You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (0)
Developer's Application (265)
- All Documents
- Additional Information (Reg 6) (1)
- Application Form (3)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (2)
- Drawings (17)
- Environmental Statement (209)
- Other Documents (19)
- Plans (3)
- Reports (8)
Acceptance (0)
Pre Examination (33)
- All Documents
- Adequacy of Consultation (19)
- Correspondence (3)
- Environmental Impact Assessment (4)
- Land Rights (2)
- Other (2)
- Procedural Decisions (3)
Examination (182)
- All Documents
- Additional Submissions (14)
- + Comments (13)
- Correspondence (2)
- + Examining Authority questions (5)
- Further information requested by the Examining Authority (17)
- + Hearings (33)
- LIR and SoCG (54)
- Preliminary Meeting (1)
- Procedural Decisions (4)
- Written Representations (38)
- Written Reps (1)
Decision (36)
Decided (329)
Source | Description |
---|---|
Other |
The Independent Geological Assessor's Report for the Preesall Saltfield Underground Gas Storage (PDF, 2 MB)
The Independent Geological Assessor's Report for the Preesall Saltfield Underground Gas Storage
|
Other |
Preston's Collage (PDF, 178 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation
|
Other |
Secretary of State for Energy and Climate change (PDF, 71 KB)
The Secretary of State for Energy and Climate Change response to Mr Ollerenshaw MP relating concerns raised by Mr Ollerenshaw's constituent Mr Greenwood.
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
SOCG 39 - Tourism Economic Development - WBC (PDF, 138 KB)
|
Other |
6.1 Draft Development Consent Order (PDF, 399 KB)
|
Other | |
Other |
CR004 Halite Energy (ZIP, 8 MB)
Comments on Local Impact Report(s), Relevant Representation(s), Written Representation(s) and on responses to the ExA's First Written Questions.
|
Other |
Preesall correction notice (PDF, 207 KB)
|
Other | |
Other |
Preesall decision letter dated 17 July 2015 (PDF, 465 KB)
|
Other |
Preesall final DCO (signature version) (PDF, 451 KB)
Development Consent Order as made by the Secretary of State
|
Other | |
Other |
Ben Wallace on behalf of Protect Wyre Group (PDF, 589 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Alan Chapman (PDF, 148 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Alison Ransome (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Andy Barbour (PDF, 38 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Anna Lindsay-Thinn (PDF, 184 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Annie Frances (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Barrie Mair (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Ben McCabe (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Ben Soffa (PDF, 48 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Bob Harrison (PDF, 135 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Carol Chapman (PDF, 133 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Catherine Jamieson (PDF, 149 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Cheryl Raynor (PDF, 129 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Christine Kindlen (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Christine Steele Steele (PDF, 149 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Damian Arstall (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Darren Acton (PDF, 83 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Deborah Steele (PDF, 36 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Denise Wood (PDF, 149 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Diane Davis (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Doug Owens (PDF, 140 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Edwin Thwaites (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Eileen Mullervy (PDF, 136 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Ellen Ronson (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Erica Lewis (PDF, 136 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
George Scott (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Heather Pelham (PDF, 127 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Ian Blezard (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Ian Love (PDF, 137 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Ian Melvin (PDF, 38 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Irene Barton (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Jacqueline Beavers (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Jacqueline Holden (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Jacqueline Seary (PDF, 133 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Jane Nicholls (PDF, 128 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Janet Sherwood (PDF, 136 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Janine Wilkinson (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Jeff Merchant (PDF, 143 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Jennifer Lamb (PDF, 127 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Joan Little (PDF, 127 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Joan Ware (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
John Jones (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
John Roberts (PDF, 120 KB)
Further representations received by the Secretary of State since 27 March 2015 update. This submission also contains a reply from the Department of Energy and Climate Change?s Chief Scientific Advisor John Loughhead.
|
Other |
Jonathan Maher (PDF, 143 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
June Brand (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Katrina McDonald (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Kevin Walsh (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Kris Butler (PDF, 141 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Lesley Ronson (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update
|
Other |
Linda Moore (PDF, 143 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Liz Edmondson (PDF, 130 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Lucy Brown (PDF, 2 MB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Lyn Butterworth (PDF, 133 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Mandy Knott (PDF, 136 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Margaret Jackson (PDF, 127 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Maria Allen (PDF, 46 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Mark Edwards (PDF, 133 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Martin Normington (PDF, 149 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Mary Stirzaker (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Milena Wobbe (PDF, 137 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Neil Lonsdale (PDF, 144 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Nicholas Riding (PDF, 47 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Patricia Humphrey (PDF, 32 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Patricia Laurence (PDF, 36 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Paul Critchley (PDF, 47 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Paula Disley (PDF, 83 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Peter Jamieson Sinclair (PDF, 136 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Peter Stubbs (PDF, 252 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Protect Wyre Group (PDF, 51 KB)
Further representations received by the Secretary of State since 27 March 2015 update
|
Other |
Ray Hutchinson (PDF, 134 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Richard Ion (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Richard Turner (PDF, 143 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Rob Walker (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Robert Haworth (PDF, 137 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Robert Kane (PDF, 133 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Rod Steele (PDF, 38 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Ronald Beaver (PDF, 127 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Sandra Nixon (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Sandra Seary (PDF, 132 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Sharon Conley (PDF, 129 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Stella Charnley (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Sue Mccormick (PDF, 134 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Suzanne Bradshaw (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Tom Cummings (PDF, 82 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Val Schofield (PDF, 133 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
William Catterall (PDF, 143 KB)
Further representations received by the Secretary of State since 27 March 2015 update.
|
Other |
Department for Energy and Climate Change (PDF, 39 KB)
Update regarding the Preesall Redetermination
|
Other |
Joint statement from various Interested Parties. (PDF, 244 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 11 September 2014 but accepted by the Secretary of State as part of the consultation. This is a joint submission from Aggregate Industries UK; Bastion Infrastructure Group; CBI North West; CECA North West; Chamber of Commerce East Lancashire; Community; Confederation of Paper Industries; DTP; Downtown in Business; Energy and Utilities Alliance; GMB Commercial Service Section; Institute of Directors North West region; IGEM; Major Energy Users? Council; National Joint Council for the Engineering Construction Industry; North & Western Lancashire Chambers of Commerce; Steelite International; Unite the Union; Construction, Energy & Utilities and Gibraltar Unite the Union; Whitehelm Capital.
|
Other |
Late consultation response by Equality and Human Rights Commission 1 (PDF, 259 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Late consultation response by Equality and Human Rights Commission 2 (PDF, 242 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
North and Western Lancashire Chamber of Commerce (PDF, 15 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 11 September 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
CBI North West, Institute of Directors North West, East and North & Western Chamber of Commerce (PDF, 630 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 11 September 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Equality and Human Rights Commission (PDF, 85 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 11 September 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Edward Greenwood (PDF, 364 KB)
Comments on the responses to the consultations conducted by the Secretary of State for Energy and Climate Change, into the re-determination of the Preesall Saltfield Underground Gas Storage application promoted by Halite Energy Group Limited.
