Keuper Gas Storage Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (210)

Acceptance (9)

Pre Examination (6)

Examination (191)

Decision (5)

Decided (2)

Date

SourceDescription
Other
Size: 235 KB
Examination Library
Other
Size: 157 KB
Keuper Gas Storage Limited
Summary of position in relation to the Unilateral Undertaking (section 106 agreement). This submission was received before the close of examination. The Examining Authority has exercised its discretion and agreed to accept this as an additional submission.
Other
Size: 67 KB
Notification of Completion of Examination
Other
Size: 6 MB
Cheshire West and Chester Borough Council
Summary of position and comments on the applicants Unilateral Undertaking submitted on 14th September 2016. The Examining Authority has exercised its discretion and agreed to accept this submission.
Other
Size: 5 MB
Cheshire West and Chester Borough Council
Update on the progress of the Section 106 Agreement. The Examining Authority has exercised its discretion and agreed to accept this submission.
Other
Size: 19 MB
Cheshire West and Chester Borough Council
Final draft of the Section 106 Agreement between Cheshire West and Chester Council, Cheshire East Council, Keuper Gas Storage Limited, INEOS Enterprises Group Limited, INOVYN Enterprises Limited and The Bank of New York Mellon (London Branch). The Examining Authority has exercised its discretion and agreed to accept this submission.
Other
Size: 7 MB
Keuper Gas Storage Limited
Unilateral Undertaking under s106 and supporting documents. The Examining Authority has exercised its discretion and agreed to accept this submission.
Other
Size: 435 KB
Keuper Gas Storage Limited
Letter requesting the replacement of the ’10.16 Further Responses to Written Representations’ document submitted for Deadline 8 - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Size: 345 KB
Keuper Gas Storage Limited
Copy of KGSL’s Deadline 8 submission ’10.16 Further Responses to Written Representations’ with paragraph 5.2 removed - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Size: 171 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Ltd
Comments on the Applicant’s revised draft DCO
Other
Size: 284 KB
University of Manchester
Comments on the Applicant’s revised draft DCO
Other
Size: 443 KB
Keuper Gas Storage Limited
Covering Letter for Deadline 8
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 Draft Development Consent Order - Rev 7 (Clean version)
Other
Size: 1 MB
Keuper Gas Storage Limited
3.3 Change Log for the DCO - Revision 7
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 Draft Development Consent Order - Rev 7 (Tracked changed version)
Other
Size: 350 KB
Keuper Gas Storage Limited
10.16 Applicant’s Further Responses to Written Representations
Other
Size: 1 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 4 - Barn Owl Occupancy Check 2016 (Submitted for Deadline 7)
Other
Size: 435 KB
Keuper Gas Storage Limited
10.13 Environmental Statement clarifications and errata (including annex 1 & 2)
Other
Size: 1 MB
Keuper Gas Storage Limited
3.3 Change Log for the DCO - Revision 6
Other
Size: 444 KB
Keuper Gas Storage Limited
Covering Letter for Deadline 7
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 Draft Development Consent Order - Rev 6 (Clean version)
Other
Size: 2 MB
Keuper Gas Storage Limited
6.5 Construction Environmental Management Plan (CEMP) - Rev 4 (Tracked changed version)
Other
Size: 5 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 2 - Badger Licence Application Documentation (Submitted for Deadline 7)
Other
Size: 549 KB
Keuper Gas Storage Limited
10.15 Written Summary of Applicant’s submissions in relation to representations made by the Canal & River Trust
Other
Size: 448 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Ltd
Submission for Deadline 7
Other
Size: 11 MB
Keuper Gas Storage Limited
10.13 Environmental Statement clarifications and errata - Annex 4 ES Figures 14.4-14.19
Other
Size: 47 MB
Keuper Gas Storage Limited
