Thames Tideway Tunnel

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

Thames Tideway Tunnel

Received 29 April 2013
From East of England Waste Technical Advisory Body (East of England Waste Technical Advisory Body)

Representation

The East of England Waste Technical Advisory Body is the grouping of waste planning authority officers in the East of England. These planning authorities are concerned that spoil and other wastes from the Thames Tunnel project are managed sustainably and not dumped in the East of England in innappropriate locations or in facilities that are required for other wastes arising in less distant locations. It is not clear that the impact of waste from the construction phase of the project has been properly assessed.