You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (15)
Developer's Application (261)
- All Documents
- Application Form (6)
- Compulsory Acquisition Information (5)
- Draft Development Consent Orders (2)
- Environmental Statement (133)
- Other Documents (21)
- Plans (87)
- Reports (7)
Acceptance (12)
Pre Examination (2)
Examination (253)
- All Documents
- Additional Submissions (4)
- Deadline 1 - 21 August 2015 - 21-08-2015 (52)
- Deadline 2 - 7 September 2015 - 07-09-2015 (20)
- Deadline 3 - 2 October 2015 - 02-10-2015 (12)
- Deadline 4 - 6 November 2015 - 06-11-2015 (62)
- Deadline 5 - 20 November 2015 - 20-11-2015 (9)
- Deadline 6 - 16 December 2015 - 16-12-2015 (32)
- Deadline 7 - 30 December 2016 - 30-12-2016 (11)
- Deadline 8 - 13 January 2016 (10)
- Deadline 9 - 20 January 2016 (7)
- Development Consent Order (1)
- Environmental Impact Assessment (1)
- + Examining Authority questions (2)
- + Hearings (17)
- Other (1)
- Preliminary Meeting (6)
- Procedural Decisions (5)
- Site Inspection (Accompanied) - 23-09-2015 - 1000 - Wilton Centre Redcar (1)
Decision (8)
- All Documents
- Decision (5)
- Examination Library.pdf (1)
- Other Documents (1)
- Procedural Decisions (1)
Decided (13)
Source | Description |
---|---|
Other |
DCO Hearing Agenda 25 September 2015 (PDF, 53 KB)
|
Other |
CA Hearing Agenda 24 September 2015 (PDF, 51 KB)
|
Other |
ExA Second Round Questions (PDF, 323 KB)
Examining Authority's second written questions
|
Other |
Rule 8 Letter (PDF, 109 KB)
|
Other |
ExA First Round Questions (PDF, 367 KB)
Examining Authority's first written questions
|
Other |
Timetable Amendment and Notice of Hearings (PDF, 100 KB)
|
Other |
Open Floor Hearing Agenda 24 September 2015 (PDF, 47 KB)
|
Other |
Rule 17 Letter (PDF, 86 KB)
Letter notifying Publication of the Report on the Implications for European Sites, publication of the draft Development Consent Order, and a request for information issued by the Examining Authority on 25 November 2015
|
Other |
Preliminary Meeting Note (PDF, 78 KB)
Note of the preliminary meeting held on 21 July 2015
|
Other |
Site Visit Itinerary 23 September 2015 (PDF, 51 KB)
|
Other | |
Other |
Recording of DCO hearing (PDF, 31 KB)
Audo Recording of the Issue Specific Hearing on the Draft Development Consent Order 25 September 2015
|
Other |
Preliminary Meeting Audio 21 July 2015 (PDF, 31 KB)
Preliminary Meeting Audio Recording
|
Other |
Recording of Open Floor Hearing (PDF, 31 KB)
Audio Recording of the Open Floor Hearing on 24 September 2015
|
Other |
Recording of CA Hearing (PDF, 31 KB)
Audio Recording of the Compulsory Acquisition Hearing 24 September 2015
|
Other | |
Other | |
Other |
Amoco (UK) Exploration Company (PDF, 1 MB)
Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
|
Other |
Anglian Water (PDF, 51 KB)
Submission dated 25 June 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
|
Other |
CATS Management Limited (PDF, 7 MB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
CATS Parties (PDF, 258 KB)
Statement of Response to the Applicant?s document 8.11 for Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
CATS Parties (PDF, 2 MB)
Update on discussions with the applicant dated 20 October 2015. Submission for Deadline 4 of 6 November 2015
|
Other |
CATS parties (PDF, 2 MB)
Young Lady Report. Submission for Deadline 6 of 16 December 2015
|
Other |
CATS Parties (PDF, 205 KB)
Submission to the Compulsory Acquisiton hearing of 24 November 2015
|
Other |
CATS Parties (PDF, 809 KB)
Update on Protective Provisions. Submission for Deadline 4 of 6 November 2015
|
Other |
CATS Parties (PDF, 5 MB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
CATS Parties (PDF, 222 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
CATS parties (PDF, 2 MB)
Statement of difference. Submission for Deadline 6 of 16 December 2015
|
Other |
DEA UK SNS Limited (PDF, 328 KB)
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
|
Other |
DEA UK SNS Limited (PDF, 18 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
DEA UK SNS Limited (PDF, 3 MB)
Written representation and Summary. Submission for Deadline 1 of 21 August 2015
|
Other |
DEA UK SNS Limited (PDF, 5 MB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Environment Agency (PDF, 554 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Environment Agency (PDF, 1 MB)