10.13 Environmental Statement clarifications and errata - Annex 3 ES Technical Annex Groundsure Report
Other
Size: 73 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 1 - Great Crested Newt Licence Application Documentation (Submitted for Deadline 7)
Other
Size: 6 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 3 - Ecological Survey Whitley and Runcorn (Submitted for Deadline 7)
Other
Size: 2 MB
Keuper Gas Storage Limited
3.1 Draft Development Consent Order - Rev 6 (Tracked changed version)
Other
Size: 33 KB
Keuper Gas Storage Limited
10.14 Book of Reference and Land Plans Clarifications and Errata
Other
Size: 2 MB
Keuper Gas Storage Limited
6.5 Construction Environmental Management Plan (CEMP) - Rev 4 (Clean version)
Other
Size: 70 KB
Changes to the original application
Letter from the ExA confirming that changes proposed by the applicant are considered non material
Other
audio recording
Size: 16 MB
Audio recording from the Issue Specific Hearing held on 28 July 2016 - part 1
Other
audio recording
Size: 15 MB
Audio recording from the Issue Specific Hearing held on 28 July 2016 - part 2
Other
audio recording
Size: 13 MB
Audio recording from the Issue Specific Hearing held on 28 July 2016 - part 3
Other
Size: 77 KB
Rule 8(3) Variation to timetable Letter
Other
Size: 334 KB
Ward Hadaway on behalf of Canal & River Trust
Additional submission concerning Compulsory Acquisition - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Size: 162 KB
Issue Specific Hearing agenda - 28 July 2016
Other
Size: 589 KB
Cheshire West and Chester Borough Council
Latest working draft of the Section 106 Agreement between Cheshire West and Chester Borough Council, Cheshire East Council, Keuper Gas Storage Ltd, Ineos Enterprises Group Ltd and Inovyn Enterprises Ltd
Other
Size: 91 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Ltd
Submission for Deadline 6
Other
Size: 200 KB
Halton Borough Council
Late submission accepted at the discretion of the Examining Authority
Other
Size: 431 KB
Keuper Gas Storage Limited
Submission for Deadline 6
Other
Size: 14 KB
Environment Agency
Comment on changes to the original application
Other
Size: 86 KB
Natural England
Comment on changes to the original application
Other
Size: 391 KB
Keuper Gas Storage Limited
Draft Statement of Common Ground with the University of Manchester (tracked changed version)
Other
Size: 132 KB
Environment Agency
Response to Examining Authority’s Second Round of Written Questions
Other
Size: 873 KB
Keuper Gas Storage Limited
Updated DCO Change Log - Revision 5
Other
Size: 11 MB
Keuper Gas Storage Limited
Updated draft CEMP (Clean version)
Other
Size: 43 KB
Cheshire West and Chester Borough Council
Extension request to submit draft Section 106 Agreement
Other
Size: 2 MB
Keuper Gas Storage Limited
Updated draft CEMP (Tracked changed version)
Other
Size: 130 KB
Natural England
Response to Examining Authority’s Second Round of Written Questions
Other
Size: 329 KB
Keuper Gas Storage Limited
Draft S106 Agreement Version 4 (Tracked changed version)
Other
Size: 4 MB
Keuper Gas Storage Limited
Comments on the written summaries of cases put forward at the second Issue Specific and Compulsory Acquisition Hearings
Other
Size: 41 KB
SP Manweb PLC
Response from SP Energy Networks on behalf of SP Manweb
Other
Size: 303 KB
Keuper Gas Storage Limited
Draft Statement of Common Ground with the University of Manchester (Clean version)
Other
Size: 495 KB
Keuper Gas Storage Limited
Covering Letter for Deadline 5
Other
Size: 1 MB
Keuper Gas Storage Limited
Draft DCO Revision 5 (Clean version)
Other
Size: 1,019 KB
Keuper Gas Storage Limited
Draft DCO Revision 5 (Tracked changed version)
Other
Size: 231 KB
Keuper Gas Storage Limited
Draft S106 Agreement Version 4 (Clean version)
Other
Size: 3 MB
Keuper Gas Storage Limited
Response to Examining Authority’s Second Round of Written Questions
Other
Size: 62 KB
Cheshire West and Chester Borough Council
Response to Examining Authority’s Second Round of Written Questions
Other
Size: 87 KB