|
Other |
Health and Safety Executive (PDF, 581 KB)
Health and Safety Executive?s response to Secretary of State?s letter dated 16 October 2014 seeking clarification on Hazardous Substances Consent
|
Other |
Senergy (The independent Geological Assessor appointed by the Secretary of State) (PDF, 774 KB)
Senergy Ltd Response to Issues raised related to their Independent Geological Assessment of the Proposed Preesall Gas Storage Site
|
Other |
GTC Pipelines, Quadrant Pipelines, Electricity Network Company, Independent Power Networks, Independent Water Networks, Independent Fibre Networks (PDF, 55 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 11 September 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Energetics (PDF, 276 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 11 September 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Halite Energy Group Ltd (PDF, 1 MB)
Halite Energy Limited response to the Department of Energy and Climate Change?s letter requesting clarification on proposed parameters for the underground gas storage facility.
|
Other |
Secretary of State for Energy & Climate Change (PDF, 1 MB)
Letter from the Secretary of State to Health and Safety Executive seeking clarification on Hazardous Substance Consent.
|
Other | |
Other |
Finsbury (PDF, 381 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
5.1. Volume 1A Environmental Statement (PDF, 8 MB)
|
Other |
North and Western Lancashire Chamber of Commerce (PDF, 865 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Institute of Directors (PDF, 110 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Kenneth Penswick (PDF, 1 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation. Please note that Mr Penswick previously submitted a representation before the 9 of May 2014 deadline.
|
Other |
Ann M Moore (PDF, 66 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Ben Wallace MP (PDF, 7 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Edward Greenwood (PDF, 461 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Energetics (PDF, 63 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
English Heritage (PDF, 465 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Environment Agency (PDF, 8 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Fulcrum (PDF, 72 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Gas Transportation Company Limited (PDF, 59 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
George and Vivienne Parkinson (PDF, 2 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Halite Energy Group Limited (PDF, 15 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Halite Energy Group Ltd (PDF, 2 MB)
Halite Energy Group Ltd?s comments on the responses to the first round of consultation, conducted by the Secretary of State for Energy and Climate Change, in regard to the re-determination of the Preesall Saltfield Underground Gas Storage application promoted by Halite Energy Group Limited.
|
Other |
Hambleton Parish Council (PDF, 49 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Highways Agency (PDF, 167 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation contains additional information not included in the Highways Agency?s submission dated 4 August 2014
|
Other |
Hilda Dickinson (PDF, 12 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Historic Railways Estate Section of the Highways Agency (PDF, 26 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Lancashire County Council (PDF, 185 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Marilyn Mulroy (PDF, 67 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Mr and Mrs Booth (PDF, 762 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Mr B Bayley (PDF, 17 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Mr D Baker (PDF, 1 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Mrs D Hillman (PDF, 424 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Natural England (PDF, 17 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation contains Natural England?s comments following the publication of the additional geological information requested by the Protect Wyre Group.
|
Other |
Natural England (PDF, 77 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Over Wyre Action Group (PDF, 717 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Persimmon Homes (PDF, 564 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Philip Moore (PDF, 68 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Preesall Town Council (PDF, 28 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Protect Wyre Group (PDF, 96 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Quadrant Pipelines Limited, Utility Grid Installations Limited and Independent Pipelines Limited (PDF, 40 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Sefton Council (PDF, 82 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Stalmine with Staynall Parish Council (PDF, 28 KB)
Second round of consultation response by Stalmine with Staynall Parish Council
3. Add the following description: Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
The Electricity Network Company Limited, GTC Pipelines Limited and Independent Pipelines Limited (PDF, 40 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
The Highways Agency (PDF, 14 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
3 Man Factory (PDF, 223 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Institute of Directors (PDF, 77 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Macdonald Tickled Trout Hotel (PDF, 78 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Cotton Court (PDF, 212 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation
|
Other |
Champion Business Advisors Limited (PDF, 2 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation
|
Other |
J Murphy and Son Ltd (PDF, 109 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
OneFit Software (PDF, 3 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Thomas Consulting Ltd (PDF, 2 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Secretary of State for Energy & Climate Change (PDF, 4 MB)
Additional information from the Secretary of State to Protect Wyre Group relating to their query dated 19 August 2014
|
Other |
Glenn Sibbick (PDF, 54 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Protect Wyre Group (PDF, 122 KB)
Second request for further geological information from the Protect Wyre group
|
Other |
Secretary of State for Energy & Climate Change (PDF, 1 MB)
The Secretary of State's response to Protect Wyre Group dated 19 August 2014
|
Other |
Bastion Infrastructure Group (PDF, 206 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Haslam Printers Limited (PDF, 104 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
One Fine Summer (PDF, 351 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Protect Wyre Group (PDF, 80 KB)
Request for further geological information from the Protect Wyre group.
|
Other |
Secretary of State for Energy & Climate Change (PDF, 2 MB)
Further information produced by the Independent Geological Assessor following a query by the Protect Wyre group.
|
Other |
John Day (PDF, 103 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Steelite International (PDF, 879 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Boulting (PDF, 586 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
2nd Round consultation on redetermination of the Preesall Underground Gas Storage Facility July (PDF, 36 KB)
The Secretary of States second round consultation on redetermination of the Preesall Underground Gas Storage Facility
|
Other |
Mitchell's Scaffolding Ltd (PDF, 49 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Steve Fountain (PDF, 684 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Liquid Metering Instruments Ltd (PDF, 12 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Enviro Solution (PDF, 122 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Glovers Project Services Limited (PDF, 87 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Siemens (PDF, 154 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Damian Waters (PDF, 12 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Lesley Middleton (PDF, 211 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Mantec Group Ltd (PDF, 1 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
The HR Department Limited (PDF, 460 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Finning (UK) Ltd (PDF, 232 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Red Rose Select Services Ltd (PDF, 165 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
VolkerWessels UK (PDF, 1 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Aggregate Industries UK Ltd (PDF, 141 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Community (PDF, 126 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Orion Windows (PDF, 747 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Source One Environmental Ltd (PDF, 298 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Lifting Projects UK (PDF, 10 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Business Solutions (PDF, 507 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
IGEM (PDF, 1,006 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
SRL Technical Services Limited (PDF, 83 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
DHL Supply Chain Solutions (PDF, 202 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Haztech Consultants Limited (PDF, 1 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Craven Electrical and Security Ltd (PDF, 228 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
AE Capital Advisers (PDF, 338 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
CPI (PDF, 683 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
East Lancashire Chamber of Commerce (PDF, 887 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
JCK Professional Building Service Ltd (PDF, 209 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
PSA Design Ltd (PDF, 91 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Unite (PDF, 152 KB)
Late consultation response by Unite.pdf
Desc: Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Pendle Signs & Plastics Ltd (PDF, 171 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
AE Capital Advisers (PDF, 170 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
JCK Professional Building Services Ltd (PDF, 210 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Eric Wright Construction Ltd (PDF, 204 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Lesar (PDF, 35 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Sonia Youd Associates Limited (PDF, 274 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation
|
Other |
Halite Energy Group Limited (ZIP, 99 MB)
Further geological information requested by the Secretary of State for Energy and Climate Change on 23 May 2014 for the redetermination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. The Geological model used the requested Petrel format. The .xyz files can be opened with Microsoft Notepad or similar text editors.
|
Other |
Halite Energy Group Ltd (PDF, 795 KB)
Cover letter relating to the geological information requested by the assessor on 23 May 2014
|
Other |
A E Yates Ltd (PDF, 202 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Cheetham Hill Construction Ltd (PDF, 2 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Formative Facilities Group Ltd (PDF, 143 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Harry Fairclough Construction Ltd (PDF, 99 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Kenneth Penswick (PDF, 4 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation. Please note that Mr Penswick previously submitted a representation before the 9 of May 2014 deadline.
