Thames Tideway Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (406)

Acceptance (28)

Pre Examination (59)

Examination (1978)

Decision (41)

Decided (93)

Date

The documents on this page relate to the round(s) of questions issued by the Examining authority and the responses received from interested parties.

SourceDescription
Other
APP54 Thames Water Historic Environment (PDF, 2 MB)
Other
APP56.04.07 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Kirtling Street (PDF, 628 KB)
Other
APP56.04.06 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Cremorne Wharf Depot (PDF, 964 KB)
Other
APP56.04.11 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Earl Pumping Station (PDF, 805 KB)
Other
APP56.04.03 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Barn Elms (PDF, 737 KB)
Other
APP56.04.08 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Shad Thames Pumping Station (PDF, 747 KB)
Other
APP56 Thames Water Noise and Disturbance (PDF, 3 MB)
Other
APP54.13.01 SUPPORTING APPENDIX Victoria Embankment Foreshore - Additional Visualisations (PDF, 10 MB)
Other
APP56.04.10 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - King Edward Memorial Park Foreshore (PDF, 745 KB)
Other
APP56.04.05 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Carnwath Road Riverside (PDF, 713 KB)
Other
APP56.04.02 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Hammersmith Pumping Station (PDF, 775 KB)
Other
APP56.04.12 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Greenwich Pumping Station (PDF, 974 KB)
Other
APP56.04.04 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Putney Embankment Foreshore (PDF, 934 KB)
Other
APP52 Thames Water Development Consent Order Drafting and Related Matters (PDF, 403 KB)
Other
APP54.15.01 SUPPORTING APPENDIX Monitoring Point Location Diagram (PDF, 2 MB)
Other
APP56.04.09 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Chambers Wharf (PDF, 762 KB)
Other
APP50.05.01 SUPPORTING APPENDIX Historic Drawings (PDF, 7 MB)
Other
APP49 Thames Water Coastal River Change (PDF, 296 KB)
Other
APP47 Thames Water Air Quality and Emissions (PDF, 270 KB)
Other
APP54.10.01 SUPPORTING APPENDIX Albert Embankment Foreshore - Initial results from archaeological cores (PDF, 141 KB)
Other
APP51 Thames Water Design Landscape and Visual Impact (PDF, 320 KB)
Other
APP50 Thames Water Compulsory Acquisition and Related Matters (PDF, 1 MB)
Other
APP54.01.01 SUPPORTING APPENDIX Technical Note on Timing and Evaluation (PDF, 158 KB)
Other
APP53 Thames Water Flood Risk and Climate Change (PDF, 270 KB)
Other
APP48 Thames Water Biodiversity Biological Environment and Ecology (PDF, 294 KB)
Other
APP55 Thames Water Land Use Including Regeneration and Open Space (PDF, 2 MB)
Other
APP50.03.01 SUPPORTING APPENDIX Common Land - Counsel Opinion (PDF, 533 KB)
Other
APP56.04.01 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Acton Storm Tanks (PDF, 1 MB)
Other
City of London Corporation (PDF, 23 KB)
Other
David Percival (PDF, 15 KB)
Other
David Starkie on behalf of Elm Quay Court (PDF, 12 KB)
Other
English Heritage (PDF, 2 MB)
Other
Environment Agency (PDF, 309 KB)
Other
Juliet Munn on behalf of Battersea Power Station Development Company (PDF, 750 KB)
Other
London Borough of Lambeth (PDF, 19 KB)
Other
London Borough of Lewisham (PDF, 28 KB)
Other
London Borough of Richmond Upon Thames (PDF, 23 KB)
Other
London Borough of Southwark (PDF, 130 KB)
Other
London Borough of Wandsworth (PDF, 141 KB)
Other
London Borough of Westminster (PDF, 289 KB)
Other
Mayor for London (PDF, 83 KB)
Late submission for the 13 January Deadline
Other
Mayor of London (PDF, 47 KB)
Other
Minerva Wandsworth Limited (PDF, 772 KB)
Other
MMO (PDF, 127 KB)
Other
National Grid Gas Plc and National Grid Electricity Plc (PDF, 482 KB)
Other
Natural England (PDF, 74 KB)
Other
Port of London Authority (PDF, 541 KB)
Other
St Paul's Church (PDF, 21 KB)
Other
Stuart Tyler (PDF, 834 KB)
Other
Thames Water (PDF, 302 KB)
APP96 Covering Letter (Noise and Disturbance ? Supplementary Information) - Agreed Late Submission for 13 January Deadline
Other
Thames Water (PDF, 507 KB)
APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 886 KB)