Rule 17 and 8(3) Letter - Changes to the Original Application
Other
Size: 552 KB
Keuper Gas Storage Limited
Non-Material Amendment Drawing - 13-03-01-HOL-24-343-B2
Other
Size: 146 KB
Keuper Gas Storage Limited
Non-Material Amendment Covering Letter
Other
Size: 574 KB
Keuper Gas Storage Limited
Non-Material Amendment Drawing - 13-03-01-HOL-24-512-B2
Other
Size: 73 KB
Notification of Hearing and ExA Second Questions
Other
Size: 96 KB
Keuper Gas Storage ExA's Second Written Questions
Other
Size: 33 KB
Audio recording from the Compulsory Acquisition Hearing held on 23 May 2016 - part 2
Other
audio recording
Size: 80 MB
Audio recording from the Issue Specific Hearing held on 26 May 2016 - part 1
Other
audio recording
Size: 75 MB
Audio recording from the Issue Specific Hearing held on 25 May 2016 - part 3
Other
audio recording
Size: 67 MB
Audio recording from the Issue Specific Hearing held on 25 May 2016 - part 1
Other
audio recording
Size: 69 MB
Audio recording from the Issue Specific Hearing held on 26 May 2016 - part 2
Other
audio recording
Size: 103 MB
Audio recording from the Issue Specific Hearing held on 25 May 2016 - part 4
Other
audio recording
Size: 99 MB
Audio recording from the Issue Specific Hearing held on 25 May 2016 - part 2
Other
Size: 33 KB
Audio recording from the Compulsory Acquisition Hearing held on 23 May 2016 - part1
Other
Size: 17 MB
Keuper Gas Storage Limited
10.9 Applicants Further Responses to Written Representations and Written Questions
Other
Size: 572 KB
Pinsent Masons on behalf of Mr and Mrs Wildman
Report on impact of proposed gas storage project on farm business - presented at the Issue specific hearing on local environmental impacts on 25 May 2016
Other
Size: 598 KB
Keuper Gas Storage Limited
10.10 Mitigation Schedule (Revision 1)
Other
Size: 2 MB
Keuper Gas Storage Limited
6.5 Construction Environmental Management Plan (CEMP) (Revision 2)
Other
Size: 186 KB
Berwin Leighton Paisner LLP on behalf of National Grid Gas plc
Letter regarding withdrawal of objections - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 Track changes version - Draft Development Consent Order (Revision 4)
Other
Size: 753 KB
Keuper Gas Storage Limited
3.3 Change Log for the DCO (Revision 4)
Other
Size: 710 KB
Pinsent Masons on behalf of Mr and Mrs Wildman
Oral Representations made on behalf of Mr and Mrs Wildman at the Compulsory Acquisition and Issue Specific Hearings
Other
Size: 38 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Limited
Written summary of the oral submissions made on behalf of HGSL at the issue specific hearings on the local environmental impacts of the Proposed Development and the draft DCO
Other
Size: 390 KB
Cheshire West and Chester Council
Submission for Deadline 4
Other
Size: 792 KB
Keuper Gas Storage Limited
Covering Letter for Deadline 4
Other
Size: 193 KB
University of Manchester
Summary of Representations at Issue Specific Hearing on 25 May 2016
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 Draft Development Consent Order (Revision 4)
Other
Size: 87 KB
Ward Hadaway on behalf of Canal & River Trust
Deadline 4 submission
Other
Size: 2 MB
Keuper Gas Storage Limited
6.5 Construction Environmental Management Plan - Track changes version (Revision 2)
Other
Size: 2 MB
Keuper Gas Storage Limited
9.1 Seismic Survey Report (supporting document) - Cheshire Basin 2D Seismic Processing Report: this document was originally requested under question 1.3 of the ExAs first written questions
Other
Size: 2 MB
Keuper Gas Storage Limited
The Soil Resources and Agricultural Land Classification for the Byley Gas Storage, Brine and Water Infrastructure Project This document was cited in section 7.3.22 of the applicant?s Environmental Statement, which the ExA requested in question 1.3 of his first round written questions
Other
Size: 3 MB
Keuper Gas Storage Limited
10.8 comments/responses to Written Representations, Answers to Questions and Local Impact Reports
Other
Size: 384 KB
University of Manchester
Comment on SoCG with the Keuper Gas Storage Limited and response to comments on Relevant Representations