|
Other |
North & Western Lancashire Chamber of Commerce (PDF, 397 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
A B Alderton (PDF, 83 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Alf Clempson (PDF, 181 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Ann Moore (PDF, 66 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Ben Wallace (MP) (PDF, 156 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
British Ceramic Confederation (PDF, 715 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. Attached to this submission is the Right Honourable Michael Fallon?s (MP) response to the letter. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
D Morgan PLC (PDF, 296 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
D Myerscough (PDF, 666 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
D.S, M.J and R.S Jackson (PDF, 13 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Dr Connaughton (PDF, 15 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Edward Greenwood (PDF, 426 KB)
: Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Engineering Contractors Association (PDF, 40 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
English Heritage (PDF, 3 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Environment Agency (PDF, 8 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Equality and Human Rights Commission (PDF, 299 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Eric Ollerenshaw (MP) (PDF, 100 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
George and Vivienne Parkinson (PDF, 2 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Gordon McCann (PDF, 35 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Halite Energy Group Ltd (PDF, 124 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Halite Energy Group Ltd (ZIP, 19 KB)
Further geological information requested by the Secretary of State for Energy and Climate Change on 1 May 2014 for the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. The Geological model used the requested Petrel format. The .xyz files can be opened with Microsoft Notepad or similar text editors.
|
Other |
Hambleton Parish Council (PDF, 70 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Highways Agency (PDF, 681 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Irene Homer (PDF, 31 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
J Crean (PDF, 984 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Joseph Cooper (PDF, 814 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Kenneth Penswick (PDF, 1 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Lancashire County Council (PDF, 73 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Lesley and Michael Jeynes (PDF, 194 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Marilyn Mulroy (PDF, 83 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Michael Tucker (PDF, 111 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Mr Beniston (PDF, 54 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Mr D Barker (PDF, 1 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Mr P Moore (PDF, 67 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Mr R. P. Darby (PDF, 59 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Natural England (PDF, 85 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Network Rail (PDF, 107 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
P J ETCHELLS (PDF, 928 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Paul Maynard (MP) (PDF, 16 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Persimmon Homes (PDF, 2 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Preesall Town Council (PDF, 69 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Protect Wyre Group (PDF, 24 MB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Remsol Ltd (PDF, 179 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Ribble Fisheries Consultative Association (PDF, 129 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Roy Pickup (PDF, 423 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
S ETCHELLS (PDF, 907 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Secretary of State for Energy & Climate Change (PDF, 45 KB)
After reviewing the geological information received on 15 May 2014 the Secretary of State has requested that Halite Energy Limited provided the assessor with further geological information to complement the information received on 15 May 2014
|
Other |
Stalmine with Staynall Residents' Association (PDF, 18 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Staynall Parish Council. (PDF, 31 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Stephen Duncalf (PDF, 12 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited
|
Other |
Susan Tucker (PDF, 18 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
The Coal Authority (PDF, 27 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
The Trustees of the J Smith & Sons ltd directors pension scheme (PDF, 473 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
ThyssenKrupp Uhde Energy & Power (PDF, 203 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Utility Grid Installations, GTC, Independent Pipelines, Quadrant Pipelines and The Electricity Network Company (PDF, 40 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Westshield Ltd (PDF, 75 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Wyre Borough Council (PDF, 14 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Yorkshire Dales National Park Authority (PDF, 34 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited.
|
Other |
Les Mason (PDF, 40 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Tesselaar Ltd (PDF, 56 KB)
Representation received by the Secretary of State for Energy and Climate Change relating to the re-determination of the Preesall Saltfield Underground Gas Storage application by Halite Energy Group Limited. This representation was received after 9 May 2014 but accepted by the Secretary of State as part of the consultation.
|
Other |
Secretary of State for Energy & Climate Change (PDF, 55 KB)
Letter from the Secretary of State advising Halite Energy Group Ltd about what geological information the assessor will request from them.
|
Other |
Approved Halite judgment - 17 January 2014 (33897406) (2) (PDF, 504 KB)
High Court judgement on 9 April 2013 concerning the Secretary of State for Energy and Climate Change?s decision made on Halite Energy Group Limited?s application for development consent.
|
Other |
Statement of Matters for redetermination of the Preesall Underground Gas Storage Facility (PDF, 73 KB)
Letter from the Department of Energy and Climate Change regarding a Statement of Matters with respect to further written representations for the Preesall Underground Gas Storage Facility
|
Other |
140225 EN030001 Calderbrook Construction Ltd (PDF, 95 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Correspondence with the applicant (PDF, 107 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Alan Marsh (PDF, 16 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Andrew Brough (PDF, 41 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Ann Brown (PDF, 18 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Stephen Scott on behalf of Baker Mallett (PDF, 555 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Stephen Jackson on behalf of Baker Mallett (PDF, 555 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Mike Birchall on behalf of bea construction consultants (PDF, 40 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Ben Wallace MP (PDF, 987 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Bestin Cleaning Services (PDF, 537 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
British Ceramic Federation (PDF, 58 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Alban Cassidy on behalf of Cassidy + Ashton (PDF, 870 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Alban P. Cassidy on behalf of Cassidy + Ashton (PDF, 577 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Clayton Jones (PDF, 14 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
CNG Services Ltd (PDF, 651 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Conlon Construction Ltd (PDF, 1 MB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Croft Goode (PDF, 158 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
D R Holt (PDF, 244 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Daniel McWhinnie (PDF, 39 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
David Evans (PDF, 19 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
David Pellett (PDF, 66 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Craid Smith on behalf of DejaView (PDF, 602 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Downton in Business (PDF, 686 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Energy & Utilities Alliance (PDF, 53 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Eric Ollerenshaw OBE MP (PDF, 1 MB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
European Geophysical Services (PDF, 470 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
FJ Fabrication Ltd (PDF, 18 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
GJ Brooks Ltd (PDF, 52 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Gary Smith on behalf of GMB (PDF, 26 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Granthams (PDF, 26 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Halite Energy Group (PDF, 9 MB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
John Chesworth on behalf of Harrison Drury (PDF, 331 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Hilary Dales (PDF, 16 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Ian & Anna Faulkner (PDF, 16 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Ian Mcleod (PDF, 42 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Jas Signs & Graphics (PDF, 287 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Jennie Pickersgill (PDF, 43 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
John Jensen (PDF, 40 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Judith Knibbs (PDF, 33 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Ross Etchells on behalf of Lancashire Chauffeur Services (PDF, 13 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Les Dawson (PDF, 48 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Maggie Walsh (PDF, 16 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Marriott Drilling Group (PDF, 746 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
National Joint Council for the Engineering Construction Industry (PDF, 500 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Babs Murphy on behalf of North & Western Lancashire Chamber of Commerce (PDF, 1 MB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Mike McNulty on behalf of O'Connor Utilities Ltd. (PDF, 899 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Norman Tenray on behalf of OBAS (PDF, 3 MB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Panaz Ltd (PDF, 2 MB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Peter Taylor (PDF, 14 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Roberta Austin (PDF, 61 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Bob Morrison on behalf of Sec-Tech UK (PDF, 3 MB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Nilam Karia on behalf of Sector Security Services Ltd (PDF, 1 MB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Silver Service (PDF, 226 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Bill Sutton on behalf of Sutton Employment Services (PDF, 245 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
Richard Taylor on behalf of TFS Training (PDF, 17 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
The Lancashire Wildlife Trust (PDF, 39 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
William Bashall (PDF, 32 KB)
Representations received by the Secretary of State for Energy and Climate Change following decision made on the application on 9 April 2013.
