Scoping Consultation Response (PDF, 10 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 9.18 Ecology and Nature Conservation Non-Statutory Designated Site Citations (PDF, 220 KB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 1.1 EIA Scoping Report Fig - Ecology and Cultural Heritage Sheet 2 of 3 (PDF, 6 MB)
Other
14.1-WX40004-UE31D-01-Character-Types and Areas-Sheet 2 of 3 (PDF, 2 MB)
Other
5.2. ES Vol 1B Binder 4 (Potentially Excepted Information) Contents Page (PDF, 323 KB)
Other
12.3-WX40004-UE31D-01-Construction-and-Operational-Noise-Levels (PDF, 1 MB)
Other
14.9a-WX40004-UE31D-01-Photomontages 1 Yr19 Sheet 3 of 3 (PDF, 801 KB)
Other
14.9k-WX40004-UE31D-01-Photomontage 9 Sheet 1 of 3 (PDF, 1 MB)
Other
Figure 1.18-Seawater Pump Station Ground Floor Plan (PDF, 11 MB)
Other
14.9a-WX40004-UE31D-01-Photomontage 1 Sheet 1 of 3 (PDF, 771 KB)
Other
14.9c-WX40004-UE31D-01-Photomontage 3 Yr19 Sheet 3 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 1.1 EIA Scoping Report Fig - Ecology and Cultural Heritage Sheet 3 of 3 (PDF, 4 MB)
Other
Figure 1.21-Booster Pump Station and Control Centre Location Plan (PDF, 28 MB)
Other
Figure 1.49-Metering Station Location Plan (PDF, 145 KB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 7.4 Geophysical Survey Interim Report (Figs 74-102) (PDF, 41 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 12.2 Operational Vibration Impacts (PDF, 38 KB)
Other
Figure 1.3-DCO Sections (Sheet 2 of 10) (PDF, 2 MB)
Other
Figure 1.40-Gas Compressor Compound Site Plan (PDF, 15 MB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 6 of 10 (PDF, 2 MB)
Other
14.9i-WX40004-UE31D-01-Photomontage 7 Sheet 1 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 5.1 Schedule 4 of the Infrastructure Planning EIA Regs 2009 (PDF, 24 KB)
Other
Figure 1.1-Regional Location Map (PDF, 10 MB)
Other
Figure 1.28-Wellhead Compound No.3 Plan and Section (PDF, 14 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 16.1 Transport Assessment (PDF, 19 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 7.4 Geophysical Survey Interim Report (Figs 1-73) (PDF, 43 MB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 5 of 10 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.10 Lancashire Tranquillity Map (PDF, 3 MB)
Other
5.2. ES Vol 1B (Binder 4) - Appendix 9.16 Badger Surveys (Potentially Excepted Information) (PDF, 558 KB)
Other
Figure 1.2-Aerial View of Proposed Preesall Dev Area (PDF, 20 MB)
Other
Figure 1.3-DCO Sections (Sheet 8 of 10) (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.11 Landscape and Ecological Management Strategy Plan (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.4 Seascape Landscape Townscape and Visual Amenity Potential Effects (PDF, 609 KB)
Other
14.9k-WX40004-UE31D-01-Photomontage 9 Yr19 Sheet 3 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 1.1 EIA Scoping Report (PDF, 29 MB)
Other
Figure 1.8-Preesall Masterplan (PDF, 17 MB)
Other
Figure 1.32-Wellhead Compound No.7 Plan and Section (PDF, 20 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.9 Landscape Heritage Adopted SPG Map 2 Landscape Character Types (PDF, 3 MB)