Other
Size: 84 KB
Keuper Gas Storage Limited
Deadline 3 Covering Letter
Other
Size: 9 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Hydraulic-Hydrofrac~: Vol 2 Lab Tests: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 1,004 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Keplinger Cavern Well Abandonment Techniques (Crotagino): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 14 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Elan Interpretation Drakelow 2A (GKFRJ0003): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 729 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Hydraulic-Hydrofrac Vol 1: In-Situ Tests: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 476 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Lab Tests on Drakelow 2A Cored Samples (GKFRJ0002): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 7 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Rock mechanical Investigations (Clausthal Uni): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 798 KB
Keuper Gas Storage Limited
3.3 Change Log for the DCO (Revision 3)
Other
Size: 6 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Geotechnical Assessment Report 2: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 398 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Fragility Functions of Gas and Oil Networks (Gehl et al): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 4 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - HSE Research Document: RR605 (Evans): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 4 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Geotechnical Assessment Report 1: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 1 MB
Keuper Gas Storage Limited
9.1 Seismic Survey Report (supporting document) - 2D Seismic Survey Report: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 806 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - XRD and Thin Section Results at Drakelow 2A (GKBYL20050173): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 1 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Prediction of Geological Profile: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 KGSP Draft DCO Rev 3
Other
Size: 722 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Borehole Sites and Operations Regulations 1995 Guide (HSE L72): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 557 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - External Well Mechanical Integrity Testing (Crotagino): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 9 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Limited
Comments on the revised draft Development Consent Order submitted by the Applicant for Deadline 2
Other
Size: 2 MB
Keuper Gas Storage Limited
9.1 Seismic Survey Report (supporting document) - 2007 Geophysical Interpretation of lines 06-05, 06-06 and 06-07: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 847 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Geology of Byley GK Assessment: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 148 KB
Keuper Gas Storage Limited
Covering Letter enclosing geotechnical supporting documents originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 KGSP Draft DCO Rev 3 - Track Changes
Other
Size: 2 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - HSE Research Document: RR606 (Evans et al): this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 1 MB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - UGS Leaching Tests on Salt Cores: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 380 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Berest Brouard Safety of Salt Caverns Used for UGS 2003: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 924 KB
Keuper Gas Storage Limited
9.2 Sub-surface Safety Assessment Report (supporting document) - Beutal Black Salt Deposits and Gas Cavern Storage in the UK: this document was originally requested under question 1.3 of the ExA?s first written questions