|
Other |
130409 EN030001 Dieter Helm Report (PDF, 8 MB)
Report by Dieter Helm on Gas Storage
|
Other |
130409 EN030001 Post Examination Correspondence (PDF, 6 MB)
Correspondence recieved after the Examination
|
Other |
130121 EN030001 Preesall Report (PDF, 2 MB)
Report by the panel of Examining Inspectors (republished 15 April 2013, to include Appendix D)
|
Other |
130409 EN030001 Notice of Decision (PDF, 46 KB)
Letter sent to interested parties by the Planning Inspectorate
|
Other |
130409 EN030001 Preesall Decision (PDF, 3 MB)
The Secretary of State's Decision Letter
|
Other |
130409 EN030001 Chris Le Fevre Report (PDF, 2 MB)
Report by Chris Le Fevre on Gas Storage in Great Britain
|
Other |
121016 EN030001 Protect Wyre Group (PDF, 193 KB)
|
Other |
121004 EN030001 H16 Consequential Amendments to Brine Outfall Plans (PDF, 23 MB)
Plans and consequential amendments related to the amendments to the brine discharge outfall
|
Other |
120629 EN030001 Submission from ABP (PDF, 190 KB)
|
Other |
121017 EN030001 Speaking Notes by PWG (Clegg) (PDF, 1 MB)
|
Other |
121018 EN030001 Supplementary Info by Ben Wallace MP (PDF, 14 KB)
|
Other |
121018 EN030001 Speaking Notes by Michael Tucker (PDF, 260 KB)
|
Other |
121018 EN030001 Summary of Case by Halite Energy (PDF, 120 KB)
|
Other |
121017 EN030001 Speaking Notes by PWG (Mulroy) (PDF, 2 MB)
|
Other |
121017 EN030001 Speaking Notes by PWG (Phillips) (PDF, 1 MB)
|
Other | |
Other |
121018 EN030001 Speaking Notes by Ben Wallace MP (PDF, 165 KB)
|
Other | |
Other |
121018 EN030001 Speaking Notes by Eric Ollerenshaw MP (PDF, 300 KB)
|
Other | |
Other |
121018 EN030001 Speaking Notes by Roy Pickup (PDF, 27 KB)
|
Other | |
Other |
121018 EN030001 Speaking Notes by Cllr June Jackson (PDF, 195 KB)
|
Other |
121017 EN030001 Supplementary info by Ben Wallace MP (PDF, 626 KB)
|
Other |
121021 EN030001 Submission by Michael Tucker (PDF, 15 KB)
|
Other |
121021 EN030001 Submission by Rosemary Hogarth (PDF, 14 KB)
|
Other |
121021 EN030001 Submission by Alice Horner (PDF, 74 KB)
|
Other |
121023 EN030001 Overlay Plan - MMD-277663-G-DR-00-XX-0027 P3 by Halite (PDF, 1 MB)
This plan is a submission from Halite following the Open Floor Hearing
|
Other |
120918 EN030001 Audio Recording Part 1 (PDF, 31 KB)
|
Other |
120919 EN030001 Audio Recording (PDF, 31 KB)
|
Other |
120918 EN030001 Audio Recording Part 2 (PDF, 31 KB)
|
Other | |
Other | |
Other |
Figure 1.3-DCO Sections (Sheet 6 of 10) (PDF, 2 MB)
|
Other | |
Other | |
Other |
10.1-WX40004-UE31D-01-Drift-Geology (PDF, 2 MB)
|
Other | |
Other | |
Other |
5.2 ES Vol 1B Binder 1 Contents Page (PDF, 328 KB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
Figure 1.3-DCO Sections (Sheet 9 of 10) (PDF, 2 MB)
|
Other | |
Other | |
Other | |
Other | |
Other |
Figure 1.3-DCO Sections (Sheet 5 of 10) (PDF, 12 MB)
|
Other |
Figure 1.7-Fleetwood Masterplan (PDF, 13 MB)
|
Other |
Figure 1.50-Dual Gas Metering Station (PDF, 12 MB)
|
Other | |
Other | |
Other | |
Other | |
Other |
14.9l-WX40004-UE31D-01-Photomontage 10 Yr4 Sheet 2 of 3 (PDF, 555 KB)
|
Other | |
Other | |
Other |
Figure 1.11-Outfall Profile (PDF, 203 KB)
|
Other | |
Other | |
Other | |
Other |
14.10-WX40004-WXD-01-Landscape and Ecological (PDF, 8 MB)
|
Other | |
Other |
Figure 1.3-DCO Sections (Sheet 4 of 10) (PDF, 2 MB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
5.2. ES Vol 1B Binder 3 Contents Page (PDF, 369 KB)
|
Other |
Figure 1.44-Compressor Compound Proposed Plantings (PDF, 45 MB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
14.9a-WX40004-UE31D-01-Photomontages 1 Yr19 Sheet 3 of 3 (PDF, 801 KB)
|
Other | |
Other |
Figure 1.18-Seawater Pump Station Ground Floor Plan (PDF, 11 MB)
|
Other |
14.9a-WX40004-UE31D-01-Photomontage 1 Sheet 1 of 3 (PDF, 771 KB)
|
Other | |
Other | |
Other | |
Other |
Figure 1.49-Metering Station Location Plan (PDF, 145 KB)
|
Other | |
Other | |
Other |
Figure 1.3-DCO Sections (Sheet 2 of 10) (PDF, 2 MB)
|
Other |
Figure 1.40-Gas Compressor Compound Site Plan (PDF, 15 MB)
|
Other | |
Other | |
Other | |
Other |
Figure 1.1-Regional Location Map (PDF, 10 MB)
|
Other |
Figure 1.28-Wellhead Compound No.3 Plan and Section (PDF, 14 MB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
Figure 1.2-Aerial View of Proposed Preesall Dev Area (PDF, 20 MB)
|
Other |
Figure 1.3-DCO Sections (Sheet 8 of 10) (PDF, 2 MB)
|
Other | |
Other | |
Other | |
Other | |
Other |
Figure 1.8-Preesall Masterplan (PDF, 17 MB)
|
Other |
Figure 1.32-Wellhead Compound No.7 Plan and Section (PDF, 20 MB)
|
Other | |
Other |