Other
Figure 1.12-Outfall Typical Trench Detail (PDF, 632 KB)
Other
14.5-WX40004-UE31D-01-Sections-Sheet 1 of 2 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.3 Seascape Landscape Townscape and Visual Amenity Existing Baseline Information (PDF, 104 KB)
Other
Figure 1.3-DCO Sections (Sheet 3 of 10) (PDF, 755 KB)
Other
Figure 1.5-Masterplan Overall (PDF, 14 MB)
Other
Figure 1.29-Wellhead Compound No.4 Plan and Section (PDF, 18 MB)
Other
Figure 1.46-Indicative Line of Proposed Access Road Junction with A588 (PDF, 4 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 9.14 Bat Surveys (PDF, 3 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 16.2 Construction Worker Travel Plan (PDF, 4 MB)
Other
14.9c-WX40004-UE31D-01-Photomontage 3 Yr4 Sheet 2 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 1.1 EIA Scoping Report Fig - Public Rights of Way Sheet 1 of 3 (PDF, 5 MB)
Other
14.2-WX40004-UE31D-01-Viewpoints Locations (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 7.4 Geophysical Survey Interim Report (Figs 103-113) (PDF, 30 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 12.3 Traffic Noise (CRTN) Calculations and Predictions (PDF, 91 KB)
Other
Figure 1.23-Booster Pump Station Ground Floor Plan and Section (PDF, 17 MB)
Other
Figure 1.48-Electrical Cable Crossing (PDF, 3 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 7.4 Geophysical Survey Interim Report (text) (PDF, 5 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.2 Ecology and Nature Conservation Post-Scoping Consultation Responses (PDF, 349 KB)
Other
Figure 1.3-DCO Master Plan (Sheet 1 of 10) (PDF, 9 MB)
Other
Figure 1.27-Wellhead Compound No.2 Plan and Section (PDF, 13 MB)
Other
14.9i-WX40004-UE31D-01-Photomontage 7 Yr19 Sheet 3 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 7.2 Geophysical Survey of Proposed Brine Outfall Pipe - Fleetwood Report (PDF, 13 MB)
Other
12.4-WX40004-UE31D-01-Operational-Noise-Levels (PDF, 1 MB)
Other
14.9b-WX40004-UE31D-01-Photomontage 2 Sheet 1 of 3 (PDF, 696 KB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.2 Seascape Landsape Townscape and Visual Amenity Evaluation of Receptors (PDF, 79 KB)
Other
Figure 1.6-Location of Outfall OS Map (PDF, 2 MB)
Other
Figure 1.30-Wellhead Compound No.5 Plan and Section (PDF, 22 MB)
Other
Figure 1.39-Compressor Station and Electrical Sub-Station Locations (PDF, 11 MB)
Other
10.2-WX40004-UE31D-01-Solid-Geology (PDF, 2 MB)
Other
1.9-WX40004-UE31D-01-Process-Diagram (PDF, 1 MB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 2 of 10 (PDF, 1 MB)
Other
14.9g-WX40004-UE31D-01-Photomontage 5b-Yr19 Sheet 3 of 3 (PDF, 1 MB)
Other
14.9f-WX40004-UE31D-01-Photomontage 5a Sheet 1 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 3.1 Site Waste Management Plan (PDF, 360 KB)
Other
Figure 1.38-Entrance Facilities Gatehouse and Farmhouse (PDF, 3 MB)
Other
6.1-WX40004-UE31D-01-Air-Qulaity-Receptor-Locations (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 7.5 Archaeological and Built Heritage Post-Scoping Consultation Responses (PDF, 66 KB)