Other
Size: 159 KB
Site Visit Itinerary - 24 May 2016
Other
Size: 91 KB
Issue Specific Hearing agenda - 25 and 26 May 2016
Other
Size: 72 KB
Compulsory acquisition agenda - 23 May 2016
Other
Size: 41 KB
Highways England
Response to Examining Authority?s first written questions
Other
Size: 1 MB
Copy of Rule 13(6) notice as published in the Northwich Guardian on 27 April 2016
Notice of Compulsory Acquisition Hearing and Issue Specific Hearing
Other
Size: 1 MB
Keuper Gas Storage Limited
Responses to ExA's first written questions
Other
Size: 870 KB
Rostons Ltd on behalf of M J Richardson
Written representation
Other
Size: 366 KB
Canal & River Trust
Written representation ? including summary
Other
Size: 18 KB
Environment Agency
Written Representation
Other
Size: 73 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 1 - Great Crested Newt Licence Application Documentation
Other
Size: 661 KB
Rostons Ltd on behalf of A E Percival and J Percival
Written representation
Other
Size: 494 KB
Pinsent Masons on behalf of Mr and Mrs Wildman
Written representation
Other
Size: 583 KB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 10 - Drawing 13-03-01/HOL/60/139 P4 and Drawing 13-03-01/HOL/60/142 P4
Other
Size: 34 KB
Natural England
Summary of written representation
Other
Size: 7 MB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 4 - Statement of Common Ground between Keuper Gas Storage Limited and the Environment Agency
Other
Size: 189 KB
University of Manchester
Response to ExA?s first written questions
Other
Size: 1 MB
Historic England
Written representation and response to ExA?s first written questions
Other
Size: 224 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Limited
Annexe to Written representation
Other
Size: 503 KB
Keuper Gas Storage Limited
10.7 Section 106 Legal Agreement between Cheshire West and Chester Council, Cheshire East Council, Keuper Gas Storage Limited, INEOS Enterprises Group Limited and INOVYN Enterprises Limited
Other
Size: 738 KB
Rostons Ltd on behalf of Mr P O'Rourke
Written representation and response to ExA?s first written questions
Other
Size: 33 KB
Keuper Gas Storage Limited
4.3 Book of Reference (Revision 2)
Other
Size: 5 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 2 - Badger Licence Application Documentation
Other
Size: 486 KB
Health & Safety Executive
Response to ExA?s first written questions
Other
Size: 8 MB
Berwin Leighton Paisner LLP on behalf of National Grid Gas
Written representation and response to ExA?s first written questions
Other
Size: 33 KB
Keuper Gas Storage Limited
Schedule of changes to Book of Reference (Revision 2)
Other
Size: 21 KB
Environment Agency
Response to ExA?s first written questions
Other
Size: 124 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Limited
Written representation
Other
Size: 604 KB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 2 - Drawing 13-03-01/HOL/60/193 P5 and Drawing 13-03-01/HOL/60/194 P5
Other
Size: 5 MB
Keuper Gas Storage Limited
6.5 Construction Environmental Management Plan (CEMP) (Revision 1)
Other
Size: 327 KB
Pinsent Masons on behalf of Mr and Mrs Wildman
Summary of written representation
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 Draft Development Consent Order (Revision 2)
Other
Size: 6 MB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 11 - Drawing 13-03-01/HOL/24/237 B1 and Drawing 13-03-01/HOL/24/238 B1
Other
Size: 1 MB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 7 - Drawing 13-03-01/HOL/60/172 P5 and Drawing 13-03-01/HOL/60/173 P4
Other
Size: 2 MB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 9 - Letter from KGSL to Network Rail Infrastructure Limited, dated 28th January 2016, including drawings 13-03-01/HOL/24/700 B1, 13-03-01/HOL/24/701 B1, 13-03- 01/HOL/24/702 B1 and 13-03-01/HOL/24/703 B1
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 Track changes version - Draft Development Consent Order (Revision 2)
Other
Size: 801 KB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 5 - Drawing 13-03-01/HOL/60/140 P5 and Drawing 13-03-01/HOL/60/143 P5