Figure 1.12-Outfall Typical Trench Detail (PDF, 632 KB)
|
Other |
14.5-WX40004-UE31D-01-Sections-Sheet 1 of 2 (PDF, 1 MB)
|
Other | |
Other |
Figure 1.3-DCO Sections (Sheet 3 of 10) (PDF, 755 KB)
|
Other |
Figure 1.5-Masterplan Overall (PDF, 14 MB)
|
Other |
Figure 1.29-Wellhead Compound No.4 Plan and Section (PDF, 18 MB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
14.2-WX40004-UE31D-01-Viewpoints Locations (PDF, 1 MB)
|
Other | |
Other | |
Other | |
Other |
Figure 1.48-Electrical Cable Crossing (PDF, 3 MB)
|
Other | |
Other | |
Other |
Figure 1.3-DCO Master Plan (Sheet 1 of 10) (PDF, 9 MB)
|
Other |
Figure 1.27-Wellhead Compound No.2 Plan and Section (PDF, 13 MB)
|
Other | |
Other | |
Other |
12.4-WX40004-UE31D-01-Operational-Noise-Levels (PDF, 1 MB)
|
Other |
14.9b-WX40004-UE31D-01-Photomontage 2 Sheet 1 of 3 (PDF, 696 KB)
|
Other | |
Other |
Figure 1.6-Location of Outfall OS Map (PDF, 2 MB)
|
Other |
Figure 1.30-Wellhead Compound No.5 Plan and Section (PDF, 22 MB)
|
Other | |
Other |
10.2-WX40004-UE31D-01-Solid-Geology (PDF, 2 MB)
|
Other |
1.9-WX40004-UE31D-01-Process-Diagram (PDF, 1 MB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
2.1-NH50679-UE31D-01-Discharge-Modelling (PDF, 560 KB)
|
Other | |
Other |
14.9h-WX40004-UE31D-01-Photomontage 6 Sheet 1 of 3 (PDF, 993 KB)
|
Other |
Figure 1.20-Profile of Wyre Estuary Crossing (PDF, 934 KB)
|
Other |
14.9b-WX40004-UE31D-01-Photomontage 2 Yr19 Sheet 3 of 3 (PDF, 721 KB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
5.2. ES Vol 1B Binder 2 Contents Page (PDF, 326 KB)
|
Other |
Figure 1.41-Gas Compressor Compound Floor Plans (PDF, 9 MB)
|
Other |
12.1-WX40004-UE31D-01-Noise-Mon-Locations (PDF, 2 MB)
|
Other | |
Other | |
Other |
Figure 1.3-DCO Sections (Sheet 10 of 10) (PDF, 972 KB)
|
Other |
Figure 1.31-Wellhead Compound No.6 Plan and Section (PDF, 13 MB)
|
Other | |
Other | |
Other | |
Other |
Figure 1.25-Wellhead Location Plan (PDF, 1 MB)
|
Other |
7.2-WX40004-UE31D-01-Built-Heritage (PDF, 5 MB)
|
Other |
14.4-WX40004-UE31D-01-2D Contour Plan (PDF, 863 KB)
|
Other | |
Other |
5.2. ES Vol 1B (Binder 3) - Appendix 10.1 RIGS Citation (PDF, 502 KB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
Figure 1.24-Booster Pump Station Elevations (PDF, 6 MB)
|
Other |
7.1-WX40004-UE31D-01-Archaeology-Assets (PDF, 5 MB)
|
Other |
14.5-WX40004-UE31D-01-Sections-Sheet 2 of 2 (PDF, 2 MB)
|
Other |
14.9h-WX40004-UE31D-01-Photomontage 6 Yr19 Sheet 3 of 3 (PDF, 589 KB)
|
Other | |
Other | |
Other | |
Other | |
Other |
Figure 1.43-Compressor Compound Equipment Elevations (PDF, 303 KB)
|
Other | |
Other |
Figure 1.26-Wellhead Compound No.1 Plan and Section (PDF, 26 MB)
|
Other |
1.4-WX40004-UE31D-01-Masterplan (PDF, 3 MB)
|
Other |
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 1 of 10 (PDF, 910 KB)
|
Other | |
Other |
14.9h-WX40004-UE31D-01-Photomontage 6 Yr4 Sheet 2 of 3 (PDF, 606 KB)
|
Other | |
Other |
Figure 1.17-Seawater Pump Station Site Plan (PDF, 19 MB)
|
Other | |
Other |
17.1-WX40004-UE31D-01-Water-Environment-Features (PDF, 3 MB)
|
Other | |
Other |
Figure 1.3-DCO Sections (Sheet 7 of 10) (PDF, 2 MB)
|
Other |
Figure 1.10-Typical Concrete Diffuser (PDF, 816 KB)
|
Other |
Figure 1.33-Cavern Reach from Wellhead Locations (PDF, 3 MB)
|
Other | |
Other |
14.9a-WX40004-UE31D-01-Photomontage 1 Yr4-Sheet 2 of 3 (PDF, 813 KB)
|
Other | |
Other | |
Other |
Figure 1.13-Seawall Crossing site location plan (PDF, 609 KB)
|
Other |
Figure 1.37-Entrance Facilities Proposed Barn Rebuild (PDF, 452 KB)
|
Other | |
Other |
14.9b-WX40004-UE31D-01-Photomontage 2 Yr4 Sheet 2 of 3 (PDF, 733 KB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
9.1-WX40004-UE31D-01-SDS (PDF, 3 MB)
|
Other |
14.3-WX40004-UE31D-01-Baseline Photos-Sheet 4 of 10 (PDF, 907 KB)
|
Other | |
Other | |
Other |
17.2-WX40004-UE31D-01-Surface-Water-features (PDF, 4 MB)
|
Other | |
Other | |
Other |
121026 EN030001 S99 Close of Examination Letter (PDF, 54 KB)
Letter informing Interested Parties about the completion of the Preesall Saltfield UGS examination
|
Other |
121024 EN030001 Halite & Blackpool BC option agreement (PDF, 892 KB)
|
Other |
121024 EN030001 Submission by PWG (PDF, 168 KB)
|
Other | |
Other |
121024 EN030001 Submission by Mark Hamer (PDF, 527 KB)
|
Other |
121004 EN030001 Halite Comments on PWG Appendicies (PDF, 498 KB)
A letter from the applicant relating to the Appendices to PWG's written representation.
|
Other |
121005 EN030001 V5 DCO Halite (ZIP, 10 MB)
A revised Draft Development Conset Order and Development Consent Obligation, submitted by Halite Energy on 5 October 2012.
