Keuper Gas Storage Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (210)

Acceptance (9)

Pre Examination (6)

Examination (191)

Decision (5)

Decided (2)

Date

SourceDescription
Other
Size: 1 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 4 - Barn Owl Occupancy Check 2016 (Submitted for Deadline 7)
Other
Size: 435 KB
Keuper Gas Storage Limited
10.13 Environmental Statement clarifications and errata (including annex 1 & 2)
Other
Size: 1 MB
Keuper Gas Storage Limited
3.3 Change Log for the DCO - Revision 6
Other
Size: 444 KB
Keuper Gas Storage Limited
Covering Letter for Deadline 7
Other
Size: 1 MB
Keuper Gas Storage Limited
3.1 Draft Development Consent Order - Rev 6 (Clean version)
Other
Size: 2 MB
Keuper Gas Storage Limited
6.5 Construction Environmental Management Plan (CEMP) - Rev 4 (Tracked changed version)
Other
Size: 5 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 2 - Badger Licence Application Documentation (Submitted for Deadline 7)
Other
Size: 549 KB
Keuper Gas Storage Limited
10.15 Written Summary of Applicant’s submissions in relation to representations made by the Canal & River Trust
Other
Size: 448 KB
Pinsent Masons LLP on behalf of Holford Gas Storage Ltd
Submission for Deadline 7
Other
Size: 11 MB
Keuper Gas Storage Limited
10.13 Environmental Statement clarifications and errata - Annex 4 ES Figures 14.4-14.19
Other
Size: 47 MB
Keuper Gas Storage Limited
10.13 Environmental Statement clarifications and errata - Annex 3 ES Technical Annex Groundsure Report
Other
Size: 73 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 1 - Great Crested Newt Licence Application Documentation (Submitted for Deadline 7)
Other
Size: 6 MB
Keuper Gas Storage Limited
6.5 CEMP - Annex 3 - Ecological Survey Whitley and Runcorn (Submitted for Deadline 7)
Other
Size: 2 MB
Keuper Gas Storage Limited
3.1 Draft Development Consent Order - Rev 6 (Tracked changed version)
Other
Size: 33 KB
Keuper Gas Storage Limited
10.14 Book of Reference and Land Plans Clarifications and Errata
Other
Size: 2 MB
Keuper Gas Storage Limited
6.5 Construction Environmental Management Plan (CEMP) - Rev 4 (Clean version)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.