Other
Size: 664 KB
Rostons Ltd on behalf of C A Wilkinson
Written representation
Other
Size: 146 KB
Peel Ports
Response to ExA?s first written questions
Other
Size: 567 KB
Keuper Gas Storage Limited
3.3 Change Log for the DCO (Revision 2)
Other
Size: 33 MB
Keuper Gas Storage Limited
10.2 Annexes 1-10 to response to ExA?s first written questions
Other
Size: 33 KB
Keuper Gas Storage Limited
4.3 Track changes version - Book of Reference (Revision 2)
Other
Size: 353 KB
Keuper Gas Storage Limited
Covering Letter
Other
Size: 8 MB
Keuper Gas Storage Limited
6.5 Track changes version - Construction Environmental Management Plan (Revision 1)
Other
Size: 51 KB
Cheshire East Council
Response to ExA?s first written questions
Other
Size: 695 KB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 3 - Drawing 13-03-01/HOL/60/141 P5 and Drawing 13-03-01/HOL/60/144 P5
Other
Size: 216 KB
Pinsent Masons on behalf of Mr and Mrs Wildman
Response to ExA?s first written questions
Other
Size: 2 MB
Natural England
Written representation and response to ExA?s first written questions
Other
Size: 363 KB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 1 - Drawing 13-03-01/HOL/24/239 B1
Other
Size: 423 KB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 6 - Letter of No Impediment - Draft Mitigation Licence Application - Great Crested Newts dated 8th March 2016 and Letter of No Impediment - Draft Mitigation Licence Application - Badgers dated 3rd March 2016
Other
Size: 91 KB
Ward Hadaway on behalf of Canal & River Trust
Response to ExA?s first written questions
Other
Size: 71 KB
Halton Borough Council
Local Impact Report
Other
Size: 302 KB
Keuper Gas Storage Limited
Response to Relevant Representations - Annex 8 - Letter from KGSL to Uniper Energy Storage Limited dated 23rd February 2016
Other
Size: 252 KB
Cheshire West and Chester Council
Written representation
Other
Size: 472 KB
Cheshire West and Chester Council
Local Impact Report
Other
Size: 891 KB
Keuper Gas Storage Limited
10.6 Statement of Common Ground between Keuper Gas Storage Limited and Manchester University (APPLICANT?S FIRST DRAFT)
Other
Size: 1 MB
Keuper Gas Storage Limited
10.1 Response to relevant representations
Other
Size: 7 MB
Keuper Gas Storage Limited
10.3 Statement of Common Ground between Keuper Gas Storage Limited and the Environment Agency (FINAL)
Other
Size: 129 KB
Cheshire West and Chester Council
Response to ExA?s first written questions
Other
Size: 10 MB
University of Manchester
Written representation ? including annexes
Other
Size: 82 KB
Notification of Hearings and ASV
Other
Size: 509 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Limited
Submission for Deadline 1 containing topics to be discussed at the forthcoming hearings and a written summary of the oral submissions made at the DCO hearing on 16 March 2016
Other
Size: 25 KB
Pinsent Masons LLP on behalf of Mr and Mrs Wildman
Submission for Deadline 1 confirming wish to attend the Compulsory Acquisition Hearing, the second Issue Specific Hearing on local environmental impacts and the accompanied site visit.
Other
Size: 193 KB
Rule 8 Letter
Other
Size: 406 KB
160323 Keuper Gas Storage ExA's First written questions
Other
Size: 70 KB
160316 Keuper Gas Storage Note of Preliminary Meeting
Other
audio recording
Size: 77 MB
Audio Recording - Issue Specific Hearing
Issue Specific Hearing on the draft Development Consent Order 16 March 2016.
Other
Size: 24 KB
Pinsent Masons on behalf of Mr and Mrs Wildman
Additional submission from Pinsent Masons, submitted during the pre-examination stage - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
audio recording
Size: 40 MB
Audio Recording - Preliminary Meeting (Part 1 of 2)
Audio recording of the Preliminary Meeting - 16 March 2016. Part 1 of 2
Other
audio recording
Size: 29 MB
Audio Recording - Preliminary Meeting (Part 2 of 2)
Audio recording of the Preliminary Meeting - 16 March 2016. Part 2 of 2
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.