|
Other |
121005 EN030001 Halite response re Statutory Undertakers (PDF, 523 KB)
A response by Halite Energy to the Panel's letter of 3 October 2012
|
Other |
121012 EN030001 Halite draft HSC (PDF, 1 MB)
|
Other |
121022 EN030001 Submission from D Jackson (PDF, 667 KB)
|
Other |
121015 EN030001 Knott End Golf Club (PDF, 1 MB)
|
Other |
121017 EN030001 Audio Recording Fleetwood 1000 (PDF, 31 KB)
|
Other |
121017 EN030001 Audio Recording Fleetwood 1900 (PDF, 31 KB)
|
Other |
121018 EN030001 Audio Recording Stalmine 1900 (PDF, 31 KB)
|
Other |
121017 EN030001 Audio Recording Fleetwood 1430 (PDF, 31 KB)
|
Other |
121018 EN030001 Audio Recording Stalmine 1430 (PDF, 31 KB)
|
Other |
121018 EN030001 Audio Recording Stalmine 1000 (PDF, 31 KB)
|
Other |
121019 EN030001 Audio Recording Part 3 (PDF, 31 KB)
|
Other |
121019 EN030001 Audio Recording Part 1 (PDF, 31 KB)
|
Other |
121019 EN030001 Audio Recording Part 1 1 (PDF, 31 KB)
|
Other |
121019 EN030001 Audio Recording Part 2 (PDF, 31 KB)
|
Other |
121004 EN030001 Halite Energy (PDF, 2 MB)
A response by Halite Energy to the Panel's letter of 26 September 2012
|
Other | |
Other |
121015 EN030001 Submission from Wyre BC (PDF, 924 KB)
|
Other |
121011 EN030001 Parkinson (PDF, 2 MB)
|
Other |
121012 EN030001 Submission from Protect Wyre Group (PDF, 77 KB)
|
Other |
121012 EN030001 E & S Raby (PDF, 379 KB)
|
Other |
121011 EN030001 HSE (PDF, 30 KB)
A response to the Panel's letter of 28 September 2012 re draft Requirement 6
|
Other |
121012 EN030001 Lancashire CC (PDF, 380 KB)
A response to the Panel's letter of 28 September 2012 re draft Requirement 6
|
Other |
121012 EN030001 Environment Agency (PDF, 14 KB)
A response to the Panel's letter of 28 September 2012 re draft Requirement 6
|
Other |
121012 EN030001 Halite Energy (PDF, 1 MB)
A response to the Panel's letter of 28 September 2012 re draft Requirement 6
|
Other |
120912 EN030001 Submission from GTC UK (PDF, 16 KB)
|
Other |
121009 EN030001 Blackpool Transport (PDF, 187 KB)
|
Other |
121009 EN030001 Blackpool Borough Council (PDF, 115 KB)
|
Other |
121009 EN030001 Knott End Golf Club (HSE Email) (PDF, 449 KB)
|
Other |
120913 EN030001 Submission from Mark Hamer (PDF, 716 KB)
|
Other |
121001 EN030001 H16 Qualifications & experience (PDF, 927 KB)
|
Other | |
Other | |
Other |
121008 EN030001 Halite's revised draft DCO documents and S106 Agreement (ZIP, 10 MB)
Applicant's updated submission following the 2nd Issue Specific Hearing into the Development Consent Order (DCO) held on 18 September 2012
|
Other |
121004 EN030001 Blackpool College (PDF, 458 KB)
|
Other |
120828 EN030001 Wyre BC (PDF, 197 KB)
|
Other |
121004 EN030001 James Houghton (PDF, 24 KB)
|
Other |
120912 EN030001 Blackpool Borough Council (PDF, 30 KB)
|
Other |
120907 EN030001 Rule 17 Response Halite (PDF, 788 KB)
|
Other |
120828 EN030001 Rule 17 Response MMO (PDF, 71 KB)
|
Other | |
Other |
120907 EN030001 Rule 17 Response Natural England (PDF, 727 KB)
|
Other |
120917 EN030001 HSE attachment (PDF, 130 KB)
|
Other |
120917 EN030001 HSE (PDF, 76 KB)
|
Other |
120928 EN030001 Rule 17 Letter re Requirement 6 Comment (PDF, 53 KB)
A letter from the Panel to the Applicant,
Lancashire County Council,
Wyre Borough Council, the HSE and the Environment Agency
requesting comments on DCO Requirement 6
|
Other |
120926 EN030001 Rule 17 letter to Halite re Crown Land (PDF, 50 KB)
A letter from the Panel requesting Halite supply further information on Crown Land
|
Other | |
Other |
120913 EN030001 Updated DCO and 106 Agreement from HE (ZIP, 2 MB)
A revised Draft Development Conset Order and Development Consent Obligation, submitted by Halite Energy on 12 September 2012.
|
Other |
120913 EN030001 Rule 17 Response - Ammendments (ZIP, 4 MB)
A letter Halite supplying further information on the proposed amendments to the brine discharge outfall, in response to the Panel's letter of 30 August 2012.
|
Other |
120913 EN030001 Blackpool Council CA objection (PDF, 30 KB)
|
Other |
WR012 Written Representation by Protect Wyre Group Appendix Part 001 (PDF, 69 MB)
Appendix - Part 1
|
Other |
WR012 Written Representation by Protect Wyre Group Appendix Part 003 (PDF, 42 MB)
Appendix - Part 3
|
Other |
WR012 Written Representation by Protect Wyre Group Appendix Part 002 (PDF, 31 MB)
Appendix - Part 2
|
Other |
WR012 Written Representation by Protect Wyre Group Appendix Part 004 (PDF, 18 MB)
Appendix - Part 4
|
Other |
120830 Covering Note 3rd Version DCO (PDF, 305 KB)
A cover note for the revised Draft Development Consent Order and Development Consent Obligation, submitted by Halite Energy on 30 August 2012
|
Other |
120830 EN030001 Draft EA Agreement (PDF, 43 KB)
A draft legal agreement submitted by the Environment Agency on 30 August 2012
|
Other |
120830 EN030001 3rd Version DCO (ZIP, 15 MB)
A revised Draft Development Consent Order and Development Consent Obligation, submitted by Halite Energy on 30 August 2012
|
Other |
120816 EN030001 PWG Flier query (PDF, 3 MB)
|
Other |
120806 EN030001 KEGC Flier query (PDF, 3 MB)
|
Other |
120725 EN030001 KEGC CA query (PDF, 382 KB)
|
Other | |
Other |
120627 EN030001 KEGC Late WR (PDF, 846 KB)
|
Other |
120820 EN030001 Electricity Northwest reply (PDF, 209 KB)
|
Other |
120823 EN030001 Halite Comments on ISH Request (PDF, 1 MB)
|
Other |
120718 EN030001 Pickup (PDF, 459 KB)
|
Other |
120720 EN030001 Hillman (PDF, 551 KB)
|
Other |
HE Comments on Responses to 2nd Questions (PDF, 110 KB)
Comments on responses to the ExA's Second Written Questions.
|
Other |
120831 EN030001 Letter re October OF and CA Hearings (PDF, 63 KB)
|
Other |
HE Comments on Responses to 2nd Questions Appendix (PDF, 158 KB)
Appendix to comments on responses to the ExA's Second Written Questions
|
Other |
120815 EN030001 Halite Energy amendment request (ZIP, 63 MB)
Proposed amendment requested following request for information on proposed deemed marine licence
|
Other |
120824 EN030001 Rule 17 regarding Habitats Regulations (PDF, 47 KB)
A letter from the Panel requesting that parties supply information
|
Other |
120823 EN030001 Letter re August ISHs Final (PDF, 53 KB)
|
Other |
120815 EN030001 QR008 Halite Energy (ZIP, 13 MB)
A response to the Panel's second round of questions
|
Other |
QR003 - Natural England (PDF, 203 KB)
|
Other |
QR001 - Wyre BC (PDF, 4 MB)
|
Other |
QR002 - HSE (PDF, 98 KB)
|
Other |
QR004 - Halite Energy (ZIP, 19 KB)
|
Other |
120724 EN030001 Hearing Audio Recording PM (PDF, 31 KB)
|
Other |
120724 EN030001 Hearing Audio Recording AM (PDF, 31 KB)
|
Other | |
Other |
120718 EN030001 Panel's 2nd Written Questions (PDF, 71 KB)
|
Other |
120627 EN030001 Rule 13 Notice for 24 July and 22 August Hearings (PDF, 15 KB)
A notice by applicant of the time and place of Hearings
|
Other |
CR004a Corrections Sheet (PDF, 44 KB)
A Corrections Sheet submitted by Halite Energy on 5 July 2012 to be read with their comments on Local Impact Report(s), Relevant Representation(s), Written Representation(s) and on responses to the ExA's First Written Questions.