Comments on the Examining Authority?s draft Development Consent Order and RIES. Submission for Deadline 6 of 16 December 2015
|
Other |
Environment Agency (PDF, 2 MB)
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
Environment Agency (PDF, 179 KB)
Comments on responses to the Examining Authority?s First Written Questions. Submitted for Deadline II of 7 September 2015
|
Other |
Environment Agency (PDF, 767 KB)
Response to the Examining Authority?s First Written Questions and Statement of Common Ground with applicant. Submission for Deadline 1 of 21 August 2015
|
Other |
Examining Authority�s Draft Development Consent Order (PDF, 1,018 KB)
Examining Authority?s Draft Development Consent Order issued by the Examining Authority on 25 November 2015
|
Other |
GTC group of companies (PDF, 34 KB)
No comments. Submission for Deadline 8 of 13 January 2016
|
Other |
GTC group of companies (PDF, 194 KB)
No comments. Submission for Deadline 6 of 16 December 2015
|
Other |
Health and Safety Executive (PDF, 393 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
Historic England (PDF, 83 KB)
Comments on the RIES and the Examining Authority?s draft Development Consent Order. Accepted as a late submission for Deadline 6 at the discretion of the Examining Authority.
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 329 KB)
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 18 KB)
Response to Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 6 MB)
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 5 MB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 3 MB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 39 KB)
Summary of Written Representation. Submission for Deadline 1 of 21 August 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 76 KB)
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 101 KB)
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
ICI Chemicals & Polymers Limited (PDF, 65 KB)
Withdrawal of representation submitted on 21 August 2015. Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
|
Other |
ICI Chemicals and Polymers Limited (PDF, 19 KB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
ICI Chemicals and Polymers Limited (PDF, 1 MB)
Land Registry Plan CE148382 of the Bran Sands Site. Referred to in ICI?s submission for Deadline 1of 21 August 2015
|
Other |
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA) (PDF, 102 KB)
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA) (PDF, 6 MB)
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
|
Other |
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA) (PDF, 76 KB)
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
Marine Management Organisation (PDF, 216 KB)
Additional information to Response to Examining authority?s questions. Submission for Deadline 6 of 16 December 2015
|
Other |
Marine Management Organisation (PDF, 297 KB)
Comments on responses to the Examining Authority First Written Questions
|
Other |
Marine Management Organisation (PDF, 482 KB)
Written representation and Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
Marine Management Organisation (PDF, 511 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 Nowember 2015
|
Other |
Marine Management Organisation (PDF, 3 MB)
Responses to the Examining Authority?s questions
|
Other |
Marine Management Organisation (PDF, 511 KB)
Response to Examining Authority?s Questions. Submission for Deadline 6 of 16 December 2015
|
Other |
Marine Management Organisation (PDF, 145 KB)
Comments on responses to the Examining Authority?s second round of written questions. Submission for Deadline 5 of 20 November 2015
|
Other |
Marine Management Organisation (PDF, 95 KB)
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
Marine Management Organisation (PDF, 133 KB)
No further comments. Submission for Deadline 7 of 30 December 2015
|
Other |
Marine Management Organisation (PDF, 15 KB)
Answers to the Examining Authority?s questions at the Development Consent Order hearing of 24 November 2014
|
Other |
National Grid (PDF, 35 KB)
Submission prior to the Development Consent Order Hearing of 25 September 2015
|
Other |
National Grid Electricity Transmission Plc (PDF, 27 KB)
Withdrawing objection. Submission for Deadline 4 of 6 November 2015
|
Other |
National Grid Electricity Transmission Plc (PDF, 37 KB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
Natural England (PDF, 247 KB)
