You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (4)
Developer's Application (210)
Acceptance (9)
Pre Examination (6)
- All Documents
- Additional Submissions (3)
- Other (1)
- Procedural Decisions (2)
Examination (191)
- All Documents
- Additional Submissions (11)
- Compulsory Acquisition Hearing - 23/05/2016 - 1400 - Best Western Crewe Arms Hotel (2)
- + Deadline (46)
- Deadline 1 - 13-04-2016 (2)
- Deadline 2 - 29-04-2016 (55)
- + Deadline 3 - 17-05-2016 (31)
- Deadline 4 - 07/06/2016 (13)
- Examination Library.pdf (1)
- + Hearings (9)
- Issue Specific Hearing - 25/05/2016 - 1000 - Best Western Crewe Arms Hotel (6)
- Non-Material Change (3)
- Notification regarding close of examination (1)
- Preliminary Meeting (3)
- Procedural Decisions (8)
Decision (5)
Decided (39)
The selection shows documents received from the applicant in relation to the development consent order application.
Source | Description |
---|---|
Other |
2.5.5 KGSP Plan 234 B2 (PDF, 506 KB)
Site layout plan showing the preferred layout of the buildings and structures at Lostock Works. Post-submission change to ?2.5.5 KGSP Plan 234 B1? (supersedes the application document received on 24 November 2015)
|
Other |
5.4 KGSP HRA Revised (PDF, 6 MB)
Habitats Regulation Screening Assessment. Post-submission change to ?5.4 KGSP HRA? (supersedes the application document received on 24 November 2015)
|
Other |
2.6.1 KGSP Plan 270 B2 (PDF, 386 KB)
Plan showing elevations for buildings and structures on Gas Processing Plant (GPP). Post-submission change to ?2.6.1 KGSP Plan 270 B1? (supersedes the application document received on 24 November 2015)
|
Other |
2.3.9 KGSP Plan 510 B2 (PDF, 389 KB)
Works plan showing proposed location. Post-submission change to ?2.3.9 KGSP Plan 510 B1? (supersedes the application document received on 24 November 2015)
|
Other |
2.6.2 KGSP Plan 271 B2 (PDF, 461 KB)
Plan showing elevations for buildings and structures on Solution Mining Compound (SMC3). Post-submission change to ?2.6.2 KGSP Plan 271 B1? (supersedes the application document received on 24 November 2015)
|
Other |
4.3 KGSP Book of Reference Rev 1 - Track Changes (PDF, 33 KB)
Book of Reference (Rev 1) showing Tracked changes against application version received on 24 November 2015
|
Other |
3.1 KGSP Draft DCO Rev 1 (PDF, 505 KB)
Draft Development Consent Order. Post-submission change to ?3.1 KGSP Draft DCO? (supersedes the application document received on 24 November 2015)
|
Other |
2.6.4 KGSP Plan 273 B2 (PDF, 414 KB)
Plan showing elevations for buildings and structures of 132kV to 33kV Substation. Post-submission change to ?2.6.4 KGSP Plan 273 B1? (supersedes the application document received on 24 November 2015)
|
Other |
4.3 KGSP Book of Reference Rev 1 (PDF, 33 KB)
Revised Book of Reference: Compulsory Acquisition Information outlining the land over which compulsory acquisition powers will be exercised
|
Other |
3.1 KGSP Draft DCO Rev 1 - Track Changes (PDF, 565 KB)
Draft Development Consent Order (Rev 1) showing Tracked changes against application version received on 24 November 2015
|
Other |
KGSP PINS S51 Response Annex 1 Equipment Description Tables (PDF, 77 KB)
DAS: Annex 1 - Equipment Description Tables
Revised Annex 1 from the Design and Access Statement (this annex also appears in Post-submission change document '8.3 KGSP DAS - Revised')
|
Other |
3.3 KGSP DCO Change Log (PDF, 395 KB)
Consolidated list of all proposed and discussed changes to the submission version of the draft DCO
|
Other |
KGSP PINS S51 Response Annex 4 ES Technical Annex Groundsure (PDF, 158 MB)
Doc Ref 6.2 (Geology Annex A) ? Environmental Statement Technical Annexes
Geology Annex A ? Groundsure Report
|
Other |
KGSP PINS S51 Response Annex 5 ES Table 14.1 (Revised) (PDF, 58 KB)
6.1 - Environmental Statement - Chapter 14 ? Landscape and Visual
Revised Table 14.1 (Page 14-2) - Post-submission change (supersedes table 14.1 in '6.1 KGSP ES' received on 24 November 2015)
|
Other |
2.8.5 KGSP Plan 277 B2 (PDF, 521 KB)
Plan showing general arrangement of Solution Mining Compound (SMC3). Post-submission change to ?2.8.5 KGSP Plan 277 B1? (supersedes the application document received on 24 November 2015)
|
Other |
8.3 KGSP DAS - Revised (PDF, 35 MB)
Revised Design and Access Statement - to explain the design and access principles and objectives for the development
|
Other |
Keuper Gas Storage Limited (PDF, 188 KB)
Letter enclosing non-material amendments to the DCO application documents, following Section 51 advice from The Planning Inspectorate
|