|
Other |
CR003 Protect Wyre Group (PDF, 1 MB)
Comments on Local Impact Report(s), Relevant Representation(s), Written Representation(s) and responses to the ExA's First Written Questions.
|
Other |
CR001 Knott End Golf Club (PDF, 2 MB)
Comments on Local Impact Report(s), Relevant Representation(s), Written Representation(s) and on responses to the ExA's First Written Questions.
|
Other |
120704 Halite Energy Revised DCO and Planning Obligation (ZIP, 16 MB)
A revised Draft Development Conset Order and Development Consent Obligation, submitted by Halite Energy on 4 July 2012
|
Other |
CR002 DS MJ and RS Jackson (PDF, 3 MB)
Comments on responses to the ExA's First Written Questions.
|
Other |
SoCG 44 - United Utilities Infrastructure - United Utilities (PDF, 4 MB)
This document is Appendix 2 to Halite Energy's comments on Local Impact Report(s), Relevant Representation(s), Written Representation(s) and on responses to the ExA's First Written Questions.
|
Other |
120703 EN030001 120724 ISH Notification Letter (PDF, 47 KB)
|
Other |
SoCG 1 - Geology - WBC Endorsement (PDF, 43 KB)
|
Other |
WR007 Written Representation by Hilda Dickinson (PDF, 70 KB)
|
Other |
WR015 Written Representation by Rossall School (PDF, 429 KB)
|
Other |
120606 EN030001 Other Submissions Received Before 6 June 2012 (PDF, 783 KB)
The Panel have decided to accept these submissions to the examination
|
Other |
SoCG 37 - LEMSP - RSPB (PDF, 6 MB)
|
Other |
SoCG 14 - Ecology - LCC (PDF, 395 KB)
|
Other | |
Other |
WR005 Written Representation by Kenneth Penswick (PDF, 754 KB)
|
Other |
SoCG 41 - Civil and Military Aviation - LCC (PDF, 526 KB)
|
Other |
SoCG 21 - Landscape - NE (PDF, 78 KB)
|
Other |
SoCG 1 - Geology - LCC (PDF, 344 KB)
|
Other |
SOCG 42 - Civil and Military Aviation - WBC (PDF, 126 KB)
|
Other |
SoCG 15 - Safety and risk above ground - LCC (PDF, 187 KB)
|
Other |
WR017 Written Representation by the NWIFCA (PDF, 35 KB)
This document was amended on 12 June 2012
|
Other |
SoCG 26 - Sustainable use of salt - WBC (PDF, 146 KB)
|
Other |
SoCG 24 - Transport and Access - Highways Agency (PDF, 75 KB)
|
Other | |
Other |
WR027 Written Representation by Ian Mulroy (PDF, 36 KB)
|
Other | |
Other |
SoCG 7 - Noise and Vibration - WBC (PDF, 102 KB)
|
Other |
LIR001 Local Impact Report by Lancashire County Council (PDF, 333 KB)
|
Other |
SoCG 6 - Transport and Access - LCC (PDF, 164 KB)
|
Other |
SoCG 11 - Ecology - EA (PDF, 116 KB)
|
Other |
SoCG 38 - LEMSP - LWT (PDF, 6 MB)
|
Other |
SoCG 12 - Ecology - RSPB (PDF, 95 KB)
|
Other | |
Other |
WR006 Written Representation by Roy Pickup (PDF, 310 KB)
|
Other |
SoCG 13- Ecology - LWT (PDF, 94 KB)
|
Other |
WR030 Written Representation by Brian Paley (PDF, 225 KB)
|
Other |
SoCG 33 - Air Quality - WBC (PDF, 88 KB)
|
Other |
SoCG 3 - Draft DCO - LCC (PDF, 553 KB)
|
Other |
SoCG 23 - Marine water quality - MMO (PDF, 79 KB)
|
Other |
WR010 Written Representation from D Barker (PDF, 2 MB)
|
Other |
WR025 Written Representation by George Parkinson (PDF, 15 KB)
|
Other |
SoCG 6 - Transport and Access - WBC Endorsement (PDF, 42 KB)
|
Other |
SoCG 27 - Use of Salt - LCC (PDF, 1 MB)
|
Other |
WR022 Written Representation by Marilyn Mulroy (PDF, 148 KB)
|
Other |
SoCG 5 - LEMSP - LCC (PDF, 8 MB)
|
Other | |
Other | |
Other | |
Other |
SoCG 36 - LEMSP - EA (PDF, 6 MB)
|
Other |
SoCG 5 - LEMSP - WBC Endorsement (PDF, 42 KB)
|
Other |
SoCG 32 - Archaeology and Built Heritage - WBC (PDF, 78 KB)
|
Other |
WR002 Written Representation by Paul Maynard MP (PDF, 569 KB)
This document was amended on 12 June 2012
|
Other |
SoCG 34 - Air Quality - NE (PDF, 77 KB)
|
Other |
SoCG 14 - Ecology - WBC Endorsement (PDF, 33 KB)
|
Other |
WR020 Written Representation by Ben Wallace MP (PDF, 65 KB)
|
Other |
WR023 Written Representation by Derek Booth (PDF, 16 KB)
|
Other |
SoCG 25 - Health Impact - NHS North Lancashire (PDF, 144 KB)
|
Other |
SoCG 4 - LEMSP - WBC (PDF, 7 MB)
|
Other | |
Other |
WR014 Written Representation by Joseph Cooper (PDF, 6 MB)
|
Other |
SoCG 18 - Development Planning Policy - WBC (PDF, 282 KB)
|
Other |
WR003 Written Representation by Ruth Bradbury (PDF, 410 KB)
|
Other |
WR013 Written Representation by Rosemary Hogarth (PDF, 2 MB)
|
Other |
WR032 Written Representation by Elaine Raby (PDF, 65 KB)
|
Other |
SoCG 30 - Archaeology and built heritage - LCC (PDF, 293 KB)
|
Other |
SoCG 10 - Deemed Marine Licence - MMO (PDF, 1 MB)
|
Other |
WR024 Written Representation by Averil Booth (PDF, 16 KB)
|
Other |
SoCG 20 - Landscape - LCC (PDF, 193 KB)
|
Other |
SoCG 35 - LEMSP - NE (PDF, 6 MB)
|
Other |
WR034 Written Representation by Natural England (PDF, 990 KB)
This document was amended on 12 June 2012
|
Other |
List of Statements of Common Ground (PDF, 70 KB)
|
Other |
WR031 Written Representation by Stanley Raby (PDF, 57 KB)
|
Other | |
Other |
LIR002 Local Impact Report by Wyre Borough Council (PDF, 228 KB)
This document was amended on 12 June 2012
|
Other |
SoCG 43 - Marine and estuarial ecology - MMO (PDF, 78 KB)
|
Other |
SoCG 28 - Land Use - WBC (PDF, 150 KB)
|
Other |
WR029 Written Representation by Philip Moore (PDF, 86 KB)
|
Other |
SoCG 29 - Land Use - LCC (PDF, 719 KB)
|
Other |
SoCG 19 - Development Planning Policy - LCC (PDF, 4 MB)
|
Other | |
Other |
WR012 Written Representation by Protect Wyre Group (PDF, 3 MB)
The appendix to this submission is now published here