Written Representation Annex B ? Designated site conservation objectives and citations
Submission for Deadline 1 of 21 August 2015
|
Other |
Natural England (PDF, 542 KB)
Written Representation, Executive Summary, and Annexes A-C. Submission for Deadline 1 of 21 August 2015
|
Other |
Natural England (PDF, 359 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Natural England (PDF, 236 KB)
Response to Examining Authority?s Questions on the RIES issued on 25 November 2015. Submission for Deadline 6 of 16 December 2015
|
Other |
Natural England (PDF, 5 MB)
Written Representation Annex A ? Designated Site Maps. Submission for Deadline 1 of 21 August 2015
|
Other |
Network Rail (PDF, 50 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
Network Rail Infrastructure Limited (PDF, 56 KB)
Submission dated 9 July 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
|
Other |
North Yorkshire County Council (PDF, 64 KB)
Additional response to the Examining Authority?s First Written Questions. Accepted at the discretion of the Examining Authority
|
Other |
North Yorkshire County Council (PDF, 218 KB)
Responses to the Examining Authority?s First Round of Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
Northern Powergrid (Northeast) Limited (PDF, 362 KB)
Withdrawal of representations. Submission for Deadline 8 of 13 January 2016
|
Other |
Northern Powergrid (Northeast) Limited (PDF, 36 KB)
Update on discussions with applicant. Submission for Deadline 5 of 20 November 2015
|
Other |
Northumbrian Water (PDF, 300 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
Northumbrian Water Limited (PDF, 396 KB)
Update on discussions with the applicant. Submission for Deadline 4 of 6 November 2015
|
Other |
Northumbrian Water Limited (PDF, 247 KB)
Submission dated 4 June 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
|
Other |
Oil and Gas Authority (PDF, 48 KB)
Comments on CATS Pipelines System?s concerns regarding the possible routes of the conveyor system. Accepted at the discretion of the Examining Authority
|
Other |
P D Teesport Limited (PDF, 61 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
P D Teesport Limited (PDF, 220 KB)
Submission prior to the Development Consent Order Hearing of 25 September 2015
|
Other |
PD Teesport Limited (PDF, 18 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
PD Teesport Limited (PDF, 115 KB)
Written Representation and Summary. Submission for Deadline 1 of 21 August 2015
|
Other |
Recording of CA Hearing (PDF, 31 KB)
Audio Recording of the Compulsory Acquisition Hearing 24 November 2015
|
Other |
Recording of DCO Hearing (PDF, 31 KB)
Audio Recording of the Development Consent Order Hearing 24 November 2015
|
Other |
Redcar & Cleveland Borough Council (PDF, 85 KB)
No further comments. Submission for Deadline 7 of 30 December 2015
|
Other |
Redcar & Cleveland Borough Council (PDF, 89 KB)
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016.Submission for Deadline 8 of 13 January 2016
|
Other |
Redcar & Cleveland Borough Council (PDF, 37 KB)
No comments on the draft Development Consent Order or the RIES. Submission for Deadline 6 of 16 December 2015
|
Other |
Redcar & Cleveland Borough Council (PDF, 37 KB)
Withdrawal of objection to proposed conveyor bridge. Submission for Deadline 6 of 16 December 2015
|
Other |
Redcar & Cleveland Borough Council (PDF, 89 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
Redcar and Cleveland Borough Council (PDF, 509 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Redcar and Cleveland Borough Council (PDF, 137 KB)
Local Impact Report. Submission for Deadline 1 of 21 August 2015
|
Other |
Redcar and Cleveland Borough Council (PDF, 197 KB)
Update on discussions with the applicant. Submission for Deadline 5 of 20 November 2015
|
Other |
Redcar and Cleveland Borough Council (PDF, 250 KB)
Comments on responses to the Examining Authority's First Written Questions and other comments.
|
Other |
Redcar and Cleveland Borough Council (PDF, 98 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
Report on the Implications for European Sites (RIES) (PDF, 390 KB)
Report on the Implications for European Sites (RIES) issued by the Examining Authority on 25 November 2015
|
Other |
Royal Mail Group Ltd (PDF, 162 KB)
Written Representation
|
Other |
Rules 8(3) and 17 Letter (PDF, 77 KB)
Examining Authority?s Request for further information from specified parties and deadline for comments.