APP63 Thames Water Water Quality and Resources
Other
Thames Water (PDF, 1 MB)
APP72.1 Code of Construction Practice Part A General Requirements - Comparite against 28 February 2013
Other
Thames Water (PDF, 2 MB)
APP59 Thames Water Rationale for the Selection of Work Sites and Drive Strategies
Other
Thames Water (PDF, 629 KB)
APP72.12 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street (Comparite against 23 September 2013)
Other
Thames Water (PDF, 887 KB)
APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 1 MB)
APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 882 KB)
APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Comparite against 28 February 2013)
Other
Thames Water (PDF, 891 KB)
APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 47 MB)
APP65 Book of Plans - Revised Drawings - Part 2 of 3
Other
Thames Water (PDF, 150 KB)
APP64.1 Thames Water Additional Statement of Common Ground Request - LB Southwark, LB Newham, PLA and Thames Tideway Tunnel
Other
Thames Water (PDF, 451 KB)
APP72.12 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street (Revised 13 January 2014)
Other
Thames Water (PDF, 45 MB)
APP65 Book of Plans - Revised Drawings - Part 1 of 3
Other
Thames Water (PDF, 826 KB)
APP97 Noise and Disturbance - Question 29.2 - Supplementary Information - Agreed Late Submission for 13 January Deadline
Other
Thames Water (PDF, 520 KB)
APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 539 KB)
APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 913 KB)
APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Comparite against 28 February 2013)
Other
Thames Water (PDF, 891 KB)
APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 767 KB)
APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 446 KB)
APP69 Exceptional Hardship Procedure
Other
Thames Water (PDF, 548 KB)
APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Revised 13 January 2014)
Other
Thames Water (PDF, 243 KB)
APP64.2 Thames Water Additional Statement of Common Ground Request - Thames Tideway Tunnel and Cory Environmental and PLA
Other
Thames Water (PDF, 914 KB)
APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Comparite against 23 September 2013)
Other
Thames Water (PDF, 881 KB)
APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Comparite against 23 September 2013)
Other
Thames Water (PDF, 859 KB)
APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Comparite against 23 September 2013)
Other
Thames Water (PDF, 766 KB)
APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 805 KB)
APP73 Transport Strategy
Other
Thames Water (PDF, 564 KB)
APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 475 KB)
APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 801 KB)
APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 771 KB)
APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 515 KB)
APP59.22.04 SUPPORTING APPENDIX Profile of Movements at Chambers Wharf
Other
Thames Water (PDF, 3 MB)
APP59.07.01 SUPPORTING APPENDIX Chambers Wharf plans and construction verifiable photomontages
Other
Thames Water (PDF, 1 MB)
APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 860 KB)
APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Comparite against 28 February 2013)
Other
Thames Water (PDF, 3 MB)
APP77 Equalities Impact Assessment - 13 January 2014
Other
Thames Water (PDF, 567 KB)
APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 770 KB)
APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 628 KB)
APP72.12 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street (Comparite against 28 February 2013)
Other
Thames Water (PDF, 273 KB)
APP86 Update on Actions from Compulsory Acquisition Hearings
Other
Thames Water (PDF, 33 KB)
APP78.3 Book of Reference - 13 January 2014 - City of London
Other
Thames Water (PDF, 28 MB)
APP74 Draft s106 Legal Agreements
Other
Thames Water (PDF, 550 KB)
APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Revised 13 January 2014)
Other
Thames Water (PDF, 562 KB)
APP76.3 Design Principles - Comparite against 28 February 2013
Other
Thames Water (PDF, 513 KB)
APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 1 MB)