|
Other |
SOCG 16 - Planning History - WBC (PDF, 152 KB)
|
Other |
WR004 Written Representation by John Bradbury (PDF, 131 KB)
|
Other |
SoCG 20 - Landscape - WBC Endorsement (PDF, 33 KB)
|
Other |
WR011 Written Representation by D Hillman (PDF, 2 MB)
|
Other |
WR028 Written Representation by Ann Moore (PDF, 17 KB)
|
Other |
WR009 Written Representation from Mark Hamer (PDF, 75 KB)
|
Other |
WR016 Written Representation by Eric Ollerenshaw MP (PDF, 18 KB)
|
Other | |
Other | |
Other |
SoCG 17 - Relevant Planning History - LCC (PDF, 751 KB)
|
Other |
SoCG 40 - Tourism and economic development - LCC (PDF, 673 KB)
|
Other |
120411 EN030001 Rule 8 Letter (PDF, 186 KB)
Includes procedural decisions made at and following the Preliminary Meeting
|
Other |
120418 EN030001 Letter from Berwin Leighton Paisner dated 18 April 2012 (PDF, 400 KB)
This is the letter referred to by the Examining Authority in their letter of 2 May 2012
|
Other |
120424 EN030001 Recording of Preliminary Meeting (PDF, 31 KB)
|
Other |
EN030001 Preesall Transboundary Screening Matrix (PDF, 86 KB)
Transboundary Screening Matrix
|
Other |
120319 EN030001 Rule 4, Rule 6 and Rule 11 Letters (PDF, 124 KB)
|
Other |
120319 EN030001 Transition Leaflet (PDF, 309 KB)
|
Other |
120213 EN030001 Publication of Accepted Application - Certificates of Compliance (PDF, 33 KB)
Certificates of compliance with s.56, s.59 of the PA2008 and Regulation 13 of the Infrastructure EIA Regulations 2010
|
Other | |
Other |
101126 EN030001 Preesall Scoping Opinion v1.0 ISSUED (PDF, 9 MB)
Scoping Opinion issued by the IPC
|
Other |
101019 EN030001 Preesall Scoping Report (PDF, 85 MB)
Scoping report submitted to the IPC by the developer
|
Other |
101221 Presall Scoping Opinion Late Responses v2.0 (PDF, 8 MB)
EIA scoping consultation responses which were received after the consultation deadline.
|
Other | |
Other | |
Other | |
Other | |
Other |
111213 EN030001 Adequacy of Consultation Rep by Wyre BC (PDF, 604 KB)
|
Other | |
Other |
110816 EN030001 Halite letter RE S42 consultation (PDF, 251 KB)
|
Other | |
Other |
110803 EN030001 751983 Letter from Halite Withdrawal of all six s.53 requests (PDF, 206 KB)
Letter from the Halite Energy Group Limited withdrawing the request for authorisation under s.53 of the Planning Act 2008.
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
111213 EN030001 Adequacy of Consultation Rep by Fylde BC (PDF, 287 KB)
|
Other | |
Other | |
Other | |
Other | |
Other |
1.1 Covering Letter (PDF, 2 MB)
|
Other |
6 2 Explanatory Memorandum (PDF, 217 KB)
|
Other |
2.5 l Directionally Drilled River Crossings (PDF, 6 MB)
|
Other |
2.5 h Security Entrance and Support Facilities (PDF, 22 MB)
|
Other |
111223 EN030001 Section 55 Acceptance Checklist (PDF, 165 KB)
|
Other | |
Other |
1.3 Register of Application Documents (PDF, 201 KB)
|
Other |
2.1 Application Boundary (PDF, 26 MB)
|
Other |
9.2.2 Geological Summary Report (PDF, 45 MB)
|
Other |
2.5 c Master Plans (PDF, 47 MB)
|
Other |
9.4.6 Technical Explanation of Draft DCO Schedule 1 (PDF, 457 KB)
|
Other |
2.5 e Booster Pump Station (PDF, 39 MB)
|
Other | |
Other | |
Other |
2.5 i Proposed Access Road (PDF, 14 MB)
|
Other |
2.5 f Gas Storage Cavern and Wellhead Compounds (PDF, 36 MB)
|
Other |
3.1.1 Appendices part 4 (PDF, 40 MB)
|
Other |
2.5 j Metering Station (PDF, 4 MB)
|
Other |
9.1.3 Project Overview (PDF, 4 MB)
|
Other |
2.5 o General (PDF, 36 MB)
|
Other |
2.5 d Seawater Pump Station (PDF, 20 MB)
|
Other |
8.1 Pipeline Statement (PDF, 94 KB)
|
Other |
2.5 k Hazardous Substance Aplication (PDF, 27 MB)
|
Other |
9.1.5 Preesall Needs Case (PDF, 4 MB)
|
Other |
9.1.6 Construction Report (PDF, 8 MB)
|
Other |
2.2.Land Plans (1) (PDF, 43 MB)
|
Other |
9.1.8 Health Impact Appendices (PDF, 4 MB)
|
Other |
2.3.Work Plans (PDF, 28 MB)
|
Other |
9.1.2 Design and Access Statement (PDF, 8 MB)
|
Other |
9.2.1 Legacy Brinewell Impact Assessment (PDF, 11 MB)
|
Other |
3.1.1 Appendices part 1 (PDF, 15 MB)
|
Other |
4.2 Application for Deemed Marine Consent (PDF, 2 MB)
|
Other |
1.2 IPC Application Form (PDF, 3 MB)
|
Other |
2.5.a Temporary Construction Compounds (PDF, 17 MB)
|
Other |
3.1.1 Appendices part 2 (PDF, 32 MB)
|
Other | |
Other |
7.1 Statement of Reasons (PDF, 347 KB)
|
Other | |
Other |
2.4.Access and Temporary Stopping Up Plans (PDF, 19 MB)
|
Other |
3.4 Statement of Engagement (PDF, 404 KB)
|
Other |
2.5 g Gas Compressor Compound (PDF, 38 MB)
|
Other |
2.5 b Pipelines-Brine Outfall (PDF, 15 MB)
|
Other |
2.5 n Pipeline and Brine Outfall (PDF, 7 MB)
|
Other |
9.2.3 NTS Interconnector Preesall Subsidence Assessment Report (Document 34 MB)
|
Other |
2.2.Land Plans (2) (PDF, 33 MB)
|
Other |
7.3 Book of Reference (PDF, 45 KB)
|
Other | |
Other |
7.2 Funding Statement (PDF, 1 MB)
|
Other |
3.1.1 Appendices part 3 (PDF, 29 MB)
|
Other |
9.1.7 Health Impact Assessment (PDF, 18 MB)
|
Other |
9.2.6 Gas Interconnector Pipeline to the NTS (PDF, 36 MB)
|
Other |
9.3.1 Risk Assessment (PDF, 15 MB)
|
Other |
3.1 Consultation Report (PDF, 2 MB)
|
Other | |
Other |
9.1.1 Planning and Sustainability Statement (PDF, 4 MB)
|
Other |
9.2.7 Seismic Desk Study (PDF, 25 MB)
|
Other |
110804 EN030001 Letter to Halite acknowledging withdrawal of request (PDF, 34 KB)
Letter from the IPC acknowledging Halite's withdrawal of the request for authorisation under s.53 of the Planning Act 2008.
|