Other
2.1-NH50679-UE31D-01-Discharge-Modelling (PDF, 560 KB)
Other
14.6-WX40004-UE31D-01-Visual-Receptors Construction-Sheet 1 of 3 (PDF, 2 MB)
Other
14.9h-WX40004-UE31D-01-Photomontage 6 Sheet 1 of 3 (PDF, 993 KB)
Other
Figure 1.20-Profile of Wyre Estuary Crossing (PDF, 934 KB)
Other
14.9b-WX40004-UE31D-01-Photomontage 2 Yr19 Sheet 3 of 3 (PDF, 721 KB)
Other
14.9e-WX40004-UE31D-01-Photomontage 4b Yr4 Sheet 2 of 3 (PDF, 2 MB)
Other
18.1-WX40004-UE31D-01-Cumulative-Effects-Assessment (PDF, 8 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 1.1 EIA Scoping Report Fig - Public Rights of Way Sheet 2 of 3 (PDF, 5 MB)
Other
Figure 1.42-Gas Compressor Compound Sections-Sheet 2 of 2 (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 9.15 Brown Hare Surveys (PDF, 28 KB)
Other
5.2. ES Vol 1B Binder 2 Contents Page (PDF, 326 KB)
Other
Figure 1.41-Gas Compressor Compound Floor Plans (PDF, 9 MB)
Other
12.1-WX40004-UE31D-01-Noise-Mon-Locations (PDF, 2 MB)
Other
14.9k-WX40004-UE31D-01-Photomontage 9 Yr4 Sheet 2 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 3.2 Schedule of Consents (PDF, 91 KB)
Other
Figure 1.3-DCO Sections (Sheet 10 of 10) (PDF, 972 KB)
Other
Figure 1.31-Wellhead Compound No.6 Plan and Section (PDF, 13 MB)
Other
11.3-WX40004-UE31D-01-Land-Use-and-Socio-Economics-PROW (PDF, 3 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 9.17 Ecology and Nature Conservation Statutory Designated Site Citations (PDF, 366 KB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 1.1 EIA Scoping Report Fig - Ecology and Cultural Heritage Sheet 1 of 3 (PDF, 7 MB)
Other
Figure 1.25-Wellhead Location Plan (PDF, 1 MB)
Other
7.2-WX40004-UE31D-01-Built-Heritage (PDF, 5 MB)
Other
14.4-WX40004-UE31D-01-2D Contour Plan (PDF, 863 KB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 6.1 Air Quality Modelling Inputs (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 10.1 RIGS Citation (PDF, 502 KB)
Other
9.2-WX40004-UE31D-01-Non-Statutory-Designated-Sites-for-Nature-Conservation (PDF, 3 MB)
Other
14.7-WX40004-UE31D-01-Visual-Receptors Operational-Sheet 1 of 3 (PDF, 2 MB)
Other
14.9j-WX40004-UE31D-01-Photomontage 8 Sheet 1 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 4) - Appendix 9.13 Barn Owl Surveys (Potentially Excepted Information) (PDF, 44 KB)
Other
Figure 1.15-Photomontage of Proposed Sea Wall Crossing - Rossall (PDF, 16 MB)
Other
11.1-WX40004-UE31D-01-Land-Use-and-Socio-Economics-ALC (PDF, 3 MB)
Other
14.7-WX40004-UE31D-01-Visual-Receptors Operational-Sheet 2 of 3 (PDF, 1 MB)
Other
14.9j-WX40004-UE31D-01-Photomontage 8 Yr4 Sheet 2 of 3 (PDF, 1 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 12.1 Operational Noise Calculations and Results (PDF, 217 KB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 7.3 Proposed Brine Outfall Pipe - Marine Archaeological Assessment Report (PDF, 2 MB)
Other
Figure 1.24-Booster Pump Station Elevations (PDF, 6 MB)
Other
7.1-WX40004-UE31D-01-Archaeology-Assets (PDF, 5 MB)
Other
14.5-WX40004-UE31D-01-Sections-Sheet 2 of 2 (PDF, 2 MB)
Other