|
Other |
SABIC UK Petrochemicals Limited (PDF, 76 KB)
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 18 KB)
Response to Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 5 MB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 102 KB)
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 3 MB)
Written representation and S ummary. Submission for Deadline 1 of 21 August 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 6 MB)
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 331 KB)
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
|
Other |
SABIC UK Petrochemicals Limited, Huntsman Polyurethanes (UK) Limited and INEOS UK SNS Limited (PDF, 183 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
Sahaviriya Steel Industries UK Limited (SSI) (PDF, 2 MB)
Winding Up Order and update on discussions with applicant. Submission for Deadline 5 of 20 November 2015
|
Other |
Sembcorp Utilities (UK) Limited (PDF, 340 KB)
Submission dated 16 July 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
|
Other |
Tata Steel UK and Redcar Bulk Terminal (PDF, 78 KB)
Confirmation of the Applicant?s submission for Deadline 7 of 30 December 2015
|
Other |
Tata Steel UK and Redcar Bulk Terminal (PDF, 569 KB)
Comments on the Examining Authority's draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
Tata Steel UK Limited (PDF, 642 KB)
Tata/RBT?s Comments on Responses to the Examining Authority?s second round of written questions and two Appendices. Submission for Deadline 5 of 20 November 2015
|
Other |
Tata Steel UK Limited (PDF, 36 KB)
Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
|
Other |
TATA Steel UK Limited and others (PDF, 1,000 KB)
Written representation and Summary, and suggested Site Visit locations. Submission for Deadline 1 of 21 August 2015
|
Other |
Tata Steel UK Limited and Others (PDF, 6 MB)
In lieu of oral submissions at Hearings on 24-25 September 2015. Late submission for Deadline 3 of 2 October 2015 accepted at the discretion of the Examining Authority
|
Other |
Tata Steel UK Limited and others (PDF, 47 KB)
Comments on responses to Examining Authority's First Written Questions and Response to Comments on Relevant Representations
|
Other |
Trinity House (PDF, 70 KB)
No further comments on the drafy Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
Trinity House (PDF, 42 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 774 KB)
Statement of Common Ground with Natural England. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 1 MB)
3.16 Access Around the RBT Conveyor. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 9 MB)
Annual Report and Accounts. Appendix 2 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 2 MB)
Conveyor Options Study Supplementary Report. Appendix 4 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Applicant?s draft Accompanied Site Visit Itinerary and location maps. Late submission for Deadline 1 of 21 August 2015. Accepted at the discretion of the Examining Authority
|
Other |
York Potash Limited (PDF, 216 KB)
Hierarchy Diagram. Appendix 3 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 942 KB)
Updated Governance Tracker. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 377 KB)
8.9 Applicant?s Response to Rule 17 Letter of 25 November 2015 and Comment on the RIES. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Statement of Common Ground with Redcar and Cleveland Borough Council (Transport). Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 1 MB)
4.1D draft Development Consent Order (Tracked). Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Covering Letter and Document List. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 2 MB)
Permanent Compound Site A plan. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 334 KB)
Revised Screening and Integrity Matrices. Appendix 8 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 569 KB)
Outline Ecological Management Plan. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 307 KB)
Biodiversity Offsetting. Appendix 7 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 2 MB)
Outline Construction Environmental Management Plan. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 385 KB)
Update Parameters Table. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Covering Letter and Document list. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 278 KB)
Company Structure Diagram. Appendix 1 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 1 MB)
4.1D draft Development Consent Order (clean). Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Statement of Common Ground with Highways England. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 426 KB)
Applicant?s Response to Relevant Representations. Submission for Deadline 1 of 21 August 2015.
|
Other |
York Potash Limited (PDF, 45 KB)
5.3B Book of Reference (Tracked). Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 4 MB)
Treatment of Contaminated Silt. Appendix 6 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 990 KB)
Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 4 MB)
Draft Development Consent Obligation. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 573 KB)