APP84 The Excavated Material and Waste Commitments
Other
Thames Water (PDF, 33 KB)
APP78.2 Book of Reference - 13 January 2014 - City of Westminster
Other
Thames Water (PDF, 1 MB)
APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 47 MB)
APP65 Book of Plans - Revised Drawings - Part 3 of 3
Other
Thames Water (PDF, 184 KB)
APP61.13.02 SUPPORTING APPENDIX Lorry movement capacity at river sites
Other
Thames Water (PDF, 684 KB)
APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 609 KB)
APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Revised 13 January 2014)
Other
Thames Water (PDF, 500 KB)
APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Revised 13 January 2014)
Other
Thames Water (PDF, 1 MB)
APP61 Thames Water Traffic Travel and Transportation
Other
Thames Water (PDF, 481 KB)
APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Comparite against 23 September 2013)
Other
Thames Water (PDF, 286 KB)
APP81 List of Application Documents
Other
Thames Water (PDF, 727 KB)
APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Comparite against 23 September 2013)
Other
Thames Water (PDF, 231 KB)
APP75.1 Drafting Notes relating to Updated Draft DCO
Other
Thames Water (PDF, 447 KB)
APP61.04.01 SUPPORTING APPENDIX Marine Routes of Entry to Project V3.0
Other
Thames Water (PDF, 816 KB)
APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Comparite against 28 February 2013)
Other
Thames Water (PDF, 1 MB)
APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 576 KB)
APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Revised 13 January 2014)
Other
Thames Water (PDF, 833 KB)
APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 1 MB)
APP67 Summary of Further On-site Mitigation Measures and Revisions to Compensation Policies
Other
Thames Water (PDF, 512 KB)
APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 971 KB)
APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Comparite against 28 February 2013)
Other
Thames Water (PDF, 845 KB)
APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 499 KB)
APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Revised 13 January 2014)
Other
Thames Water (PDF, 627 KB)
APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Revised 13 January 2014)
Other
Thames Water (PDF, 845 KB)
APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 771 KB)
APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 160 KB)
APP58 Thames Water Policy
Other
Thames Water (PDF, 848 KB)
APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Comparite against 23 September 2013)
Other
Thames Water (PDF, 33 KB)
APP78.1 Book of Reference - 13 January 2014 - Change Log
Other
Thames Water (PDF, 1 MB)
APP60 Thames Water Socio-Economic Effects
Other
Thames Water (PDF, 363 KB)
APP64.3 Thames Water Additional Statement of Common Ground Request - Thames Tideway Tunnel and London Duck Tours and PLA
Other
Thames Water (PDF, 773 KB)
APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 33 KB)
APP78.8 Book of Reference - 13 January 2014 - LB Wandsworth
Other
Thames Water (PDF, 1 MB)
APP57 Thames Water Other Matters
Other
Thames Water (PDF, 1 MB)
APP72.1 Code of Construction Practice Part A General Requirements - Comparite against 23 September 2013
Other
Thames Water (PDF, 779 KB)
APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Comparite against 28 February 2013)
Other
Thames Water (PDF, 847 KB)
APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Comparite against 28 February 2013)
Other
Thames Water (PDF, 770 KB)
APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 801 KB)
APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 966 KB)
APP72.1 Code of Construction Practice Part A General Requirements - Revised 13 January 2014
Other
Thames Water (PDF, 303 KB)
APP59.14.01 SUPPORTING APPENDIX Noise and vibration assessment tables for the Heckford Street and Park option
Other
Thames Water (PDF, 533 KB)
APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Revised 13 January 2014)
Other
Thames Water (PDF, 728 KB)
APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Comparite against 28 February 2013)
Other
Thames Water (PDF, 822 KB)
APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 834 KB)
APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 653 KB)
APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 780 KB)
APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Comparite against 23 September 2013)
Other
Thames Water (PDF, 778 KB)
APP56.04.13 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Minor Works Site (Bekesbourne Street)
Other
Thames Water (PDF, 544 KB)
APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Revised 13 January 2014)
Other
Thames Water (PDF, 503 KB)
APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Revised 13 January 2014)
Other
Thames Water (PDF, 684 KB)
APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 615 KB)
APP59.22.02 SUPPORTING APPENDIX Effect at Abbey Mills of Variable Drive Rates
Other
Thames Water (PDF, 243 KB)
APP70 Settlement Deed
Other
Thames Water (PDF, 1 MB)
APP79.3 Statement of Reasons - Comparite against 28 February 2013
Other
Thames Water (PDF, 948 KB)
APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 816 KB)
APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Comparite against 23 September 2013)
Other
Thames Water (PDF, 917 KB)
APP79.1 Statement of Reasons - Revised for 13 January 2014
Other
Thames Water (PDF, 549 KB)
APP76.2 Design Principles - Comparite against 23 September 2013
Other
Thames Water (PDF, 827 KB)
APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Comparite against 28 February 2013)
Other
Thames Water (PDF, 618 KB)
APP71 Updated Settlement Information Paper
Other
Thames Water (PDF, 716 KB)
APP61.13.01 SUPPORTING APPENDIX Draft Transport Strategy Summary
Other
Thames Water (PDF, 564 KB)
APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 33 KB)
APP78.4 Book of Reference - 13 January 2014 - LB Hammersmith and Fulham
Other
Thames Water (PDF, 47 MB)
APP66 Supporting Drawings - Part 2 of 2
Other
Thames Water (PDF, 33 KB)
APP78.6 Book of Reference - 13 January 2014 - LB Lambeth
Other
Thames Water (PDF, 482 KB)
APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Comparite against 28 February 2013)
Other
Thames Water (PDF, 589 KB)
APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 33 KB)
APP78.7 Book of Reference - 13 January 2014 - LB Newham
Other
Thames Water (PDF, 447 KB)
APP82 Draft Guide for Developers
Other
Thames Water (PDF, 947 KB)
APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 509 KB)
APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 743 KB)
APP76.1 Design Principles Update - January 2014
Other
Thames Water (PDF, 33 KB)
APP78.5 Book of Reference - 13 January 2014 - RB Kensington and Chelsea
Other
Thames Water (PDF, 547 KB)
APP59.22.01 SUPPORTING APPENDIX Profile of Movements at Abbey Mills with Four Barges
Other
Thames Water (PDF, 827 KB)
APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Comparite against 23 September 2013)
Other
Thames Water (PDF, 972 KB)
APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Comparite against 23 September 2013)
Other
Thames Water (PDF, 887 KB)
APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 1 MB)
APP79.2 Statement of Reasons - Comparite against 4 November 2013
Other
Thames Water (PDF, 3 MB)
APP83 The Groundwater Environmental Management Dewatering and Monitoring Strategy
Other
Thames Water (PDF, 655 KB)
APP68 Non Statutory Off-site Mitigation and Compensation Policy (DRAFT)
Other
Thames Water (PDF, 20 MB)
APP66 Supporting Drawings - Part 1 of 2
Other
Thames Water (PDF, 771 KB)
APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 873 KB)
APP68.01.01 SUPPORTING APPENDIX Houseboat Compensation Policy
Other
Thames Water (PDF, 123 KB)
APP64.01.01 SUPPORTING APPENDIX Meeting Minutes
Other
Thames Water Utilities Limited (PDF, 453 KB)
Cover letter for APP80 - River Transport Strategy
Other
Thames Water Utilities Limited (PDF, 484 KB)
APP80 Draft River Transport as submitted 21 January 2014
Other
Thames Water Utilities Limited (PDF, 179 KB)
APP59.22.03 SUPPORTING APPENDIX Inefficiency of Barging at Abbey Mills
Other
Thamesbank (PDF, 4 MB)
Other
Transport for London (PDF, 132 KB)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.