Thames Tideway Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (406)

Acceptance (28)

Pre Examination (59)

Examination (1978)

Decision (41)

Decided (63)

Date

The selected filter includes comments received by the Planning Inspectorate regarding:

  1. the representations made on the application (including responses to the Examining authority’s first round of questions) and
  2. the responses to the Examining authority’s subsequent round of questions.

The Planning Inspectorate is required to make these comments available in accordance with Rule 3(5) and Rule 21 of the Infrastructure Planning (Examination Procedure) Rules 2010.

SourceDescription
Other
Size: 543 KB
Thames Water Utilities Ltd
Response to Royal Borough of Kensington and Chelsea Local Impact Report.
Other
Size: 119 KB
Thames Water Utilities Ltd
Response to London Borough of Hounslow Local Impact Report.
Other
Size: 599 KB
Thames Water Utilities Ltd
Response to London Borough of Wandsworth Local Impact Report.
Other
Size: 147 KB
Thames Water Utilities Ltd
Response to London Borough of Richmond Local Impact Report.
Other
Size: 1 MB
Thames Water Utilities Ltd
Response to Local Impact Report from London Borough of Hammersmith and Fulham.
Other
Size: 983 KB
Thames Water Utilities Ltd
Response to Mayor of London Local Impact Report
Other
Size: 99 KB
Thames Water Utilities Ltd
Response to London Borough of Newham Local Impact Report
Other
Size: 594 KB
Thames Water Utilities Ltd
London Borough of Tower Hamlets Local Impact Report
Other
Size: 385 KB
Thames Water Utilities Ltd
Response to Westminster City Council Local Impact Report.
Other
Size: 684 KB
Thames Water Utilities Ltd
Response to London Borough of Southwark Local Impact Report
Other
Size: 1 MB
Thames Water Utilities Ltd
Response to City of London Local Impact Report
Other
Size: 150 KB
Thames Water Utilities Ltd
Response to London Legacy Development Corporation Local Impact Report
Other
Size: 115 KB
Thames Water Utilities Ltd
Response to London Borough of Lambeth Local Impact Report
Other
Size: 265 KB
Thames Water Utilities Ltd
Response to London Borough of Lewisham Local Impact Report
Other
Size: 114 KB
Thames Water Utilities Ltd
Response to London Borough of Ealing Local Impact Report.
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.