6.11B Outline Ecological Management Plan. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 2 MB)
Permanent Compound Site C plan. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 406 KB)
8.8 Applicant?s Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 45 KB)
5.3B Book of Reference (Clean). Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 20 MB)
Statement of Common Ground with Redcar and Cleveland Borough Council (Planning) and 9 Appendices. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 855 KB)
6.10A Outline Construction Environmental Management Plan. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 739 KB)
Statement of Common Ground with Environment Agency. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 797 KB)
Contaminated Silt Disposal. Appendix 5 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 780 KB)
8.10 Schedule of Changes to the draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Ltd (PDF, 408 KB)
Document 2.1I - YPL Land Plan Inset 6 - Rev v4
|
Other |
York Potash Ltd (PDF, 568 KB)
Document 8.4 Applicant?s Responses to Other Responses to ExA Q1
|
Other |
York Potash Ltd (PDF, 745 KB)
Document 8.3 Appendix 4 - No 2 Tunnel Note
|
Other |
York Potash Ltd (PDF, 6 MB)
Document 6.12A - Mitigation and Monitoring Strategy - Rev 4
|
Other |
York Potash Ltd (PDF, 399 KB)
Document 2.1E - YPL Land Plan Inset 2 - Rev v4
|
Other |
York Potash Ltd (PDF, 663 KB)
Document 4.2A Draft Explanatory Memorandum (Tracked)
|
Other |
York Potash Ltd (PDF, 513 KB)
Letter to the Examining Authority dated 07 09 15
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2H - Layout Plans (Ground Level) Southern Route Sheet 1 - Rev D
|
Other |
York Potash Ltd (PDF, 417 KB)
Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 460 KB)
Document 2.1K - YPL Land Plan Inset 8 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 4.1A Draft DCO (Tracked)
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2D - Layout Plans (Ground Level) Northern Route Sheet 3 - Rev G
|
Other |
York Potash Ltd (PDF, 45 KB)
Doc 5.3A - Book of Reference (Tracked)
|
Other |
York Potash Ltd (PDF, 903 KB)
Document 3.15B - YPL Pipeline Corridor Plan Sheet 2 - Rev v4
|
Other |
York Potash Ltd (PDF, 73 KB)
Response to Tata Steel UK and Redcar Bulk Terminal?s submission for Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.3L - Conveyor Route Plans Northern Route Sheet 4 - Rev F
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.3G - Conveyor Route Plans Southern Route Sheet 6 - Rev H
|
Other |
York Potash Ltd (PDF, 416 KB)
Document 2.1L - YPL Land Plan Inset 9 - Rev v4
|
Other |
York Potash Ltd (PDF, 45 KB)
Doc 5.3A - Book of Reference (Clean)
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2C - Layout Plans (Ground Level) Northern Route Sheet 2 - Rev G
|
Other |
York Potash Ltd (PDF, 13 MB)
8.11 Applicant?s Response to BP CATS Objection to Southern Conveyor Route. Submission for Deadline 6 of 16 December 2015 (Republished 5 April 2016)
|
Other |
York Potash Ltd (PDF, 486 KB)
Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 486 KB)
Document 2.1J(i) - YPL Land Plan Inset 7(i) (Northern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (with Tracked Changes)
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.15C - YPL Pipeline Corridor Plan Sheet 3 - Rev v4
|
Other |
York Potash Ltd (PDF, 218 KB)
Hierarchy Document. Submission for Deadline 5 of 20 November 2015
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.16 - Access Around RBT Conveyors
|
Other |
York Potash Ltd (PDF, 261 KB)
Document 8.3 Appendix 1 - Notes on INSPIRE and NPL Guidelines
|
Other |
York Potash Ltd (PDF, 52 MB)
Applicant's Responses to Examining Authority?s Second Questions, including appendices 1 - 5
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.3F - Conveyor Route Plans Southern Route Sheet 5 - Rev H
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Comparite with version 4.1C). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 520 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 2.1C - YPL Land Plan Sheet 3 - Rev v4
|
Other |
York Potash Ltd (PDF, 3 MB)
8.12 ? Applicant?s Responses to other parties submissions for Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
York Potash Ltd (PDF, 394 KB)
Document 2.1M - YPL Land Plan Inset 10 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 3 MB)
Document 3.15 - YPL Pipeline Corridor Plan Key Plan - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Covering email, letter and 1.4H - Document List. Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 240 KB)
CIL Note. Appendix 5 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 8.3 Appendix 3 - Constructability Notes
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2B - Layout Plans (Ground Level) Northern Route Sheet 1 - Rev G
|
Other |
York Potash Ltd (PDF, 860 KB)
Constructability Notes - BP CATS Pipeline Southern Route. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Ltd (PDF, 418 KB)
Document 2.1N(i) - YPL Land Plan Inset 11(i) (Northern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 390 KB)
Document 2.1F - YPL Land Plan Inset 3 - Rev v4
|
Other |
York Potash Ltd (PDF, 81 KB)