14.9h-WX40004-UE31D-01-Photomontage 6 Yr19 Sheet 3 of 3 (PDF, 589 KB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 9.11 Great Crested Newt Surveys (PDF, 13 MB)
Other
Figure 1.19-Seawater Pump Station Elevation Cross Section and Location Plan (PDF, 6 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 2.1 EA Consent to Discharge (including Notice of Variation) (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 1.1 EIA Scoping Report Fig - Public Rights of Way Sheet 3 of 3 (PDF, 4 MB)
Other
Figure 1.43-Compressor Compound Equipment Elevations (PDF, 303 KB)
Other
5.2. ES Vol 1B (Binder 1) - Appendix 7.1 Archaeological and Built Heritage Desk-Based Assesment (PDF, 851 KB)
Other
Figure 1.26-Wellhead Compound No.1 Plan and Section (PDF, 26 MB)
Other
1.4-WX40004-UE31D-01-Masterplan (PDF, 3 MB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 1 of 10 (PDF, 910 KB)
Other
14.6-WX40004-UE31D-01-Visual-Receptors Construction-Sheet 2 of 3 (PDF, 2 MB)
Other
14.9h-WX40004-UE31D-01-Photomontage 6 Yr4 Sheet 2 of 3 (PDF, 606 KB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 9.12 Breeding and Wintering Bird Surveys (PDF, 4 MB)
Other
Figure 1.17-Seawater Pump Station Site Plan (PDF, 19 MB)
Other
14.9c-WX40004-UE31D-01-Photomontage 3 Sheet 1 of 3 (PDF, 1 MB)
Other
17.1-WX40004-UE31D-01-Water-Environment-Features (PDF, 3 MB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.5 Phase 1 Habitat Surveys (PDF, 5 MB)
Other
Figure 1.3-DCO Sections (Sheet 7 of 10) (PDF, 2 MB)
Other
Figure 1.10-Typical Concrete Diffuser (PDF, 816 KB)
Other
Figure 1.33-Cavern Reach from Wellhead Locations (PDF, 3 MB)
Other
11.2-WX40004-UE31D-01-Land-Use-and-Socio-Economics-Receptors (PDF, 3 MB)
Other
14.9a-WX40004-UE31D-01-Photomontage 1 Yr4-Sheet 2 of 3 (PDF, 813 KB)
Other
5.2. ES Vol 1B (Binder 2) - Appendix 9.8 Water Vole and Ditch Surveys (PDF, 4 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 14.7 Lancashire and Amounderness Plain National Character Area 32 (PDF, 331 KB)
Other
Figure 1.13-Seawall Crossing site location plan (PDF, 609 KB)
Other
Figure 1.37-Entrance Facilities Proposed Barn Rebuild (PDF, 452 KB)
Other
12.2-WX40004-UE31D-01-Noise-Assessment-Receptor-Locations (PDF, 2 MB)
Other
14.9b-WX40004-UE31D-01-Photomontage 2 Yr4 Sheet 2 of 3 (PDF, 733 KB)
Other
14.9e-WX40004-UE31D-01-Photomontage 4b Sheet 1 of 3 (PDF, 2 MB)
Other
14.9l-WX40004-UE31D-01-Photomontage 10 Yr19 Sheet 3 of 3 (PDF, 2 MB)
Other
5.2. ES Vol 1B (Binder 3) - Appendix 11.1 Note of Meetings with Commercial Fishing Interests (PDF, 37 KB)
Other
Figure 1.45-Indicative Line of Proposed Access Road (PDF, 5 MB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 7 of 10 (PDF, 1 MB)
Other
14.9f-WX40004-UE31D-01-Photomontage 5a Yr19 Sheet 3 of 3 (PDF, 1 MB)
Other
9.1-WX40004-UE31D-01-SDS (PDF, 3 MB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 4 of 10 (PDF, 907 KB)
Other
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 9 of 10 (PDF, 2 MB)
Other
14.9g-WX40004-UE31D-01-Photomontage 5b Yr4 Sheet 2 of 3 (PDF, 1 MB)
Other
17.2-WX40004-UE31D-01-Surface-Water-features (PDF, 4 MB)
Other