Network Rail s127. Appendix 1 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 481 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
York Potash Ltd (PDF, 386 KB)
Document 2.1H - YPL Land Plan Inset 5 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Applicant?s Newspaper Notices of Hearings on 24 November 2015
|
Other |
York Potash Ltd (PDF, 400 KB)
Letter accepted by the Examining Authority as a late submission to Deadline 9
|
Other |
York Potash Ltd (PDF, 877 KB)
Constructability Notes - BP CATS Pipeline Northern Route. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Ltd (PDF, 416 KB)
Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 635 KB)
Covering Letter and attachment. Submission for Deadline 7 of 30 December 2015
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2K - Layout Plans (Ground Level) Southern Route Sheet 4 - Rev D
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2I - Layout Plans (Ground Level) Southern Route Sheet 2 - Rev D
|
Other |
York Potash Ltd (PDF, 942 KB)
Document 6.8B - Governance Tracker
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2J - Layout Plans (Ground Level) Southern Route Sheet 3 - Rev D
|
Other |
York Potash Ltd (PDF, 413 KB)
Document 8.3 Applicant?s Response to Written Representations
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2E - Layout Plans (Ground Level) Northern Route Sheet 4 - Rev G
|
Other |
York Potash Ltd (PDF, 432 KB)
Document 8.3 Appendix 5 - Shipping Notes Part 3
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Tracked). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 859 KB)
Document 2.1A - YPL Land Plan Sheet 1 - Rev v4
|
Other |
York Potash Ltd (PDF, 458 KB)
Document 1.4B Document List
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 4.1A Draft DCO (Clean)
|
Other |
York Potash Ltd (PDF, 4 MB)
Document 7.4B - Development Consent Obligation (signed)
|
Other |
York Potash Ltd (PDF, 472 KB)
1.4E- Updated document list reflecting appropriate additions. Submission for Deadline 5 of 20 November 2015
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Clean). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 49 KB)
Applicant?s request for clarification of Examining Authority?s First Written Questions and PINS response
|
Other |
York Potash Ltd (PDF, 1 MB)
Covering Letter to the Planning Inspectorate and Document List for Deadline 4
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.3K - Conveyor Route Plans Northern Route Sheet 3 - Rev G
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 4.1C - Draft Development Consent Order (Clean)
|
Other |
York Potash Ltd (PDF, 9 MB)
Document 8.3 Appendix 5 - Shipping Notes Part 2
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Clean)
|
Other |
York Potash Ltd (PDF, 538 KB)
Covering Letter to the Planning Inspectorate. Submission for Deadline 5 of 20 November 2015
|
Other |
York Potash Ltd (PDF, 405 KB)
Document 2.1D - YPL Land Plan Inset 1 - Rev v4
|
Other |
York Potash Ltd (PDF, 651 KB)
Document 4.2A Draft Explanatory Memorandum (Clean)
|
Other |
York Potash Ltd (PDF, 20 MB)
Decision Notices and s106 Agreements. Appendix 4 Parts 1 and 2 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 573 KB)
Document 6.11A - Outline Ecological Management Plan
|
Other |
York Potash Ltd (PDF, 981 KB)
8.7- Applicant?s Responses to Other Parties Responses to the Examining Authority?s second round of written questions. Submission for Deadline 5 of 20 November 2015
|
Other |
York Potash Ltd (PDF, 629 KB)
Document 4.2B - Explanatory Memorandum (Clean)
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Comparite with version 4.1). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.3E - Conveyor Route Plans Southern Route Sheet 4 - Rev H
|
Other |
York Potash Ltd (PDF, 669 KB)
Document 3.15A - YPL Pipeline Corridor Plan Sheet 1 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 2.1B(i) - YPL Land Plan Sheet 2(i) (Northern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 647 KB)
Document 4.2B - Explanatory Memorandum (Tracked)
|
Other |
York Potash Ltd (PDF, 476 KB)
1.4G ? Document List. Submission for Deadline 7 of 30 December 2015
|
Other |
York Potash Ltd (PDF, 57 KB)
Document 8.3 Appendix 2 - References
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 4.1C - Draft Development Consent Order (Tracked)
|
Other |
York Potash Ltd (PDF, 60 KB)
Submission relating to Alternatives. Appendix 2 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 6 MB)
Document 6.12 Mitigation and Monitoring Strategy
|
Other |
York Potash Ltd (PDF, 69 KB)
Dredging Note. Appendix 3 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 1 MB)
Covering Letter to the Planning Inspectorate and Document List for Deadline 3
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.3D - Conveyor Route Plans Southern Route Sheet 3 - Rev H
|
Other |
York Potash Ltd (PDF, 3 MB)
Document 2.1 - YPL Land Plan Key Plan - Rev v4
|
Other |
York Potash Ltd (PDF, 372 KB)
Document 2.1G - YPL Land Plan Inset 4 - Rev v4
|
Other |
York Potash Ltd (PDF, 5 MB)
Document 8.3 Appendix 5 - Shipping Notes Part 1
|
Other |
York Potash Ltd (PDF, 141 KB)
Document 3.4E - Contractor's Temporary Compound Layout Site D- Rev F
|