14.1-WX40004-UE31D-01-Character-Types and Areas-Sheet 3 of 3 (PDF, 2 MB)
Other
14.9e-WX40004-UE31D-01-Photomontage 4b Yr19 Sheet 3 of 3 (PDF, 2 MB)
Other
1.1 Covering Letter (PDF, 2 MB)
Other
6 2 Explanatory Memorandum (PDF, 217 KB)
Other
2.5 l Directionally Drilled River Crossings (PDF, 6 MB)
Other
2.5 h Security Entrance and Support Facilities (PDF, 22 MB)
Other
1.3 Register of Application Documents (PDF, 201 KB)
Other
2.1 Application Boundary (PDF, 26 MB)
Other
9.2.2 Geological Summary Report (PDF, 45 MB)
Other
2.5 c Master Plans (PDF, 47 MB)
Other
9.4.6 Technical Explanation of Draft DCO Schedule 1 (PDF, 457 KB)
Other
2.5 e Booster Pump Station (PDF, 39 MB)
Other
3.3. Information to Support HRA - Morecambe Bay SPA and Ramsar (PDF, 18 MB)
Other
9.2.5 Review of the Proposed Drilling and Completion Programmes (PDF, 2 MB)
Other
2.5 i Proposed Access Road (PDF, 14 MB)
Other
2.5 f Gas Storage Cavern and Wellhead Compounds (PDF, 36 MB)
Other
3.1.1 Appendices part 4 (PDF, 40 MB)
Other
2.5 j Metering Station (PDF, 4 MB)
Other
9.1.3 Project Overview (PDF, 4 MB)
Other
2.5 o General (PDF, 36 MB)
Other
2.5 d Seawater Pump Station (PDF, 20 MB)
Other
8.1 Pipeline Statement (PDF, 94 KB)
Other
2.5 k Hazardous Substance Aplication (PDF, 27 MB)
Other
9.1.5 Preesall Needs Case (PDF, 4 MB)
Other
9.1.6 Construction Report (PDF, 8 MB)
Other
2.2.Land Plans (1) (PDF, 43 MB)
Other
9.1.8 Health Impact Appendices (PDF, 4 MB)
Other
2.3.Work Plans (PDF, 28 MB)
Other
9.1.2 Design and Access Statement (PDF, 8 MB)
Other
9.2.1 Legacy Brinewell Impact Assessment (PDF, 11 MB)
Other
3.1.1 Appendices part 1 (PDF, 15 MB)
Other
4.2 Application for Deemed Marine Consent (PDF, 2 MB)
Other
1.2 IPC Application Form (PDF, 3 MB)
Other
2.5.a Temporary Construction Compounds (PDF, 17 MB)
Other
3.1.1 Appendices part 2 (PDF, 32 MB)
Other
9.1.4 Development Consent Obligations (Draft Heads of Terms) (PDF, 139 KB)
Other
7.1 Statement of Reasons (PDF, 347 KB)
Other
9.2.4 Assessment of Brinewell 45 Incident (Subsurface Aspects) (PDF, 12 MB)
Other
2.4.Access and Temporary Stopping Up Plans (PDF, 19 MB)
Other
3.4 Statement of Engagement (PDF, 404 KB)
Other
2.5 g Gas Compressor Compound (PDF, 38 MB)
Other
2.5 b Pipelines-Brine Outfall (PDF, 15 MB)
Other
2.5 n Pipeline and Brine Outfall (PDF, 7 MB)
Other
9.2.3 NTS Interconnector Preesall Subsidence Assessment Report (Document 34 MB)
Other
2.2.Land Plans (2) (PDF, 33 MB)
Other
7.3 Book of Reference (PDF, 45 KB)
Other
2.5 m Wellhead Compounds and Indicative Cavern Layout (PDF, 9 MB)
Other
7.2 Funding Statement (PDF, 1 MB)
Other
3.1.1 Appendices part 3 (PDF, 29 MB)
Other
9.1.7 Health Impact Assessment (PDF, 18 MB)
Other
9.2.6 Gas Interconnector Pipeline to the NTS (PDF, 36 MB)
Other
9.3.1 Risk Assessment (PDF, 15 MB)
Other
3.1 Consultation Report (PDF, 2 MB)
Other
3.2. Information to Support a HRA - Morecambe Bay SAC - Liverpool Bay SPA - Shell Flat and Lune Deep cSAC (PDF, 10 MB)
Other
9.1.1 Planning and Sustainability Statement (PDF, 4 MB)
Other
9.2.7 Seismic Desk Study (PDF, 25 MB)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.